PERFORMANCE WORK STATEMENT
249th ENGINEER BATTALION (PRIME POWER)
POWER LINE DISTRIBUTION COURSE MODULES A THROUGH G
1.0 General Information
1.1 Description of services and introduction:
The U.S. Army Prime Power School (USAPPS) 661-12P Power Line Distribution Course
(PLDC) Additional Skill Identifier (ASI) U4 requires training curriculum materials and services to develop, train, validate, and sustain the operation of the PLDC program. The contractor shall provide the personnel, materials, and services as outlined in the statement of work for PLDC students, cadre, and instructional staff at the USAPPS, Fort Leonard
Wood Missouri. The number of classes and students trained per class are based on the training quotas validated during the Structure Manning Decision Review (SMDR) process and documented in the Army Training Requirements and Resources System
(ATRRS). Classes conducted annually can range from one to three classes, with four to twelve students per class, depending on resource and personnel availability.
1.2 Background:
The USAPPS provides industry standard technical training to Soldiers and Sailors to enable them to install, operate and maintain utility grade power production and distribution systems in support of unified land operation support missions worldwide.
The PLDC trains active duty and reserve Soldiers to meet the Army requirements to provide the knowledge and skills required to safely install, operate and maintain medium voltage electrical power distribution systems in support of Unified Land Operation missions worldwide while meeting current industry standards. This mission focus training prepares Soldiers to be safe, productive, and efficient technical specialists in a complex and dynamic operating environment.
Historically, the ASI U4 training was conducted at the U.S. Air Force Electrical Systems
Apprentice Course at Sheppard Air Force Base. Training of ASI U4 critical tasks were no longer supported due to curriculum changes in 2014. The new PLDC was created at
Fort Leonard Wood Missouri to support the mission requirements of the U4 personnel.
Personnel attending the U4 Course are required to be 12P Prime Power Production
Specialist qualified personnel. Military personnel may attend PLDC either in a temporary duty status or immediately upon graduation from the USAPPS.
This is the second contract of this course. The previous contract was awarded and established a foundation on which to continue constructing and refining PLDC. The previous contract performance period ended August 2015.
1.3 Objectives:
1.3.1 The contractor shall provide one qualified and industry certified instructor to teach the certification portions of G Module and to evaluate students for the purpose of certification.
Draf t
1.3.2 The contractor shall certify the current military instructors (train the trainer) and, on request, any new additional PLDC military instructors validating that they are teaching A through F Modules in accordance with industry standards.
1.3.3 The contractor shall provide annual training to current military instructors for skills enhancements and/or any annual industry required recertification.
1.3.4 The contractor shall instruct G Module and materials contained in the Program of
Instruction (POI) in a manner that the students can comprehend, practice and demonstrate a mastery of subject matter through homework, problem solving exercises, tests and/or practical hands on exercises.
1.3.5 Based off of the current Courses curriculum to include; lesson titles, slide decks, practical exercises, homework, and examinations the contractor shall develop workbooks for the blocks of instruction listed in Enclosure 1 for each instructor and student per class.
1.3.6 The contractor shall provide student qualifications and certifications upon completion of
Occupational Safety and Health Administration (OSHA) 10 Hour Safety Training for
Construction Safety and Health, National Safety Council Flagging, Qualified Climber, and Qualified Digger Derrick operations. All qualifications must be recognized by national and industry standards.
1.3.7 The contractor shall provide training yard drawings for each instructor and student per class, which shall consist of staking sheets and specification sheets.
1.4 Scope:
The US Army Prime Power School requires the course materials and certified industry training to conduct the Power Line Distribution course and certify Soldiers in the
Additional Skill Identifier U4. This includes at a minimum the student and instructor workbooks, training materials, contractor instructed training and certification for OSHA
10 Hour Safety Training for Construction Safety and Health, National Safety Council
Flagging, Qualified Climber evaluation and certificate of qualification, and Qualified
Digger Derrick industry certification in-line with the Army credentialing program. All qualifications shall be recognized by national industry standards. PLDC is programed for three (3), 40 training day classes per year with a minimum of four (4) and a maximum of twelve (12) students per class. PLDC cadre consist of three (3) active duty military instructors. The military instructors are responsible for all instruction and administration of the course material with the exclusion of the industry led training blocks of instruction.
1.5 Period of performance:
1.5.1 The period of performance for this contract will start on the effective date of award for a period of one (1) year and four (4) option years.
