A22_W912HZ-15-T-0004.pdf
PDF 342 KB Posted
- Attached to
- Fire protection (fire sprinkler) maintenance
- Solicitation number
- W912HZ-15-T-0004
About this file
Solicitation for fire protection (fire sprinkler) maintenance.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Past_Performance_Questionnaire.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SEE ADDENDUM
(No Collect Calls)
W912HZ-15-T-0004 01-Sep-2015
b. TELEPHONE NUMBER
601-634-5322
8. OFFER DUE DATE/LOCAL TIME
04:00 PM 16 Sep 2015
5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 2/2012)
Prescribed by GSA – FAR (48 CFR) 53.212
(TYPE OR PRINT)
(SIGNATURE OF CONTRACTING OFFICER)
ADDENDA ARE
26. TOTAL AWARD AMOUNT (For Gov t. Use Only )
23.
CODE 10. THIS ACQUISITION IS
SUCH ADDRESS IN OFFER
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT
BELOW IS CHECKED
TELEPHONE NO.
W912HZ9. ISSUED BY
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME
DAVID S HUMPHREYS
2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER
(TYPE OR PRINT)
30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA
0 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.
25. ACCOUNTING AND APPROPRIATION DATA
1. REQUISITION NUMBER
20.
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
ARE NOT ATTACHED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
. YOUR OFFER ON SOLICITATION
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
% FOR:SET ASIDE:UNRESTRICTED ORX
SMALL BUSINESS
WOMEN-OWNED SMALL
BUSINESS (WOSB)
17a.CONTRACTOR/ CODE FACILITY
OFFEROR CODE
ERDC CONTRACTING OFFICE
3909 HALLS FERRY ROAD
VICKSBURG MS 39180-6199
18a. PAYMENT WILL BE MADE BY CODE
RATED ORDER UNDER
DPAS (15 CFR 700)
13a. THIS CONTRACT IS A
13b. RATING
CODE15. DELIVER TO CODE 16. ADMINISTERED BY
SEE SCHEDULE
12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
14. METHOD OF SOLICITATION
RFQ IFB RFPX
FAX:
TEL: SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
8(A)
HUBZONE SMALL
BUSINESS
ECONOMICALLY DISADVANTAGED
WOMEN-OWNED SMALL BUSINESS
(EDWOSB)
SIZE STANDARD:
$15,000,000.00
NAICS:
238220
X
OFFER DATED
29. AWARD OF CONTRACT: REF.
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
EMAIL:
TEL:
31c. DATE SIGNED
SEE SCHEDULE
SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT
24.22.21.19.
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
(CONTINUED)
PAGE 2 OF83
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
37. CHECK NUMBER
FINALPARTIALCOMPLETE
36. PAYMENT35. AMOUNT VERIFIED
CORRECT FOR
34. VOUCHER NUMBER
FINAL
33. SHIP NUMBER
PARTIAL
38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE
42a. RECEIVED BY (Print)
42b. RECEIVED AT (Location)
42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS
STANDARD FORM 1449 (REV. 2/2012) BACK
Prescribed by GSA – FAR (48 CFR) 53.212
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
SEE SCHEDULE
20.
SCHEDULE OF SUPPLIES/ SERVICES
21.
QUANTITY UNIT
22. 23.
UNIT PRICE
24.
AMOUNT
19.
ITEM NO.
W912HZ-15-T-0004
Section SF 1449 - CONTINUATION SHEET
INSTRUCTIONS
Section B Supplies/ services and prices NOTE: Award will be made as a whole to one offeror. All services shall be in accordance with the attached Performance Work Statement.
BIDDING SCHEDULE
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 FFP 12 Months $___________ $_____________
BASE YEAR
Preventive maintenance in accordance with the Performance Work Statement FOB: Destination
0002 COST 1 Lump Sum $3,500.00
BASE YEAR
Service calls in accordance with the Performance Work Statement FOB: Destination
Loaded labor rates for service calls:
Regular rate - $________ Overtime rate - $________ Double time rate - $________
0003 COST 1 Lump Sum $3,500.00
BASE YEAR
Service call parts reimbursement in accordance with the Performance Work Statement FOB: Destination
Markup percentage for each purchase Percentage ________%
TOTAL BASE YEAR $_______________
1001 FFP 12 Months $___________ $_____________
OPTION YEAR 1
Preventive maintenance in accordance
1002 COST 1 Lump Sum $3,500.00
OPTION YEAR 1
Service calls in accordance
Loaded labor rates for service calls:
Regular rate - $________
1003 COST 1 Lump Sum $3,500.00
OPTION YEAR 1
Service call parts reimbursement in accordance with the Performance Work Statement FOB: Destination
TOTAL OPTION YEAR 1 $_______________
2001 FFP 12 Months $____________ $____________
OPTION YEAR 2
Preventive maintenance in accordance
2002 COST 1 Lump Sum $3,500.00
OPTION YEAR 2
Service calls in accordance with the Performance Work Statement FOB: Destination
Loaded labor rates for service calls:
Regular rate - $________
2003 COST 1 Lump Sum $3,500.00
OPTION YEAR 2
Service call parts reimbursement in accordance with the Performance Work Statement FOB: Destination
TOTAL OPTION YEAR 2 $_______________
3001 FFP 12 Months $____________ $____________
OPTION YEAR 3
Preventive maintenance in accordance
3002 COST 1 Lump Sum $3,500.00
OPTION YEAR 3
Service calls in accordance with the Performance Work Statement FOB: Destination
Loaded labor rates for service calls:
Regular rate - $________
3003 COST 1 Lump Sum $3,500.00
OPTION YEAR 3
Service call parts reimbursement in accordance with the Performance Work Statement FOB: Destination
TOTAL OPTION YEAR 3 $_______________
4001 FFP 12 Months $___________ $_____________
OPTION YEAR 4
Preventive maintenance in accordance
4002 COST 1 Lump Sum $3,500.00
OPTION YEAR 4
Service calls in accordance with the Performance Work Statement FOB: Destination
Loaded labor rates for service calls:
Regular rate - $________
4003 COST 1 Lump Sum $3,500.00
OPTION YEAR 4
Service call parts reimbursement in accordance with the Performance Work Statement FOB: Destination
TOTAL OPTION YEAR 4 $_______________
TOTAL BASE YEAR PLUS ALL OPTION YEARS $_______________
GENERAL INFORMATION
NOTE: Specifications and any amendments, which may be issued to this solicitation, may be obtained from the Federal Business Opportunities (FedBizOpps) Web Page at http://www.fedbizopps.gov/
1. Please submit all proposals in response to this RFQ on or before 16 September 2015 at 4:00 Central time. Proposals are to be submitted as described in Section L, Instructions to Offerors/ Bidders.
