AM_0007.pdf

PDF 18 KB Posted

Attached to
St. Stephen SC Fishlift Programmable Logic Controller Federal contract opportunity
Solicitation number
W912HP-16-R-0004
Issued by
Department of the Army Corps of Engineers Engineering District Charleston

About this file

Amendment 0007 to extend closing date

View the file

Other files for this federal contract opportunity

Other files attached to St. Stephen SC Fishlift Programmable Logic Controller, newest first.
File Type Posted
16C0005___FBO_Award_Notice.pdf PDF
W912HP-16-R-0004_Am_0010.pdf PDF
W912HP-16-R-0004_Am_0009.pdf PDF
STAMPED_Fishlift_Critical_Electrical_Repairs_Final_Drawings_I_21Mar2016.pdf PDF
St_Stephen_Dam_Fishlift_SOO_Final_21March2016.pdf PDF
AM0006.pdf PDF
16R0004___CRRP_Fishlift_PLC_Rplcmt___Amendment_0005___3_Mar_16.pdf PDF
16R0004___CRRP_Fishlift_PLC_Rplcmt___Amendment_0004___3-1-16.pdf PDF
Stoplog_Locations_and_Elevations_07-23-13.pdf PDF
Sequence_of_Operation.pdf PDF
Fishlift_PLC_Drawing_Set_I_Notes_24Feb2016.docx DOCX document
16R0004___CRRP_Fishlift_PLC_Rplcmt___Amendment_0003___2-25-16.pdf PDF
Fish_Lift_Critical_Electrical_Repairs_Final_Drawings_G_thru_E_1-17-14.pdf PDF
16R0004___CRRP_Fishlift_PLC_Rplcmt___Amendment_0002___2-22-16.pdf PDF
PE-247_Fishlift_Electrical4.pdf PDF
PE-245_Fishlift_Electrical2.pdf PDF
16R0004___CRRP_Fishlift_PLC_Rplcmt___Amendment_0001___2-19-16.pdf PDF
16R0004___2nd_Site_Visit_Sign-in_Roster___18_Feb_16.pdf PDF
PE-244_Fishlift_Electrical1.pdf PDF
PS112_Fishlift_Concrete_Walls_Floors3.pdf PDF
PG-1_Plant_Layout.pdf PDF
PE-249_Fishlift_Electrical5.pdf PDF
PE-246_Fishlift_Electrical3.pdf PDF
PS113_Fishlift_Concrete_Walls_Floors1.pdf PDF
PE-95_Motor_Control_Center.pdf PDF
PS101_Fishlift_Concrete_Walls_Floors2.pdf PDF
PE-248Fishlift_Electrical_Fishlift_Logic.pdf PDF
16R0004___Site_Visit_Sign-in_Roster___8_Feb_16.pdf PDF
Fish_Lift_Critical_Electrical_Repairs_Final_Drawings_EC_1-17-14.pdf PDF
16R0004_Final_RFP-CRRP_Fishlift_PLC_Rplcmt_1-29-15.pdf PDF
Fish_Lift_Critical_Electrical_Repairs_Final_Drawings_I_1-17-14.pdf PDF
Critical_Electrical_Repairs_FINAL_SPECS_-_05-27-14.pdf PDF
Show all 32

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to extend the closing date indefintiely until an amendment is posted w ith the stamped draw ings.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 15-Mar-2016

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912HP-16-R-0004

X 9B. DATED (SEE ITEM 11)

29-Jan-2016

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

15-Mar-2016

CODE

US ARMY CORPS OF ENGINEERS, CHARLESTON

69-A HAGOOD AVENUE

CHARLESTON SC 29403

W912HP 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912HP-16-R-0004

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

(End of Summary of Changes)

File details come from the government source that posted it. Updated .