23_09_93,_Sequences_of_Operation_for_HVAC_Control,_20180703.pdf

PDF 74 KB Posted

Attached to
Bldg 25 Supply Warehouse Renovation
Solicitation number
W912L318B5000
Issued by

About this file

specs

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Repai r Supply building 25 DPEZ022002 (Rev 20180703)

SECTI ON 23 09 93

SEQUENCES OF OPERATI ON FOR HVAC CONTROL

11/15

PART 1 GENERAL

1. 1 DEFINITIONS

For def i ni t i ons r el at ed t o t hi s Sect i on, see Sect i on 23 09 00

I NTRUMENTATI ON AND CONTROL FOR HVAC.

1. 2 SUBMITTALS

Submi t t al s r el at ed t o t hi s Sect i on ar e speci f i ed i n Sect i on 23 09 00

I NTRUMENTATI ON AND CONTROL FOR HVAC.

PART 2 PRODUCTS

Pr oduct s r el at ed t o t hi s Sect i on ar e speci f i ed i n Sect i on 23 09 00 I NTRUMENTATI ON AND CONTROL FOR HVAC and r el at ed Sect i on 23 09 23. 02 BACNET

DI RECT DI GI TAL CONTROL FOR HVAC AND OTHER BUI LDI NG CONTROL SYSTEMS.

PART 3 EXECUTI ON

3. 1 SEQUENCES OF OPERATI ON FOR OCCUPANCY SCHEDULI NG

3. 1. 1 Syst em Mode

Oper at e ai r handl i ng uni t s ( AHUs) i n Occupi ed, War m- Up- Cool - Down, or Unoccupi ed modes as speci f i ed. VAV boxes, Fan Coi l s, and oper at e ot her t er mi nal equi pment i n Occupi ed or Unoccupi ed modes as speci f i ed. Chi l l er s, boi l er s, and ot her sour ces of heat i ng/ cool i ng f or hydr oni c l oads do not r equi r e schedul i ng; t hese syst ems r ecei ve r equest s f or heat i ng/ cool i ng f r om t hei r l oads.

3. 1. 2 Syst em Schedul er Requi r ement s

The Syst em Schedul er f unct i onal i t y must r esi de i n ei t her a pi ece of DDC Har dwar e dedi cat ed t o t hi s f unct i onal i t y or i n t he DDC Har dwar e cont r ol l i ng t he syst em AHU. A s i ngl e pi ece of DDC Har dwar e dedi cat ed t o schedul i ng ( per f or mi ng no ot her cont r ol f unct i onal i t y) may cont ai n mul t i pl e Syst em Schedul er s. Pr ovi de a uni que Syst em Schedul er f or : each AHU i ncl udi ng i t ' s associ at ed Ter mi nal Uni t s, and each st and- al one Ter mi nal Uni t ( t hose not dependent upon AHU ser vi ce) or gr oup of st and- al one Ter mi nal Uni t s act i ng accor di ng t o a common schedul e. Each Syst em Schedul er must pr ovi de t he f ol l owi ng f unct i onal i t y :

3. 1. 2. 1 Schedul ed Occupancy I nput

Accept net wor k var i abl e of t ype SNVT_occupancy. Suppor t t he f ol l owi ng possi bl e val ues: OC_STANDBY, OC_OCCUPI ED and OC_UNOCCUPI ED.

3. 1. 2. 2 Occupancy Over r i de I nput

Accept net wor k var i abl e of t ype SNVT_occupancy. Suppor t t he f ol l owi ng possi bl e val ues: OC_STANDBY, OC_OCCUPI ED, OC_UNOCCUPI ED, and OC_NUL.

SECTI ON 23 09 93 Page 1

Repai r Suppl y Bui l di ng 25 DPEZ022002

3. 1. 2. 3 Space Occupancy I nput s

For syst ems wi t h mul t i pl e occupancy sensor s, accept mul t i pl e i nput s of net wor k var i abl e t ype SNVT_Occupancy. Suppor t t he f ol l owi ng possi bl e val ues: OC_OCCUPI ED, OC_UNOCCUPI ED, and OC_NUL. For syst ems wi t h a s i ngl e occupancy sensor , accept a net wor k var i abl e i nput of t ype SNVT_Occupancy or a har dwar e bi nar y i nput ( BI ) i ndi cat i ng t he space occupancy st at us as Occupi ed or Unoccupi ed.

3. 1. 2. 4 Ai r Handl er Occupancy Out put

For a Syst em Schedul er f or a syst em cont ai ni ng an ai r handl er , out put one or mor e SNVTs i ndi cat i ng t he desi r ed occupancy st at us as one of t he f ol l owi ng possi bl e val ues: War m- Up- Cool - Down ( when r equi r ed by t he AHU Sequence of Oper at i on) , Occupi ed and Unoccupi ed.

3. 1. 2. 5 Ter mi nal Uni t Occupancy Out put

For a Syst em Schedul er f or a st and- al one t er mi nal uni t , or a gr oup of t er mi nal uni t s ser ved by a s i ngl e ai r handl er , out put one or mor e SNVTs i ndi cat i ng t he desi r ed occupancy st at us as one of t he f ol l owi ng possi bl e val ues: Occupi ed and Unoccupi ed.

3. 1. 2. 6 Def aul t Schedul e

I ncor por at e a 24- hour 7- day def aul t schedul e as shown on t he dr awi ngs whi ch may be act i vat ed and deact i vat ed by t he Syst em Schedul er Logi c.

3. 1. 2. 7 Communi cat i on Det er mi nat i on

Det er mi ne t he t i me el apsed bet ween r ecei pt s of t he schedul ed occupancy i nput SNVT, and use t hi s el apsed t i me t o act i vat e and deact i vat e t he Def aul t Schedul e as speci f i ed. ( Thi s pr ovi des t he capabi l i t y f or t he syst em schedul er t o use i t s Def aul t Schedul e i f i t l oses communi cat i on wi t h t he UMCS) .