1.5.2 The government reserves the right to extend the terms of this contract at the prices set forth in accordance with the terms and conditions contained in clause 52.217-9 entitled, “Option to extend the terms of the contract”.
1.5.3 Each option year shall be awarded based on the continued needs of the government for the services outlined in this contract. The period of performance, class schedule, and schedule of deliverables for each option year shall be provided by the government to the contractor upon award of each option year.
1.6 General Work Information:
1.6.1 Quality Control (QC): The contractor shall develop and maintain an effective QC program to ensure services are performed in accordance with this PWS. The contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The contractor's QC program is the means to assure work complies with the requirement of the contract.
1.6.2 Quality Assurance (QA): The government shall evaluate the contractor's performance under this contract in accordance with the quality assurance surveillance plan. This plan is primarily focused on what the government must do to ensure the contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and the minimum acceptable defect rates.
1.6.3 Government remedies: The Contracting Officer (KO) shall follow Federal Acquisition
Requirement (FAR) 52.212-4, "Contract Terms and Conditions-Commercial Items" or
52.246-4, "Inspection of Services-Fixed Price" for a contractor's failure to perform satisfactory services or failure to correct non-conforming services.
1.6.4 Recognized holidays: The Prime Power School recognizes all federal holidays.
Contractor shall not be required to perform any services at the USAPPS on these holidays. A list of all observed federal holidays is available upon request approximately two months prior to the start of the fiscal year.
1.6.5 Hours of operation and place of performance: The contractor is responsible for conducting training at Building 12630 FLW 28, Fort Leonard Wood, Missouri between the hours of 0730 hours and 1630 hours during the contractor led instruction requirements of this PWS. Normal duty days are Monday through Friday except federal holidays or when the government facility is closed due to local or national emergencies, administrative closings, or similar government-directed facility closings. The contractor shall be required to conduct training to fulfill the requirements of the contractor led instruction portions of this PWS outside of normal duties days or times in the event of an unscheduled facility closing.
1.6.6 Security requirements: Indicate the level of security required, if necessary. If a
Department of Defense Form 254 [Contract Security Classification Specification] is required, the unit security monitor should initiate a DD 254 that will become an attachment to this PWS.
1.6.6.1 Credential Requirement: Contractor employees shall possess the credentials required to enter a military installation. This may require registering the vehicle with the visitor processing center and submitting to vehicle inspections at access control points. State or federal issued photo identification is required to gain access to Fort Leonard Wood. A security clearance is not required in the performance of this contract.
1.6.6.2 Physical security. The contractor shall be responsible for safeguarding all government property provided for contractor’s use. At the close of each work period, government facilities, equipment, and materials shall be secured.
1.6.6.3 Data and IT Security: The contractor must understand, secure and perform “Data and IT
Security”. The USAPPS shall provide all IT requirements to support training and security storage containers for course materials. The instructors are responsible for their action in use of the IT assets and the securing of storage containers. The shredding and destroying of course materials is the responsibility of the USAPPS.
1.6.6.4 Disclosure of Information: Contractor employees shall understand and secure information outlined in the “Disclosure of Information”. Information made available to the contractor by the Government for the performance or administration of this contract shall be used only for those purposes and shall not be used in any other way without the written agreement of the Contracting Officer. The contractor agrees to assume responsibility for protecting the confidentiality of Government records, which are not public information.
Each contractor or employee of the contractor to whom information may be made available or disclosed shall be notified in writing by the contractor that such information may be disclosed only for a purpose and to the extent authorized herein.
1.6.6.5 Pre-screen candidates using E-Verify Program: The contractor must pre-screen
Candidates using the E-Verify Program (http://www.uscis.gov/e-verify) website to meet the established employment eligibility requirements. The Vendor must ensure that the
Candidate has two valid forms of Government issued identification prior to enrollment to ensure the correct information is entered into the E-verify system. An initial list of verified/eligible Candidates must be provided to the COR no later than 3 business days after the initial contract award.
1.6.6.6 OPSEC Training: Per AR 530-1, (Operations Security) contractor employees must complete Level I OPSEC Training within 30 calendar days of contract award. All new contractor employees will complete Level I OPSEC Training within 30 calendar days of their reporting for duty. Additionally, all contractor employees must complete annual
OPSEC awareness training. The contractor shall submit certificates of completion for each affected contractor and subcontractor employee, to the COR or to the contracting officer (if a COR is not assigned), within 5 calendar days after completion of training.
