Amendment 02- Consolidated Report
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 18B0001_FINAL_Abstract_of_Offers.pdf | ||
| 20171128-20171130_CHU_Combined.xyz | XYZ file | |
| PLANS_SHEET_C-01_to_C-08_REVa.pdf | ||
| Summary_of_Changes_FY18_Charleston_Upper_Harbor_Maintenance_Dredging_AM0002.docx | DOCX document | |
| W912HP-18-B-0001U0002_Amendment_02.pdf | ||
| FY18_Chas_Upper_Bid_Schedule_REVa.pdf | ||
| 35_20_23_DREDGING_Work_Covered_By_Contract_Price_and_Estimated_Quantities_REVa.pdf | ||
| W912HP-18-B-00010001_Amendment_01.pdf | ||
| W912HP-18-B-0001_Solicitation_FY18_Upper_Harbor_Dredging.pdf | ||
| SPECIFICATIONS_FY18_Upper_Harbor_Maintenance_Dredging.pdf | ||
| PLANS_FY18_Upper_Harbor_Maintenance_Dredging.pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FY18 CHARLESTON UPPER HARBOR W912HP-18-B-0001
MAINTENANCE DREDGING
L-1 ATTACHMENT L
CONSOLIDATED REPORT - DREDGING
TITLE: FY18 CHARLESTON UPPER HARBOR MAINTENANCE DREDGING, CHARLESTON AND BERKELY
COUNTIES, SOUTH CAROLINA
IFB NO. W912HP-18-B-0001 CONTRACT NO. W912HP-18-C-00XX
DRAWING NO. 9596 (Contract), 9597 (BD), 9598 (AD)
GOVERNMENT INSPECTOR:
CONTRACTOR:
CONTRACTOR'S SUPERINTENDENT:
TYPE EQUIPMENT USED ON JOB:
DREDGE(S): (NAME, SIZE, PUMP HP, BOOSTER, ETC.)
OTHER EQUIPMENT: (DRAGLINES, DOZERS, ETC.)
SUBCONTRACTORS:
DATES:
ADVERTISEMENT: BID OPENING:
AWARD: NOTICE TO PROCEED:
REQUIRED STARTING: ACTUAL STARTING:
REQUIRED COMPLETION DATE: ACTUAL COMPLETION:
NUMBERS DAYS ON JOB (PUMPING):
NUMBERS DAYS ON JOB (TOTAL):
DREDGING QUANTITIES:
REQUIRED PRODUCTION RATE:
ACTUAL PRODUCTION RATE:
CHARACTER OF MATERIALS:
NOTE: HARD MATERIAL OR ANY CHANGE OF CONDITIONS SHOULD BE
NOTED. ANY DEBRIS ENCOUNTERED SHOULD ALSO BE LISTED
WITH EXPLANATION OF HOW IT WAS REMOVED AND WHAT EQUIP
WAS USED FOR REMOVAL.
L-2 ATTACHMENT L
CONSOLIDATED REPORT – DREDGING
ADVERTISED QUANTITIES:
REQUIRED
DREDGING
PRISM
ALLOWABLE
OVERDEPTH
PRISM
TOTAL
C.Y. SHOAL
NO. LOCATION CY PL. MEAS.
CY PL. MEAS.
** PL. MEAS.
1 Shipyard River
2+00 to 34+00
2 Daniel Island Reach
1348+00 to 1410+00
3 Daniel Island Bend
1420+00 to 1438+00
4 Navy Yard Reach (Right)
1538+00 to 1564+00
5 Navy Yard Reach (Left)
6 Port Terminal Reach
1658+00 to 1670+00
7 Ordnance Reach
1690+00 to 1720+83
8 Ordnance Reach TB
1698+64 to 1720+83
TC Dock
1703+90 to 1720+83
MARAD Pier S
Northern berth
MARAD Pier T
Northern Berth
MARAD Pier U
TOTALS
L-3 ATTACHMENT L
BEFORE DREDGING QUANTITIES:
PRISM
ALLOWABLE
OVERDEPTH
PRISM
TOTAL
C.Y. SHOAL
NO. LOCATION CY PL. MEAS.
CY PL. MEAS.