3. 1. 3 Syst em Schedul er Out put Det er mi nat i on

For cont r ol l i ng an Ai r Handl er , i nt er pr et a SNVT i nput of OC_STANDBY as War m- Up- Cool - Down i f t he sequence of oper at i on suppor t s t hat mode, ot her wi se i nt er pr et OC_STANDBY as Occupi ed. For Ter mi nal Uni t s, i nt er pr et OC_STANDBY as Occupi ed.

3. 1. 3. 1 Ai r Handl er Occupancy Out put

I f mor e t han 95 mi nut es have passed si nce t he l ast r ecei pt of t he Schedul ed Occupancy i nput , det er mi ne t he Ai r Handl er Occupancy Out put by t he def aul t schedul e and t he Space Occupancy I nput s. Ot her wi se, det er mi ne t he out put as f ol l ows:

a. I f t he Over r i de Occupancy I nput i s not OC_NUL, det er mi ne t he Ai r Handl er Occupancy Out put f r om t he Over r i de Occupancy I nput .

b. Ot her wi se, i f at l east t he r equi r ed number ( as shown on t he Occupancy Schedul e Dr awi ng) of Space Occupancy I nput s ar e OC_OCCUPI ED or t he har dwar e BI i s Occupi ed t he Ai r Handl er Occupancy Out put must be

OC_OCCUPIED.

SECTI ON 23 09 93 Page 2

c. Ot her wi se, det er mi ne t he Ai r Handl er Occupancy Out put f r om t he Schedul ed Occupancy I nput SNVT.

3. 1. 3. 2 Ter mi nal Uni t Occupancy Out put

I f mor e t han 95 mi nut es have passed si nce t he l ast r ecei pt of t he Schedul ed Occupancy i nput , det er mi ne t he Ter mi nal Uni t Occupancy Out put by t he def aul t schedul e. Ot her wi se, det er mi ne t he out put as f ol l ows:

a. I f t he Over r i de Occupancy I nput i s not OC_NUL, det er mi ne t he Ter mi nal Uni t Occupancy Out put f r om t he Over r i de Occupancy I nput SNVT:

b. Ot her wi se, det er mi ne t he Ter mi nal Uni t Occupancy Out put f r om t he Schedul ed Occupancy SNVT.

3. 1. 4 Ai r Handl er Syst em Schedul i ng

a. Bi nd t he AHU Occupancy Out put SNVT f r om t he Syst em Schedul er t o t he DDC Har dwar e t hat execut es t he Occupancy Mode Det er mi nat i on par t of t he Ai r Handl er Sequence of Oper at i on

b. For Ai r Handl er s usi ng occupancy sensor s, bi nd t he out put SNVT ( of t ype SNVT_Occupancy) of each occupancy sensor t o a Space Occupancy I nput of t he Syst em Schedul er .

c. Bi nd t he Ter mi nal Uni t Occupancy Out put SNVT f r om t he Syst em Schedul er t o each AHU- Dependent Ter mi nal Uni t .

d. AHU- Dependent Ter mi nal Uni t s wi t h occupancy sensor s must have t he Ef f ect i ve Occupancy SNVT ( of t ype SNVT_Occupancy) of each Ter mi nal Uni t bound t o a Space Occupancy I nput of t he Syst em Schedul er .

3. 1. 5 St and- Al one Ter mi nal Uni t Schedul i ng

Bi nd t he Ter mi nal Uni t Occupancy Out put f r om t he Syst em Schedul er t o t he DDC Har dwar e t hat execut es t he Occupancy Mode Det er mi nat i on par t of t he Ter mi nal Uni t Sequence of Oper at i on.

3. 2 SEQUENCES OF OPERATI ON FOR AI R HANDLI NG UNI TS

3. 2. 1 Heat i ng and Vent i l at i ng Uni t ( or Uni t Vent i l at or )

I nst al l DDC har dwar e t o per f or m t hi s Sequence of Oper at i on and t o pr ovi de SNVT i nput s and out put s as speci f i ed and shown on t he Poi nt s Schedul e.

Unl ess ot her wi se speci f i ed, al l modul at i ng cont r ol must be pr opor t i onal - i nt egr al ( PI ) cont r ol .

3. 2. 1. 1 HAND- OFF- AUTO Swi t ches

Suppl y f an mot or st ar t er must accept a Fi r e Al ar m Panel ( FAP) s i gnal t hat t akes pr ecedence over al l ot her st ar t er i nput s and swi t ches and st ar t t he f an. The f an mot or st ar t er must accept an occupant accessi bl e emer gency shut of f swi t ch as i ndi cat ed. The suppl y f an mot or st ar t er must have an H- O- A swi t ch:

3. 2. 1. 1. 1 HAND

Wi t h t he H- O- A swi t ch i n HAND posi t i on, t he suppl y f an st ar t s and r uns cont i nuousl y, subj ect t o Saf et i es.

SECTI ON 23 09 93 Page 3

3. 2. 1. 1. 2 OFF

Wi t h t he H- O- A swi t ch i n OFF posi t i on, t he suppl y f an st ops.

3. 2. 1. 1. 3 AUTO

Wi t h t he H- O- A swi t ch i n AUTO posi t i on, t he suppl y f an r uns subj ect t o t he Suppl y Fan St ar t / St op ( SF- SS) command and Saf et i es.

3. 2. 1. 2 Occupancy Modes

Obt ai n t he syst em' s Occupancy Mode i nput f r om t he Syst em Schedul er as speci f i ed and i ndi cat ed. Oper at e t he syst em i n one of t he f ol l owi ng modes:

3. 2. 1. 2. 1 Occupied

The Uni t ' s DDC Har dwar e must be i n t he Occupi ed Mode when t he i nput f r om t he Syst em Schedul er ( SYS- OCC) i s occupi ed or when t he l ocal space occupancy i nput ( s) ( ZN- OCC) i ndi cat e t hat t he space i s occupi ed.

3. 2. 1. 2. 2 Unoccupied

The Uni t ' s DDC Har dwar e must be i n t he Unoccupi ed Mode when t he i nput f r om t he Syst em Schedul er ( SYS- OCC) i s unoccupi ed and when t he l ocal space occupancy i nput ( s) ( ZN- OCC) i ndi cat e t hat t he space i s unoccupi ed.

