Questions and Answers.pdf
PDF 48 KB Posted
- Attached to
- Electric Ground Power Unit
- Solicitation number
- W912J6-22-Q-0005
- Issued by
-
Department of the Army National Guard
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Salient Characteristics_Electric Ground Power Unit.pdf | ||
| 889 certification.pdf | ||
| Full text provisions and clauses.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions and Answers
1. What are the makes and models of all aircraft the unit will be used with?
a. MBB-BK117 C2-E UH-72A Lakota
2. Are you looking for start power, continuous power or a combination of both?
a. We are looking for both continuous power and starting power if need.
3. If start power, how many starts per day are required across the fleet?
a. No set amount of starts are required. We would like to have a contingency in the event battery voltage in inadequate for start operations.
4. If continuous power is required, what systems will be run and for how long?
a. Continuous power would supply our VEMD (Vehicular Engine Maintenance Display), CPDS (Caution Display Screen), AVDU (utility screen), MX Turret Ball for troubleshooting and maintenance
5. What main supply do you have available (Building)?
a. Within our building we have typical 120V wall plug, 100 amp 250VAC 3 phase plug and 20 amp 250VAC 3 phase plug
6. What is the 3-phase input voltage required (Aircraft)?
a. 28 V
File details come from the government source that posted it. Updated .