W912ES18T0112-0001 Revised SOW and Extension of Quote due date and time.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W912ES18T0130_RFQ_-_Asphalt_Overlay_HWY_75_Project.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W81G6782252488
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of Amendment 0001 to RFQ W912ES18T0130 for 2" bituminous overlay on existing asphalt road surface located at HWY 75 Dam, South of Odessa in Bellingham, Minnesota is to revise the statement of w ork removing the requirement for prime coat and asphalt base course.
See revised Statement of Work in Summary of Changes on Page 2.
All other terms and conditions of this RFQ remain unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 5
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 13-Sep-2018
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912ES18T0130
X 9B. DATED (SEE ITEM 11)
30-Aug-2018
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
13-Sep-2018
CODE
CONTRACTING DIVISION
USACE - ST. PAUL
180 5TH STREET E SUITE 700
ST. PAUL MN 55101-1678
W912ES 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912ES18T0130
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00 10 00 - SOLICITATION
The required response date/time has changed from 14-Sep-2018 11:00 AM to 17-Sep-2018 11:00 AM.
The following have been modified:
STATEMENT OF WORK
ASPHALT ROAD AND PARKING LOT OVERLAY
HWY 75, BIGSTONE/WHETSTONE PROJECT
U.S. Army Corps of Engineers (USACE)
HWY 75 Dam Project South of Odessa, Minnesota
1. DESCRIPTION:
Work will consist of placing a 2-inch bituminous overlay on existing asphalt road surface located at HWY 75 Dam (see first photo below for continuous area outlined in red). Work includes cleaning surface and placement of bituminous material. Asphalt will butt up to existing county highway.
Road surface totals approximately 8,890 square yards.
a. Safety and Occupational Health. Prior to the on-site pre-construction meeting, the Contractor/Erector shall submit a Safety Plan for performing the work. The Safety Plan shall be in conformance with USACE EM 385-1-1. The Safety Plan will be reviewed by the Contracting Officer’s Representative and discussed at the on-site pre-construction meeting. The Safety Plan shall be approved prior to starting work at the project site.
b. Permits. It is the Contractor’s responsibility to apply for and comply with any required permits.
c. Quality Control. The Contractor shall have a designated supervisor who shall be present on the job during all working hours. The Contractor shall establish and maintain quality control to assure compliance with contract requirements and shall maintain records for all construction operations including, but not limited to, the following:
▫ Tack Coat application rate and temperature ▫ Bituminous material certificates, delivery tickets, and temperature at delivery ▫ Density and thickness of each bituminous course.
Copies of the records of inspections and tests, as well as the records of corrective action taken, shall be furnished to the Government as directed by the Contracting Officer.
2. PRODUCTS:
Materials.
a. Tack Coat – Grade CSS-1 or CSS-1HD per Mn/DOT 2357.
b. Bituminous Asphalt Wearing Course – Grade SPWEA230B.
Bio-Based The United States Department of Agriculture (USDA) designates certain biobased products for federal procurement and specifies minimum biobased content levels for those products. Any designated product that is being offered or supplied under this contract shall meet USDA BioPreferred’s minimum biobased content level. Visit the BioPreferred website (www.biopreferred.gov) for the complete list of designated products and the associated minimum biobased content level requirements.
3. EXECUTION:
Installation Requirements.
a. Prior to applying the Tack Coat, the Contracting Officer’s Representative will inspect underlying surfaces for acceptability before granting approval to proceed with subsequent operations. Removal of vegetation in the existing asphalt will be the responsibility of USACE personnel. The contractor will clear all foreign matter from asphalt surface using mechanical broom, power blowers, or hand brooms prior to application of tack coat.
b. Prior to placing the Bituminous Asphalt Wearing Course, a Tack Coat at an application rate per Grade CSS-1 or CSS-1HD per MN/DOT 2357 shall be applied to the clean, prepared undersurfaces.
c. A 2-inch wearing overlay course shall be placed in the entire area outlined in red on top photo below.
After placing the Bituminous Asphalt Wearing Course, the mixture shall be thoroughly and uniformly compacted by rolling. Compact the surface as soon as possible without causing displacement, cracking or shoving. The sequence of rolling operations and the type of rollers used shall be at the discretion of the Contractor.
Technical Point of Contact:
Randy Melby MN Section Supervisor 651-290-5099 http://www.biopreferred.gov/
(End of Summary of Changes)