3. 2. 1. 3 Syst em Enabl e and Loop Enabl e

3. 2. 1. 3. 1 Occupi ed Mode

Enabe t he suppl y f an ( SYS- ENA) and command t o r un ( SF- SS) . Enabl e t he Zone Temper at ur e Cont r ol l oop and Mi xed Ai r Damper Cont r ol .

3. 2. 1. 3. 2 Unoccupi ed Mode

Di sabl e al l cont r ol l oops. When BLDG- T dr ops bel ow BLDG- T- LL- SP ( wi t h a 5 degr ees F deadband) enabl e t he suppl y f an ( SYS- ENA) and command t o r un ( SF- SS) and enabl e t he Zone Temper at ur e Cont r ol l oop.

3. 2. 1. 4 Pr oof s and Saf et i es

Subj ect t he suppl y f an and al l DDC Har dwar e cont r ol l oops t o Pr oof s and Saf et i es. Di r ect - har dwi r e i nt er l ock saf et i es t o t he f an st ar t er c i r cui t as i ndi cat ed. DDC Har dwar e must moni t or al l pr oof s and saf et i es and f ai l ur e of any pr oof or act i vat i on of any saf et y must r esul t i n al l cont r ol l oops bei ng di sabl ed and t he AHU f an bei ng commanded of f unt i l r eset .

3. 2. 1. 4. 1 Proofs

Suppl y f an st at us ( pr oof ) ( SF- S)

3. 2. 1. 4. 2 Safeties

a. Heat i ng Coi l di schar ge ai r t emper at ur e l ow l i mi t ( f r eeze st at )

(HTG-DA-T-LL)

b. Suppl y ai r smoke ( SA- SMK)

SECTI ON 23 09 93 Page 4

c. Ret ur n ai r smoke ( RA- SMK)

3. 2. 1. 4. 3 DDC Har dwar e

DDC Har dwar e r eset al l pr oof s and saf et i es v i a a l ocal bi nar y push- but t on ( RST- BUT) i nput t o t he DDC Har dwar e, v i a a r emot e command t o t he DDC Har dwar e v i a SNVT or bot h ( wher e t he Cont r act or pr ovi des bot h r eset f unct i ons and t he oper at or can use ei t her one t o per f or m t he r eset ) , as i ndi cat ed on t he Poi nt s Schedul e dr awi ng.

3. 2. 1. 5 Zone Temper at ur e Cont r ol

3. 2. 1. 5. 1 Enabl ed Loop

When t hi s l oop i s enabl ed, t he DDC Har dwar e must modul at e t he heat i ng val ve and out s i de ai r , r el i ef , and r et ur n ai r damper s i n sequence t o mai nt ai n zone t emper at ur e ( ZN- T) at set poi nt ( ZN- T- SP) . Pr ovi de sequenci ng as i ndi cat ed: Upon a r i se i n zone t emper at ur e above zone t emper at ur e set poi nt ( ZN- T- SP) , subj ect t o t he zone t emper at ur e set poi nt deadband as i ndi cat ed, mocul at e t he out s i de ai r , r el i ef , and r et ur n ai r damper s t o mai nt ai n zone t emper at ur e at set poi nt . Dur i ng occupi ed mode, out s i de ai r damper mi ni mum posi t i on ( OA- D- MI N) shal l be as i ndi cat ed. Upon a f al l i n zone t emper at ur e bel ow zone t emper at ur e set poi nt , subj ect t o t he deadband as i ndi cat ed, modul at e t he heat i ng val ve t owar ds open t o mai nt ai n zone t emper at ur e setpoint.

3. 2. 1. 5. 2 Di sabl ed Loop

When t hi s l oop i s di sabl ed, c l ose t he heat i ng val ve and cl ose t he out s i de ai r damper and r el i ef damper and open t he r et ur n damper .

3. 2. 2 Var i abl e Ai r Vol ume Syst em wi t hout Ret ur n Fan

I nst al l DDC har dwar e t o per f or m t hi s Sequence of Oper at i on and t o pr ovi de SNVT i nput s and out put s as speci f i ed and shown on t he Poi nt s Schedul e.

Unl ess ot her wi se speci f i ed, al l modul at i ng cont r ol shal l be pr opor t i onal - i nt egr al ( PI ) cont r ol .

3. 2. 2. 1 HAND- OFF- AUTO Swi t ches

Suppl y f an var i abl e f r equency dr i ve ( VFD) uni t shal l accept a Fi r e Al ar m Panel ( FAP) s i gnal t hat t akes pr ecedence over al l ot her VFD i nput s and swi t ches and shal l cause t he VFD t o r un at 100 per cent speed. The VFD shal l accept an occupant accessi bl e emer gency shut of f swi t ch as shown. The suppl y f an var i abl e f r equency dr i ve ( VFD) uni t shal l have an i nt egr al H- O- A switch:

3. 2. 2. 1. 1 HAND

Wi t h t he H- O- A swi t ch i n HAND posi t i on, t he suppl y f an shal l s t ar t and r un cont i nuousl y, subj ect t o Saf et i es. Fan speed shal l be under manual - oper at or control.

3. 2. 2. 1. 2 OFF

Wi t h t he H- O- A swi t ch i n OFF posi t i on, t he suppl y f an shal l s t op.

SECTI ON 23 09 93 Page 5

3. 2. 2. 1. 3 AUTO

Wi t h t he H- O- A swi t ch i n AUTO posi t i on, t he suppl y f an shal l r un subj ect t o t he Suppl y Fan St ar t / St op Si gnal ( SF- SS) and Saf et i es. Fan speed shal l be under cont r ol of t he DDC Har dwar e.

3. 2. 2. 2 Occupancy Modes

The syst em shal l obt ai n i t s Occupancy Mode i nput f r om t he Syst em Schedul er as speci f i ed and shown. The syst em shal l oper at e i n one of t he f ol l owi ng modes: Occupi ed, Unoccupi ed, or War m Up/ Cool Down.

