SOW Relocate Modular Structures

View the file

Other files for this federal contract opportunity

Other files attached to RELOCATE MODULAR STRUCTURES site visit Wed 5 July, newest first.
File Type Posted
Questions_answers_and_site_visit_notes.pdf PDF
SOW_Attach_3-01400_Quality_Requirements_FINAL.doc DOC document
SOW_Attach_2-01100_Summary_and_Work_Restrictions_FINAL.doc DOC document
SOW_Attach_5-01500_Temporary_Facilities_and_Controls_FINAL.doc DOC document
PROVISIONS_CLAUSES.docx DOCX document
SOW_Attach_6-01330_Submittal_Procedures_FINAL.doc DOC document
SOW_Attach_7-01595_Safety_Requirements_FINAL.doc DOC document
SOW_Attach_1-_Project_Drawings.pdf PDF
SOW_Attach_4-01410_Environmental_Protection_(Rev_22_Oct_15)_FINAL.doc DOC document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

Relocate Modular Structures, B418 911AW to B304 171ARW Pittsburgh IAP, PAANG

25 May 2017

1.1 BACKGROUND

Two existing two story modular office buildings (MODS) are to be relocated from the 911AW B418 to the 171ARW B304. The upcoming construction projects in B418 require the removal of all items from the hangar floor. The intent of this contract is to dismantle the two existing MODS to a condition suitable for highway transport. Transport the MODS from the 911AW property via public roadway. The contractor shall then reassemble the MODS inside B304 at the 171ARW. The contractor shall be responsible for providing all labor and materials to accomplish these tasks.

1.2 SCOPE OF WORK

A. Contractor shall dismantle MODS inside B418 at the 911AW. Mods shall be dismantled to a condition suitable for highway transport. This includes but is not limited to:

1. Interior finishes (any interior finish, i.e. cabinets, lighting, plumbing fixtures, sprinkler fittings, HVAC ductwork, that are present and determined salvageable by the contracting officer shall be salvaged for reinstallation, any finishes present deemed not salvageable i.e. floor tiles, ceiling tiles, shall be disposed of per the specifications)

2. Floor and ceiling decks

3. Wiring systems

4. Walls, including doors and windows

5. Steel sub-structure

6. Exterior stairs At the conclusion of dismantling/transportation activities there should be no remainder of either modular facility within B418 unless approved by the contracting officer.

B. The contractor shall prepare dismantled MODS for transportation. Transportation shall be over public highway. It is the contractors responsibility to conform to all laws and regulations pertaining to transport on public thoroughfares. Contractor shall take into consideration access to both facilities over existing base roads on either installation, i.e. clearances to wires, signage, buildings, etc.

C. The contractor shall be responsible to reassemble both MODS inside B304 at the 171ARW. B304 was a fuel cell hangar that half of which has been converted to a simulator bay. The remaining floor of B304 slopes towards a central floor drain, buildings shall be shimmed as required by the manufacturer to maintain true walls. The MODS shall be reassembled to a condition equal to their condition prior to disassembly (post interior finish salvage). Reassembly shall include all interior walls and fixtures such as doors, windows, subfloors, and interior electrical systems connections. Additionally, reassemble shall include exterior metal stairs. Reassembly shall NOT include any interior finishes salvaged during the demolition process.

(c1) Base facility drawings will be provided to the contractor by the government if requested.

D. Contractor shall assume all work on the airfield shall require government escort.

1.3 REFERENCES

A. All references to and citing of government and industry standards and codes must show the date of the reference used. It is not acceptable to state “use of latest or current issue” or state “install per code” in lieu of delineating portions of the code in application to installations, assemblies, and materials. All work shall be in accordance with the latest versions of the following; however, final determinations of code compliance shall be made by the Base Civil Engineer.

1. All DoD Unified Facility Criteria see http://www.wbdg.org and any Air Force Engineering Technical Letters (ETL) see http://www.e-publishing.af.mil

2. Military Handbook 1013/10

3. Allegheny County Plumbing Code

4. EPA and PA DEP Regulations

5. International Building Code

6. PA Dept of L & I

7. National Electrical and Plumbing Codes,

8. NFPA Codes

9. Applicable industry standards such as ASHRAE and ASME.

10. State and Federal OSHA regulations

B. Contracted work will take place in the area shown on attached drawings. The contractor shall coordinate construction activities with the Contracting Officer to ensure that the primary mission of Pittsburgh ARS and Pittsburgh ANG is not compromised at any time during contract execution.

C. All installation of materials shall be per manufacturers’ recommendations; UFC guidance; federal, state, and local building and electrical code requirements.

ATTACHMENTS

Project Drawings

Specifications

DIVISION 01 - GENERAL REQUIREMENTS

01100Summary and Work Restrictions
01400Quality Requirements
01410Environmental Protection
01500Temporary Facilities and Controls
01595Safety Requirements
01330Submittal Procedures

***END OF STATEMENT OF WORK***