ATTACHMENT_L_Consolidated_Report_REVa.pdf

PDF 72 KB Posted

Attached to
FY18 Upper Harbor Dredging Charleston SC Federal contract opportunity
Solicitation number
W912HP-18-B-0001
Issued by
Department of the Army Corps of Engineers Engineering District Charleston

About this file

Amendment 02- Consolidated Report

View the file

Other files for this federal contract opportunity

Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FY18 CHARLESTON UPPER HARBOR W912HP-18-B-0001

MAINTENANCE DREDGING

L-1 ATTACHMENT L

CONSOLIDATED REPORT - DREDGING

TITLE: FY18 CHARLESTON UPPER HARBOR MAINTENANCE DREDGING, CHARLESTON AND BERKELY

COUNTIES, SOUTH CAROLINA

IFB NO. W912HP-18-B-0001 CONTRACT NO. W912HP-18-C-00XX

DRAWING NO. 9596 (Contract), 9597 (BD), 9598 (AD)

GOVERNMENT INSPECTOR:

CONTRACTOR:

CONTRACTOR'S SUPERINTENDENT:

TYPE EQUIPMENT USED ON JOB:

DREDGE(S): (NAME, SIZE, PUMP HP, BOOSTER, ETC.)

OTHER EQUIPMENT: (DRAGLINES, DOZERS, ETC.)

SUBCONTRACTORS:

DATES:

ADVERTISEMENT: BID OPENING:

AWARD: NOTICE TO PROCEED:

REQUIRED STARTING: ACTUAL STARTING:

REQUIRED COMPLETION DATE: ACTUAL COMPLETION:

NUMBERS DAYS ON JOB (PUMPING):

NUMBERS DAYS ON JOB (TOTAL):

DREDGING QUANTITIES:

REQUIRED PRODUCTION RATE:

ACTUAL PRODUCTION RATE:

CHARACTER OF MATERIALS:

NOTE: HARD MATERIAL OR ANY CHANGE OF CONDITIONS SHOULD BE

NOTED. ANY DEBRIS ENCOUNTERED SHOULD ALSO BE LISTED

WITH EXPLANATION OF HOW IT WAS REMOVED AND WHAT EQUIP

WAS USED FOR REMOVAL.

L-2 ATTACHMENT L

CONSOLIDATED REPORT – DREDGING

ADVERTISED QUANTITIES:

REQUIRED

DREDGING

PRISM

ALLOWABLE

OVERDEPTH

PRISM

TOTAL

C.Y. SHOAL

NO. LOCATION CY PL. MEAS.

CY PL. MEAS.

** PL. MEAS.

1 Shipyard River

2+00 to 34+00

2 Daniel Island Reach

1348+00 to 1410+00

3 Daniel Island Bend

1420+00 to 1438+00

4 Navy Yard Reach (Right)

1538+00 to 1564+00

5 Navy Yard Reach (Left)

6 Port Terminal Reach

1658+00 to 1670+00

7 Ordnance Reach

1690+00 to 1720+83

8 Ordnance Reach TB

1698+64 to 1720+83

TC Dock

1703+90 to 1720+83

MARAD Pier S

Northern berth

MARAD Pier T

Northern Berth

MARAD Pier U

TOTALS

L-3 ATTACHMENT L

BEFORE DREDGING QUANTITIES:

PRISM

ALLOWABLE

OVERDEPTH

PRISM

TOTAL

C.Y. SHOAL

NO. LOCATION CY PL. MEAS.

CY PL. MEAS.

L-4 ATTACHMENT L

AFTER DREDGING QUANTITIES:

PRISM

ALLOWABLE

OVERDEPTH

PRISM

TOTAL

C.Y. SHOAL

NO. LOCATION CY PL. MEAS.

CY PL. MEAS.

