W912GY-18-R-0034.pdf
PDF 527 KB Posted
- Attached to
- Fiber Repair Services
- Solicitation number
- W912GY18R0034
About this file
Solicitation
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Question__1.docx | DOCX document | |
| Visitor_Request_form1246R_Mar-2017.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SEE ADDENDUM
(No Collect Calls)
W912GY18R0034 11-Sep-2018
b. TELEPHONE NUMBER
530-827-4776
8. OFFER DUE DATE/LOCAL TIME
10:00 AM 11 Oct 2018
5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 2/2012)
Prescribed by GSA – FAR (48 CFR) 53.212
(TYPE OR PRINT)
(SIGNATURE OF CONTRACTING OFFICER)
ADDENDA X ARE
26. TOTAL AWARD AMOUNT (For Gov t. Use Only )
23.
CODE 10. THIS ACQUISITION IS
SUCH ADDRESS IN OFFER
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT
BELOW IS CHECKED
TELEPHONE NO.
W912GY9. ISSUED BY
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME
LISSA KAARBO
2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER
(TYPE OR PRINT)
30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA
1 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.X
25. ACCOUNTING AND APPROPRIATION DATA
1. REQUISITION NUMBER
20.
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
W62G2W8115049A
ARE NOT ATTACHED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
. YOUR OFFER ON SOLICITATION
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
% FOR:SET ASIDE:UNRESTRICTED OR X
SMALL BUSINESSX
17a.CONTRACTOR/ CODE FACILITY
OFFEROR CODE
SIERRA ARMY DEPOT
CONTRACTING OFFICE
74 C STREET BUILDING 60
HERLONG CA 96113
18a. PAYMENT WILL BE MADE BY CODE
RATED ORDER UNDER
DPAS (15 CFR 700)
13a. THIS CONTRACT IS A
13b. RATING
CODE15. DELIVER TO CODE W62G2W 16. ADMINISTERED BY
12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
14. METHOD OF SOLICITATION
RFQ IFB RFPX
DIRECTORATE OF INFORMATION MANAGEMENT
KENT HINDERLIDER
SIERRA ARMY DEPOT
BUILDING 51
HERLONG CA 96113
TEL: 530-827-4355 FAX:
530-827-4722FAX:
TEL: 530-827-5146 SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
8(A)
HUBZONE SMALL
BUSINESS
SIZE STANDARD:
$15,000,000
NAICS:
238210
X
OFFER DATED
29. AWARD OF CONTRACT: REF.
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
EMAIL:
TEL:
31c. DATE SIGNED
SEE SCHEDULE
SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT
24.22.21.19.
WOMEN-OWNED SMALL BUSINESS (WOSB)
ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
EDWOSB
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
(CONTINUED)
PAGE 2 OF61
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
37. CHECK NUMBER
FINALPARTIALCOMPLETE
36. PAYMENT35. AMOUNT VERIFIED
CORRECT FOR
34. VOUCHER NUMBER
FINAL
33. SHIP NUMBER
PARTIAL
38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE
42a. RECEIVED BY (Print)
42b. RECEIVED AT (Location)
42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS
STANDARD FORM 1449 (REV. 2/2012) BACK
Prescribed by GSA – FAR (48 CFR) 53.212
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
SEE SCHEDULE
20.
SCHEDULE OF SUPPLIES/ SERVICES
21.
QUANTITY UNIT
22. 23.
UNIT PRICE
24.
AMOUNT
19.
ITEM NO.
W912GY18R0034
Section SF 1449 - CONTINUATION SHEET
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Lot Fiber Repair
FFP
Description: Provide Fiber Repair services to locate, identify, repair, and thoroughly test the damaged section of Fiber Optic cable per the Performance Work Statement. Period of Performance 05 November 2018- 15 November 2018.
FOB: Destination
NSN: AASSVC8115049A
MILSTRIP: W62G2W8115049A
PURCHASE REQUEST NUMBER: W62G2W8115049A
PSC CD: J060
NET AMT
0002 1 Each Contract Manpower Report
FFP
Description: Contractor Manpower Reporting in accordance with Local Narrative CS7237. The CMR is a government requirement for all service contracts that include labor. The contractor is required to login into the CMR website after completion of the contract and record labor hours worked in support of the contract. Typically requires approximately 1-2 hours of time. This line item will be not seperately priced (NSP).
FOB: Destination
NSN: AASSVC8115049A
MILSTRIP: W62G2W8115049A
PURCHASE REQUEST NUMBER: W62G2W8115049A
0003 1 Each Contract Data Requirement List (CDRL)
FFP
Description: Contract Data Requirement List A001: The contractor shall submit an approved dig permit to SIAD Directorate of Information Management COR via email within 5 days of the start of work. For required information see PWS para.
5.2.1. This line item will be not seperately priced (NSP).
FOB: Destination
INSPECTION AND ACCEPTANCE TERMS
Supplies/services will be inspected/accepted at:
CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
0001 Destination Government Destination Government 0002 Destination Government Destination Government 0003 Destination Government Destination Government
DELIVERY INFORMATION
CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
0001 POP 05-NOV-2018 TO
15-NOV-2018
N/A DIRECTORATE OF INFORMATION
MANAGEMENT
KENT HINDERLIDER
SIERRA ARMY DEPOT
BUILDING 51
HERLONG CA 96113
530-827-4355
W62G2W
0002 POP 05-NOV-2018 TO
15-NOV-2018
N/A (SAME AS PREVIOUS LOCATION)
0003 POP 05-NOV-2018 TO
15-NOV-2018
N/A (SAME AS PREVIOUS LOCATION)
PERFORMANCE WORK STATEMENT
PERFORMANCE WORK STATEMENT (PWS)
Fiber Optic Cable Repair
PART 1
GENERAL INFORMATION
1 GENERAL: This is a non-personnel services contract to provide Fiber Optic Cable Repair. The Government shall not exercise any supervision or control over the contract service providers performing the services herein.
