amd1.pdf
PDF 167 KB Posted
- Solicitation number
- W912HN19B5005
About this file
Amd 1
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 19B5005_Abstract_14A_Dike_Raising.pdf | ||
| 19B5005_Attendees_Sign_In_Sheet.pdf | ||
| Site_Visit_Roster_18_March_2019.pdf | ||
| W912HN19B5005_Site_Visit_7_March_19.pdf | ||
| 19B5005.PDF | ||
| W912HN19B5005.pdf | ||
| 19B5005.PDF | ||
| Synopsis_19B5005.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
A. CONTRACT CHANGES: The purpose of this admendment is to update the Scope of Work and increase the duration of w ork from 120 days to 170 days after Notice to Proceed.
B. TECHNICAL SPECIFICATION CHANGES: There are no technical specification changes w ith this amendment.
C. CONTRACT DRAWINGS: There are no draw ing changes w ith this amendment.
1. CONTRACT ID CODE PAGE OF PAGES
1 12
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 06-Mar-2019
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912HN19B5005
X 9B. DATED (SEE ITEM 11)
19-Feb-2019
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
07-Mar-2019
CODE
USACE - SAVANNAH DISTRICT
100 W. OGLETHORPE AVE
SAVANNAH GA 31401
W912HN 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912HN19B5005
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00 10 00 - SOLICITATION
The contractor period of performance end date has increased by 50 days from 120 days to 170 days.
The following Delivery Schedule item for SUBCLIN 0001AA has been changed from:
DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
120 dys. ANP 8,560 USACE - SAVANNAH DISTRICT
SEE SCHEDULE FOR DELIVERY
LOCATION
100 W. OGLETHORPE AVE
SAVANNAH GA 31401
SEE SCHEDULE
FOB: Destination
W912HN
To:
DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
170 dys. ANP 8,560 USACE - SAVANNAH DISTRICT
SEE SCHEDULE FOR DELIVERY
LOCATION
100 W. OGLETHORPE AVE
SAVANNAH GA 31401
SEE SCHEDULE
The following Delivery Schedule item for SUBCLIN 0001AB has been changed from:
CAGE
120 dys. ANP 860 USACE - SAVANNAH DISTRICT
SEE SCHEDULE FOR DELIVERY
LOCATION
100 W. OGLETHORPE AVE
SAVANNAH GA 31401
SEE SCHEDULE
CAGE
170 dys. ANP 860 USACE - SAVANNAH DISTRICT
SEE SCHEDULE FOR DELIVERY
LOCATION
100 W. OGLETHORPE AVE
SAVANNAH GA 31401
SEE SCHEDULE
The following Delivery Schedule item for SUBCLIN 0002AA has been changed from:
CAGE
120 dys. ANP 150,000 USACE - SAVANNAH DISTRICT
SEE SCHEDULE FOR DELIVERY
LOCATION
100 W. OGLETHORPE AVE
SAVANNAH GA 31401
SEE SCHEDULE
CAGE
170 dys. ANP 150,000 USACE - SAVANNAH DISTRICT
SEE SCHEDULE FOR DELIVERY
LOCATION
100 W. OGLETHORPE AVE
SAVANNAH GA 31401
SEE SCHEDULE
The following Delivery Schedule item for SUBCLIN 0002AB has been changed from:
CAGE
120 dys. ANP 50,000 USACE - SAVANNAH DISTRICT
SEE SCHEDULE FOR DELIVERY
LOCATION
100 W. OGLETHORPE AVE
SAVANNAH GA 31401
SEE SCHEDULE
170 dys. ANP 50,000 USACE - SAVANNAH DISTRICT
LOCATION
100 W. OGLETHORPE AVE
SAVANNAH GA 31401
SEE SCHEDULE
The following Delivery Schedule item for CLIN 0003 has been changed from:
CAGE
120 dys. ANP 1 USACE - SAVANNAH DISTRICT
SEE SCHEDULE FOR DELIVERY
LOCATION
100 W. OGLETHORPE AVE
SAVANNAH GA 31401
SEE SCHEDULE
CAGE
170 dys. ANP 1 USACE - SAVANNAH DISTRICT
SEE SCHEDULE FOR DELIVERY
LOCATION
100 W. OGLETHORPE AVE
SAVANNAH GA 31401
SEE SCHEDULE
The following Delivery Schedule item for SUBCLIN 0004AA has been changed from:
CAGE
120 dys. ANP 45 USACE - SAVANNAH DISTRICT
SEE SCHEDULE FOR DELIVERY
LOCATION
100 W. OGLETHORPE AVE
SAVANNAH GA 31401
SEE SCHEDULE
170 dys. ANP 45 USACE - SAVANNAH DISTRICT
LOCATION
100 W. OGLETHORPE AVE
SAVANNAH GA 31401
SEE SCHEDULE