L-5 ATTACHMENT L

EFFECTIVE AND NON-EFFECTIVE TIME:

NAME OF

DREDGE

PUMPING:

HANDLING PIPE LINES:

HANDLING SWING LINES:

CLEARING PUMP AND PIPELINES:

CLEARING CUTTER:

CHANGING LOCATION ON JOB:

PASSING VESSELS:

SHORE LINE & SHORE WORK:

MINOR REPAIR:

PREPARATION:

MISCELLANEOUS:

MOBILIZATION AND

DEMOBILIZATION:

PRIVATE WORK:

SUNDAYS AND HOLIDAYS:

MAJOR REPAIRS:

LOST TIME:

LOST TIME NOT CHARGEABLE TO COST AT WORK:

TOTAL TIME:

AVERAGES:

WIDTH OF CUT:

LIFT:

NUMBER OF LOADS PER DAY:

CUBIC YARDS PER LOAD:

CUBIC YARDS PUMPED PER HOUR - CREDIT:

CUBIC YARDS PUMPED PER HOUR - GROSS:

CUBIC YARDS PUMPED PER DAY - CREDIT:

CUBIC YARDS PUMPED PER DAY - GROSS:

PUMPING TIME - HOURS PER DAY

TIME DELAYS AND CAUSES OF SUCH DELAYS:

L-6 ATTACHMENT L

DISPOSAL AREA(S): (FOR EACH DISPOSAL AREA)

DISPOSAL AREA: CLOUTER CREEK NORTH CELL

TOTAL GROSS CYDS PLACED IN THE DISPOSAL AREA:

LOCATION: (WHAT DISCHARGE POINT)

REMARKS:

DISPOSAL AREA: CLOUTER CREEK HIGHWAY CELL

TOTAL GROSS CYDS PLACED IN THE DISPOSAL AREA:

LOCATION: (WHAT DISCHARGE POINT)

REMARKS:

WATER QUALITY:

NOTE: DOCUMENTATION SHOULD LIST ALL EFFORTS MADE TO INSURE

WATER QUALITY HAS BEEN MAINTAINED AND ANY PROBLEMS

THAT WERE ENCOUNTERED.

OTHER - EXPLAIN:

REMARKS, COMMENTS, AND LESSONS LEARNED:

L-7 ATTACHMENT L

COSTS/PRICES:

ORIGINAL CONTRACT AWARD AMOUNTS:

ITEM

NO. DESCRIPTION ESTIMATED

QUANTITY U/I UNIT PRICE AMOUNT

BASE

0001 MOBILIZATION AND

DEMOBILIZATION –

MAINTENANCE DREDGING IN

CHARLESTON UPPER HARBOR

1 JA LUMP SUM $_________

0002 DREDGING OF UNCLASSIFIED

MAINTENANCE MATERIAL IN

SHOAL 2 - DANIEL ISLAND

REACH

175,000 CY $_________ $_________

0003 DREDGING OF UNCLASSIFIED

MAINTENANCE MATERIAL IN

SHOAL 3 - DANIEL ISLAND

BEND

105,000 CY $_________ $_________

0004 DREDGING OF UNCLASSIFIED

MAINTENANCE MATERIAL IN

SHOAL 4 - NAVY YARD REACH

(RIGHT)

40,000 CY $_________ $_________

0005 DREDGING OF UNCLASSIFIED

MAINTENANCE MATERIAL IN

SHOAL 6 - PORT TERMINAL

REACH

27,000 CY $_________ $_________

0006 DREDGING OF UNCLASSIFIED

MAINTENANCE MATERIAL IN

SHOAL 7 - ORDNANCE REACH

210,000 CY $_________ $_________

0007 DREDGING OF UNCLASSIFIED

MAINTENANCE MATERIAL IN

SHOAL 8 - ORDNANCE REACH

TURNING BASIN

555,000 CY $_________ $_________

TOTAL (COMBINATION OF BASE

BID ITEMS 0001-0007)