Such contract service providers shall be accountable solely to the Contractor who, in turn is responsible to the Government.
1.1 Description of Services/Introduction: The contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform Fiber Optic Cable Repair as defined in this Performance Work Statement except for those items specified as government furnished property and services. The contractor shall perform to the standards in this contract.
1.2 Background: We have a requirement for a one-time repair of a 24 strand fiber optic cable. The cable is approximately 1.5 miles long. The exact location of the break is unknown at this time.
1.3 Objectives: Locate, identify, repair, and thoroughly test the damaged section of Fiber Optic cable to ensure the segment is fully capable of maximum data transmission.
1.4 Scope: Contractor will locate, identify, repair, and test the fusion splice of a twenty four strand fiber optic cable between building A and the manhole near building B, the distance of the cable is approximately 1.5 miles long. The repair of the fiber optic cable will require excavation by the contractor in order to reach the damaged section. The Contractor will need to provide a fiber splice case (at least 24 strand) and any other associated material to properly complete the repair. The scope shall be performed IAW the PWS section 5 Specific Tasks.
1.5 Period of Performance: This is a onetime repair. Period of performance will be determined upon award.
1.6 General Information:
1.6.1 Quality Control: The contractor shall develop and maintain an effective quality control program to ensure services are performed in accordance with this PWS. The contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The contractor's quality control program is the means by which he assures himself that his work complies with the requirement of the contract.
1.6.2 Quality Assurance: The government shall evaluate the contractor's performance under this contract in accordance with the Quality Assurance Surveillance Plan. This plan is primarily focused on what the Government must do to ensure that the contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and the minimum acceptable defect rate(s).
1.6.3 Contractor is not required to perform work on the following recognized Holidays:
New Year's Day Martin Luther King Jr.'s Birthday President's Day Memorial Day Independence Day
Labor Day Columbus Day Veteran's Day Thanksgiving Day Christmas Day
1.6.4 Hours of Operation: The contractor is responsible for conducting business, between the hours of 0700- 1700 Monday thru Thursday except Federal holidays or when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings. For other than firm fixed price contracts, the contractor will not be reimbursed when the government facility is closed for the above reasons. The Contractor must at all times maintain an adequate workforce for the uninterrupted performance of all tasks defined within this PWS when the Government facility is not closed for the above reasons. When hiring personnel, the Contractor shall keep in mind that the stability and continuity of the workforce are essential.
1.6.5 Place of Performance: The work to be performed under this contract will be performed at Sierra Army Depot, Herlong, California. Location will be provided upon award.
1.6.6 Type of Contract: The government will award a firm fixed price contract.
1.6.7 Security Requirements: Contractor personnel performing work under this contract must pass a basic security background check at time of the proposal submission, and must maintain the level of security required for the life of the contract.
1.6.7.1 PHYSICAL Security: The contractor shall be responsible for safeguarding all government equipment, information and property provided for contractor use. At the close of each work period, government facilities, equipment, and materials shall be secured.
1.6.7.2 Key control. N/A
1.6.7.3 Lock combination. N/A
1.6.8 Special Qualifications: The contractor will ensure that technical personnel possess an industry standard certification for Fiber Optic splicing and maintenance.
1.6.9 Post Award Conference/Periodic Progress Meetings: The Contractor agrees to attend any post award conference convened by the contracting activity or contract administration office in accordance with Federal Acquisition Regulation Subpart 42.5. The contracting officer, Contracting Officers Representative (COR), and other Government personnel, as appropriate, may meet periodically with the contractor to review the contractor's performance. At these meetings the contracting officer will apprise the contractor of how the government views the contractor's performance and the contractor will apprise the Government of problems, if any, being experienced. Appropriate action shall be taken to resolve outstanding issues. These meetings shall be at no additional cost to the government.
1.6.10 Contracting Officer Representative (COR): The (COR) will be identified by separate letter. The COR monitors all technical aspects of the contract and assists in contract administration The COR is authorized to perform the following functions: assure that the Contractor performs the technical requirements of the contract:
perform inspections necessary in connection with contract performance: maintain written and oral communications with the Contractor concerning technical aspects of the contract: issue written interpretations of technical requirements, including Government drawings, designs, specifications: monitor Contractor's performance and notifies both the Contracting Officer and Contractor of any deficiencies; coordinate availability of government furnished property, and provide site entry of Contractor personnel. A letter of designation issued to the COR, a copy of which is sent to the Contractor, states the responsibilities and limitations of the COR, especially with regard to changes in cost or price, estimates or changes in delivery dates. The COR is not authorized to change any of the terms and conditions of the resulting order.
