Amendment_7_Drawings.pdf
PDF 1 MB Posted
- Attached to
- LD10 Roof Replacement Federal contract opportunity
- Solicitation number
- W912ES18T0062
About this file
Amendment 7 Drawings
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment_7_LD10_Roof.pdf | ||
| Amendment_7_Specifications.pdf | ||
| Amendment_5_LD10_Roof.pdf | ||
| LD_10_Roof_Amendment_4.pdf | ||
| Amendment_3_W912ES18T0062.pdf | ||
| LD10_Roof_Amendment_2.pdf | ||
| LD_10_Amendment_1.pdf | ||
| LD_10_As_Built_Page_1.pdf | ||
| LD_10_Blank_Eng_4025.pdf | ||
| LD_10_As_Built_Page_3.pdf | ||
| LD_10_As_Built_Page_2.pdf | ||
| LD_10_ENG_4288.pdf | ||
| LD_10_Request_for_Quotes.pdf | ||
| LD_10_Existing_Roof_Pictures.pdf | ||
| LD_10_Specifications.pdf |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
LOCK AND DAM NO 10 GENERAL NOTES:
1. ALL DIMENSIONS ARE TO FACE OF CONRETE, MASONARY, AND PLYWOOD UNLESS OTHERWISE NOTED.
2. REMOVE AND STOCKPILE BALLAST STONE, CONCRETE PAVERS AND PAVER PADS AS SPECIFIED.
3. FURNISH AND INSTALL NEW EPDM ROOF WALKWAY PADS TO REPLACE CONCRETE PAVER PATHWAY TO
BUILDING EQUIPMENT AND REGULARILY SERVICED POINTS.
4. REMOVE AND DISPOSE OF EXISTING ROOFING ASSEMBLY INCLUDING BUT NOT LIMITED TO, EPDM MEMBRANE, TAPERED INSULATION, PERLITE, TREATED PLYWOOD AND BLOCKING, FLASHING, CLAMPING, CONNECTIONS, CAULKING, ADHESIVES, AND SEALANTS DOWN TO THE METAL ROOF DECK AND CONCRETE
PARAPET WALL PER EPDM MANUFACTURER'S REQUIREMENTS AS SPECIFIED.
5. FURNISH AND INSTALL NEW ROOFING ASSEMBLY INCLUDING BUT NOT LIMITED TO, EPDM MEMBRANE, TAPERED INSULATION, COVER BOARD, FLASHING, CLAMPING, CONNECTIONS, CAULKING, ADHESIVES, AND
SEALANTS PER EPDM MANUFACTURER'S REQUIREMENTS AS SPECIFIED.
6. ROOF BUILT-INS SHALL BE PROPERLY PROTECTED, FLASHED AND FINISHED PER EPDM MANUFACTURER'S
REQUIREMENTS.
7. REMOVE AND DISPOSE OF EXISTING EQUIPMENT PADS BELOW A/C UNITS.
8. FURNISH AND INSTALL NEW 3X3' EQUIPMENT PADS BELOW A/C UNITS.
9. FURNISH AND INSTALL NEW ICE GUARD/SNOW BAR ON METAL ROOF TO MATCH EXISTING. ICE GUARD/SNOW
BAR TO BE INSTALLED.
10. REMOVE AND RESET PARAPET HANDRAILS, GROUNDING WIRES, A/C UNITS (IF NECESSARY), AND
DOWNSPOUTS (IF NECESSARY).
ROOF ACCESS
DENOTES CHANGE IN ROOF
SYSTEM ELEVATION (TYP.) IN
RELATION TO SCUPPERS AT +0
REMOVE AND REPLACE ROOF
ASSEMBLY TO METAL ROOF
DECK
SEE NOTES 4 AND 5
LOCK AND DAM NO 10 GENERAL NOTES:
1. ALL DIMENSIONS ARE TO FACE OF CONRETE, MASONARY, AND PLYWOOD UNLESS OTHERWISE NOTED.
2. REMOVE AND STOCKPILE BALLAST STONE, CONCRETE PAVERS AND PAVER PADS AS SPECIFIED.
3. FURNISH AND INSTALL NEW EPDM ROOF WALKWAY PADS TO REPLACE CONCRETE PAVER PATHWAY TO BUILDING EQUIPMENT AND REGUALARLY
SERVICED POINTS.
4. REMOVE AND DISPOSE OF EXISTING ROOFING ASSEMBLY INCLUDING BUT NOT LIMITED TO, EPDM MEMBRANE, TAPERED INSULATION, PERLITE, TREATED PLYWOOD AND BLOCKING, FLASHING, CLAMPING, CONNECTIONS, CAULKING, ADHESIVES, AND SEALANTS DOWN TO THE METAL ROOF DECK AND CONCRETE
PARAPET WALL PER EPDM MANUFACTURER'S REQUIREMENTS AS SPECIFIED.