3. 2. 2. 3 Pr oof s and Saf et i es

The suppl y f an, r et ur n f an, and al l DDC Har dwar e cont r ol l oops shal l be subj ect t o Pr oof s and Saf et i es. Saf et i es shal l be di r ect - har dwi r e i nt er l ocked t o t he VFD as shown. DDC Har dwar e shal l moni t or al l pr oof s and saf et i es and f ai l ur e of any pr oof or act i vat i on of any saf et y shal l r esul t i n al l cont r ol l oops bei ng di sabl ed and t he AHU f an bei ng commanded of f unt i l r eset .

3. 2. 2. 3. 1 Proofs

a. Suppl y f an st at us ( SF- S)

3. 2. 2. 3. 2 Safeties

a. Pr eheat coi l di schar ge ai r t emper at ur e l ow l i mi t ( f r eezest at ) ( PH- DA- T- LL) f or syst ems wi t h a pr eheat coi l . Cool i ng coi l di schar ge ai r t emper at ur e l ow l i mi t ( f r eezest at ) ( CLG- DA- T- LL) f or al l ot her systems

b. Suppl y ai r duct pr essur e hi gh l i mi t ( SA- P- HL)

c. Suppl y ai r smoke ( SA- SMK)

3. 2. 2. 3. 3 DDC Har dwar e Reset

DDC Har dwar e r eset of al l pr oof s and saf et i es shal l be v i a a l ocal bi nar y push- but t on ( RST- BUT) i nput t o t he DDC Har dwar e, v i a a r emot e command t o t he DDC Har dwar e v i a SNVT or bot h ( wher e t he Cont r act or pr ovi des bot h r eset f unct i ons and t he oper at or can use ei t her one t o per f or m t he r eset ) , as shown on t he Poi nt s Schedul e dr awi ng.

3. 2. 2. 4 Syst em Enabl e and Loop Enabl e

3. 2. 2. 4. 1 Occupi ed Mode

The suppl y f an shal l be enabl ed ( SYS- ENA) and commanded t o r un ( SF- SS) .

Al l cont r ol l oops shal l be enabl ed.

3. 2. 2. 4. 2 Unoccupi ed Mode

Whi l e t he bui l di ng t emper at ur e ( BLDG- T) i s above t he l ow l i mi t set poi nt ( BLDG- T- LL) al l cont r ol l oops shal l be di sabl ed and t he suppl y f an shal l not r un. When BLDG- T dr ops bel ow BLDG- T- LL ( wi t h a 5 degr ees F deadband) t he suppl y f an shal l be enabl ed ( SYS- ENA) and commanded t o r un ( SF- SS) , t he

SECTI ON 23 09 93 Page 6

Suppl y Duct St at i c Pr essur e Cont r ol , Pr eheat Cont r ol l oops shal l be enabl ed. The Mi ni mum Out si de Ai r Fl ow Cont r ol , Mi xed Ai r Temper at ur e Cont r ol , and Cool i ng Coi l Cont r ol l oops shal l be di sabl ed.

3. 2. 2. 4. 3 War m Up/ Cool Down

The suppl y f an shal l be enabl ed ( SYS- ENA) and commanded t o r un ( SF- SS) .

The Mi ni mum Out s i de Ai r Fl ow Cont r ol l oop shal l be di sabl ed and al l ot her cont r ol l oops shal l be enabl ed.

3. 2. 2. 5 Fan Capaci t y Cont r ol

3. 2. 2. 5. 1 Suppl y Duct St at i c Pr essur e Cont r ol

When t hi s l oop i s enabl ed t he DDC Har dwar e shal l modul at e t he suppl y f an var i abl e f r equency dr i ve uni t t o mai nt ai n t he duct st at i c pr essur e ( SA- P) at set poi nt ( SA- P- SP) as shown, as measur ed by t he duct st at i c pr essur e t ap and sensor as shown. When t hi s l oop i s di sabl ed, t he DDC Har dwar e capaci t y modul at i on out put t o t he VFD shal l be zer o per cent .

3. 2. 2. 6 Mi ni mum Out si de Ai r Fl ow Cont r ol

When t hi s l oop i s enabl ed t he DDC Har dwar e shal l modul at e t he mi ni mum out si de ai r damper t o mai nt ai n t he mi ni mum OA vol umet r i c f l ow ( MI NOA- F) at set poi nt ( MI NOA- F- SP) as shown. When t hi s l oop i s di sabl ed, t he mi ni mum out si de ai r damper shal l be c l osed.

3. 2. 2. 7 Mi xed Ai r Temper at ur e Cont r ol Wi t h Economi zer

3. 2. 2. 7. 1 Enabl ed Loop

When t hi s l oop i s enabl ed, and t he Economi zer i s ON as det er mi ned by t he Economi zer Enabl e Logi c, t he DDC Har dwar e shal l modul at e t he economi zer out s i de ai r , r el i ef , and r et ur n ai r damper s t o mai nt ai n t he mi xed ai r t emper at ur e ( MA- T) at set poi nt ( MA- T- SP) as shown.

3. 2. 2. 7. 2 Di sabl ed Loop

When t hi s l oop i s di sabl ed, or t he Economi zer i s OFF as det er mi ned by t he Economi zer Enabl e Logi c, t he economi zer out s i de ai r and r el i ef ai r damper s shal l be c l osed, and t he r et ur n ai r damper shal l be open.

3. 2. 2. 7. 3 Economi zer Enabl e Logi c

The economi zer shal l be ON when t he out s i de ai r dr y bul b t emper at ur e i s bet ween t he hi gh l i mi t ( ECO- HL- SP) and l ow l i mi t ( ECO- LL- SP) set poi nt s as shown. The Economi zer shal l ot her wi se be OFF. ECO- HL- SP and ECO- LL- SP shal l each have a 2 degr ees F deadband.

3. 2. 2. 8 Cool i ng Coi l Cont r ol

When t hi s l oop i s enabl ed t he DDC Har dwar e shal l modul at e t he cool i ng coi l val ve t o mai nt ai n t he suppl y ai r t emper at ur e ( SA- T) set poi nt ( SA- T- SP) as shown. When t hi s l oop i s di sabl ed, t he cool i ng coi l val ve shal l be c l osed.