2. DELIVERY FOB: DESTINATION
(See delivery location in specifications)
3. Payment Terms:_______________
4. REGISTERED ON SAM.GOV?
YES NO
NOTE: No. 4 is very important (See Clause 52.204-99)! If you are not registered on SAM, an award CANNOT be made to your company. You may register electronically at https://www.sam.gov. Registering electronically will expedite the registration process.
5. DUN & BRADSTREET NUMBER: ________________
6. CAGE CODE: ________________
7. COMPLETE APPLICABLE INFORMATION ON THE FRONT OF THIS FORM (STANDARD FORM
1449), THE BID SCHEDULE, ATTACHMENT A, AND THE ATTACHED REPRESENTATION AND
CERTIFICATIONS INCLUDING 52.212-3, OFFEROR REPRESENTATIONS AND CERTIFICATIONS
– COMMERCIAL ITEMS (JAN 2005). SEE SECTION L FOR ADDITIONAL REQUIREMENTS.
PLEASE PROVIDE THE FOLLOWING INFORMATION:
a) PHONE NUMBER: _________________
b) FAX NUMBER: __________________
c) E-MAIL ADDRESS: ________________
d) PAYMENT ADDRESS IF DIFFERENT FROM MAILING ADDRESS:
e) POINT OF CONTACT: ______________________
GOVERNMENT CONTRACTING POINT OF CONTACT:
David S. Humphreys
PHONE: (601) 634-5322
EMAIL: david.s.humphreys@usace.army.mil
PERFORMANCE WORK STATEMENT
Performance Work Statement
For Maintenance of Water Based Fire Protection Systems Directorate of Public Works
Engineer Research and Development Center US Army Corps of Engineers
Section C
1.0 Introduction
The U.S. Army Engineer Research and Development Center (ERDC) is one of the most diverse engineering and scientific research organizations in the world. ERDC conducts research and development in support of the Soldier, military installations, and the Corps of Engineers' civil works mission, as well as for other federal agencies, state and municipal authorities, and with U.S. industries through innovative work agreements. ERDC has a staff of approximately 2,500 federal employees and contractors, and an annual research program exceeding $1.6 billion in FY11. ERDC has unique world-class equipment and facilities, ranging from the world’s fastest supercomputers to one-of-a-kind physical models. ERDC hosts one of six Department of Defense High Performance Computing Centers. The center's supercomputers are some of the most powerful and fastest in the world. Other unique and world-class facilities include the world’s most powerful centrifuge, blast effects facilities, physical models of river and coastal projects, endangered species laboratories, heavy vehicle simulators, hazardous waste research laboratories, frost and ice engineering facilities, an earthquake simulator, and an 1,800-foot coastal research pier.
The ERDC Directorate of Public Works (DPW) is responsible for providing direct support to each of the ERDC laboratories in the form of engineering services, model fabrication and construction, and production of custom built research components and equipment. The DPW is also responsible for the overall ERDC facilities and provides master planning, minor construction and operation and maintenance services.
1.1 Purpose and Scope.
This performance work statement (PWS) sets forth the requirements for the contractor to provide inspection, testing and maintenance of the water based fire protection systems for the systems at the ERDC, Vicksburg, MS. Campus. The Vicksburg Campus is located at 3909 Halls Ferry Road, in Vicksburg, Mississippi, approximately two miles south of Interstate 20 and consists of approximately 80 Buildings, 5 trailers and 6 residential quarters situated on approximately 800 acres.
The purpose is to maintain the water based fire protection systems such that they are functioning properly and in accordance with the manufacture’s specifications and the latest version of the DoD Unified Facility Criteria (UFC) for Fire Protection Systems. UFC Technical Publication, UFC 3- 601-02, Operation and Maintenance: Inspection, Testing and Maintenance of Fire Protection Systems can be found at http://dod.wbdg.org/. All of the ERDC water based fire protection systems are currently in working condition and operating properly.
During the 5 year period of performance of this contract the government may add or remove water based fire protection systems to/from the systems that the contractor is responsible for maintaining.
Additions may be due to the construction or acquisition of new buildings, facilities or equipment;
removals may be due to the replacement or obsolescence of existing buildings, facilities or equipment. In the case of adding equipment, the Contractor may request an equitable adjustment to incorporate the new equipment into the Contractor’s maintenance service. Likewise, an equitable adjustment shall be due the government for equipment that no longer requires maintenance due to obsolescence or other reasons.
