Questions_and_Answers_Set_3.doc

DOC document 23 KB Posted

Attached to
Repair and Construct 2 Parking Lots
Solicitation number
W912GY16B0007
Issued by

View the file

Other files

File Type Posted
OF_1419.xls XLS spreadsheet
Questions_and_Answers_Set_5.doc DOC document
Amendment_0002.pdf PDF
Questions_and_Answers_Set_4.doc DOC document
Amendment_0001.pdf PDF
Site_Visit_Sign_In_Sheet.pdf PDF
Questions_and_Answers_Set_1.doc DOC document
Question_and_Answer_Set_1.pdf PDF
Drawing_-_Bldg_544_Parking_-_2016-05-26.pdf PDF
W912GY-16-B-0007.pdf PDF
Construction_Control_Manual.pdf PDF
Asphalt_Section..pdf PDF
Drawing_-_Bldg_144_Paving_-_2016-06-06.pdf PDF
Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions and Answers Set 3

1. USACE often requires use of the RMS (Resident Management System) online computer system for running the project. Is this required for this project?

ANSWER: No.

2. Assume that we can submit per solicitation an email bid? Does this include a copy of the bid bond?

ANSWER: Solicitation may be emailed to the group email address listed in the 100 section of the solicitation. Bid bond copy is required to be emailed as well if you are the apparent low, the original will be requested from your company

File details come from the government source that posted it. Updated .