Questions and answers based on site visit.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| PEERLESS_BOILER_SERES_211A.pdf | ||
| BOILER_PICS.pdf | ||
| CROWN_BOILER_LITERATURE.pdf | ||
| ASBESTOS.pdf | ||
| WAGE_DETERMINATION.pdf | ||
| DRAWINGS.pdf | ||
| 2815_Boiler_SOW_Final.doc | DOC document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
2 September 2015
MEMORANDUM FOR Prospective Proposal’s
FROM: 166 MSG/MSC 2600 Spruance Drive New Castle, Delaware 19720-1615
SUBJECT: W912L5-15-T-0103 REMOVE AND REPLACE BOILER QUESTIONS AND ANSWERS
1. The following questions were asked by prospective proposals and are answered by this office:
QUESTION: 1. Are Mechanical drawings for the boiler room available?
ANSWER: - The drawings we have were uploaded in Amendment #1 to the solicitation. This is an old building and additional drawings are not available at this time.
QUESTION: 2. What is the date on the order equipment arrival?
ANSWER: - New boiler is supposed to ship within the next 2 weeks, we will update the date at the time of the award.
QUESTION: 3. Is there a warranty on the Crown Boiler?
ANSWER: - Warranty is not effective on the Crown Boiler
QUESTION: 4. Will there be testing for asbestos?
ANSWER: - Contractor responsible for testing for asbestos in the boiler.
QUESTION: 5. Will there be abatement testing available?
ANSWER: - If asbestos is found, DANG will coordinate the abatement.
QESTION: 6. Is the fuel supply natural gas or propane?
ANSWERS: - Natural Gas
QUESTION: 7. Cut sheets for the Crown Boiler.
ANSWERS: - The cut sheets have uploaded in Amendment #1 to the solicitation
QUESTION: 8. Wage determinations rate.
ANSWER: www.wdol.gov
QUESTION: 9. What are the specific boiler model numbers?
ANSWERS: - CROWN SERIES 32, PEERLESS SERIES 211A STEAM BOILERS
QUESTION: 10. Are we to install the new boilers as per two boiler installation procedures in either the Peerless or Crown installation manuals?
ANSWER: - Yes, to the manufacture specifications as much as possible. This may change a bit when hooking them to the header when you will have to adjust accordingly.
QUESTION: 11. Are we required to use the pipe sizing as per the installation manuals for the steam risers and header?
ANSWERS: - Yes, they will be smaller than the header so that should not be much of an issue.
QUESTION: 12. Are we required to design and install a new vent system for both boilers?
ANSWER: - The only vent that may change is the vent pipes for the blow offs, they must dump outside.
The combustion air in place will be reused.
QUESTION: 13. Are we reusing the combustion air louver as is?
ANSWER: - Yes, just needs to be tied into the controller.
QUESTION: 14. Does the contractor have to procure a New Castle County heating permit?
ANSWER: - NO
QUESTION: 15. Are we responsible for having all new work insulated?
ANSWER: - YES
QUESTION: 14. Is a boiler feed system being provided for installation by the successful contractor?
ANSWER: - Yes, there is a MCDONNEL MILLER sitting in a box in the boiler room.
QUESTION: 15. Are we permitted additional site visits?
ANSWER: - We can coordinate additional site visits if desired.
QUESTION: 16. Is there a preferred roofing contractor for the building?
ANSWER: - NO
2. If you have further questions, please e-mail them to MSgt Amy Kline at amy.l.kline.mil@mail.mil
AMY L KLINE, MSGT, DANG
Contracting Officer
| 2015-09-03T14:41:36-0400 | |
| KLINE.AMY.L.1045346176 |
File details come from the government source that posted it. Updated .