2.0 Contractor Personnel.
2.1 General. All Contractor personnel shall be able to read, write, speak and understand English and shall possess good written and verbal communications skills. In general, the contractor shall provide trained and experienced service technicians with recent and relevant experience with the types of systems located at ERDC and to provide quality services in accordance with manufacture’s specifications and common industry standards.
2.2 Specific Qualifications. The Contractor’s personnel shall be trained and qualified in accordance with the applicable requirements of UFC 3-601-02, paragraph 1-8, Personnel Qualifications regarding inspection, testing and maintenance of water based fire protection systems.
2.3 Past Performance. See attached Past Performance Questionnaire.
2.4 Pre-work Conference. Prior to the initiation of any work under this contract, the contractor shall meet with the COR at a time, date and location established by the COR for the purpose of coordinating the initiation of work.
3.0 Description of Services. The contractor shall provide all management, quality control, labor, supervision, parts, materials, tools, equipment, supplies, transportation and other services necessary for the inspection, testing, maintenance and repair of the water based fire protection systems at ERDC, Vicksburg, MS campus. The contractor shall inspect, test, maintain and clean the systems to determine whether they are in service and in satisfactory operating condition in accordance with UFC 3-601-2 Standards and accomplish any minor or major repairs.
The contractor shall, without additional expense to the Government, be responsible for obtaining any and all necessary licenses and permits and shall comply with any applicable safety and health requirements by Federal, State and Local laws, codes or ordinances in connection with performance of this contract.
3.1 Perform all Periodic Inspections, Testing and Maintenance on all Water Based Fire Protection Systems in accordance with UFC 3-601-2 with a frequency of 5 years or less.
The contractor shall inspect, test and maintain the water based fire protection systems located in ERDC buildings and identified in paragraph 3.2 in accordance with UFC 3-601-02, Operation and Maintenance: Inspection, Testing, and Maintenance of Fire Protection Systems. The contractor shall perform all periodic inspection, testing, and maintenance on all items in UFC 3-601-02, Table 2-2 (Wet Pipe Sprinkler Systems), Table 2-3 (Dry Pipe Automatic Sprinkler Systems) and Table 2-13 (Standpipe Systems) with a frequency of 5 years or less and provide major and minor repairs. Minor repairs are repairing or replacing automatic heads (up to 3 per system per year), tamper switches, water flow switches, pressure switches and drain valves. These are considered minor repairs and the price shall be included as part of the fixed price annual maintenance and shall not be billed as a separate repair item. Major repairs include, but are not limited to, the main riser, branch lines, trim and fittings, fire hose valves, back flow assemblies and dry pipes. Major repairs shall be accomplished in accordance with paragraph 4 below.
3.2 ERDC Water Based Fire Protection Systems
Type Location Number of Heads Wet and Dry 1006 445 Wet 3200 215 Wet and Dry 3270 895 Dry 3299 438 Standpipe 3396 N/A Wet 6001 400 Wet 6008 137 Wet 8000 306 Wet and Dry 8000 Annex 332 Wet and Dry 8000 Addition 681
3.2 Services Hours. All contractor services shall be performed between the hours of 8:00 AM and 5:00 PM Monday through Friday, excluding federal holidays.
3.3 Schedule. The contractor shall provide a proposed annual schedule with his initial proposal for completing the annual and five year inspection, testing and maintenance in accordance with paragraph 3.1. The items designated for five year intervals shall be scheduled in the first (base) year.
The schedule shall be approved by the COR prior to commencement of any services. Any subsequent changes require prior approval by the COR.
3.4 Inspection, Testing and Maintenance Report. The contractor shall provide a sample report with his initial proposal that documents the inspection, testing and maintenance as required in paragraph 3.1. The report format and contents shall be approved by the COR prior to commencement of any services. Any subsequent changes require prior approval by the COR.
3.5 Repair Response. The contractor shall respond within 2 working days of notification by the government or discovery of the requirement for repairs.
4.0 Repairs
4.1 All repairs shall be performed in accordance with UFC 3-601-02, standard industry practices, equipment manufacture’s recommendations and applicable standards (National Fire Protection Association, National Electric Code, Standard Plumbing Code, etc.) It is noted that repairs shall include both services that require labor only and services that require both labor and parts.
4.2 For repairs that are billed separately (i.e., other than minor repairs that are included in the fixed price maintenance) the Contractor shall not perform the service or procure any parts without prior COR approval.
4.3 All replacement parts and components shall be new and from the original equipment manufacturer where available. Where not available, parts and components shall meet or exceed the original equipment manufacture’s specifications. The use of any part that is not new (i.e. refurbished) shall require COR approval. All repair work shall be promptly and fully completed such that all components have been reassembled as originally designed, whether cosmetic or functional. Repair work shall be of high quality so as to minimize or eliminate call backs for the same problem.
4.4 Any equipment requiring removal from ERDC for repair shall require prior written approval from the COR.
4.5 The Contractor shall invoice for any repairs at the end of the month performed using the Contract Line Item Numbers for Labor and Parts. No other charges, including trip charges, will be reimbursed. The Contractor shall only invoice and be reimbursed for the actual cost of parts plus the contract markup.
4.6 The cost of special lifting equipment required for repairs or installation is considered part of the costs of the part or equipment.
5.0 Warranties.
The Contractor shall provide a warranty for parts and components to the extent a warranty is provided by the OEM/supplier. The contractor will not be responsible for warranting material or equipment that is government furnished.
6.0 Clean-up
The Contractor shall maintain areas serviced and mechanical rooms in a clean and orderly fashion and free of trash and debris.
All residues shall be disposed of off-site; Any spills shall be reported and cleaned up in accordance with EPA regulations.