3. 2. 2. 9 Pr eheat Coi l Cont r ol

When t hi s l oop i s enabl ed t he DDC Har dwar e shal l modul at e t he pr eheat coi l val ve t o mai nt ai n t he pr eheat coi l di schar ge ai r t emper at ur e ( PH- DA- T) at

SECTI ON 23 09 93 Page 7 set poi nt ( PH- DA- T- SP) as shown. When t hi s l oop i s di sabl ed, t he pr eheat coi l val ve shal l be c l osed.

3. 3 SEQUENCES OF OPERATI ON FOR TERMI NAL UNI TS

3. 3. 1 Zone Temper at ur e Cont r ol - Cool i ng- Onl y VAV Box

I nst al l DDC har dwar e t o per f or m t hi s Sequence of Oper at i on and t o pr ovi de SNVT i nput s and out put s as speci f i ed and shown on t he Poi nt s Schedul e.

Unl ess ot her wi se speci f i ed, al l modul at i ng cont r ol shal l be pr opor t i onal - i nt egr al ( PI ) cont r ol .

3. 3. 1. 1 Occupancy Modes

3. 3. 1. 1. 1 Occupied

The VAV box DDC Har dwar e shal l be i n t he Occupi ed Mode when t he l ocal space occupancy i nput ( s) ( ZN- OCC) i ndi cat e t hat t he space i s occupi ed or when t he i nput f r om t he Syst em Schedul er ( SYS- OCC) i s occupi ed.

3. 3. 1. 1. 2 Unoccupied

The VAV box DDC Har dwar e must be i n t he Unoccupi ed Mode when t he l ocal space occupancy i nput ( s) ( ZN- OCC) i ndi cat e t hat t he space i s unoccupi ed and t he i nput f r om t he Syst em Schedul er ( SYS- OCC) i s unoccupi ed.

Safeties

Thi s syst em has no saf et i es.

3. 3. 1. 2 Zone Temper at ur e Cont r ol

3. 3. 1. 2. 1 Occupi ed Mode

I n t he Occupi ed Mode t he zone t emper at ur e set poi nt ( ZN- T- SP) must be at t he conf i gur ed set poi nt or at t he occupant - adj ust abl e set poi nt v i a t he wal l - mount ed t her most at , as shown. The DDC Har dwar e must modul at e t he VAV box damper t o mai nt ai n VAV box suppl y ai r f l ow ( VAV- SA- F) at set poi nt as measur ed by a mul t i - poi nt f l ow sensi ng el ement at t he i nl et t o t he VAV box. Sequenceas i ndi cat ed: Upon a r i se i n zone t emper at ur e ( ZN- T) above zone set poi nt ( ZN- T- SP) , subj ect t o t he zone t emper at ur e set poi nt deadband as i ndi cat ed, adj ust t he ai r f l ow set poi nt bet ween mi ni mum and maxi mum f l ow based on t he di f f er ence bet ween zone t emper at ur e and zone t emper at ur e set poi nt as i ndi cat ed.

3. 3. 1. 2. 2 Unoccupi ed Mode

I n t he Unoccupi ed Mode t he VAV box damper shal l be at i t s mi ni mum posi t i on.

3. 3. 2 Zone Temper at ur e Cont r ol - VAV Box wi t h Reheat

I nst al l DDC har dwar e t o per f or m t hi s Sequence of Oper at i on and t o pr ovi de SNVT i nput s and out put s as speci f i ed and shown on t he Poi nt s Schedul e.

Unl ess ot her wi se speci f i ed, al l modul at i ng cont r ol shal l be pr opor t i onal - i nt egr al ( PI ) cont r ol .

SECTI ON 23 09 93 Page 8

3. 3. 2. 1 Occupancy Modes

3. 3. 2. 1. 1 Occupied

The VAV box DDC Har dwar e shal l be i n t he Occupi ed Mode when t he l ocal space occupancy i nput ( s) ( ZN- OCC) i ndi cat e t hat t he space i s occupi ed or when t he i nput f r om t he Syst em Schedul er ( SYS- OCC) i s occupi ed.

3. 3. 2. 1. 2 Unoccupied

The VAV box DDC Har dwar e shal l be i n t he Unoccupi ed Mode when t he l ocal space occupancy i nput ( s) ( ZN- OCC) i ndi cat e t hat t he space i s unoccupi ed and t he i nput f r om t he Syst em Schedul er ( SYS- OCC) i s unoccupi ed.

3. 3. 2. 2 Safeties

VAV boxes wi t h el ect r i c r esi st ance heat i ng el ement s shal l r equi r e pr oof of ai r f l ow bef or e act i vat i ng t he heat i ng el ement s.

3. 3. 2. 3 Zone Temper at ur e Cont r ol

a. I n t he Occupi ed Mode t he zone t emper at ur e set poi nt ( ZN- T- SP) shal l be at t he conf i gur ed set poi nt or at t he occupant - adj ust abl e set poi nt v i a t he wal l - mount ed t her most at , as shown.

b. I n t he Unoccupi ed Mode t he zone t emper at ur e set poi nt ( ZN- T- SP) shal l be at t he conf i gur ed set poi nt as shown.

c. The DDC Har dwar e shal l modul at e t he VAV box damper t o mai nt ai n VAV box suppl y ai r f l ow ( VAV- SA- F) at set poi nt as measur ed by a mul t i - poi nt f l ow sensi ng el ement at t he i nl et t o t he VAV box. Sequenci ng shal l be as shown: Upon a r i se i n zone t emper at ur e above zone t emper at ur e set poi nt ( ZN- T- SP) , subj ect t o t he zone t emper at ur e set poi nt deadband as shown, t he ai r f l ow set poi nt shal l be adj ust ed bet ween mi ni mum and maxi mum f l ow based on t he di f f er ence bet ween zone t emper at ur e and zone t emper at ur e set poi nt as shown. Upon a f al l i n zone t emper at ur e bel ow zone t emper at ur e set poi nt , subj ect t o t he deadband as shown, t he ai r f l ow shal l be mai nt ai ned at a f i xed ai r f l ow set poi nt ( wi t h a set t i ng i ndependent of t he cool i ng mi ni mum ai r f l ow) , and t he heat i ng val ve shal l modul at e t owar ds open or t he st aged el ect r i c r esi st ance heat i ng coi l ( s) shal l cycl e on i n sequence.

