W912KN-18-B-6001_Solicitation_QA_20180628.pdf
PDF 134 KB Posted
- Attached to
- RSS Site and Comm Tower Site Work Federal contract opportunity
- Solicitation number
- W912KN18B6001
About this file
Solicitation Q&A current as of June 28, 2018 Final Q&A Log will be uploaded to www.FBO.gov as a Solicitation Amandment.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 18-B-6001_IFB_Opening_Sign_In.pdf | ||
| 18-B-6001_Abstract_SF_1409.pdf | ||
| 18-B-6001_ConcPd_PreProp_Conf_PPT.pdf | ||
| 18-B-6001-U001_ConcPd_Solic_Amend01.pdf | ||
| AQRC182003_SOW_R01.docx | DOCX document | |
| ConcPd_Pre-Bid_Sign-In.pdf | ||
| SOW_Attachment_2_-_Tower_Site_Overview.pdf | ||
| SOW_Attachment_5_-_Tower_Foundation.pdf | ||
| SOW_Attachment_3_-_Tower_Shelter_Layout.pdf | ||
| SOW_Attachment_6_-_Shelter_Foundation_Details.pdf | ||
| SF1442.pdf | ||
| AQRC182003_SOW(1).docx | DOCX document | |
| SOW_Attachment_4__-_Site_Grounding_details.pdf | ||
| SOW_Attachment_7_-_Comm_requirements.pdf | ||
| SOW_Attachment_1_-_Concrete_Layout.pdf |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation #: W912KN‐18‐B‐6001 Project Name & Number: AQRC182003 RSS Site and Comm Tower Site Work
Updated: Thursday, June 28, 2018
RFI # Submitted Answered Question Response Response By 1 25‐Jun‐18 28‐Jun‐18 Who is to dispose of the existing transformer? Contractor to remove and dispose of existing transformer. 177 CES 2 25‐Jun‐18 28‐Jun‐18 Does this transformer contain PCB oil? No, transformer does not contain PCB oil. 177 CES
3 25‐Jun‐18 28‐Jun‐18 Where is the sectionalizer in relationship to the transformer location (How far Away)?
Sectionalizer is approx. 50 ft away from transformer location. 177 CES
4 25‐Jun‐18 28‐Jun‐18 Note A2 c. i. in the scope calls for the Utility rack to be 1ft. 6in x 6ft. 6in., figure #2 appears to show a rack much larger.
Those dimensions are for the concrete footing of the Utility rack. Figure two is an example of what the Utility Rack should look like.
177 CES
5 25‐Jun‐18 28‐Jun‐18 The equipment described to be installed on the Electrical/Utility rack will not fit on a rack that is 18” x 78”. Are there to be multiple racks installed?
Adjust the Rack's base and length to accommodate Equipment measurements.
177 CES
6 25‐Jun‐18 28‐Jun‐18 What are they showing us in the attached sketch? They seem to be showing the tower shelter with multiple 4” conduits be stubbed up on two sides of the building. Where are these conduits going or coming from?
The attachment is illustrating the footprint of the Concrete Modular Shelter. Disregard installation of the 4 Conduits, as starting location has yet to be determined and could change.
177 CES
7 25‐Jun‐18 28‐Jun‐18 Is this sketch showing cable tray to be installed? No, cable tray will not be installed. 177 CES
177th Fighter Wing Pre-Proposal Questions & Clarifications