35_20_23_DREDGING_Work_Covered_By_Contract_Price_and_Estimated_Quantities_REVa.pdf
PDF 47 KB Posted
- Attached to
- FY18 Upper Harbor Dredging Charleston SC Federal contract opportunity
- Solicitation number
- W912HP-18-B-0001
About this file
Amendment 02- Dredging Work
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 18B0001_FINAL_Abstract_of_Offers.pdf | ||
| 20171128-20171130_CHU_Combined.xyz | XYZ file | |
| PLANS_SHEET_C-01_to_C-08_REVa.pdf | ||
| Summary_of_Changes_FY18_Charleston_Upper_Harbor_Maintenance_Dredging_AM0002.docx | DOCX document | |
| W912HP-18-B-0001U0002_Amendment_02.pdf | ||
| FY18_Chas_Upper_Bid_Schedule_REVa.pdf | ||
| ATTACHMENT_L_Consolidated_Report_REVa.pdf | ||
| W912HP-18-B-00010001_Amendment_01.pdf | ||
| W912HP-18-B-0001_Solicitation_FY18_Upper_Harbor_Dredging.pdf | ||
| SPECIFICATIONS_FY18_Upper_Harbor_Maintenance_Dredging.pdf | ||
| PLANS_FY18_Upper_Harbor_Maintenance_Dredging.pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FY18 CHARLESTON UPPER HARBOR W912HP-18-B-0001
MAINTENANCE DREDGING
SECTION 35 20 23 PAGE 1
1.4.2. Work Covered By Contract Price
ITEM 0001, MOBILIZATION AND DEMOBILIZATION (SHOALS 2 – 4 and 6 - 8), shall include all costs connected with the mobilization and demobilization of all the Contractor's dredging plant and equipment.
ITEMS 0002-0008, DREDGING WORK (SHOALS 2 – 4 and 6 - 8), shall include the cost of removal and disposal of all material and the layout and accomplishment of all work, as specified herein or indicated on the contract drawings. The movement of plant between shoals, as indicated on the contract drawings, shall be included in the unit price. The contract price per cubic yard for dredging shall be applicable to quantities in any extensions of the dredging limits except as provided in Paragraph “Variations In Estimated Quantity – Dredging”. Calculated volumes for cubic yardage will be determined according to Subsection SURVEY for payment purposes.
OPTIONAL ITEM 0009, DREDGING WORK (SHOAL 1 – Shipyard River), shall include the cost of removal and disposal of all material and the layout and accomplishment of all work, as specified herein or indicated on the contract drawings. The movement of plant between shoals, as indicated on the contract drawings, shall be included in the unit price. The contract price per cubic yard for dredging shall be applicable to quantities in any extensions of the dredging limits except as provided in Paragraph “Variations In Estimated Quantity – Dredging”. Calculated volumes for cubic yardage will be determined according to Subsection SURVEY for payment purposes.
OPTIONAL ITEM 0010, MOBILIZATION AND DEMOBILIZATION (TC DOCK), shall include all costs connected with the mobilization and demobilization of all the Contractor's dredging plant and equipment.
ITEM 0011, DREDGING WORK (TC DOCK), shall include the cost of removal and disposal of all material and the layout and accomplishment of all work, as specified herein or indicated on the contract drawings. The movement of plant between shoals, as indicated on the contract drawings, shall be included in the unit price. The contract price per cubic yard for dredging shall be applicable to quantities in any extensions of the dredging limits except as provided in Paragraph “Variations In Estimated Quantity – Dredging”.
Calculated volumes for cubic yardage will be determined according to Subsection SURVEY for payment purposes. Contractor shall also comply with any special conditions contained the permit to dredge TC Dock found in the ATTACHMENT Naval Weapons Station Dredging Permit.
OPTIONAL ITEM 0012, MOBILIZATION AND DEMOBILIZATION (MARAD PIERS S, T, U),
shall include all costs connected with the mobilization and demobilization of all the Contractor's dredging plant and equipment.
OPTIONAL ITEM 0013, DREDGING WORK (MARAD PIERS S, T, U), shall include the cost of removal and disposal of all material and the layout and accomplishment of all work, as specified herein or indicated on the contract drawings. The contract price per cubic yard for dredging shall be applicable to quantities in any extensions of the dredging limits except as provided in Paragraph “Variations In Estimated Quantity – Dredging”. Calculated volumes for cubic yardage will be determined according to Subsection SURVEY for payment purposes. Contractor shall also comply with any special conditions contained the permit to dredge MARAD Piers found in the ATTACHMENT CMMC Dredging Permit.
SECTION 35 20 23 PAGE 2
1.4.3. Estimated Quantities
The total estimated quantity of material necessary to be removed from within the specified limits to complete the work are as follows:
REQUIRED
DREDGING
PRISM
ALLOWABLE
OVERDEPTH
PRISM
TOTAL C.Y.
SHOAL
NO. LOCATION CY MEAS. * CY MEAS. ** PL.
1 Shipyard River 180,000 95,000 275,000
2+00 to 34+00
2 Daniel Island Reach 85,000 90,000 175,000
1348+00 to 1410+00
3 Daniel Island Bend 80,000 25,000 105,000
1420+00 to 1438+00
4 Navy Yard Reach (Right) 17,000 23,000 40,000
1538+00 to 1564+00
5 Navy Yard Reach (Left) 6,000 12,000 18,000
1538+00 to 1564+00
6 Port Terminal Reach 12,000 15,000 27,000
1658+00 to 1670+00
7 Ordnance Reach 140,000 70,000 210,000
1690+00 to 1720+83
8 Ordnance Reach TB 450,000 105,000 555,000
1698+64 to 1720+83
TC Dock
40,000 10,000 50,000
1703+90 to 1720+83
MARAD Pier S 65,000 9,000 74,000
Northern berth
MARAD Pier T 65,000 8,000 73,000
Northern Berth
MARAD Pier U 50,000 7,000 57,000
Northern Berth
TOTALS
1,184,000 457,000 1,641,000
SECTION 35 20 23 PAGE 3
NOTE:
* 1. Required depth will be as shown on the contract drawings. The required dredging prism quantities include the optional side slope material associated with the required depth.
** 2. The allowable overdepth quantities include optional side slope materials associated with the allowable overdepth.