BRFI_002_Response_Worksheet_20170131.pdf
PDF 12 KB Posted
- Attached to
- Rilea Electrical Repair Federal contract opportunity
- Solicitation number
- W912JV-17-B-4003
About this file
RFI 2
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| A_07_Soliciation_0002.pdf | ||
| BRFI_004a.pdf | ||
| BRFI_003R_Response_Worksheet_20170207.pdf | ||
| BRFI_004.pdf | ||
| BRFI_001_Response_Worksheet_20170131.pdf | ||
| BRFI_003_Response_Worksheet_20170201.pdf | ||
| A_07_Solicitation.pdf | ||
| Binder1.pdf | ||
| A_01_SOW_Camp_Rilea_Type_B3__SPEC_BOOK_20140414.pdf | ||
| A_01_AF_Form_66_ERWM132060_Electrical_Service_Upgrades.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Request for Information Worksheet
Page 1 of 1RFIW, v1.0
Requirement Information
Requirement Description Solicitation Number Contracting Officer
BRFI 002 - OR ANG Camp Rilea Elec Serv Upgrades W912JV-17-B-4003 Harry Danberg
Questions and Answers
Number Question
1 Details 3, 4 and 5. There appears to be a conflict in dimensions with E-503 with respect to wall dimensions. Could you give me the width of all 6 walls both existing and new? The length is critical for new wireways and conduit.
Answer The following are the measurements for the new power stands:
(N) Power Stand H1 = 11’-0” and is referenced by S-101, detail 5.
(N) North Power Stand N4 = 10’-0” and is referenced by S-101, detail 4.
(N) North Power Stand N5 = 10’-0” and is referenced by S-101, detail 4
2 Detail 2 shows the Cable Tray pedestal. There appear to be two 36” anchor bolts. What size are the bolts?
Answer Please refer to Sheet E-001, General Note 6.
This notes places the responsibility for the design of the electrical equipment and raceway supports on the contractor. The diameter of the anchor bolts will be driven by the type of cable tray selected and how the contractor chooses to support the system, which will require providing the proper calculations that indicate meeting the Oregon Structural Specialty Code.
3 Is there a post shown on top of the pedestal? Please clarify this detail.
Answer Please refer to Sheet E-001, General Note 6.
This notes places the responsibility for the design of the electrical equipment and raceway supports on the contractor. The diameter of the anchor bolts will be driven by the type of cable tray selected and how the contractor chooses to support the system, which will require providing the proper calculations that indicate meeting the Oregon Structural Specialty Code.