5. FURNISH AND INSTALL NEW ROOFING ASSEMBLY INCLUDING BUT NOT LIMITED TO, EPDM MEMBRANE, TAPERED INSULATION, COVER BOARD, FLASHING, CLAMPING, CONNECTIONS, CAULKING, ADHESIVES, AND SEALANTS PER EPDM MANUFACTURER'S REQUIREMENTS AS SPECIFIED.
6. ROOF BUILT-INS SHALL BE PROPERLY PROTECTED, FLASHED AND FINISHED PER EPDM MANUFACTURER'S REQUIREMENTS.
7. REMOVE AND DISPOSE OF EXISTING EQUIPMENT PADS BELOW A/C UNITS.
8. FURNISH AND INSTALL NEW EQUIPMENT PADS BELOW A/C UNITS.
9. FURNISH AND INSTALL NEW ICE GUARD/SNOW BAR AND GUTTER ON METAL ROOF TO MATCH EXISTING. ICE GUARD/SNOW BAR TO BE INSTALLED 15" FROM ROOF EDGE OF THE STANDING SEAM METAL ROOF. GUTTER MATERIAL TYPE, COLOR, AND CROSS-SECTION PROFILE WITH PROPER TRANSITION TO MATCH
AND PROPERLY ADJOIN EXISTING GUTTERS AND DOWNSPOUTS.
10. REMOVE AND RESET PARAPET HANDRAILS, GROUNDING WIRES, A/C UNITS (IF NECESSARY), AND DOWNSPOUTS (IF NECESSARY).
11. PENETRATION INVESTIGATIONS AT SCUPPERS SHOWED NEW ROOFING SYSTEM ASSEMBLY IS REQUIRED TO CONSIST OF A MINIMUM OF 4" ON CCS ROOF;
THICKNESS INCLUDING COVER BOARD AND INSULATION.
REMOVE BALLAST
STONE, SEE NOTE
EPDM TO EXTEND UP
AND OVER PEAK NEAR
EXTERIOR OF PARAPET
WALL
METAL COPING TO
BE REPLACED
REMOVE BALLAST
STONE, SEE NOTE 2.
REMOVE ALL EXISTING
ROOFING ASSEMBLY,
SEE NOTE 4.
REMOVE BALLAST
STONE, SEE NOTE 2
EPDM TO EXTEND UP
AND OVER PEAK TO
EXTERIOR OF PARAPET
WALL
REPLACE DAMAGED GUTTER
SECTIONS
INSTALL NEW ICE
GUARD/SNOW BAR
LOCK AND DAM NO 10 GENERAL NOTES:
1. ALL DIMENSIONS ARE TO FACE OF CONRETE, MASONARY, AND PLYWOOD UNLESS OTHERWISE NOTED.
2. REMOVE AND STOCKPILE BALLAST STONE, CONCRETE PAVERS AND PAVER PADS AS SPECIFIED.
3. FURNISH AND INSTALL NEW EPDM ROOF WALKWAY PADS TO REPLACE CONCRETE PAVER PATHWAY TO BUILDING EQUIPMENT AND REGUALARLY SERVICED POINTS.
4. REMOVE AND DISPOSE OF EXISTING ROOFING ASSEMBLY INCLUDING BUT NOT LIMITED TO, EPDM MEMBRANE, TAPERED INSULATION, PERLITE, FLASHING, CLAMPING, CONNECTIONS, CAULKING, ADHESIVES, AND SEALANTS DOWN TO THE METAL ROOF DECK AND CONCRETE PARAPET WALL PER EPDM MANUFACTURER'S REQUIREMENTS
AS SPECIFIED.
5. FURNISH AND INSTALL NEW ROOFING ASSEMBLY INCLUDING BUT NOT LIMITED TO, EPDM MEMBRANE, TAPERED INSULATION, COVER BOARD, TREATED PLYWOOD AND BLOCKING, FLASHING, CLAMPING, CONNECTIONS, CAULKING, ADHESIVES, AND SEALANTS PER EPDM MANUFACTURER'S REQUIREMENTS AS SPECIFIED.
6. ROOF BUILT-INS SHALL BE PROPERLY PROTECTED, FLASHED AND FINISHED PER EPDM MANUFACTURER'S REQUIREMENTS.
7. REMOVE AND DISPOSE OF EXISTING EQUIPMENT PADS BELOW A/C UNITS.
8. FURNISH AND INSTALL NEW 3X3' EQUIPMENT PADS BELOW A/C UNITS.
9. FURNISH AND INSTALL NEW ICE GUARD/SNOW BAR ON METAL ROOF TO MATCH EXISTING. ICE GUARD/SNOW BAR TO BE INSTALLED.