About this file

Drawing Set I Notes

View the file

Other files for this federal contract opportunity

Other files attached to St. Stephen SC Fishlift Programmable Logic Controller, newest first.
File Type Posted
16C0005___FBO_Award_Notice.pdf PDF
W912HP-16-R-0004_Am_0010.pdf PDF
W912HP-16-R-0004_Am_0009.pdf PDF
STAMPED_Fishlift_Critical_Electrical_Repairs_Final_Drawings_I_21Mar2016.pdf PDF
St_Stephen_Dam_Fishlift_SOO_Final_21March2016.pdf PDF
AM_0007.pdf PDF
AM0006.pdf PDF
16R0004___CRRP_Fishlift_PLC_Rplcmt___Amendment_0005___3_Mar_16.pdf PDF
16R0004___CRRP_Fishlift_PLC_Rplcmt___Amendment_0004___3-1-16.pdf PDF
Sequence_of_Operation.pdf PDF
Stoplog_Locations_and_Elevations_07-23-13.pdf PDF
16R0004___CRRP_Fishlift_PLC_Rplcmt___Amendment_0003___2-25-16.pdf PDF
Fish_Lift_Critical_Electrical_Repairs_Final_Drawings_G_thru_E_1-17-14.pdf PDF
16R0004___CRRP_Fishlift_PLC_Rplcmt___Amendment_0002___2-22-16.pdf PDF
PE-245_Fishlift_Electrical2.pdf PDF
16R0004___CRRP_Fishlift_PLC_Rplcmt___Amendment_0001___2-19-16.pdf PDF
16R0004___2nd_Site_Visit_Sign-in_Roster___18_Feb_16.pdf PDF
PE-244_Fishlift_Electrical1.pdf PDF
PE-247_Fishlift_Electrical4.pdf PDF
PS112_Fishlift_Concrete_Walls_Floors3.pdf PDF
PG-1_Plant_Layout.pdf PDF
PE-249_Fishlift_Electrical5.pdf PDF
PE-246_Fishlift_Electrical3.pdf PDF
PS113_Fishlift_Concrete_Walls_Floors1.pdf PDF
PE-95_Motor_Control_Center.pdf PDF
PS101_Fishlift_Concrete_Walls_Floors2.pdf PDF
PE-248Fishlift_Electrical_Fishlift_Logic.pdf PDF
16R0004___Site_Visit_Sign-in_Roster___8_Feb_16.pdf PDF
16R0004_Final_RFP-CRRP_Fishlift_PLC_Rplcmt_1-29-15.pdf PDF
Fish_Lift_Critical_Electrical_Repairs_Final_Drawings_I_1-17-14.pdf PDF
Fish_Lift_Critical_Electrical_Repairs_Final_Drawings_EC_1-17-14.pdf PDF
Critical_Electrical_Repairs_FINAL_SPECS_-_05-27-14.pdf PDF
Show all 32

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Fishlift PLC Drawing Set “I” Notes

Amended Drawing Set I will be posted to FedBizOps. The following (or similarly worded) notes will be included in that set.

1. CONTRACTOR TO PROVIDE A NEW COMPLETE WORKING PLC SYSTEM TO CONTROL/MONITOR THE FISH LIFT SYSTEM. THE NEW PLC SYSTEM SHALL INCORPORATE ALL EXISTING AND NEW FISH LIFT COMPONENTS, FUNCTIONS AND SEQUENCES AS IDENTIFIED IN THE CONTRACT DOCUMENTS.

2. CONTRACTOR TO DEVELOP APPLICATIONS PROGRAMING FOR NEW PLC OPERATING SYSTEM BASED ON THE FOLLOWING: THE OPERATION OF EACH OF THE EXISTING FISH LIFT COMPONENTS, THE INFORMATION PROVIDED ON THE CONTRACT DRAWINGS, THE "PROCESS CONTROLS SPECIFICATION" (SECTION 40 95 00) AND THE FISH LIFT SEQUENCE OF OPERATIONS DOCUMENT. THE PROGRAMMING AND SOFTWARE SHALL BE COMPATIBLE WITH ALL EXISTING AND NEW EQUIPMENT INSTALLED AND PROVIDED UNDER THIS PROJECT.

3. CONTRACTOR TO EXAMINE THE CONTRACT DOCUMENTS AS WELL AS VERIFY THE EXISTING CONDITIONS OF THE FISH LIFT STRUCTURE AND ALL COMPONENTS TO ENSURE INSTALLATION AND OPERATION OF NEW PLC SYSTEM WILL BE IN ACCORDANCE WITH THE DESIGN INTENT OF THIS PROJECT.