OPSEC awareness training is available at the following websites:
https://www.iad.gov/ioss/ or https: www.cdse.edu/catalog/operations-security.html, or it can be provided by the RA OPSEC Officer in presentation form which will be documented via memorandum.
1.6.6.7 Access and General Protection/Security Policy and Procedures: All contractor and all associated sub-contractors employees shall comply with applicable installation, facility and area commander installation/facility access and local security policies and procedures
(provided by government representative). The contractor shall also provide all information required for background checks to meet installation/facility access requirements to be accomplished by installation Provost Marshal Office, Director of
Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204-9, Personal Identity
Draf t http://www.uscis.gov/e-verify https://www.iad.gov/ioss/ http://www.cdse.edu/catalog/operations-security.html
Verification of Contractor Personnel) as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any installation or facility change, the
Government may require changes in contractor security matters or processes.
2.0 Definitions and acronyms:
This section includes all acronyms, special terms and phrases used in the PWS.
2.1 Contracting Officer (KO): KO has authority to enter into, administer, or terminate contracts and make related determinations and findings. KO may bind the Government only to the extent of the authority delegated to them. KO shall receive from the appointing authority clear instructions in writing regarding the limits of their authority.
Information on the limits of the contracting officers’ authority shall be readily available to the public and agency personnel.
2.2 Contracting Officer’s Representative (COR): COR is and individual designated in accordance with subsection 201.602-2 of the Defense Federal Acquisitions Regulation
Supplement and authorized in writing by the KO to perform specific technical and administrative functions. A representative from the requiring activity appointed in writing by the KO to perform surveillance and to act as liaison to the contractor.
2.3 Performance Work Statement (PWS) is a statement of work for performance-based acquisitions that describes the required results in clear, specific and objective terms with measurable outcomes.
2.4 The USAPPS Power Line Distribution Course (PLDC) is the course that will utilize the curriculum to train students on overhead and underground distribution tasks.
2.5 Quality Assurance Surveillance Plan (QASP): A written document specifying the surveillance method used for surveillance of contractor performance.
2.6 Quality control (QC): Actions taken by a contractor to control the performance of contracted services to meet PWS requirements.
2.7 Quality assurance (QA): Actions taken by the government to assure contracted services meet PWS requirements.
2.8 Defective Service: Service output that does not meet the standard of performance associated with it in the PWS.
2.9 Terminal Learning Objective (TLO): A terminal learning objective states the instructor’s expectations of student performance at the end of a specific lesson or unit. TLO’s include an action, condition, and standard.
3.0 Government-furnished items and services:
The government shall provide the facilities, utilities, equipment and/or materials as listed below.
3.1 Facilities: The government shall furnish the necessary workspace for contractor staff during the industry led training (ILT) and/or instructor certification periods as outlined in the PWS. This includes work space, telephones, classroom, overhead power distribution training facility, tools, utility vehicles, and other equipment necessary to conduct the training outlined in this PWS. Lodging, transportation, and meals are not provided by the government when the contractor is on site.
3.2 Utilities: All utilities in the facility are available for the contractor’s use in performance of duties outlined in this PWS. The Contractor shall instruct employees in utilities conservation practices. The Contractor shall be responsible for operating under conditions that preclude the waste of utilities.
4.0 Contractor-furnished items and services:
The contractor shall furnish everything required to perform work outlined in this PWS.
4.1 Post-award conference or periodic progress meetings: The contractor agrees to attend any post-award conference convened by the contracting activity or contract administration office in accordance with FAR Subpart 42.5. The KO, COR, and other government personnel, as appropriate, may meet periodically with the contractor to review the contractor's performance. At these meetings, the KO will apprise the contractor of how the government views the contractor's performance, and the contractor will apprise the government of problems, if any, being experienced. Appropriate action shall be taken to resolve outstanding issues. These meetings shall be at no additional cost to the government.
4.2 The COR monitors all technical aspects of the contract and assists in contract administration. The COR is authorized to perform the following functions: assure the contractor performs the technical requirements of the contract; perform inspections necessary in connection with contract performance; maintain written and oral communications with the contractor concerning technical aspects of the contract; issue written interpretations of technical requirements, including government drawings, designs, and specifications; monitor contractor's performance and notify both the KO and contractor of any deficiencies; coordinate availability of government-furnished property;
and provide site-entry of contractor personnel. A letter of designation issued to the COR, a copy of which is sent to the contractor, states the responsibilities and limitations of the
COR, especially with regard to changes in cost or price, estimates, or changes in delivery dates. The COR is not authorized to change any of the terms and conditions of the resulting order.