OPTIONS

0008 DREDGING OF UNCLASSIFIED

MAINTENANCE MATERIAL IN

SHOAL 1 - SHIPYARD RIVER

275,000 CY $_________ $_________

0009 MOBILIZATION AND

DEMOBILIZATION –

MAINTENANCE DREDGING IN TC

DOCK

1 JA JOB $_________

0010 DREDGING OF UNCLASSIFIED

MAINTENANCE MATERIAL IN TC

DOCK

50,000 CY $_________ $_________

L-8 ATTACHMENT L

0011 MOBILIZATION AND

DEMOBILIZATION –

MAINTENANCE DREDGING IN

MARAD PIERS S, T, U

1 JA JOB $_________

0012 DREDGING OF UNCLASSIFIED

MAINTENANCE MATERIAL IN

MARAD PIERS S, T, U

204,000 CY $_________ $_________

TOTAL (COMBINATION OF

OPTIONAL BID ITEMS 0008-

0012)

TOTAL

TOTAL (COMBINATION OF ALL

BID ITEMS 0001-0012)

L-9 ATTACHMENT L

ACTUAL CONTRACT AMOUNTS:

ITEM

NO. DESCRIPTION ESTIMATED

QUANTITY U/I UNIT PRICE AMOUNT

BASE

0001 MOBILIZATION AND

DEMOBILIZATION –

MAINTENANCE DREDGING IN

CHARLESTON UPPER HARBOR

1 JA LUMP SUM $_________

0002 DREDGING OF UNCLASSIFIED

MAINTENANCE MATERIAL IN

SHOAL 2 - DANIEL ISLAND

REACH

175,000 CY $_________ $_________

0003 DREDGING OF UNCLASSIFIED

MAINTENANCE MATERIAL IN

SHOAL 3 - DANIEL ISLAND

BEND

105,000 CY $_________ $_________

0004 DREDGING OF UNCLASSIFIED

MAINTENANCE MATERIAL IN

SHOAL 4 - NAVY YARD REACH

(RIGHT)

40,000 CY $_________ $_________

0005 DREDGING OF UNCLASSIFIED

MAINTENANCE MATERIAL IN

SHOAL 6 - PORT TERMINAL

REACH

27,000 CY $_________ $_________

0006 DREDGING OF UNCLASSIFIED

MAINTENANCE MATERIAL IN

SHOAL 7 - ORDNANCE REACH

210,000 CY $_________ $_________

0007 DREDGING OF UNCLASSIFIED

MAINTENANCE MATERIAL IN

SHOAL 8 - ORDNANCE REACH

TURNING BASIN

555,000 CY $_________ $_________

TOTAL (COMBINATION OF BASE

BID ITEMS 0001-0007)

OPTIONS

0008 DREDGING OF UNCLASSIFIED

MAINTENANCE MATERIAL IN

SHOAL 1 - SHIPYARD RIVER

275,000 CY $_________ $_________

0009 MOBILIZATION AND

DEMOBILIZATION –

MAINTENANCE DREDGING IN TC

DOCK

1 JA JOB $_________

0010 DREDGING OF UNCLASSIFIED

MAINTENANCE MATERIAL IN TC

DOCK

50,000 CY $_________ $_________

L-10 ATTACHMENT L

0011 MOBILIZATION AND

DEMOBILIZATION –

MAINTENANCE DREDGING IN

MARAD PIERS S, T, U

1 JA JOB $_________

0012 DREDGING OF UNCLASSIFIED

MAINTENANCE MATERIAL IN

MARAD PIERS S, T, U

204,000 CY $_________ $_________

TOTAL (COMBINATION OF

OPTIONAL BID ITEMS 0008-

0012)

TOTAL

TOTAL (COMBINATION OF ALL

BID ITEMS 0001-0012)

MODIFICATIONS:

MOD 1: (BRIEF DESCRIPTION) $___________

MOD 2: (BRIEF DESCRIPTION) $___________

CLAIMS:

CLAIM 1: (BRIEF DESCRIPTION) $___________

CLAIM 2: (BRIEF DESCRIPTION) $___________

ADDITIONAL COSTS:

NOTE: INCLUDE ALL OTHER COSTS NOT LISTED ABOVE.