3. 3. 3 Uni t Heat er and Cabi net Uni t Heat er

I nst al l DDC har dwar e t o per f or m t hi s Sequence of Oper at i on and t o pr ovi de SNVT i nput s and out put s as speci f i ed and shown on t he Poi nt s Schedul e.

Unl ess ot her wi se speci f i ed, al l modul at i ng cont r ol shal l be pr opor t i onal - i nt egr al ( PI ) cont r ol .

3. 3. 3. 1 Of f - Aut o Swi t ch

3. 3. 3. 1. 1 OFF

Wi t h t he t her most at OFF- AUTO swi t ch i n t he OFF posi t i on, t he DDC Har dwar e shal l s t op t he f an and cl ose t he heat i ng cont r ol val ve.

3. 3. 3. 1. 2 AUTO

Wi t h t he t her most at OFF- AUTO swi t ch i n t he AUTO posi t i on, t he DDC Har dwar e

SECTI ON 23 09 93 Page 9 shal l cont r ol t he uni t i n accor dance wi t h i t s Occupancy Mode.

3. 3. 3. 2 Occupancy Modes

3. 3. 3. 2. 1 Occupied

The uni t heat er DDC Har dwar e shal l be i n t he Occupi ed Mode when t he l ocal space occupancy i nput ( s) i ndi cat e t hat t he space i s occupi ed or when t he i nput f r om t he Syst em Schedul er i s occupi ed.

3. 3. 3. 2. 2 Unoccupied

The uni t heat er DDC Har dwar e shal l be i n t he Unoccupi ed Mode when t he l ocal space occupancy i nput ( s) i ndi cat e t hat t he space i s unoccupi ed and when t he i nput f r om t he Syst em Schedul er i s unoccupi ed.

3. 3. 3. 3 Safeties

The uni t shal l r un subj ect t o t he uni t manuf act ur er ' s saf et i es.

3. 3. 3. 4 Space Temper at ur e Cont r ol

3. 3. 3. 4. 1 Occupi ed Mode

I n t he Occupi ed Mode t he DDC Har dwar e shal l modul at e t he heat i ng cont r ol val ve and cycl e t he mul t i - speed f an t o mai nt ai n space t emper at ur e at t he conf i gur ed set poi nt or at t he occupant - adj ust abl e set poi nt v i a t he wal l - mount ed t her most at , as shown.

3. 3. 3. 4. 2 Unoccupi ed Mode

I n t he Unoccupi ed Mode t he DDC Har dwar e shal l modul at e t he heat i ng cont r ol val ve and cycl e t he mul t i - speed f an t o mai nt ai n space t emper at ur e at t he conf i gur ed set poi nt as shown.

3. 3. 4 Gas- Fi r ed I nf r ar ed Heat er

I nst al l DDC har dwar e t o per f or m t hi s Sequence of Oper at i on and t o pr ovi de SNVT i nput s and out put s as speci f i ed and shown on t he Poi nt s Schedul e.

Unl ess ot her wi se speci f i ed, al l modul at i ng cont r ol shal l be pr opor t i onal - i nt egr al ( PI ) cont r ol .

3. 3. 4. 1 On- Of f - Aut o Swi t ch

3. 3. 4. 1. 1 ON

Wi t h t he t her most at ON- OFF- AUTO swi t ch i n t he ON posi t i on, t he DDC Har dwar e shal l ener gi ze t he heat er and t he heat er shal l r un cont i nuousl y.

3. 3. 4. 1. 2 OFF

Wi t h t he t her most at ON- OFF- AUTO swi t ch i n t he OFF posi t i on, t he DDC Har dwar e shal l de- ener gi ze t he heat er .

3. 3. 4. 1. 3 AUTO

Wi t h t he t her most at ON- OFF- AUTO swi t ch i n t he AUTO posi t i on, t he DDC Har dwar e shal l cont r ol t he heat er i n accor dance wi t h i t s Occupancy Mode.

SECTI ON 23 09 93 Page 10

3. 3. 4. 2 Occupancy Modes

3. 3. 4. 2. 1 Occupied

The uni t DDC Har dwar e shal l be i n t he Occupi ed Mode when t he l ocal space occupancy i nput ( s) i ndi cat e t hat t he space i s occupi ed.

3. 3. 4. 2. 2 Unoccupied

The uni t DDC Har dwar e shal l be i n t he Unoccupi ed Mode when t he l ocal space occupancy i nput ( s) i ndi cat e t hat t he space i s unoccupi ed.

3. 3. 4. 3 Safeties

The heat er shal l r un subj ect t o t he uni t manuf act ur er ' s saf et i es.

3. 3. 4. 4 Space Temper at ur e Cont r ol

3. 3. 4. 4. 1 Occupi ed Mode

I n t he Occupi ed Mode t he DDC Har dwar e shal l oper at e t he heat er t o mai nt ai n space t emper at ur e at t he conf i gur ed set poi nt or at t he occupant - adj ust abl e set poi nt v i a t he wal l - mount ed t her most at , as i ndi cat ed.

3. 3. 4. 4. 2 Unoccupi ed Mode

I n t he Unoccupi ed Mode t he DDC Har dwar e shal l oper at e t he heat er t o mai nt ai n space set poi nt at t he conf i gur ed unoccupi ed set poi nt as i ndi cat ed.

3. 4 SEQUENCES OF OPERATI ON FOR HYDRONI C SYSTEMS

3. 4. 1 Hydr oni c Heat i ng Hot Wat er Fr om Bui l di ng Boi l er s

I nst al l DDC har dwar e t o per f or m t hi s Sequence of Oper at i on and t o pr ovi de SNVT i nput s and out put s as speci f i ed and shown on t he Poi nt s Schedul e.

Unl ess ot her wi se speci f i ed, al l modul at i ng cont r ol shal l be pr opor t i onal - i nt egr al ( PI ) cont r ol .