The Contractor shall comply with all applicable laws and regulations that pertain to or govern any aspect of water based fire protection systems.
7.0 Safety
The Contractor shall comply with US Army Corps of Engineers EM 385-1-1 Safety and Health Requirements Manual. This manual is distributed in electronic format on the internet at the HQUSACE Publication Library website located at http://www.usace.army.mil/publications/eng-manuals/em.htm. The Contractor shall strictly comply with this manual as it relates to activities under this contract and also routinely discuss applicable provisions of this manual with all employees.
8.0 Reporting
8.1 Inspection, Testing and Maintenance Report. The Contractor shall submit this report of the completed work to the COR within 15 days of completion. See paragraph 3.4 for report format and contents. The Report shall be provided electronically in Microsoft Excel.
8.2 Repairs. The Contractor shall submit a Monthly summary of all repairs for the month being invoiced to the COR. For each repair, the report shall include the building and equipment identification, date of service, labor and materials, brief description of work and any applicable comments as to conditions. The report shall be provided electronically in Microsoft Excel. The Report content and format shall be approved by the COR prior to the due date of the first report.
8.3 Invoices. The contractor shall provide the government with an itemized invoice that list the contract line item number, description of services and/or supplies and cost. All invoices shall be submitted electronically.
8.4 Performance Evaluation. The contractor’s performance of services will be evaluated quarterly (if services are performed in that quarter) with an annual evaluation being completed for entry into CPAR. The criteria used for the annual evaluation will be the performance metrics as described in the Performance Metrics below or other metrics included in individual task orders. If the contractor receives an overall composite rating of Unsatisfactory, then the contractor shall submit a corrective action plan to the COR. If the corrective action taken does not cure the unsatisfactory rating the Government may terminate this task order/contract. A Quality Assurance Surveillance Plan (QASP) will used to evaluate performance on all task order/contracts.
Performance evaluations shall be done annually on each task within 15 days of the end of the year by the government point of contact. Performance evaluations may also be done as considered necessary throughout the duration of a task. The contractor shall initiate the required annual evaluations and provide the government POC the COR furnished electronic evaluation form in MS Word for completion. The COR will review and submit the completed form to the contractor. The contractor shall have 30 days in which to respond. The COR will consider any comments provided by the contractor and attach a copy to the evaluation. The evaluations will be a major factor in determining if the government exercises any option periods.
8.5 Performance Metrics. The following metrics will be employed to monitor and report the contractor’s performance on this contract.
PERFORMANCE REQUIREMENTS MATRIX
Requirement Performance Objectives
Performance Threshold
PWS Method of Surveillance
Performance Standard
Successful Inspection, Testing and Maintenance
Inspection, Testing and Maintenance completed in accordance with UFC 3-601-02
3.1 Annual/
Monthly Inspection
95% IAW UFC
Timely Inspection, Testing and Maintenance
Inspection, Testing and Maintenance completed in accordance with Schedule
3.3 Annual/
Monthly Inspection
100% Monitored
Repair Response Time
Contractor responds within 2 working days of notification or discovery
3.5 Monthly
Inspection and Customer complaints
95% within time frames
Repair of Equipment
Repairs completed in accordance with UFC 3-601-02, applicable industry standards and manufacturers recommendations
4.1 Monthly
Inspection and Customer complaints
95% Timely and IAW PWS
Reports Submission of complete and accurate Reports IAW PWS
8.1-8.3 Monthly Inspection
99% Complete and Accurate
Customer satisfaction
Client Satisfaction Survey Random sampling and Customer complaints
95% Resolution (No unresolved complaints)
Security Requirements
Performance in accordance with PWS Security Requirements
10.0 Report to COR 90%
9.0 Other Contractor Responsibilities.
9.1 The Contractor shall notify the Government when it is more economical to engage in a timely replacement program for equipment when the useful life cannot reasonably be prolonged of trouble free operations.
9.2 The Contractor is responsible for Quality Control (QC) so as to insure high quality, efficient and economical delivery of services.
10.0 Security Requirements.
10.1 Access and General Protection/Security Policy and Procedures:
The contractor and all associated subcontractors’ employees shall comply with applicable ERDC installation, access and local security policies and procedures. Policies and procedures will be provided by the ERDC Security Office. The contractor workforce must comply with all personal identity verification requirements as directed by DoD, HQDA, and local policies. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes.
10.2 Suitability Investigation Requirements. Contractor and employees of the contractor are required to be citizens of the United States and must maintain such status during the duration of this contract. Each of the Contractor’s employees is required to submit investigative paperwork for a National Agency Check with Written Inquiries (NACI) for a Suitability Investigation. The contractor shall ensure that each contractor employee coordinates with the Government Security Office and submits appropriate investigative forms and the required information for the Suitability Investigation prior to beginning work.
10.3 Onsite-Access. The Government has the right to restrict on-site access to any contractor personnel who is identified as a potential threat to the health, safety, security, or operational mission of the Corps of Engineers.
10.4 Access to Certain Restricted Areas. Certain facilities, buildings or rooms are restricted to only individuals with proper security clearance. When the Contractor employees are required to perform work in these sensitive areas, they shall be escorted at all time by an authorized government employee. Other sensitive areas may require only pre-clearance of one or more particular Contractor employees.