1.6.11 Key Personnel: The follow personnel are considered key personnel by the government: FIBER OPTIC TECHNICIAN. The contractor shall provide a contract manager who shall be responsible for the performance of the work. The name of this person and an alternate who shall act for the contractor when the manager is absent shall be designated in writing to the contracting officer. The contract manager or alternate shall have full authority to act for the contractor on all contract matters relating to daily operation of this contract. The contract manager or alternate shall be available between 8:00 A.M. TO 4:30P.M., Monday thru Thursday except Federal holidays or when the government facility is closed for administrative reasons. Qualifications for all key personnel are listed below: FIBER OPTIC TECHNICIAN must have an industry certification in the repair, splicing, and maintenance of Fiber Optic cable.
1.6.12 Identification of Contractor Employees: All contract personnel attending meetings, answering Government telephones, and working in other situations where their contractor status is not obvious to third parties are required to identify themselves as such to avoid creating an impression in the minds of members of the public that they are Government officials. They must also ensure that all documents or reports produced by contractors are suitably marked as contractor products or that contractor participation is appropriately disclosed.
CONTRACTOR PERSONNEL WILL BE REQUIRED TO OBTAIN AND WEAR A VISITORS BADGE IN
PEFORMANCE OF THIS SERVICE.
1.6.13 Data Rights: The Government has unlimited rights to all documents/material produced under this contract. All documents and materials, to include the source codes of any software, produced under this contract shall be Government owned and are the property of the Government with all rights and privileges of ownership/copyright belonging exclusively to the Government. These documents and materials may not be used or sold by the contractor without written permission from the Contracting Officer. All materials supplied to the Government shall be the sole property of the Government and may not be used for any other purpose. This right does not abrogate any other Government rights.
1.6.14 Organizational Conflict of Interest: Contractor and subcontractor personnel performing work under this contract may receive, have access to or participate in the development of proprietary or source selection information (e.g., cost or pricing information, budget information or analyses, specifications or work statements, etc.) or perform evaluation services which may create a current or subsequent Organizational Conflict of Interests (OCI) as defined in FAR Subpart 9.5. The Contractor shall notify the Contracting Officer immediately whenever it becomes aware that such access or participation may result in any actual or potential OCI and shall promptly submit a plan to the Contracting Officer to avoid or mitigate any such OCI. The Contractor's mitigation plan will be determined to be acceptable solely at the discretion of the Contracting Officer and in the event the Contracting Officer unilaterally determines that any such OCI cannot be satisfactorily avoided or mitigated, the Contracting Officer may affect other remedies as he or she deems necessary, including prohibiting the Contractor from participation in subsequent contracted requirements which may be affected by the OCI.
1.7 Environmental:
1.7.1 Sec. 1- Compliance with Environmental Laws and Regulations:
Contractor shall comply with all applicable federal, state, and local environmental laws, statutes, regulations, executive orders, permits, Army regulations (with supplements), as well as Major Subordinate Command (MSC) and Sierra Army Depot (SIAD) regulation, policy, Host Tenant Agreement, Interagency Service Support Agreement, or Status-of-Forces Agreement. Contractor shall immediately report any conflicts between applicable federal, state, local environmental laws, statutes, executive orders, and provisions of Army Regulation 200-1, and any specifications within this contract to the Contracting Officer Representative (COR).
1.7.2 Sec. 2 - Compliance with Green Procurement Requirements: N/A
1.7.3 Sec. 3 - Compliance with License and Certification Requirements:
Contractor shall obtain all license and certification required by Federal, State, and Local environmental laws and regulations necessary to adhere to the specifications of this contract. The Contractor shall submit all plans, notifications, reports, submittal documents, and fees required by Federal, State, and Local environmental laws and regulations to the appropriate Federal, State, and Local authority and/or agency as necessary to adhere to the specification of this contract. All required licenses and certifications required by Federal, State, and Local environmental laws and/or regulations shall be considered a contract deliverable upon award.
1.7.4 Sec. 4 - Notification of Federal and State Regulators:
Contractor shall immediately notify the Designated Government Representative (DGR) and COR of the arrival on site of any Federal, State, local and/or DoD environmental regulator or enforcement agent and/or the receipt of any correspondence from above mentioned environmental regulatory agencies.
1.7.5 Sec. 5 - Inspections of Work Sites:
Contractor shall submit to potential Federal, State, Local, Army and installation work site environmental regulatory inspections and/or investigations into noncompliance, and fully cooperate with such inspections/investigations by providing the appropriate records and documentation. Environmental regulatory agencies are authorized by law to inspect any work site for environmental compliance with regulatory requirements. If an inspection is conducted, it will not stop or disrupt ongoing contract activities. The inspection will only require the work site environmental officer, or supervisor/manager to answer questions and/or escort the inspector to specific work site areas with the potential to affect environmental quality.
1.7.6 Sec. 6 - Reporting Noncompliance: N/A
1.7.7 Sec. 7 - Verification of National Environmental Policy Act Documents: N/A
1.7.8 Sec. 8 - Conformance with Environmental Management System (EMS): N/A
1.7.9 Sec. 9 - Assignment of Environmental Compliance Designee (ECD): N/A
1.7.10 Sec. 10 - Competency Training for Contractor Personnel: N/A
1.7.11 Sec. 11 - Generation of Solid Waste: N/A
1.7.12 Sec. 12 - Generation of Hazardous Waste: N/A
1.7.13 Sec. 13. - Use of Hazardous Materials:
Contractor shall assign all hazardous materials management responsibilities to the appointed ECD or designated personnel. Contractor shall contact the DGR or COR to obtain technical assistance from Environmental Office for assisting the ECD with achieving and maintaining compliance with hazardous material storage, issue, use, and disposal requirements. Contractor shall submit to the COR and/or DGR a hazardous material inventory. The hazardous material inventory will be submitted 30 days prior to commencement of work for contracts that exceed 180 consecutive days. The inventory list will contain the hazardous material type and maximum quantities of materials anticipated to be stored on-site. The hazardous material shall be properly identified and include any applicable identification number, such as National Stock Number or Special Item Number. The Contractor shall maintain copies of Safety Data Sheets for all hazardous materials used and stored on-site during performance of the contract. Contractor shall not supply or deliver any hazardous materials or chemicals to an installation that are listed on EPA toxic chemical list (33/50 Program - AKA 17 List) without prior written approval from DGR and/or COR.
