REQUEST_FOR_INFORMATIO1.docx
DOCX document 13 KB Posted
- Attached to
- CLEAN ROOM CONSTRUCTION Federal contract opportunity
- Solicitation number
- W912JA-17-B-0001
About this file
Q&A
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| ADDENDUM__1.pdf | ||
| Pre-Bid_Conference.ppt | PPT presentation | |
| W912JA-17-B-0001-0003.pdf | ||
| Site_Visit_Roster.pdf | ||
| W912JA-17-B-0001-0003_SF30.pdf | ||
| Q&A_1.pdf | ||
| W912JA-17-B-0001-0002.pdf | ||
| FAKZ_162004_-_100__SPECS.pdf | ||
| W912JA-17-B-0001.pdf | ||
| W912JA-17-B-0001-0001.pdf | ||
| FAKZ_162004_-_100__DRAWINGS.pdf | ||
| W912JA-17-B-0001-0001_SF30.pdf |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REQUEST FOR INFORMATION: DATE 11 JULY 2017
1. Please confirm laydown area, dumpster location as well as location to dispense concrete from truck.
Answer: Laydown area will be east of the building in the parking lot. Dumpster will be allowed next to the building. Concrete trucks can access via the flight line (aircraft ramp) with prior coordination to ensure no conflict with aircraft movements.
1. Is the electrical outlet at the OFOI folding table surface mounted?
Answer: The electrical outlet at the OFOI folding table is intended to be surface mounted.
1. Please clarify detail 6-A2.1 & 7-A2.1. Is the top course of the CMU low wall a solid 2” unit?
Answers: The intent is two full 8" courses of CMU. The full 8" top course block face will remain, and the back of the block is notched to receive the wood framing supporting the bench.
1. Do existing CMU walls, door and frame receive new paint?
Answers: All existing walls, doors, and frames are to receive new paint to match existing. See attached Addendum No. 1 for clarification.