10.5 Access and General Protection/Security Policy and Procedures. This standard language text is for contractor employees with an area of performance within an Army controlled installation, facility or area. Per Homeland Security Presidential Directive-12 (HSPD-12), Common Access Cards (CAC) are required for contractors working six months or more; background investigations are required prior to CAC credential issuance. Uncleared contractors working less than six months must submit to a background check, via the appropriate Provost Marshal Office, Director of Emergency Services or Security Office, and must abide by applicable identification and access control requirements. Proposed language: "All contractor and all associated sub-contractors employees shall comply with applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative). The contractor shall also provide all information required for background checks or background investigation and to meet installation/facility access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any installation or facility change, the Government may require changes in contractor security matters or processes.
10.6 Will be escorted in areas where they may be exposed to classified and/or sensitive materials and/or sensitive or restricted areas. The contractor will coordinate with the COR and/or the facility security office for access when required. (Use when security clearances are not required, i.e. facility repair or construction). Proposed language: "All contract employees, including subcontractor employees who are not in possession of the appropriate security clearance or access privileges, will be escorted in areas where they may be exposed to classified and/or sensitive materials and/or sensitive or restricted areas.
10.7 Pre-screen candidates using E-Verify Program. Proposed language: "The Contractor must pre-screen Candidates using the E-verify Program (http://www.uscis.gov/e-verify) website to meet the established employment eligibility requirements. The Vendor must ensure that the Candidate has two valid forms of Government issued identification prior to enrollment to ensure the correct information is entered into the E-verify system. An initial list of verified/eligible Candidates must be provided to the COR no later than 3 business days after the initial contract award." *When contracts are with individuals, the individuals will be required to complete a Form I-9, Employment Eligibility Verification, with the designated Government representative. This Form will be provided to the Contracting Officer and shall become part of the official contract file.
11. Government Responsibilities.
11.1 The government will employ a Quality Assurance Surveillance Program (QASP) to insure that the Contractor is performing in accordance with requirements of this contract.
11.2 Record Drawing, Manufacturer’s Data and Catalogs. All existing record drawings, manufacturer’s data and catalogs for the water based fire protection systems of the subject systems will be made available to the Contractor upon request as required to perform the contract work.
All records furnished by the Government to the Contractor shall be returned to the Government as soon as the need for these records ceases to exist or at the end of the contract period.
11.3 The Government will make available to the Contractor, from existing outlets and supplies, all power and water required in the performance of the Contractor’s work. Metering of the amount of power, gas, and water used by the Contractor shall not be required and the government shall be responsible for paying for these utilities.
Contracting Officer's Representative. The Contractor will be notified in writing of the Contracting Officer's Representative (COR) and the authority which the COR will exercise under the terms of this contract. The COR will be the Government's contact person for the Contractor in all matters relating to this contract.
Contractor Representative. The Contracting Officer shall be notified in writing of the name, address and telephone number of the person who will represent the Contractor. The notification shall also state the authority which the Representative can exercise under the terms of this contract.
Invoice Submission and Payment. An original invoice for payment under this contract shall be submitted to (and payment will be made by):
USACE Finance Center (U4) Attn:
CEFC-AO-P
5722 Integrity Drive Millington, TN 38054-5005 CEFC-payments@usace.army.mil
A copy of each invoice shall be submitted to:
U.S. Army Engineer Research and Development Center Department of Public Works 3909 Halls Ferry Road Vicksburg, MS 39180
SPECIAL CONTRACT REQUIREMENTS
SITE VISIT
A site visit/ pre-proposal conference is scheduled to take place on 9 September 2015 at 9:30 a.m. Central Time at the Engineer Research and Development Center (ERDC), 3909 Halls Ferry Road, Vicksburg, MS 39180 in the conference room of the Department of Public Works (DPW) located in building 6015.
Offerors may not visit the Government site at their own convenience for site inspection.
Also, during all site visits, offerors shall not solicit advice or assistance from any Government or Contractor employee pertaining to quote preparation. Questions pertaining to the requirement shall be submitted in writing to David S. Humphreys via email at david.s.humphreys@usace.army.mil or in person once the site visit is complete.
No questions will be answered during the site visit.
All vendors who want to attend the site visit are REQUIRED to submit the following information to David S. Humphreys via email at david.s.humphreys@usace.army.mil NO LATER THAN 12:00 p.m. Tuesday, 8 September 2015 in order to be allowed on base and accompanied through the site:
1. Company Name and Address
2. First and last name, email, and phone number of all employees attending site visit
3. Total number of employees attending site visit
Contractor's Points of Contact. The Contractor shall, prior to beginning services under this contract and thereafter on a continuing basis, keep the Government informed of the telephone numbers where both he/she and his/her authorized representative (if one is appointed) may be contacted.
Service Contract Act. Offerors are advised that this procurement is subject to the requirements of the Service Contract Act, as amended, and attention is requested to the obligations of the Contractor under Section 4 (c) of the amended Service Contract Act. Any questions regarding these obligations shall be addressed to the Department of Labor.
Damage to Property or Injury to Persons. By execution of this contract, the Contractor agrees to hold and save the United States harmless from all claims for damages to property or injuries to persons which may arise from or be incidental to the performance of work under this contract, or for damages to the property of the contractor, or for damages to the property or injuries to the person of the Contractor's officers, agents, employees, or subcontractors, and the United States shall not be responsible for such damages or injuries.
Wage Rates. Professionals are exempt from Service Contract Act requirements (FAR Clause 52.222-41 and 52.222-42) and the subsequent applicable wage rates. However, there may be some categories of employees that the successful Contractor will employ in performance of this contract that require payment of a certain wage as required by the Department of Labor. Since it is not known during the solicitation process in which state the successful Contractor will be located nor all the labor categories a successful Contractor will use, each Offeror is required to submit with their proposal a list of labor categories that might be affected by this contract. Once the successful Contractor is selected and the labor categories and particular state are identified, a Department of Labor Wage Rate will be made a part of the contract award.