4.3 Contract manager: The contractor shall provide a contract manager who shall be responsible for the performance of the work. The name of this person and an alternate who shall act for the contractor when the manager is absent shall be designated in writing to the KO. The contract manager or alternate shall have full authority to act for the contractor on all contract matters relating to daily operation of this contract.
4.4 Identification of contractor employees: All contract personnel attending meetings, answering government telephones, and working in other situations where their contractor status is not obvious to third parties are required to identify themselves as such to avoid creating an impression in the minds of members of the public that they are government officials. They must also ensure all documents or reports produced by contractors are suitably marked as contractor products or that contractor participation is appropriately disclosed.
5.0 Requirements:
5.1 Student Course Workbook:
5.1.1 Physical Construction: Workbooks shall be based off the current PLDC curriculum and printed in color and all pages shall be placed in a three (3) ring binder. Tabs shall be used to separate modules. Homework shall be placed at the end of the corresponding module in the workbook.
5.1.2 Quantity: Workbooks shall be provided for each class. The number of workbooks required per class shall be based on the number of students available. Number of workbooks required per class shall be provided to the contractor not less than sixty (60) days prior to the start of each class.
5.1.3 Digital Copies: Digital copies of the student workbook for each class shall be provided in conjunction with and at the same time as the printed versions.
5.1.4 Professional References: Technical specifications, procedures, charts, graphs, and excerpts in the course workbooks taken from professional references shall be referenced.
References used throughout the workbook shall be listed by publication name, edition, and section on a reference page at the end of each corresponding module in which they are used.
5.1.5 Course workbook Modifications: Requested additions and modifications to the workbooks shall be submitted to the contractor no later than thirty (30) days after each class completion. Requested additions and modifications to the workbooks shall be submitted to the contractor from the PLDC cadre in memorandum form. Additions and modifications shall be incorporated into subsequent versions of the printed and digital versions of the workbook.
5.1.6 Curriculum Information: Contractor is allotted access to all current curriculum materials to gather information for the purpose of developing the student course workbook.
Curriculum test information shall be given to the contractor on a disk. The contractor can pick up the disk at the USAPPS in person or can request that the disk be mailed to the contractor via certified mail. Obtaining curriculum information shall be signed for by the contractor either in person or by a return certified receipt. Upon completion of the workbook development the disk shall be returned back to the USAPPS. The contractor shall coordinated with the PLDC cadre at a minimum of two weeks in advance. Any expense incurred in obtaining Curriculum information is not reimbursable by the government.
5.2 Instructor Course Workbook:
5.2.1 Physical Construction: Workbooks shall be printed in color and all pages shall be placed in a three (3) ring binder. Tabs shall be used to separate modules. Student homework answer keys shall be placed at the end of the corresponding module in the workbook.
5.2.2 Instructors Aid: Workbooks shall act as an Instructors aid. It shall contain additional notes, references, and/or information pertaining to the class and correlate to each class’s slide decks.
5.2.3 Quantity: Workbooks shall be provided for each class. The number of workbooks required per class shall be based on the number of instructors available. Number of workbooks required per class shall be provided to the contractor not less than sixty (60) days prior to the start of each class.
5.2.4 Digital Copies: Digital copies of the instructor workbook for each class shall be provided in conjunction with and at the same time as the printed versions.
5.2.5 Professional References: Technical specifications, procedures, charts, graphs, and excerpts in the course workbooks taken from professional references shall be referenced.
References used throughout the workbook shall be listed by publication name, edition, and section on a reference page at the end of each corresponding module in which they are used.
5.2.6 Course workbook Modifications: Requested additions and modifications to the workbooks shall be submitted to the contractor no later than thirty (30) days after each class completion. Requested additions and modifications to the workbooks shall be submitted to the contractor from the PLDC cadre in memorandum form. Additions and modifications shall be incorporated into subsequent versions of the printed and digital versions of the workbook.
5.2.7 Curriculum Information: Contractor is allotted access to all current curriculum materials to gather information for the purpose of developing the instructor course workbook.
Curriculum test information shall be given to the contractor on a disk. The contractor can pick up the disk at the USAPPS in person or can request that the disk be mailed to the contractor via certified mail. Obtaining curriculum information shall be signed for by the contractor either in person or by a return certified receipt. Upon completion of the workbook development the disk shall be returned back to the USAPPS. The contractor shall coordinated with the PLDC cadre at a minimum of two weeks in advance. Any expense incurred in obtaining Curriculum information is not reimbursable by the government.