L-4 ATTACHMENT L
AFTER DREDGING QUANTITIES:
PRISM
ALLOWABLE
OVERDEPTH
PRISM
TOTAL
C.Y. SHOAL
NO. LOCATION CY PL. MEAS.
CY PL. MEAS.
L-5 ATTACHMENT L
EFFECTIVE AND NON-EFFECTIVE TIME:
NAME OF
DREDGE
PUMPING:
HANDLING PIPE LINES:
HANDLING SWING LINES:
CLEARING PUMP AND PIPELINES:
CLEARING CUTTER:
CHANGING LOCATION ON JOB:
PASSING VESSELS:
SHORE LINE & SHORE WORK:
MINOR REPAIR:
PREPARATION:
MISCELLANEOUS:
MOBILIZATION AND
DEMOBILIZATION:
PRIVATE WORK:
SUNDAYS AND HOLIDAYS:
MAJOR REPAIRS:
LOST TIME:
LOST TIME NOT CHARGEABLE TO COST AT WORK:
TOTAL TIME:
AVERAGES:
WIDTH OF CUT:
LIFT:
NUMBER OF LOADS PER DAY:
CUBIC YARDS PER LOAD:
CUBIC YARDS PUMPED PER HOUR - CREDIT:
CUBIC YARDS PUMPED PER HOUR - GROSS:
CUBIC YARDS PUMPED PER DAY - CREDIT:
CUBIC YARDS PUMPED PER DAY - GROSS:
PUMPING TIME - HOURS PER DAY
TIME DELAYS AND CAUSES OF SUCH DELAYS:
L-6 ATTACHMENT L
DISPOSAL AREA(S): (FOR EACH DISPOSAL AREA)
DISPOSAL AREA: CLOUTER CREEK NORTH CELL
TOTAL GROSS CYDS PLACED IN THE DISPOSAL AREA:
LOCATION: (WHAT DISCHARGE POINT)
REMARKS:
DISPOSAL AREA: CLOUTER CREEK HIGHWAY CELL
TOTAL GROSS CYDS PLACED IN THE DISPOSAL AREA:
LOCATION: (WHAT DISCHARGE POINT)
REMARKS:
WATER QUALITY:
NOTE: DOCUMENTATION SHOULD LIST ALL EFFORTS MADE TO INSURE
WATER QUALITY HAS BEEN MAINTAINED AND ANY PROBLEMS
THAT WERE ENCOUNTERED.
OTHER - EXPLAIN:
REMARKS, COMMENTS, AND LESSONS LEARNED:
L-7 ATTACHMENT L
COSTS/PRICES:
ORIGINAL CONTRACT AWARD AMOUNTS:
ITEM
NO. DESCRIPTION ESTIMATED
QUANTITY U/I UNIT PRICE AMOUNT
BASE
0001 MOBILIZATION AND
DEMOBILIZATION –
MAINTENANCE DREDGING IN
CHARLESTON UPPER HARBOR
1 JA LUMP SUM $_________
0002 DREDGING OF UNCLASSIFIED
MAINTENANCE MATERIAL IN
SHOAL 2 - DANIEL ISLAND
REACH
175,000 CY $_________ $_________
0003 DREDGING OF UNCLASSIFIED
MAINTENANCE MATERIAL IN
SHOAL 3 - DANIEL ISLAND
BEND
105,000 CY $_________ $_________
0004 DREDGING OF UNCLASSIFIED
MAINTENANCE MATERIAL IN
SHOAL 4 - NAVY YARD REACH
(RIGHT)
40,000 CY $_________ $_________
0005 DREDGING OF UNCLASSIFIED
MAINTENANCE MATERIAL IN
SHOAL 6 - PORT TERMINAL
REACH
27,000 CY $_________ $_________
0006 DREDGING OF UNCLASSIFIED
MAINTENANCE MATERIAL IN
SHOAL 7 - ORDNANCE REACH
210,000 CY $_________ $_________
0007 DREDGING OF UNCLASSIFIED
MAINTENANCE MATERIAL IN
SHOAL 8 - ORDNANCE REACH
TURNING BASIN
555,000 CY $_________ $_________
TOTAL (COMBINATION OF BASE
BID ITEMS 0001-0007)
OPTIONS
0008 DREDGING OF UNCLASSIFIED
MAINTENANCE MATERIAL IN