1.7.14 Sec. 14. - Prevention of Storm Water Pollution: N/A
1.7.15 Sec. 15 - Storm Water Management Low Impact Design/Development (LID): N/A
1.7.16 Sec. 16 - Use of Pesticides: N/A
1.7.17 Sec. 17 - Protection of Work Site Resources: N/A
1.7.18 Sec. 18 - Prevention of Spills: N/A
1.7.19 Sec. 19 - Protection of Sensitive Areas: N/A
1.7.20 Sec. 20 - Corrective Action for Noncompliance: N/A
1.7.21 Sec. 21 - Noise: N/A
1.7.22 Sec. 22 - Mercury: N/A
1.7.23 Sec. 23 - Universal Waste / e-Waste Management: N/A
1.7.24 Sec. 24 - Pollution Prevention / Hazardous Waste Minimization: N/A
PART 2
DEFINITIONS AND ACRONYMS
2 DEFINITIONS AND ACRONYMS:
2.1 DEFINITIONS:
2.1.1 CONTRACTOR. A supplier or vendor awarded a contract to provide specific supplies or service to the government. The term used in this contract refers to the prime.
2.1.2 CONTRACTING OFFICER. A person with authority to enter into, administer, and or terminate contracts, and make related determinations and findings on behalf of the government. Note: The only individual who can legally bind the government.
2.1.3 CONTRACTING OFFICER'S REPRESENTATIVE (COR). An employee of the U.S. Government appointed by the contracting officer to administer the contract. Such appointment shall be in writing and shall state the scope of authority and limitations. This individual has authority to provide technical direction to the Contractor as long as that direction is within the scope of the contract, does not constitute a change, and has no funding implications. This individual does NOT have authority to change the terms and conditions of the contract.
2.1.4 DEFECTIVE SERVICE. A service output that does not meet the standard of performance associated with the Performance Work Statement.
2.1.5 DELIVERABLE. Anything that can be physically delivered, but may include non-manufactured things such as meeting minutes or reports.
2.1.6 KEY PERSONNEL. Contractor personnel that are evaluated in a source selection process and that may be required to be used in the performance of a contract by the Key Personnel listed in the PWS. When key personnel are used as an evaluation factor in best value procurement, an offer can be rejected if it does not have a firm commitment from the persons that are listed in the proposal.
2.1.7 PHYSICAL SECURITY. Actions that prevent the loss or damage of Government property.
2.1.8 QUALITY ASSURANCE. The government procedures to verify that services being performed by the Contractor are performed according to acceptable standards.
2.1.9 QUALITY ASSURANCE SURVEILLANCE PLAN (QASP). An organized written document specifying the surveillance methodology to be used for surveillance of contractor performance.
2.1.10 QUALITY CONTROL. All necessary measures taken by the Contractor to assure that the quality of an end product or service shall meet contract requirements.
2.1.11 SUBCONTRACTOR. One that enters into a contract with a prime contractor. The Government does not have privity of contract with the subcontractor.
2.1.12 WORK DAY. The number of hours per day the Contractor provides services in accordance with the contract.
2.1.13 WORK WEEK. Monday through Thursday, unless specified otherwise.
2.2 ACRONYMS:
ACOR Alternate Contracting Officer's Representative AFARS Army Federal Acquisition Regulation Supplement AR Army Regulation CCE Contracting Center of Excellence CFR Code of Federal Regulations CONUS Continental United States (excludes Alaska and Hawaii) COR Contracting Officer Representative COTR Contracting Officer's Technical Representative COTS Commercial-Off-the-Shelf DA Department of the Army DD250 Department of Defense Form 250 (Receiving Report) DD254 Department of Defense Contract Security Requirement List DFARS Defense Federal Acquisition Regulation Supplement DMDC Defense Manpower Data Center DOD Department of Defense FAR Federal Acquisition Regulation HIPAA Health Insurance Portability and Accountability Act of 1996
KO Contracting Officer OCI Organizational Conflict of Interest OCONUS Outside Continental United States (includes Alaska and Hawaii) ODC Other Direct Costs PIPO Phase In/Phase Out POC Point of Contact PRS Performance Requirements Summary PWS Performance Work Statement QA Quality Assurance QAP Quality Assurance Program QASP Quality Assurance Surveillance Plan QC Quality Control QCP Quality Control Program TE Technical Exhibit
PART 3
GOVERNMENT FURNISHED PROPERTY, EQUIPMENT, AND SERVICES
3 GOVERNMENT FURNISHED ITEMS AND SERVICES:
3.1 Services: The Government will not provide any services in support of this contract.
3.2 Materials: The Government will not provide any materials in support of this contract.
PART 4
CONTRACTOR FURNISHED ITEMS AND SERVICES
4 CONTRACTOR FURNISHED ITEMS AND SERVICES:
4.1 General: The Contractor shall furnish all supplies, equipment, facilities and services required to perform work under this contract that are not listed under Section 3 of this PWS.