5.3 Training Yard Drawings:
5.3.1 Staking Sheets: Contractor shall provide staking sheets for the PLDC training pole yard.
Two separate staking sheets shall be provided, based on the existing PLDC training pole yard design and bill of material list for each structure (Enclosures 2 and 3). One staking sheet shall encompass training areas 1, 2, and 3. The second staking sheet shall encompass training areas 4 through 9. Each staking sheet shall be in acceptable standard industry format and the staking sheet format shall be reviewed and approved by the
PLDC cadre for formatting and compliance with the existing training yard. Staking sheets shall be supplied to PLDC in digital .pdf format.
5.3.2 Specification Sheets: Contractor shall reference all specification sheets on each staking sheet for each structure. All specification sheet references shall be from the most current version of the Rural Utilities Service (RUS++) handbook. Additions, deletions, changes, and remarks for each structure shall be annotated on the staking sheet and referenced to the corresponding RUS specification sheet as applicable. Contractor shall ensure all structures are in compliance with the most current version of the National Electrical
Safety Code (NESC).
5.3.3 Drawings Location: Training areas 1-3 shall be in all students and instructors workbooks for each class in F module. Training areas 4-6 shall be in the instructor’s workbooks only for each class in F module.
5.3.4 Training Yard Drawings Modifications: Requested additions and modifications to the training yard drawings shall be submitted with the workbook modifications and in the same timeframe as listed in sections 5.1.5 and 5.2.6.
5.3.5 Site Visits: Contractor is allotted access to the pole training yard for site visits to gather information on the pole yard. Site visits shall be coordinated with the PLDC cadre at a minimum of two weeks in advance and shall coincide with the availability of the PLDC cadre to assist in the site visit. Site visits shall be conducted at the contractor’s expense and are not reimbursable by the government.
5.4 Industry Led Training (ILT) Classes:
5.4.1 Conducting Classes: Contractor shall provide training to PLDC students during scheduled classes. The ILT classes shall be conducted by a trainer that has been instructor certified by the agencies from which the training has been derived.
5.4.2 Class Schedule: The ILT classes shall be conducted during week four of PLDC. ILT classes shall begin on a Monday unless the scheduled start date coincides with a national holiday. In the event a national holiday occurs on a Monday, ILT classes shall commence on Tuesday of week four of PLDC. This training shall last no longer than 21 training hours and at a minimum, the Contractor shall provide the classes outline in sections
5.4.2.1 through 5.4.2.5:
5.4.2.1 Qualified Digger Derrick Training: This training consists of the distant learning as described in section 5.4.2.5, hands on practical exercise provided by a military instructor in B module, and on site evaluation by the contractor of the Soldier’s knowledge of basic operation and controls of a digger derrick truck. Contractor shall provide a hard copy certification to each Soldier for successful completion of the digger derrick qualified operator training. This certification shall be endorsed by the contractor’s institution. This certification does not include a state issued Class A commercial driver’s license (CDL).
5.4.2.2 National Safety Council (NSC) Flagging Certification: Contractor shall instruct all portions of the NSC Flagging Certification course. Contractor shall provide an instructor that is certified by the NSC to instruct this training and provide each Soldier with the certification for successfully completing this training.
5.4.2.3 OSHA 10 Hour Safety Training Course for Construction Safety and Health: Contractor shall instruct all portions of the OSHA 10 Hour Safety Training Course for Construction
Safety and Health. Contractor shall provide an instructor that is certified by OSHA to instruct this training and provide each Soldier with the certification for successfully completing this course.
5.4.2.4 Qualified Climber Certification: A qualified climber certification shall consist of a hands on practical exercise and evaluation by the contractor of the Soldier’s basic wood pole climbing ability obtained from the A and C Modules taught by the military instructors.
The qualified climber evaluation criteria shall be reviewed and approved by the PLDC cadre prior to implementation into the course. This certification shall be endorsed by the contractor’s institution.
5.4.2.5 Distance Learning: An online, self-paced, distance learning course meeting OSHA and
American National Standards Institute (ANSI) standards shall provide leaner centric study for digger derrick truck operations. Allocations for the online training required per class shall be based on the number of students and instructors available, and shall be provided to the contractor not less than thirty (30) days prior to the start of each class.
Number of slots required shall not exceed 12 per class.