The following Delivery Schedule item for SUBCLIN 0004AB has been changed from:
CAGE
120 dys. ANP 5 USACE - SAVANNAH DISTRICT
SEE SCHEDULE FOR DELIVERY
LOCATION
100 W. OGLETHORPE AVE
SAVANNAH GA 31401
SEE SCHEDULE
CAGE
170 dys. ANP 5 USACE - SAVANNAH DISTRICT
SEE SCHEDULE FOR DELIVERY
LOCATION
100 W. OGLETHORPE AVE
SAVANNAH GA 31401
SEE SCHEDULE
The following Delivery Schedule item for CLIN 0005 has been changed from:
CAGE
120 dys. ANP 145 USACE - SAVANNAH DISTRICT
SEE SCHEDULE FOR DELIVERY
LOCATION
100 W. OGLETHORPE AVE
SAVANNAH GA 31401
SEE SCHEDULE
170 dys. ANP 145 USACE - SAVANNAH DISTRICT
SEE SCHEDULE FOR DELIVERY
LOCATION
100 W. OGLETHORPE AVE
SAVANNAH GA 31401
SEE SCHEDULE
The following Delivery Schedule item for CLIN 0006 has been changed from:
CAGE
120 dys. ANP 30 USACE - SAVANNAH DISTRICT
SEE SCHEDULE FOR DELIVERY
LOCATION
100 W. OGLETHORPE AVE
SAVANNAH GA 31401
SEE SCHEDULE
CAGE
170 dys. ANP 30 USACE - SAVANNAH DISTRICT
SEE SCHEDULE FOR DELIVERY
LOCATION
100 W. OGLETHORPE AVE
SAVANNAH GA 31401
SEE SCHEDULE
The following Delivery Schedule item for CLIN 0007 has been changed from:
CAGE
120 dys. ANP 30 USACE - SAVANNAH DISTRICT
SEE SCHEDULE FOR DELIVERY
LOCATION
100 W. OGLETHORPE AVE
SAVANNAH GA 31401
SEE SCHEDULE
CAGE
170 dys. ANP 30 USACE - SAVANNAH DISTRICT
SEE SCHEDULE FOR DELIVERY
LOCATION
100 W. OGLETHORPE AVE
SAVANNAH GA 31401
SEE SCHEDULE
The following Delivery Schedule item for SUBCLIN 0008AA has been changed from:
CAGE
120 dys. ANP 30,000 USACE - SAVANNAH DISTRICT
SEE SCHEDULE FOR DELIVERY
LOCATION
100 W. OGLETHORPE AVE
SAVANNAH GA 31401
SEE SCHEDULE
CAGE
170 dys. ANP 30,000 USACE - SAVANNAH DISTRICT
SEE SCHEDULE FOR DELIVERY
LOCATION
100 W. OGLETHORPE AVE
SAVANNAH GA 31401
SEE SCHEDULE
The following Delivery Schedule item for SUBCLIN 0008AB has been changed from:
CAGE
120 dys. ANP 10,000 USACE - SAVANNAH DISTRICT
SEE SCHEDULE FOR DELIVERY
LOCATION
100 W. OGLETHORPE AVE
SAVANNAH GA 31401
SEE SCHEDULE
CAGE
170 dys. ANP 10,000 USACE - SAVANNAH DISTRICT
SEE SCHEDULE FOR DELIVERY
LOCATION
100 W. OGLETHORPE AVE
SAVANNAH GA 31401
SEE SCHEDULE
The following Delivery Schedule item for CLIN 0009 has been changed from:
CAGE
120 dys. ANP 1 USACE - SAVANNAH DISTRICT
SEE SCHEDULE FOR DELIVERY
LOCATION
100 W. OGLETHORPE AVE
SAVANNAH GA 31401
SEE SCHEDULE
CAGE
170 dys. ANP 1 USACE - SAVANNAH DISTRICT
SEE SCHEDULE FOR DELIVERY
LOCATION
100 W. OGLETHORPE AVE
SAVANNAH GA 31401
SEE SCHEDULE
The following Delivery Schedule item for SUBCLIN 0010AA has been changed from:
CAGE
120 dys. ANP 10 USACE - SAVANNAH DISTRICT
SEE SCHEDULE FOR DELIVERY
LOCATION
100 W. OGLETHORPE AVE
SAVANNAH GA 31401
SEE SCHEDULE
CAGE
170 dys. ANP 10 USACE - SAVANNAH DISTRICT
SEE SCHEDULE FOR DELIVERY
LOCATION
100 W. OGLETHORPE AVE
SAVANNAH GA 31401
SEE SCHEDULE
The following Delivery Schedule item for SUBCLIN 0010AB has been changed from:
CAGE
120 dys. ANP 2 USACE - SAVANNAH DISTRICT
SEE SCHEDULE FOR DELIVERY
LOCATION
100 W. OGLETHORPE AVE
SAVANNAH GA 31401
SEE SCHEDULE
CAGE
170 dys. ANP 2 USACE - SAVANNAH DISTRICT
SEE SCHEDULE FOR DELIVERY
LOCATION
100 W. OGLETHORPE AVE
SAVANNAH GA 31401
SEE SCHEDULE
The following Delivery Schedule item for CLIN 0011 has been changed from:
120 dys. ANP 35 USACE - SAVANNAH DISTRICT
LOCATION
100 W. OGLETHORPE AVE
SAVANNAH GA 31401
SEE SCHEDULE
CAGE
170 dys. ANP 35 USACE - SAVANNAH DISTRICT
SEE SCHEDULE FOR DELIVERY
LOCATION
100 W. OGLETHORPE AVE
SAVANNAH GA 31401
SEE SCHEDULE
The following Delivery Schedule item for CLIN 0012 has been changed from:
CAGE
120 dys. ANP 7 USACE - SAVANNAH DISTRICT
SEE SCHEDULE FOR DELIVERY
LOCATION
100 W. OGLETHORPE AVE
SAVANNAH GA 31401