4.2 Materials. The Contractor shall provide and furnish all supplies and materials to include preformed coyote fiber optic splice cases necessary to meet the requirements under this PWS.
4.3 Equipment. The Contractor shall provide and furnish equipment, excavator and all digging tools/equipment etc. to meet the requirements under this PWS.
PART 5
SPECIFIC TASKS
5 SPECIFIC TASKS:
5.1 Basic Services. The contractor shall provide services at Sierra Army Depot Optic cable repair that is causing a communications disruption aboard the installation between specific buildings. The damage of the twenty four strand fiber optic cable is located between building A and the manhole near building B, the distance of the cable is approximately 1.5 miles long. The exact location of the break is unknown.
5.1.1 A site visit will be available for vendors to see the location. See clause FAR 52.236-27 Site Visit
Construction.
5.2 Fiber Optic Cable Repair.
5.2.1 The Contractor will locate the break or breaks in the Fiber Optic cable. The damaged cable will be identified/flagged by the government. The break or breaks are approximately 1.5 miles long segment of 24 strand cable. The break is unknown at this time. The contractor will coordinate with the COR and obtain a dig permit with the Sierra Army Depot Department of Public Works in order to ensure safe excavation of the cable. The dig permit will be fully approved and authorized by Sierra Army Depot Department of Public Works prior to any excavation taking place. Contract Data Requirement List (CDRL) A001 for Obtaining an approved dig permit for SIAD is required to be submitted via email to the COR within 5 days of the start of work.
Break(s)- 24 strand single mode fiber Break is direct buried Break location: From Building A to Manhole near Bldg B is 7,700 feet. Break can be 36”- 48” deep.
The Contractor will perform a fiber optic fusion splice or necessary action in order to repair the damaged cable.
The Contractor will need to provide a fiber splice case (at least 24 strand) and any other associated material to properly complete the repair. The cable will be fully repaired to an operational state. The Contractor will completely test the repaired fiber optic cable operational functionality. The cable will be fully tested for maximum data transmission capability. Testing shall ensure that the fiber strand is operational to all far end points (Bldg manhole B, Bldg C, Gate A and Bldg D). Bldg. locations will be identified upon award.
5.3 CONTRACTOR MANAGEMENT REPORTING (CMR) [ONLY APPLIES TO ARMY CUSTOMERS]:
Contractor Manpower Reporting: Contractor Manpower Reporting in accordance with Local Narrative CS7237. The CMR is a Government requirement for all service contracts that include labor. The Contractor is required to log into the CMR website after completion of the contract and record labor hours worked in support of the contract.
Contractors shall complete the report by performance expiration.
PART 6
APPLICABLE PUBLICATIONS
6 APPLICABLE PUBLICATIONS:
6.1 The Contractor must abide by all applicable regulations, publications, manuals, and local policies and procedures.
PART 7
ATTACHMENT/TECHICAL EXHIBIT LIST
7 ATTACHMENT/TECHICAL EXHIBIT LIST:
7.1 Attachment 1/Technical Exhibit 1 -- Performance Requirements Summary
7.2 Attachment 2/Technical Exhibit 2 -- Deliverables Schedule
TECHNICAL EXHIBIT 1
PERFORMANCE REQUIREMENTS SUMMARY
The contractor service requirements are summarized into performance objectives that relate directly to mission essential items. The performance thresholds briefly describe the minimum acceptable levels of service required for each requirement. These thresholds are critical to mission success.
Performance Objectives Standards Performance Thresholds Methods of
Surveillance The Contractor will perform a fiber optic fusion splice or necessary action in order to repair the damaged cable.
Para. 5.2.1
The cable will be fully repaired to an operational state.
100% completion of the fiber optic cable repair.
100% inspection
The Contractor will completely test the repaired fiber optic cable operational functionality.
Para 5.2.1
The cable will be fully tested for maximum data transmission capability.
100% throughput of data is required and will produce a data loss of no greater than 2.0 dB.
100% inspection
TECHNICAL EXHIBIT 2
DELIVERABLES SCHEDULE
Deliverables Frequencies # of
Copies Medium/Format Submit
To The contractor will coordinate with the COR and obtain a dig permit with the Sierra Army Depot Department of Public Works in order to ensure safe excavation of the cable. Para 5.2.1
CLIN 0003
Once One Provided by the
GOV
COR
Local Narratives:
AS3001 (PROVISION)
A.____ ELECTRONIC BIDS/PROPOSALS/OFFERS/QUOTES REQUIRED IN RESPONSE TO THIS
SOLICITATION (AUG 2015)
(a) All Army Contracting Command - Warren (SIAD) solicitations will be publicized on the Federal Business Opportunities website (https://www.fbo.gov). Any additional attachments, when available electronically, will be separate attachments or links embedded in the solicitation.
(b) Bids/Proposals must be submitted in electronic media. When submitting your bid/proposal electronically, the bid/proposal and any supplemental information (such as spreadsheets, backup data, technical information), can be submitted using any of the following electronic formats:
(1) Microsoft* Office Products (Sierra can read Microsoft* Office 2007 and lower); Word, Excel, or PowerPoint. Spreadsheets must be sent in a format that includes all formulate macro and format information. Print image is not acceptable.