5.4.2.6 Recertification Training: The contractor shall provide an annual skills enhancement class to the instructors informing them of any changes in industry policy, practices, or equipment being used on the market, and if available, provide practical exercises in the use of new equipment. Evaluate the instructors on all annual industry requirements to include but not limited to; pole top hurt man rescue, cross-arm change out, and aerial lift truck rescue.
6.0 Specified Tasks:
Specified Tasks: Performance
Objective:
Performance Requirement:
Student Workbook
Development
Develop workbooks for students
Provide workbooks as listed in sections 5.1.1 through 5.1.6.
Deliver workbooks to the USAPPS
Deliver workbooks for each class as listed in enclosure 4. The number required will be identified and the Contractor shall be notified by the KO.
Instructor
Workbook
Development
Develop workbooks for Instructors
Provide workbooks as listed in sections 5.2.1 through 5.2.7.
Deliver workbooks to the USAPPS
Deliver workbooks for each class as listed in enclosure 4. The number required will be identified and the Contractor shall be notified by the KO.
Training Yard
Drawings
Development
Develop training yard drawings
Provide training yard drawings as listed in sections 5.3.1 through 5.3.5.
Deliver training yard drawings
Deliver drawings for each class as listed in enclosure 4. The number required will be identified and the Contractor shall be notified by the KO.
Industry Led
Training (ILT)
Classes
Conduct ILT training Provide on-site classroom ILT training as listed in sections 5.4.1, 5.4.2, and sub-sections 5.4.2.1 through 5.4.2.3.
Distance Learning Provide digger derrick distance learning
Facilitate an online, self-paced, distance learning course as listed in section 5.4.2.5
Enroll students in the on-line distance learning course
Enroll students for each class as listed in enclosure 4. The number required will be identified and the Contractor shall be notified by the KO.
Certifications, license, certificates and transcripts
Provide certifications and/or license for ILT training
Evaluate students and for those who pass, provide a certification and/or license for each student as listed in sections 5.4.2.1 through
5.4.2.1
Provide certificates and transcripts
The contractor shall provide for each student a certificate of training for the entire course and transcripts for their successful completion in Overhead Distribution, Underground
Distribution, Protective Equipment, Equipment Operations, Climbing Skills, Knots, Splices, & Rigging, ILT Courses, and
Exam grades for Modules A through E.
Deliver certificates and transcripts to the
USAPPS
Deliver all students certificates and transcripts for each class at a minimum one day prior to each class graduation
Train the Trainer Provide training and evaluation for current
PLDC military instructors
Train and evaluate instructors to validate that they are training the course materials to industry standard.
Provide training and evaluation for new additional PLDC military instructors
Train, evaluate, and validate instructors on their ability to train the course materials to industry standard.
Provide certificate of training
Provide a certificate of training to all instructors that complete the Contractor’s
ASI-U4 PLDC Instructors Course verifying their ability to teach the PLDC Course to industry standard.
Instructor Annual
Skills Enhancement/
Recertification
Provide training for current PLDC military instructors
Provide an annual Skills Enhancement class to the instructors informing them of any changes in industry policy, practices, or equipment being used on the market, and if available, provide practical exercises in the use of new equipment. Evaluate the instructors on all annual industry requirements to include but not limited to;
pole top hurt man rescue, cross-arm change out, and aerial lift truck rescue.
7.0 Publications and Forms:
7.1 All work performed under this PWS shall comply with the most recent publications, regulations, and forms referenced in this PWS and shall be used until a newer version is published. Partial changes and updates to any publications, regulations, and forms shall be adhered to.
7.2 All work performed under the PWS shall comply with applicable Training and Doctrine
Command, Army, and Department of Defense regulations.
7.3 All course material shall use the most up to date industry publications and reference material throughout the performance of the contract.
8.0 Delivery Schedule:
8.1 A schedule of all deliverables is included in Enclosure 4.
8.2 The schedule of deliverables for any exercised option years shall be provided to the contractor upon the execution of each option year.
8.3 Upon delivery, all deliverables with the exclusion of any contractor owned equipment that are provided for the express purpose of conducting ILT lessons shall become the property of the United States Government.
8.4 The Contractor shall coordinate delivery with the On-Site Coordination POC prior to delivery. Contact information will be provided by the KO for the following address;
United States Army Prime Power School
BLDG. 12630, FLW 28
Fort Leonard Wood, MO 65473
9.0 List of Enclosures:
Enclosure 1: Blocks of instruction and learning modules to include homework, exams, and practical exercises
Enclosure 2: Training pole yard drawing
Enclosure 3: Bill of materials list by structure
Enclosure 4: Schedule of deliverables