PAST PERFORMANCE QUESTIONNAIRE
NAVFAC/USACE PAST PERFORMANCE QUESTIONNAIRE (Form PPQ-0) CONTRACT INFORMATION (Contractor to complete Blocks 1-4)
1. Contractor Information Firm Name: CAGE Code:
Address: DUNs Number:
Phone Number:
Email Address:
Point of Contact: Contact Phone Number:
2. Work Performed as: Prime Contractor Sub Contractor Joint Venture Other (Explain) Percent of project work performed:
If subcontractor, who was the prime (Name/Phone #):
3. Contract Information Contract Number:
Delivery/Task Order Number (if applicable):
Contract Type: Firm Fixed Price Cost Reimbursement Other (Please specify):
Contract Title:
Contract Location:
Award Date (mm/dd/yy):
Contract Completion Date (mm/dd/yy):
Actual Completion Date (mm/dd/yy):
Explain Differences:
Original Contract Price (Award Amount):
Final Contract Price (to include all modifications, if applicable):
Explain Differences:
4. Project Description:
Complexity of Work High Med Routine How is this project relevant to project of submission? (Please provide details such as similar equipment, requirements, conditions, etc.)
CLIENT INFORMATION (Client to complete Blocks 5-8)
5. Client Information Name:
Title:
Phone Number:
Email Address:
6. Describe the client’s role in the project:
7. Date Questionnaire was completed (mm/dd/yy):
8. Client’s Signature:
NOTE: NAVFAC/USACE REQUESTS THAT THE CLIENT COMPLETES THIS QUESTIONNAIRE AND SUBMITS DIRECTLY BACK TO THE OFFEROR. THE OFFEROR WILL SUBMIT THE COMPLETED QUESTIONNAIRE TO USACE WITH THEIR PROPOSAL, AND MAY DUPLICATE THIS QUESTIONNAIRE FOR FUTURE SUBMISSION ON USACE SOLICITATIONS.
CLIENTS ARE HIGHLY ENCOURAGED TO SUBMIT QUESTIONNAIRES DIRECTLY TO THE OFFEROR. HOWEVER, QUESTIONNAIRES MAY BE SUBMITTED DIRECTLY TO USACE. PLEASE CONTACT THE OFFEROR FOR USACE POC INFORMATION. THE GOVERNMENT RESERVES THE RIGHT TO VERIFY ANY AND ALL INFORMATION ON THIS FORM.
ADJECTIVE RATINGS AND DEFINITIONS TO BE USED TO BEST REFLECT
YOUR EVALUATION OF THE CONTRACTOR’S PERFORMANCE
RATING DEFINITION NOTE
(E) Exceptional Performance meets contractual requirements and exceeds many to the Government/Owner’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with few minor problems for which corrective actions taken by the contractor was highly effective.
An Exceptional rating is appropriate when the Contractor successfully performed multiple significant events that were of benefit to the Government/Owner. A singular benefit, however, could be of such magnitude that it alone constitutes an Exceptional rating. Also, there should have been NO significant weaknesses identified.
(VG) Very Good Performance meets contractual requirements and exceeds some to the Government’s/Owner’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with some minor problems for which corrective actions taken by the contractor were effective.
A Very Good rating is appropriate when the Contractor successfully performed a significant event that was a benefit to the Government/Owner.
There should have been no significant weaknesses identified.
(S) Satisfactory Performance meets minimum contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory.
A Satisfactory rating is appropriate when there were only minor problems, or major problems that the contractor recovered from without impact to the contract. There should have been NO significant weaknesses identified. Per DOD policy, a fundamental principle of assigning ratings is that contractors will not be assessed a rating lower than Satisfactory solely for not performing beyond the requirements of the contract.
(M) Marginal Performance does not meet some contractual requirements.
The contractual performance of the element or sub-element being assessed reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor's proposed actions appear only marginally effective or were not fully implemented.
A Marginal is appropriate when a significant event occurred that the contractor had trouble overcoming which impacted the Government/Owner.
(U) Unsatisfactory Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element contains serious problem(s) for which the contractor's corrective actions appear or were ineffective.
An Unsatisfactory rating is appropriate when multiple significant events occurred that the contractor had trouble overcoming and which impacted the Government/Owner. A singular problem, however, could be of such serious magnitude that it alone constitutes an unsatisfactory rating.
(N) Not Applicable No information or did not apply to your contract Rating will be neither positive nor negative.
TO BE COMPLETED BY CLIENT
PLEASE CIRCLE THE ADJECTIVE RATING WHICH BEST REFLECTS
YOUR EVALUATION OF THE CONTRACTOR’S PERFORMANCE.
1. QUALITY:
a) Quality of technical data/report preparation efforts E VG S M U N
b) Ability to meet quality standards specified for technical performance E VG S M U N
c) Timeliness/effectiveness of contract problem resolution without extensive customer guidance E VG S M U N
d) Adequacy/effectiveness of quality control program and adherence to contract quality assurance requirements (without adverse effect on performance)
E VG S M U N
2. SCHEDULE/TIMELINESS OF PERFORMANCE:
a) Compliance with contract delivery/completion schedules including any significant intermediate milestones. (If liquidated damages were assessed or the schedule was not met, please address below)
E VG S M U N
b) Rate the contractor’s use of available resources to accomplish tasks identified in the contract E VG S M U N
3. CUSTOMER SATISFACTION:
a) To what extent were the end users satisfied with the project? E VG S M U N
b) Contractor was reasonable and cooperative in dealing with your staff (including the ability to successfully resolve disagreements/disputes; responsiveness to administrative reports, businesslike and communication)
E VG S M U N
c) To what extent was the contractor cooperative, businesslike, and concerned with the interests of the customer?
