SOW_Attach_2-01100_Summary_and_Work_Restrictions_FINAL.doc
DOC document 37 KB Posted
- Attached to
- RELOCATE MODULAR STRUCTURES site visit Wed 5 July Federal contract opportunity
- Solicitation number
- W912KC-17-T-7070
About this file
SOW Attach 2-01100 Summary and Work Restrictions FINAL
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Questions_answers_and_site_visit_notes.pdf | ||
| SOW_Attach_6-01330_Submittal_Procedures_FINAL.doc | DOC document | |
| SOW_Attach_7-01595_Safety_Requirements_FINAL.doc | DOC document | |
| SOW_Attach_3-01400_Quality_Requirements_FINAL.doc | DOC document | |
| SOW_Attach_5-01500_Temporary_Facilities_and_Controls_FINAL.doc | DOC document | |
| PROVISIONS_CLAUSES.docx | DOCX document | |
| SOW_Attach_1-_Project_Drawings.pdf | ||
| SOW_Attach_4-01410_Environmental_Protection_(Rev_22_Oct_15)_FINAL.doc | DOC document | |
| SOW_Relocate_Modular_Structures.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Relocate Modular Structures, B418 911AW to B304 171ARW
Copyright 2002 and 2005 by The American Institute of Architects (AIA)
Exclusively published and distributed by Architectural Computer Services, Inc. (ARCOM) for the AIA
SECTION 01100 SUMMARY AND WORK RESTRICTIONS
This Section uses the term "Architect." Change this term to match that used to identify the design professional as defined in the General and Supplementary Conditions.
Much of this Section consists of Project-specific data. Examples given in the model text in the Evaluations illustrate possible Section content; use the model text to develop text for specific Project requirements. See Evaluations.
Verify that Section titles referenced in this Section are correct for this Project's Specifications; Section titles may have changed.
PART 1 - GENERAL
1 SUMMARY
Title of Work: Relocate Modular Structures, B418 911AW to B304 171ARW
Project includes work at 911th Airlift Wing, Pittsburgh IAP ARS, Moon Township, PA 15108-4495, and at the Air National Guard Base, Pittsburgh International Airport, Pennsylvania, 15108-1940. Site visits may be arranged through the 171st Contracting Office, Commercial (412) 776-7685.
A. This Section includes the following:
Adjust list below to suit Project.
1. Work covered by the Contract Documents.
2. Contract method.
3. Use of premises.
1.5 WORK COVERED BY CONTRACT DOCUMENTS
A. Two existing two story modular office buildings (MODS) are to be relocated from the 911AW B418 to the 171ARW B304. The upcoming construction projects in B418 require the removal of all items from the hangar floor. The intent of this contract is to dismantle the two existing MODS to a condition suitable for highway transport. Transport the MODS from the 911AW property via public roadway. The contractor shall then reassemble the MODS inside B304 at the 171ARW. The contractor shall be responsible for providing all labor and materials to accomplish these tasks.
1.2 CONTRACT METHOD
A. This contract shall be executed as a service contract.
1.6 USE OF PREMISES
Retain one of two paragraphs below. Retain first paragraph if Project is on a vacant site or in an unoccupied building being renovated and there are no Owner-occupancy requirements. Retain second if Owner will occupy portions of an existing site or building. Revise to suit Project.
A. General: Contractor shall have use of premises indicated by Contracting Officer for construction operations, including use of Project site, during construction period.
1. Work periods may be limited in duration without additional compensation to the Contractor aside from an extension to the performance period for lost time. Work schedule shall be as follows:
a. 911AW Normal work hours shall be between 7:30 and 4:00 PM with no work on federal holidays
b. 171AW Normal work hours shall be
1) 1st week: Monday to Thursday from 0700 to 1630 hours as well as Friday from 0700 to 1530 hours
2) 2nd week: Tuesday to Friday from 0700 to 1630 hours
c. Any deviation from the normal working hours must be approved three (3) working days in advance by the Contracting Officer.
2. Contractor may use restrooms within the facilities when operational, but must keep them clean.
3. Any type of advertising, including signs for advertising are not permitted on base.
4. Taking of photographs is prohibited except by the written permission coordinated through the Contracting Officer.
5. Firearms are not permitted on the base.
The words "shall," "shall be," or "shall comply with," depending on the context, are implied where a colon (:) is used within a sentence or phrase.The words "shall," "shall be," or "shall comply with," depending on the context, are implied where a colon (:) is used within a sentence or phrase.Retain paragraph and subparagraphs below if Project site will be accessible to other parties or if parts of a building being renovated will be occupied during construction; revise to suit Project. See Evaluations for model text.
B. Use of Site: Limit use of premises to work in areas indicated by Contracting Officer. Do not disturb portions of Project site beyond areas in which the Work is indicated.
1. Limits: Confine constructions operations to immediate areas of construction.
Retain first subparagraph below if reduced site disturbance is required for LEED Credit SS 5.1. Credit applies only to greenfield sites. See Evaluations.
Subparagraph and associated subparagraphs below are examples of a special requirement appropriate to many projects; revise to suit Project or delete.
2. Driveways and Entrances: Keep driveways and entrances serving premises clear and available to Government, Government employees, and emergency vehicles at all times. Do not use these areas for parking or storage of materials.
a. Schedule deliveries to minimize use of driveways and entrances.
b. Schedule deliveries to minimize space and time requirements for storage of materials and equipment on-site.
Insert other paragraphs, as appropriate, describing additional limitations on use of site by construction personnel. See Evaluations for model text.
Retain paragraph below if the Work involves existing occupied building; otherwise, delete.
C. The Contractor shall assume full responsibility for protection and safekeeping of products under this Contract.
D. The Contractor shall be responsible for protecting all remaining permanent equipment.
E. The Contractor shall obtain and pay for the use of additional storage or work areas needed for operation under this Contract.
Insert additional paragraphs specifying specific limitations on use of existing building. See Evaluations for model text.
END OF SECTION 01100
INTENTIONALLY LEFT BLANK
SUMMARY AND WORK RESTRICTIONS
Section 01100-3
SOW ATTACHMENT 2
File details come from the government source that posted it. Updated .