BRFI_002_Response_Worksheet_20170131.pdf

PDF 12 KB Posted

Attached to
Rilea Electrical Repair Federal contract opportunity
Solicitation number
W912JV-17-B-4003
Issued by
Department of the Army Oregon Army National Guard

About this file

RFI 2

View the file

Other files for this federal contract opportunity

Other files attached to Rilea Electrical Repair, newest first.
File Type Posted
A_07_Soliciation_0002.pdf PDF
BRFI_004a.pdf PDF
BRFI_003R_Response_Worksheet_20170207.pdf PDF
BRFI_004.pdf PDF
BRFI_001_Response_Worksheet_20170131.pdf PDF
BRFI_003_Response_Worksheet_20170201.pdf PDF
A_07_Solicitation.pdf PDF
Binder1.pdf PDF
A_01_SOW_Camp_Rilea_Type_B3__SPEC_BOOK_20140414.pdf PDF
A_01_AF_Form_66_ERWM132060_Electrical_Service_Upgrades.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Request for Information Worksheet

Page 1 of 1RFIW, v1.0

Requirement Information

Requirement Description Solicitation Number Contracting Officer

BRFI 002 - OR ANG Camp Rilea Elec Serv Upgrades W912JV-17-B-4003 Harry Danberg

Questions and Answers

Number Question

1 Details 3, 4 and 5. There appears to be a conflict in dimensions with E-503 with respect to wall dimensions. Could you give me the width of all 6 walls both existing and new? The length is critical for new wireways and conduit.

Answer The following are the measurements for the new power stands:

(N) Power Stand H1 = 11’-0” and is referenced by S-101, detail 5.

(N) North Power Stand N4 = 10’-0” and is referenced by S-101, detail 4.

(N) North Power Stand N5 = 10’-0” and is referenced by S-101, detail 4

2 Detail 2 shows the Cable Tray pedestal. There appear to be two 36” anchor bolts. What size are the bolts?

Answer Please refer to Sheet E-001, General Note 6.

This notes places the responsibility for the design of the electrical equipment and raceway supports on the contractor. The diameter of the anchor bolts will be driven by the type of cable tray selected and how the contractor chooses to support the system, which will require providing the proper calculations that indicate meeting the Oregon Structural Specialty Code.

3 Is there a post shown on top of the pedestal? Please clarify this detail.

Answer Please refer to Sheet E-001, General Note 6.

This notes places the responsibility for the design of the electrical equipment and raceway supports on the contractor. The diameter of the anchor bolts will be driven by the type of cable tray selected and how the contractor chooses to support the system, which will require providing the proper calculations that indicate meeting the Oregon Structural Specialty Code.