E VG S M U N
d) Overall customer satisfaction E VG S M U N
4. MANAGEMENT/ PERSONNEL/LABOR
a) Effectiveness of on-site management, including management of subcontractors, suppliers, materials, and/or labor force?
E VG S M U N
b) Ability to hire, apply, and retain a qualified workforce to this effort E VG S M U N
c) Government Property Control E VG S M U N
d) Knowledge/expertise demonstrated by contractor personnel E VG S M U N
e) Utilization of Small Business concerns E VG S M U N
f) Ability to simultaneously manage multiple projects with multiple disciplines E VG S M U N
g) Ability to assimilate and incorporate changes in requirements and/or priority, including planning, execution and response to Government changes
E VG S M U N
h) Effectiveness of overall management (including ability to effectively lead, manage and control the program)
E VG S M U N
5. COST/FINANCIAL MANAGEMENT
a) Ability to meet the terms and conditions within the contractually agreed price(s)? E VG S M U N
b) Contractor proposed innovative alternative methods/processes that reduced cost, improved maintainability or other factors that benefited the client
E VG S M U N
c) If this is/was a Government cost type contract, please rate the Contractor’s timeliness and accuracy in submitting monthly invoices with appropriate back-up documentation, monthly status reports/budget variance reports, compliance with established budgets and avoidance of significant and/or unexplained variances (under runs or overruns)
E VG S M U N
d) Is the Contractor’s accounting system adequate for management and tracking of costs? If no, please explain in Remarks section.
Yes No
e) If this is/was a Government contract, has/was this contract been partially or completely terminated for default or convenience or are there any pending terminations? Indicate if show cause or cure notices were issued, or any default action in comment section below.
Yes No
f) Have there been any indications that the contractor has had any financial problems? If yes, please explain below.
Yes No
6. SAFETY/SECURITY
a) To what extent was the contractor able to maintain an environment of safety, adhere to its approved safety plan, and respond to safety issues? (Includes: following the users rules, regulations, and requirements regarding housekeeping, safety, correction of noted deficiencies, etc.)
E VG S M U N
b) Contractor complied with all security requirements for the project and personnel security requirements.
E VG S M U N
7. GENERAL
a) Ability to successfully respond to emergency and/or surge situations (including notifying COR, PM or Contracting Officer in a timely manner regarding urgent contractual issues).
E VG S M U N
b) Compliance with contractual terms/provisions (explain if specific issues) E VG S M U N
c) Would you hire or work with this firm again? (If no, please explain below) Yes No
d) In summary, provide an overall rating for the work performed by this contractor. E VG S M U N
Please provide responses to the questions above (if applicable) and/or additional remarks. Furthermore, please provide a brief narrative addressing specific strengths, weaknesses, deficiencies, or other comments which may assist our office in evaluating performance risk (please attach additional pages if necessary):
WAGE DETERMINATION
WD 05-2297 (Rev.-15) was first posted on www.wdol.gov on 12/30/2014
REGISTER OF WAGE DETERMINATIONS UNDER | U.S. DEPARTMENT OF LABOR
THE SERVICE CONTRACT ACT | EMPLOYMENT STANDARDS ADMINISTRATION
By direction of the Secretary of Labor | WAGE AND HOUR DIVISION
| WASHINGTON D.C. 20210
| Wage Determination No.: 2005-2297 Diane C. Koplewski Division of | Revision No.: 15 Director Wage Determinations| Date Of Revision: 12/22/2014 Note: Executive Order (EO) 13658 establishes an hourly minimum wage of $10.10 for 2015 that applies to all contracts subject to the Service Contract Act for which the solicitation is issued on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.10 (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract. The EO minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
State: Mississippi
Area: Mississippi Counties of Adams, Amite, Attala, Claiborne, Copiah, Covington, Franklin, Hinds, Holmes, Humphreys, Issaquena, Jefferson, Jefferson Davis, Lamar, Lawrence, Leake, Lincoln, Madison, Marion, Pike, Rankin, Scott, Sharkey, Simpson, Smith, Walthall, Warren, Wilkinson, Yazoo **Fringe Benefits Required Follow the Occupational Listing**
OCCUPATION CODE - TITLE FOOTNOTE RATE
01000 - Administrative Support And Clerical Occupations 01011 - Accounting Clerk I 13.16 01012 - Accounting Clerk II 14.77 01013 - Accounting Clerk III 16.68 01020 - Administrative Assistant 19.90 01040 - Court Reporter 17.17 01051 - Data Entry Operator I 11.23 01052 - Data Entry Operator II 12.26 01060 - Dispatcher, Motor Vehicle 15.93 01070 - Document Preparation Clerk 11.29 01090 - Duplicating Machine Operator 11.29 01111 - General Clerk I 10.84 01112 - General Clerk II 11.83 01113 - General Clerk III 13.28 01120 - Housing Referral Assistant 16.76 01141 - Messenger Courier 9.35 01191 - Order Clerk I 11.73 01192 - Order Clerk II 13.84 01261 - Personnel Assistant (Employment) I 14.80 01262 - Personnel Assistant (Employment) II 16.56 01263 - Personnel Assistant (Employment) III 18.47 01270 - Production Control Clerk 19.50 01280 - Receptionist 10.87 01290 - Rental Clerk 12.00 01300 - Scheduler, Maintenance 12.82 01311 - Secretary I 12.82