SEE SCHEDULE
CAGE
170 dys. ANP 7 USACE - SAVANNAH DISTRICT
SEE SCHEDULE FOR DELIVERY
LOCATION
100 W. OGLETHORPE AVE
SAVANNAH GA 31401
SEE SCHEDULE
The following Delivery Schedule item for CLIN 0013 has been changed from:
120 dys. ANP 7 USACE - SAVANNAH DISTRICT
LOCATION
100 W. OGLETHORPE AVE
SAVANNAH GA 31401
SEE SCHEDULE
CAGE
170 dys. ANP 7 USACE - SAVANNAH DISTRICT
SEE SCHEDULE FOR DELIVERY
LOCATION
100 W. OGLETHORPE AVE
SAVANNAH GA 31401
SEE SCHEDULE
SECTION 00 73 00 - SUPPLEMENTARY CONDITIONS
The following have been modified:
52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)
The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 170 calendar days after receipt of notice to proceed. The time stated for completion shall include final cleanup of the premises.
(End of clause)
SECTION 01 00 00 - GENERAL REQUIREMENTS
The following have been modified:
SCOPE OF WORK
SCOPE OF WORK
for
SHEP - DMCA 14A BACK DIKE AND 14B INTERIOR BERM IMPROVEMENTS
Savannah Harbor, Jasper County, SC
31 January 2019
Savannah Harbor DMCA 14A will be used primarily for the special handling and disposal of naturally occurring cadmium containing materials that will be excavated during dredging of the Savannah River as part of the Savannah Harbor Expansion Project (SHEP). In order to safely contain these materials, other unclassified (new work) materials excavated during deepening of the river, and O&M maintenance dredging materials, the DMCA 14A back dike and counterweight as well as the new DMCA 14B interior berm needs to be raised. The Scope of Work for this project consists of placing fill across the DMCA 14A back dike to an elevation of 28 feet MLLW, placing fill across the DMCA 14A back dike counterweight to an elevation range of 17 to 16 feet MLLW, and placing fill across the DMCA 14B interior berm to an elevation of 22 feet MLLW. After constructing the DMCA 14B interior berm to grade the three existing 30 inch diameter outfall pipes with flap gates within the berm will be removed and re-set plumb. Additional soil fill is to be mounded around three temporarily closed weirs in DMCA 14B and crushed stone stockpiled in the southwest corner of DMCA 14A will be transported for placement around four weir outfall pipes along the back side of DMCA 13A.
The existing DMCA 14A back dike currently spans a length of approximately 8,500 feet and has a crest elevation ranging from about 21 to 22 feet MLLW and a counterweight elevation ranging from about 15 feet to 11 feet MLLW. For this contract the interior counterweight/stability berm will be graded to a uniform elevation ranging from 17 to 16 feet MLLW and the back dike will be raised to a crest elevation of 28 feet MLLW. Crushed stone currently stockpiled in the southwest corner of DMCA 14A will be transported for placement around four existing weir outfall pipes along the back side of DMCA 13A.
The existing DMCA 14B interior berm is approximately 6,000 feet in length and has a crest elevation of about 19 to 20 feet MLLW. This berm will be re-graded to a uniform elevation of 22 feet MLLW. After the interior berm has been brought to grade, the three existing 30 inch diameter outfall pipes with flap gates within the berm will be removed and re-set plumb. Additional soil fill is also to be mounded around three temporarily closed weirs in
DMCA 14B
New stands of grass will be established over all filled areas. The fill materials for earthwork operations will be obtained from the interior of DMCA 14B. A limited amount of fill material may be available from the interior of
DMCA 14A.
(End of Summary of Changes)