(2) Files in Adobe PDF (Portable Document Format). Scanners should be set to 300 dots per inch.
(3) Files in HTML (Hypertext Markup Language). HTML documents must not contain active links to live Internet sites or pages. All linked information must be contained within your electronic bid/offer and be accessible offline.
(4) Other electronic formats are not acceptable.
(c) Transmission methods:
(1) As of 10 August 2015, online via the Federal Business Opportunities (FBO) System.
Requirements for the online FBO bid submission:
Vendors must login to the FBO System to be able to submit electronic responses for opportunities.
Vendors must also registered in the System for Award Management (SAM) at www.sam.gov (a Federal Government owned and operated free web site) and have a CAGE Code and CCR Marketing Partner Identification Number
(MPIN).
Once logged into the FBO System, vendors will be asked to enter basic information and then will be directed to upload one or more files containing the offer and any additional information as outlined in the solicitation.
FBO will send an email to the email address on file for the user confirming the electronic submission.
For additional information on submitting electronic bid responses via the Federal Business Opportunities System reference the FBO Vendor Guide – Section 4.3.1 submitting an Electronic Response Topic (https://www.fbo.gov/downloads/FBO_Vendor_Guide.pdf).
(2) E-mail. If you choose to use e-mail, address your bid/proposal usarmy.sierra.tacom.mbx.sier-contracting-offers@mail.mil . DO NOT E-MAIL BIDS/PROPOSALS TO THE BUYERS. ENSURE THE EMAIL HAS A
SUBJECT LINE. THE SUBJECT LINE OF THE E-MAIL MUST READ:
BID-[solicitation number] or PROPOSAL-[solicitation number], whichever is applicable [Name of Company/offeror] OPENS [opening date for bids] or CLOSES [closing date for proposals], whichever is applicable.
Maximum size of each e-mail shall be 10 megabytes. Use the file compression described in the NOTE in paragraph
(a) (4) above. You may use multiple e-mail messages for each bid/submission, however, you must annotate the subject lines as described above for each message, and number them in this manner: “Message 1 of 3, 2 of 3, 3 of 3”.
Attachments CANNOT have any of the following extensions: ade, adp, app, asx, bas, bat, chm, cmd, com, cpl, crt, csh, exe, fxp, hlp, hta, inf, ins, isp, js, jse, ksh, lnk, mda, mdb, mde, mdt, mdw, mdz, msc, msi, msp, mst, ops, pcd, pif, prf, prg, reg, scf, scr, sct, shb, shs, url, vb, vbe, vbs, wsc, wsf, wsh, ade, adp, asx, bas, bat, chm, cmd, com, cpl, crt, exe, hlp, hta, htm, html, htc, inf, ins, isp, js, jse, lnk, mda, mdb, mde, mdz, mht, mhtml, msc, msi, msp, mst, pcd, pif, prf, reg, scf, scr, sct, shb, shs, shtm, shtml, stm, url, vb, vbe, vbs, wsc, wsf, wsh, xml, dir, dcr, plg, spl, swf
Ensure that filenames of attachments DO NOT contain spaces to limit virus scanners rejecting the email as unscannable.
NOTE (Compression): The above formats may be submitted in compressed form using Winzip*. NOTE: Winzip file(s) will need to have an extension of .zzz in order to be received at Sierra Army Depot.
(d) Please select only one medium by which to transmit each bid/proposal. For instance, do not submit a bid/proposal via ASFI BRS AND e-mail.
(e) Timely receipt of offers/proposals:
(1) Your attention is called to the solicitation closing date and time on the solicitation is local time for the Army Contracting Command – Warren (SIAD). Lateness rules for electronic submissions for bids are outlined in FAR 52.214-7, “Late Submissions, Modifications, and Withdrawal of Bids,” for proposals in FAR 52.215-1, “Instructions to Offerors—Competitive Acquisition” or FAR 52.212-1, “Instructions to Offerors-Commercial Items.” Pay particular attention to the applicable clause as it relates to the timing of submissions.
(2) NOTE: There is no “expected” or “target” length of time for proposal submission; size and content may be factors, therefore offerors are strongly cautioned to submit their proposals allowing adequate time for submission.
(3) Solicitations may remain posted on the ASFI Open Solicitation Web page after the solicitation closes.
Even though the system will allow you to submit a proposal after the closing date/time, your proposal will be considered late and may not be considered for award.
(f) Security Note: If you choose to password-protect access to your bid/offer, you must provide the password to Sierra Army Depot at least ten days prior to the opening/closing date. Contact the buyer identified in the solicitation Passwords used only for the purpose of write protecting files need not be provided.
(g) Electronic bids/proposals must include, as minimum:
(1) E-mailed bids/proposals must include a signed SF 33 cover sheet, SF 1449 or SF 1442 (whichever is applicable) that can be scanned. If scanned, attach it to your e-mail offer (or first e-mail message if you are sending multiple e-mails due to length).
(2) All applicable fill-in provisions. For solicitations issued on an SF 33, this would include Sections A, B, F, and K. For solicitations issued on an SF 1442, this would include Sections 00010 and 00600. For solicitations issued on an SF 1449, you must review the solicitation to ascertain where all of the required fill-ins are located since commercial acquisitions do not have designated sections.
A statement of agreement to all the terms, conditions, and provisions of the solicitation.
Any other information required by the solicitation.