01312 - Secretary II 14.34 01313 - Secretary III 16.76 01320 - Service Order Dispatcher 13.96 01410 - Supply Technician 19.90 01420 - Survey Worker 12.43 01531 - Travel Clerk I 11.20 01532 - Travel Clerk II 11.80 01533 - Travel Clerk III 12.40 01611 - Word Processor I 12.29 01612 - Word Processor II 13.79 01613 - Word Processor III 15.43 05000 - Automotive Service Occupations 05005 - Automobile Body Repairer, Fiberglass 18.56 05010 - Automotive Electrician 17.13 05040 - Automotive Glass Installer 16.21 05070 - Automotive Worker 16.21 05110 - Mobile Equipment Servicer 14.24 05130 - Motor Equipment Metal Mechanic 18.03 05160 - Motor Equipment Metal Worker 16.21 05190 - Motor Vehicle Mechanic 17.35 05220 - Motor Vehicle Mechanic Helper 13.16 05250 - Motor Vehicle Upholstery Worker 15.14 05280 - Motor Vehicle Wrecker 16.21 05310 - Painter, Automotive 17.13 05340 - Radiator Repair Specialist 16.21 05370 - Tire Repairer 12.92 05400 - Transmission Repair Specialist 18.03 07000 - Food Preparation And Service Occupations 07010 - Baker 9.91 07041 - Cook I 8.59 07042 - Cook II 10.12 07070 - Dishwasher 7.53 07130 - Food Service Worker 7.77 07210 - Meat Cutter 12.48 07260 - Waiter/Waitress 7.56 09000 - Furniture Maintenance And Repair Occupations 09010 - Electrostatic Spray Painter 16.01 09040 - Furniture Handler 9.68 09080 - Furniture Refinisher 16.01 09090 - Furniture Refinisher Helper 11.79 09110 - Furniture Repairer, Minor 13.92 09130 - Upholsterer 16.01 11000 - General Services And Support Occupations 11030 - Cleaner, Vehicles 9.12 11060 - Elevator Operator 9.12 11090 - Gardener 14.95 11122 - Housekeeping Aide 9.36 11150 - Janitor 9.47 11210 - Laborer, Grounds Maintenance 10.19 11240 - Maid or Houseman 7.54 11260 - Pruner 8.96 11270 - Tractor Operator 13.53 11330 - Trail Maintenance Worker 10.19 11360 - Window Cleaner 10.71 12000 - Health Occupations 12010 - Ambulance Driver 12.04 12011 - Breath Alcohol Technician 15.48 12012 - Certified Occupational Therapist Assistant 18.83 12015 - Certified Physical Therapist Assistant 18.74 12020 - Dental Assistant 15.24 12025 - Dental Hygienist 30.04 12030 - EKG Technician 21.41 12035 - Electroneurodiagnostic Technologist 21.41 12040 - Emergency Medical Technician 12.04 12071 - Licensed Practical Nurse I 15.22 12072 - Licensed Practical Nurse II 17.03
12073 - Licensed Practical Nurse III 17.27 12100 - Medical Assistant 12.52 12130 - Medical Laboratory Technician 14.51 12160 - Medical Record Clerk 12.68 12190 - Medical Record Technician 14.18 12195 - Medical Transcriptionist 14.24 12210 - Nuclear Medicine Technologist 29.72 12221 - Nursing Assistant I 9.42 12222 - Nursing Assistant II 10.59 12223 - Nursing Assistant III 11.56 12224 - Nursing Assistant IV 12.97 12235 - Optical Dispenser 15.92 12236 - Optical Technician 14.62 12250 - Pharmacy Technician 13.41 12280 - Phlebotomist 13.84 12305 - Radiologic Technologist 22.41 12311 - Registered Nurse I 23.01 12312 - Registered Nurse II 28.15 12313 - Registered Nurse II, Specialist 28.15 12314 - Registered Nurse III 34.05 12315 - Registered Nurse III, Anesthetist 34.05 12316 - Registered Nurse IV 40.81 12317 - Scheduler (Drug and Alcohol Testing) 19.18 13000 - Information And Arts Occupations 13011 - Exhibits Specialist I 14.52 13012 - Exhibits Specialist II 17.99 13013 - Exhibits Specialist III 21.74 13041 - Illustrator I 14.52 13042 - Illustrator II 17.99 13043 - Illustrator III 21.74 13047 - Librarian 19.92 13050 - Library Aide/Clerk 10.39 13054 - Library Information Technology Systems 17.99 Administrator 13058 - Library Technician 12.56 13061 - Media Specialist I 12.98 13062 - Media Specialist II 14.52 13063 - Media Specialist III 16.19 13071 - Photographer I 13.18 13072 - Photographer II 14.74 13073 - Photographer III 18.27 13074 - Photographer IV 22.35 13075 - Photographer V 27.03 13110 - Video Teleconference Technician 15.48 14000 - Information Technology Occupations 14041 - Computer Operator I 16.58 14042 - Computer Operator II 18.55 14043 - Computer Operator III 21.14 14044 - Computer Operator IV 27.01 14045 - Computer Operator V 27.20 14071 - Computer Programmer I (see 1) 20.08 14072 - Computer Programmer II (see 1) 24.87 14073 - Computer Programmer III (see 1) 14074 - Computer Programmer IV (see 1) 14101 - Computer Systems Analyst I (see 1) 14102 - Computer Systems Analyst II (see 1) 14103 - Computer Systems Analyst III (see 1) 14150 - Peripheral Equipment Operator 16.58 14160 - Personal Computer Support Technician 27.01 15000 - Instructional Occupations 15010 - Aircrew Training Devices Instructor (Non-Rated) 28.72 15020 - Aircrew Training Devices Instructor (Rated)…