W912KN-18-B-6001_Solicitation_QA_20180628.pdf

PDF 134 KB Posted

Attached to
RSS Site and Comm Tower Site Work Federal contract opportunity
Solicitation number
W912KN18B6001
Issued by
Department of the Army New Jersey Army National Guard

About this file

Solicitation Q&A current as of June 28, 2018 Final Q&A Log will be uploaded to www.FBO.gov as a Solicitation Amandment.

View the file

Other files for this federal contract opportunity

Other files attached to RSS Site and Comm Tower Site Work, newest first.
File Type Posted
18-B-6001_IFB_Opening_Sign_In.pdf PDF
18-B-6001_Abstract_SF_1409.pdf PDF
18-B-6001_ConcPd_PreProp_Conf_PPT.pdf PDF
18-B-6001-U001_ConcPd_Solic_Amend01.pdf PDF
AQRC182003_SOW_R01.docx DOCX document
ConcPd_Pre-Bid_Sign-In.pdf PDF
SOW_Attachment_2_-_Tower_Site_Overview.pdf PDF
SOW_Attachment_5_-_Tower_Foundation.pdf PDF
SOW_Attachment_3_-_Tower_Shelter_Layout.pdf PDF
SOW_Attachment_6_-_Shelter_Foundation_Details.pdf PDF
SF1442.pdf PDF
AQRC182003_SOW(1).docx DOCX document
SOW_Attachment_4__-_Site_Grounding_details.pdf PDF
SOW_Attachment_7_-_Comm_requirements.pdf PDF
SOW_Attachment_1_-_Concrete_Layout.pdf PDF
Show all 15

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation #: W912KN‐18‐B‐6001 Project Name & Number: AQRC182003 RSS Site and Comm Tower Site Work

Updated: Thursday, June 28, 2018

RFI # Submitted Answered Question Response Response By 1 25‐Jun‐18 28‐Jun‐18 Who is to dispose of the existing transformer? Contractor to remove and dispose of existing transformer. 177 CES 2 25‐Jun‐18 28‐Jun‐18 Does this transformer contain PCB oil? No, transformer does not contain PCB oil. 177 CES

3 25‐Jun‐18 28‐Jun‐18 Where is the sectionalizer in relationship to the transformer location (How far Away)?

Sectionalizer is approx. 50 ft away from transformer location. 177 CES

4 25‐Jun‐18 28‐Jun‐18 Note A2 c. i. in the scope calls for the Utility rack to be 1ft. 6in x 6ft. 6in., figure #2 appears to show a rack much larger.

Those dimensions are for the concrete footing of the Utility rack. Figure two is an example of what the Utility Rack should look like.

177 CES

5 25‐Jun‐18 28‐Jun‐18 The equipment described to be installed on the Electrical/Utility rack will not fit on a rack that is 18” x 78”. Are there to be multiple racks installed?

Adjust the Rack's base and length to accommodate Equipment measurements.

177 CES

6 25‐Jun‐18 28‐Jun‐18 What are they showing us in the attached sketch? They seem to be showing the tower shelter with multiple 4” conduits be stubbed up on two sides of the building. Where are these conduits going or coming from?

The attachment is illustrating the footprint of the Concrete Modular Shelter. Disregard installation of the 4 Conduits, as starting location has yet to be determined and could change.

177 CES

7 25‐Jun‐18 28‐Jun‐18 Is this sketch showing cable tray to be installed? No, cable tray will not be installed. 177 CES