(h) Please see FAR 14.406 for a description of the steps the Government shall take with regard to unreadable electronic bids received via the media described in paragraphs (b) above. See FAR 15.207(c) for a description of steps the government shall take with regard to unreadable proposals.
(i) Bidders/Offerors shall make every effort to ensure that their bid/proposal is virus-free. Bids/proposals (or portions thereof) submitted which DO reflect the presence of a virus, or which are otherwise rendered unreadable by damage in electronic transit, shall be treated as “unreadable” per paragraph (h) above. Use of any formats other than those listed above may result in the file being quarantined and will be considered by Sierra Army Depot to be “unreadable” files.
Note (Macros): The virus scanning software used by our e-mail systems cannot always distinguish a macro from a virus. Therefore, sending a macro embedded in an email message or an email attachment may cause the email bid/offer to be quarantined. In that event paragraph (g) above applies.
AS6311 (PROVISION)
A.__ Electronic Contracting
(a) All Army Contracting Command – Sierra Army Depot solicitations will be publicized on the Federal Business Opportunities website (https://www.fbo.gov). Any additional attachments, including Technical Data Packages (TDPs) when available electronically, will be separate attachments or links embedded in the solicitation.
(b) As of 10 August 2015, unless directed to do otherwise of this solicitation, vendors are required to submit a quote or proposal via the Federal Business Opportunities (FBO) system. Proposals or quotes submitted after this date using any other mechanism, including the Army Single Face to Industry Bid Response System (ASFI BRS) may be deemed non-responsive.
(c) Requirements for the online FBO bid submission:
(1) Vendors must log into the FBO System to be able to submit electronic responses for opportunities.
(2) Vendors must be registered in the System for Award Management (SAM) at www.sam.gov (a Federal Government owned and operated free web site) and have a CAGE Code and CCR Marketing Partner Identification Number (MPIN).
(3) Once logged into the FBO System, vendors will be asked to enter basic information and directed to upload one or more files containing the proposal/quote and any additional information as outlined in the solicitation.
(4) FBO will send an email to vendor’s registered email address confirming the electronic submission.
(5) For additional information on submitting electronic bid responses via the FBO system see the FBO Vendor Guide – Section 4.3.1 “Submitting an Electronic Response” (https://www.fbo.gov/downloads/FBO_Vendor_Guide.pdf).
Note to offerors:
(d) Please pay close attention to the Issued By block location on the cover page of the solicitation for closing date and time. The closing date and time is based on the local time of the listed location of the Issued By office. In accordance with FAR 15.208(a), offerors are responsible for submitting proposals, and any revisions, and modifications, so as to be received by the Government office designated in the solicitation by the time specified.
(e) It is the responsibility of the Offeror to ensure the proposal/quote is received by the date and time specified on the cover page of this solicitation. In accordance with FAR 15.208, if the proposal/quote was not received at the initial point of entry to the Government infrastructure (in this case, received through FBO) by the exact date and time specified on the cover page of this solicitation, it will be determined late. Proposal/quote is defined to mean ALL volumes or parts required in the solicitation are included in the electronic submission.
Note: There is no "expected" or "target" length of time for proposal submission; size and content may be factors, therefore offerors are strongly cautioned when submitting proposals to allow adequate time for submission.
(f) Solicitations may remain posted on the FBO after the solicitation closing date. If the response deadline has passed for the solicitation, vendors will no longer be able to submit electronic responses.
(g) Any award issued as a result of this solicitation will be distributed electronically. In the event of a FOIA request for a copy of any award issued as a result of this solicitation, or any subsequent modifications to the contract, the contract and modifications will be released, including the awarded unit price. This is the notice required by Executive Order 12600 (June 23, 1987) of the Government’s intention to release unit prices in response to any request under the Freedom of Information Act (FOIA), 5 USC 552. Unit price is defined as the contract price per unit or item purchased as it appears in Section B of the contract and is NOT referring to nor does it include Cost or Pricing data/information. If an Offeror objects to such release in the base contract or contract modifications, the Offeror must notify the contracting officer in writing prior to the closing date identified in this solicitation and include the rationale for the objection consistent with the provisions of FOIA. A release determination will be made based on rationale given.
(h) Questions pertaining to this solicitation should be directed to the Contract Specialist identified on the cover page of this solicitation. For technical assistance in doing business with the Government, and doing business electronically, please visit the Procurement Technical Assistance Center (PTAC) website at http://www.aptac-us.org/ to locate a regional center.
AS7526
A.__NOTICE OF ELEVATED THREAT LEVEL FORCE PROTECTION CONDITION (FPCON)
Contractor is hereby notified that there is a potential impact on contractor performance on during increased FPCON during periods of increased threat. During FPCONs Charlie and Delta, services may be discontinued / postponed due to higher threat. Services will resume when FPCON level is reduced to level Bravo or lower.
AS7527
A.__NOTICE OF RANDOM ANTITERRORISM MEASURES PROGRAM (RAMP)
In accordance with AR 525-13, Contractor personnel working on an Army installation, arsenal, base or other DoD facility (owned or leased by DoD/Department of the Army), are subject to participation in Installation RAMP security program (e.g. vehicles searches, wearing of ID badges, etc).
CS7520
C.__ ACCESS AND GENERAL PROTECTION/SECURITY POLICY AND PROCEDURES
(a) The contractor and all associated subcontractors’ employees shall comply with applicable installation, facility, and area commander installation and facility access and local security policies and procedures (provided by the Government representative). The contractor shall also provide all information required for background checks to meet installation access requirements to be accomplished by the installation Provost Marshal Office, Director of Emergency Services, or Security Office. The contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204-9 “Personal Identity Verification of Contractor Personnel”) as directed by DoD, HQDA, and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes.