3. 4. 1. 1 Syst em Enabl e and Loop Enabl e

a. Thi s syst em shal l moni t or t he enabl ed st at us of al l syst ems ser ved by t hi s syst em. I f one or mor e syst ems ser ved by t hi s syst em ar e enabl ed, t hi s syst em shal l be enabl ed ( SYS- ENA) . I f no syst ems ser ved by t hi s syst em ar e enabl ed, t hi s syst em shal l be di sabl ed.

b. When t hi s syst em i s enabl ed ( SYS- ENA) and t he hot wat er pump i s pr oof ed on, t he boi l er cont r ol and hot wat er t emper at ur e cont r ol l oops shal l be enabled.

3. 4. 1. 2 HAND- OFF- AUTO Swi t ch

The hot wat er pump mot or st ar t er shal l have an H- O- A swi t ch:

3. 4. 1. 2. 1 HAND

Wi t h t he H- O- A swi t ch i n HAND posi t i on, t he pump shal l s t ar t and r un continuously.

SECTI ON 23 09 93 Page 11

3. 4. 1. 2. 2 OFF

Wi t h t he H- O- A swi t ch i n OFF posi t i on, t he pump shal l s t op.

3. 4. 1. 2. 3 AUTO

Wi t h t he H- O- A swi t ch i n AUTO posi t i on, t he pump shal l r un subj ect t o t he Hot Wat er Pump St ar t / St op ( HW- PMP- SS) command.

3. 4. 1. 3 Pr oof s and Saf et i es

DDC Har dwar e shal l moni t or al l pr oof s and saf et i es.

3. 4. 1. 3. 1 Proofs

Hot wat er pump

3. 4. 1. 3. 2 Safeties

None

3. 4. 1. 3. 3 DDC Har dwar e Reset

DDC Har dwar e r eset of al l pr oof s and saf et i es shal l be v i a a l ocal bi nar y push- but t on ( RST- BUT) i nput t o t he DDC Har dwar e, v i a a r emot e command t o t he DDC Har dwar e v i a SNVT or bot h ( wher e t he Cont r act or pr ovi des bot h r eset f unct i ons and t he oper at or can use ei t her one t o per f or m t he r eset ) , as shown on t he Poi nt s Schedul e dr awi ng.

3. 4. 1. 4 Boi l er Cont r ol

When t hi s l oop i s enabl ed, t he DDC Har dwar e shal l t ur n t he boi l er on. When t hi s l oop i s di sabl ed, t he boi l er shal l be of f .

3. 4. 1. 5 Hot Wat er Temper at ur e Cont r ol

When t hi s l oop i s enabl ed t he DDC Har dwar e shal l modul at e t he 3- way mi xi ng val ve t o mai nt ai n hot wat er suppl y t emper at ur e ( HWS- T) at set poi nt ( HWS- T- SP) . The Hot Wat er Suppl y Temper at ur e Set poi nt ( HWS- T- SP) shal l be as shown. When t hi s l oop i s di sabl ed, t he val ve shal l be i n i t s nor mal ( f ai l saf e) posi t i on.

3. 4. 2 Hydr oni c Secondar y wi t h Var i abl e Speed Pump

I nst al l DDC har dwar e t o per f or m t hi s Sequence of Oper at i on and t o pr ovi de SNVT i nput s and out put s as speci f i ed and shown on t he Poi nt s Schedul e.

Unl ess ot her wi se speci f i ed, al l modul at i ng cont r ol shal l be pr opor t i onal - i nt egr al ( PI ) cont r ol .

3. 4. 2. 1 Syst em Enabl e and Loop Enabl e:

a. Thi s syst em shal l moni t or t he enabl ed st at us of al l syst ems ser ved by t hi s syst em. I f one or mor e syst ems ser ved by t hi s syst em ar e enabl ed, t hi s syst em shal l be enabl ed ( SYS- ENA) . I f al l syst ems ser ved by t hi s syst em ar e not enabl ed, t hi s syst em shal l not be enabl ed.

b. When t hi s syst em i s enabl ed ( SYS- ENA) t he Pr essur e Cont r ol l oop shal l be enabl ed.

SECTI ON 23 09 93 Page 12

3. 4. 2. 2 HAND- OFF- AUTO Swi t ch

The hot wat er pump var i abl e f r equency dr i ve ( VFD) uni t shal l have an i nt egr al H- O- A swi t ch:

3. 4. 2. 2. 1 HAND

Wi t h t he H- O- A swi t ch i n HAND posi t i on, t he pump st ar t s and r uns cont i nuousl y. Pump speed shal l be under manual - oper at or cont r ol .

3. 4. 2. 2. 2 OFF

Wi t h t he H- O- A swi t ch i n OFF posi t i on, t he pump st ops.

3. 4. 2. 2. 3 AUTO

Wi t h t he H- O- A swi t ch i n AUTO posi t i on, t he pump shal l r un subj ect t o t he Hot Wat er Pump St ar t / St op ( HW- PMP- SS) command and pump speed shal l be under cont r ol of t he DDC syst em.

3. 4. 2. 3 Pr oof s and Saf et i es

DDC Har dwar e shal l moni t or al l pr oof s and saf et i es.

3. 4. 2. 3. 1 Proofs

None

3. 4. 2. 3. 2 Safeties

None

3. 4. 2. 3. 3 DDC Har dwar e Reset

DDC Har dwar e r eset of al l pr oof s and saf et i es shal l be v i a a l ocal bi nar y push- but t on ( RST- BUT) i nput t o t he DDC Har dwar e, v i a a r emot e command t o t he DDC Har dwar e v i a SNVT or bot h ( wher e t he Cont r act or pr ovi des bot h r eset f unct i ons and t he oper at or can use ei t her one t o per f or m t he r eset ) , as shown on t he Poi nt s Schedul e dr awi ng.

3. 4. 2. 4 Pr essur e Cont r ol

When t hi s l oop i s enabl ed t he DDC Har dwar e shal l modul at e t he pump var i abl e f r equency dr i ve uni t t o mai nt ai n t he pi pe syst em pr essur e at set poi nt as shown, as measur ed by t he di f f er ent i al pr essur e t ap and sensor as shown.