SHOAL 1 - SHIPYARD RIVER
275,000 CY $_________ $_________
0009 MOBILIZATION AND
DEMOBILIZATION –
MAINTENANCE DREDGING IN TC
DOCK
1 JA JOB $_________
0010 DREDGING OF UNCLASSIFIED
MAINTENANCE MATERIAL IN TC
DOCK
50,000 CY $_________ $_________
L-8 ATTACHMENT L
0011 MOBILIZATION AND
DEMOBILIZATION –
MAINTENANCE DREDGING IN
MARAD PIERS S, T, U
1 JA JOB $_________
0012 DREDGING OF UNCLASSIFIED
MAINTENANCE MATERIAL IN
MARAD PIERS S, T, U
204,000 CY $_________ $_________
TOTAL (COMBINATION OF
OPTIONAL BID ITEMS 0008-
0012)
TOTAL
TOTAL (COMBINATION OF ALL
BID ITEMS 0001-0012)
L-9 ATTACHMENT L
ACTUAL CONTRACT AMOUNTS:
ITEM
NO. DESCRIPTION ESTIMATED
QUANTITY U/I UNIT PRICE AMOUNT
BASE
0001 MOBILIZATION AND
DEMOBILIZATION –
MAINTENANCE DREDGING IN
CHARLESTON UPPER HARBOR
1 JA LUMP SUM $_________
0002 DREDGING OF UNCLASSIFIED
MAINTENANCE MATERIAL IN
SHOAL 2 - DANIEL ISLAND
REACH
175,000 CY $_________ $_________
0003 DREDGING OF UNCLASSIFIED
MAINTENANCE MATERIAL IN
SHOAL 3 - DANIEL ISLAND
BEND
105,000 CY $_________ $_________
0004 DREDGING OF UNCLASSIFIED
MAINTENANCE MATERIAL IN
SHOAL 4 - NAVY YARD REACH
(RIGHT)
40,000 CY $_________ $_________
0005 DREDGING OF UNCLASSIFIED
MAINTENANCE MATERIAL IN
SHOAL 6 - PORT TERMINAL
REACH
27,000 CY $_________ $_________
0006 DREDGING OF UNCLASSIFIED
MAINTENANCE MATERIAL IN
SHOAL 7 - ORDNANCE REACH
210,000 CY $_________ $_________
0007 DREDGING OF UNCLASSIFIED
MAINTENANCE MATERIAL IN
SHOAL 8 - ORDNANCE REACH
TURNING BASIN
555,000 CY $_________ $_________
TOTAL (COMBINATION OF BASE
BID ITEMS 0001-0007)
OPTIONS
0008 DREDGING OF UNCLASSIFIED
MAINTENANCE MATERIAL IN
SHOAL 1 - SHIPYARD RIVER
275,000 CY $_________ $_________
0009 MOBILIZATION AND
DEMOBILIZATION –
MAINTENANCE DREDGING IN TC
DOCK
1 JA JOB $_________
0010 DREDGING OF UNCLASSIFIED
MAINTENANCE MATERIAL IN TC
DOCK
50,000 CY $_________ $_________
L-10 ATTACHMENT L
0011 MOBILIZATION AND
DEMOBILIZATION –
MAINTENANCE DREDGING IN
MARAD PIERS S, T, U
1 JA JOB $_________
0012 DREDGING OF UNCLASSIFIED
MAINTENANCE MATERIAL IN
MARAD PIERS S, T, U
204,000 CY $_________ $_________
TOTAL (COMBINATION OF
OPTIONAL BID ITEMS 0008-
0012)
TOTAL
TOTAL (COMBINATION OF ALL
BID ITEMS 0001-0012)
MODIFICATIONS:
MOD 1: (BRIEF DESCRIPTION) $___________
MOD 2: (BRIEF DESCRIPTION) $___________
CLAIMS:
CLAIM 1: (BRIEF DESCRIPTION) $___________
CLAIM 2: (BRIEF DESCRIPTION) $___________
ADDITIONAL COSTS:
NOTE: INCLUDE ALL OTHER COSTS NOT LISTED ABOVE.