(b) For contractors requiring Common Access Card (CAC). Before CAC issuance, the contractor employee requires, at a minimum, a favorably adjudicated National Agency Check with Inquiries (NACI) or an equivalent or higher investigation in accordance with Army Directive 2014-05, The contractor employee will be issued a CAC only if duties involve one of the following: (1) Both physical access to a DoD facility and access, via logon, to DoD networks on-site or remotely; (2) Remote access, via logon, to a DoD network using DoD-approved remote access procedures; or (3) Physical access to multiple DoD facilities or multiple non-DoD federally controlled facilities on behalf of the DoD on a recurring basis for a period of six (6) months or more. At the discretion of the sponsoring activity, an initial CAC may be issued on a favorable review of the FBI fingerprint check and a successfully scheduled NACI at the Office of Personal Management.
(c) For contractors that do not require CAC, but require access to a DoD facility or installation. Contractor and all associated sub-contractors employees shall comply with adjudication standards, and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (Army Directive 2014-05/AR 190-13), applicable installation, facility and area commander installation/facility access and local security policies and procedures elsewhere in Section C; Non-disclosure Statement; for OCONUS locations, refer to the Status of Forces Agreement and other theater regulations.
CS7237
C.__ CONTRACTOR MANPOWER REPORTING (CMR)
(a) The Office of the Assistant Secretary of the Army (Manpower & Reserve Affairs) operates and maintains a secure Army data collection site where the contractor will report ALL contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract via secure data collection site. The contractor is required to completely fill in all required data fields in the format using the following web address: https://armycmra.dmdc.osd.mil/. The required information includes the following:
(1) Contracting Office, Contracting Officer, Contracting Officer's Technical Representative;
(2) Contract number, including task and delivery order number;
(3) Beginning and ending dates covered by reporting period;
(4) Contractor name, address, phone number, e-mail address, identity of contractor employee entering data;
(5) Direct labor hours (including sub-contractors);
(6) Direct labor dollars paid this reporting period (including sub-contractors);
(7) Total payments (including sub-contractors);
(8) Predominant Federal Service Code (FSC) reflecting services provided by contractor (and separate predominant FSC for each sub-contractor if different);
(9) Data collection cost;
(10) Organizational title associated with the Unit Identification Code (UIC) for the Army Requiring Activity (the Army Requiring Activity is responsible for providing the contractor with its UIC for the purposes of reporting this information);
(11) Locations where contractor and sub-contractors perform the work (specified by zip code in the United States and nearest city, country, when in an overseas location, using standardized nomenclature provided on website);
(12) Presence of deployment or contingency contract language; and
(13) Number of contractor and sub-contractor employees deployed in theater this reporting period (by country).
(b) Reporting inputs will be for the labor executed during the period of performance during each Government fiscal year (FY), which runs October 1 through September30. While inputs may be reported any time during the FY, all data shall be reported no later than October 31 of each calendar year, beginning with 2013. Contractors may direct questions to the help desk at: https://armycmra.dmdc.osd.mil/ and clicking on the “Send an Email” link which is located under the Help Resources ribbon on the right hand side of the login page.
HS3001
H.____ INSURANCE (FIXED PRICE CONTRACT)
Pursuant to the requirements of the contract clause 52.228-5 titled "Insurance-Work on a Government Installation", the contractor shall obtain and maintain at least the following kinds of insurance and minimum liability coverage during any period of contract performance:
(a) Workmen's Compensation and occupational disease coverage as required by law except that, if this contract is to be performed in a state which does not require or permit private insurance, then compliance with the statutory or administrative requirements in any such state will be satisfactory. The required Workmen's Compensation Insurance shall extend to cover employers' liability for accidental bodily injury or death and for occupational disease with a minimum liability limit of $100,000.
(b) Comprehensive General Liability Insurance in the minimum limit of $500,000 per occurrence for bodily injury liability.
(c) Comprehensive Automotive Liability Insurance with minimum limits of $200,000 per person and $500,000 per occurrence for bodily injury, and a minimum limit of $20,000 per occurrence for property damage.
LS7015 (PROVISION)
L.___ HQ-AMC LEVEL PROTEST PROCEDURES
Complete AMC Protest Procedures can be found at: http://www.amc.army.mil/Connect/Legal-Resources/
An agency protest may be filed with either the contracting officer or to HQAMC but not both following the procedures listed on the website above.
WORKING DAYS (Four day work week)
Normal working days will be Monday through Thursday (except National Legal Holidays). Work hours for the contractor are from 0630 through 1700 daily. No overtime work will be authorized without specific approval and clearance of the Contracting Officer. Any overtime work not called for in the contract will be at no additional cost to the Government. THE GOVERNMENT WILL PAY FOR NO OVERTIME, UNLESS PERFORMED AT
REQUEST OF THE CONTRACTING OFFICER.
UNIT PRICES (PROVISION)
(a) Unit prices must be firm and cannot be made subject to any contingencies.
(b) Unit prices will include all Federal taxes, packing charges and transportation charges to F.O.B. point and will govern in all cases of inconsistency as to price.
FIRE PREVENTION AND PROTECTION
(a) The Contractor shall comply with all fire prevention measures prescribed in the installation fire…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.