When t hi s l oop i s di sabl ed, t he DDC Har dwar e capaci t y modul at i on out put t o t he VFD shal l be zer o per cent .

- - End of Sect i on - -

SECTI ON 23 09 93 Page 13

23 09 93 - SEQUENCES OF OPERATION FOR HVAC CONTROL
PART 1 GENERAL
1.1 DEFINITIONS
1.2 SUBMITTALS
PART 2 PRODUCTS
PART 3 EXECUTION
3.1 SEQUENCES OF OPERATION FOR OCCUPANCY SCHEDULING
3.1.1 System Mode
3.1.2 System Scheduler Requirements
3.1.2.1 Scheduled Occupancy Input
3.1.2.2 Occupancy Override Input
3.1.2.3 Space Occupancy Inputs
3.1.2.4 Air Handler Occupancy Output
3.1.2.5 Terminal Unit Occupancy Output
3.1.2.6 Default Schedule
3.1.2.7 Communication Determination
3.1.3 System Scheduler Output Determination
3.1.3.1 Air Handler Occupancy Output
3.1.3.2 Terminal Unit Occupancy Output
3.1.4 Air Handler System Scheduling
3.1.5 Stand-Alone Terminal Unit Scheduling
3.2 SEQUENCES OF OPERATION FOR AIR HANDLING UNITS
3.2.1 Heating and Ventilating Unit or Unit Ventilator
3.2.1.1 HAND-OFF-AUTO Switches
3.2.1.1.1 HAND
3.2.1.1.2 OFF
3.2.1.1.3 AUTO
3.2.1.2 Occupancy Modes
3.2.1.2.1 Occupied
3.2.1.2.2 Unoccupied
3.2.1.3 System Enable and Loop Enable
3.2.1.3.1 Occupied Mode
3.2.1.3.2 Unoccupied Mode
3.2.1.4 Proofs and Safeties
3.2.1.4.1 Proofs
3.2.1.4.2 Safeties
3.2.1.4.3 DDC Hardware
3.2.1.5 Zone Temperature Control
3.2.1.5.1 Enabled Loop
3.2.1.5.2 Disabled Loop
3.2.2 Variable Air Volume System without Return Fan
3.2.2.1 HAND-OFF-AUTO Switches
3.2.2.1.1 HAND
3.2.2.1.2 OFF
3.2.2.1.3 AUTO
3.2.2.2 Occupancy Modes
3.2.2.3 Proofs and Safeties
3.2.2.3.1 Proofs
3.2.2.3.2 Safeties
3.2.2.3.3 DDC Hardware Reset
3.2.2.4 System Enable and Loop Enable
3.2.2.4.1 Occupied Mode
3.2.2.4.2 Unoccupied Mode
3.2.2.4.3 Warm Up/Cool Down
3.2.2.5 Fan Capacity Control
3.2.2.5.1 Supply Duct Static Pressure Control
3.2.2.6 Minimum Outside Air Flow Control
3.2.2.7 Mixed Air Temperature Control With Economizer
3.2.2.7.1 Enabled Loop
3.2.2.7.2 Disabled Loop
3.2.2.7.3 Economizer Enable Logic
3.2.2.8 Cooling Coil Control
3.2.2.9 Preheat Coil Control
3.3 SEQUENCES OF OPERATION FOR TERMINAL UNITS
3.3.1 Zone Temperature Control - Cooling-Only VAV Box
3.3.1.1 Occupancy Modes
3.3.1.1.1 Occupied
3.3.1.1.2 Unoccupied
3.3.1.2 Zone Temperature Control
3.3.1.2.1 Occupied Mode
3.3.1.2.2 Unoccupied Mode
3.3.2 Zone Temperature Control - VAV Box with Reheat
3.3.2.1 Occupancy Modes
3.3.2.1.1 Occupied
3.3.2.1.2 Unoccupied
3.3.2.2 Safeties
3.3.2.3 Zone Temperature Control
3.3.3 Unit Heater and Cabinet Unit Heater
3.3.3.1 Off-Auto Switch
3.3.3.1.1 OFF
3.3.3.1.2 AUTO
3.3.3.2 Occupancy Modes
3.3.3.2.1 Occupied
3.3.3.2.2 Unoccupied
3.3.3.3 Safeties
3.3.3.4 Space Temperature Control
3.3.3.4.1 Occupied Mode
3.3.3.4.2 Unoccupied Mode
3.3.4 Gas-Fired Infrared Heater
3.3.4.1 On-Off-Auto Switch
3.3.4.1.1 ON
3.3.4.1.2 OFF
3.3.4.1.3 AUTO
3.3.4.2 Occupancy Modes
3.3.4.2.1 Occupied
3.3.4.2.2 Unoccupied
3.3.4.3 Safeties
3.3.4.4 Space Temperature Control
3.3.4.4.1 Occupied Mode
3.3.4.4.2 Unoccupied Mode
3.4 SEQUENCES OF OPERATION FOR HYDRONIC SYSTEMS
3.4.1 Hydronic Heating Hot Water From Building Boilers
3.4.1.1 System Enable and Loop Enable
3.4.1.2 HAND-OFF-AUTO Switch
3.4.1.2.1 HAND
3.4.1.2.2 OFF
3.4.1.2.3 AUTO
3.4.1.3 Proofs and Safeties
3.4.1.3.1 Proofs
3.4.1.3.2 Safeties
3.4.1.3.3 DDC Hardware Reset
3.4.1.4 Boiler Control
3.4.1.5 Hot Water Temperature Control
3.4.2 Hydronic Secondary with Variable Speed Pump
3.4.2.1 System Enable and Loop Enable:
3.4.2.2 HAND-OFF-AUTO Switch
3.4.2.2.1 HAND
3.4.2.2.2 OFF
3.4.2.2.3 AUTO
3.4.2.3 Proofs and Safeties
3.4.2.3.1 Proofs
3.4.2.3.2 Safeties
3.4.2.3.3 DDC Hardware Reset

3.4.2.4 Pressure Control

File details come from the government source that posted it.