Amendment_7_Drawings.pdf

PDF 1 MB Posted

Attached to
LD10 Roof Replacement Federal contract opportunity
Solicitation number
W912ES18T0062
Issued by
Department of the Army Corps of Engineers Engineering District St Paul

About this file

Amendment 7 Drawings

View the file

Other files for this federal contract opportunity

Other files attached to LD10 Roof Replacement, newest first.
File Type Posted
Amendment_7_LD10_Roof.pdf PDF
Amendment_7_Specifications.pdf PDF
Amendment_5_LD10_Roof.pdf PDF
LD_10_Roof_Amendment_4.pdf PDF
Amendment_3_W912ES18T0062.pdf PDF
LD10_Roof_Amendment_2.pdf PDF
LD_10_Amendment_1.pdf PDF
LD_10_As_Built_Page_1.pdf PDF
LD_10_Blank_Eng_4025.pdf PDF
LD_10_As_Built_Page_3.pdf PDF
LD_10_As_Built_Page_2.pdf PDF
LD_10_ENG_4288.pdf PDF
LD_10_Request_for_Quotes.pdf PDF
LD_10_Existing_Roof_Pictures.pdf PDF
LD_10_Specifications.pdf PDF
Show all 15

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

LOCK AND DAM NO 10 GENERAL NOTES:

1. ALL DIMENSIONS ARE TO FACE OF CONRETE, MASONARY, AND PLYWOOD UNLESS OTHERWISE NOTED.

2. REMOVE AND STOCKPILE BALLAST STONE, CONCRETE PAVERS AND PAVER PADS AS SPECIFIED.

3. FURNISH AND INSTALL NEW EPDM ROOF WALKWAY PADS TO REPLACE CONCRETE PAVER PATHWAY TO

BUILDING EQUIPMENT AND REGULARILY SERVICED POINTS.

4. REMOVE AND DISPOSE OF EXISTING ROOFING ASSEMBLY INCLUDING BUT NOT LIMITED TO, EPDM MEMBRANE, TAPERED INSULATION, PERLITE, TREATED PLYWOOD AND BLOCKING, FLASHING, CLAMPING, CONNECTIONS, CAULKING, ADHESIVES, AND SEALANTS DOWN TO THE METAL ROOF DECK AND CONCRETE

PARAPET WALL PER EPDM MANUFACTURER'S REQUIREMENTS AS SPECIFIED.

5. FURNISH AND INSTALL NEW ROOFING ASSEMBLY INCLUDING BUT NOT LIMITED TO, EPDM MEMBRANE, TAPERED INSULATION, COVER BOARD, FLASHING, CLAMPING, CONNECTIONS, CAULKING, ADHESIVES, AND

SEALANTS PER EPDM MANUFACTURER'S REQUIREMENTS AS SPECIFIED.

6. ROOF BUILT-INS SHALL BE PROPERLY PROTECTED, FLASHED AND FINISHED PER EPDM MANUFACTURER'S

REQUIREMENTS.

7. REMOVE AND DISPOSE OF EXISTING EQUIPMENT PADS BELOW A/C UNITS.

8. FURNISH AND INSTALL NEW 3X3' EQUIPMENT PADS BELOW A/C UNITS.

9. FURNISH AND INSTALL NEW ICE GUARD/SNOW BAR ON METAL ROOF TO MATCH EXISTING. ICE GUARD/SNOW

BAR TO BE INSTALLED.

10. REMOVE AND RESET PARAPET HANDRAILS, GROUNDING WIRES, A/C UNITS (IF NECESSARY), AND

DOWNSPOUTS (IF NECESSARY).

ROOF ACCESS

DENOTES CHANGE IN ROOF

SYSTEM ELEVATION (TYP.) IN

RELATION TO SCUPPERS AT +0

REMOVE AND REPLACE ROOF

ASSEMBLY TO METAL ROOF

DECK

SEE NOTES 4 AND 5

LOCK AND DAM NO 10 GENERAL NOTES:

1. ALL DIMENSIONS ARE TO FACE OF CONRETE, MASONARY, AND PLYWOOD UNLESS OTHERWISE NOTED.

2. REMOVE AND STOCKPILE BALLAST STONE, CONCRETE PAVERS AND PAVER PADS AS SPECIFIED.

3. FURNISH AND INSTALL NEW EPDM ROOF WALKWAY PADS TO REPLACE CONCRETE PAVER PATHWAY TO BUILDING EQUIPMENT AND REGUALARLY

SERVICED POINTS.

4. REMOVE AND DISPOSE OF EXISTING ROOFING ASSEMBLY INCLUDING BUT NOT LIMITED TO, EPDM MEMBRANE, TAPERED INSULATION, PERLITE, TREATED PLYWOOD AND BLOCKING, FLASHING, CLAMPING, CONNECTIONS, CAULKING, ADHESIVES, AND SEALANTS DOWN TO THE METAL ROOF DECK AND CONCRETE

PARAPET WALL PER EPDM MANUFACTURER'S REQUIREMENTS AS SPECIFIED.

5. FURNISH AND INSTALL NEW ROOFING ASSEMBLY INCLUDING BUT NOT LIMITED TO, EPDM MEMBRANE, TAPERED INSULATION, COVER BOARD, FLASHING, CLAMPING, CONNECTIONS, CAULKING, ADHESIVES, AND SEALANTS PER EPDM MANUFACTURER'S REQUIREMENTS AS SPECIFIED.

6. ROOF BUILT-INS SHALL BE PROPERLY PROTECTED, FLASHED AND FINISHED PER EPDM MANUFACTURER'S REQUIREMENTS.

7. REMOVE AND DISPOSE OF EXISTING EQUIPMENT PADS BELOW A/C UNITS.

8. FURNISH AND INSTALL NEW EQUIPMENT PADS BELOW A/C UNITS.

9. FURNISH AND INSTALL NEW ICE GUARD/SNOW BAR AND GUTTER ON METAL ROOF TO MATCH EXISTING. ICE GUARD/SNOW BAR TO BE INSTALLED 15" FROM ROOF EDGE OF THE STANDING SEAM METAL ROOF. GUTTER MATERIAL TYPE, COLOR, AND CROSS-SECTION PROFILE WITH PROPER TRANSITION TO MATCH

AND PROPERLY ADJOIN EXISTING GUTTERS AND DOWNSPOUTS.

10. REMOVE AND RESET PARAPET HANDRAILS, GROUNDING WIRES, A/C UNITS (IF NECESSARY), AND DOWNSPOUTS (IF NECESSARY).

11. PENETRATION INVESTIGATIONS AT SCUPPERS SHOWED NEW ROOFING SYSTEM ASSEMBLY IS REQUIRED TO CONSIST OF A MINIMUM OF 4" ON CCS ROOF;

THICKNESS INCLUDING COVER BOARD AND INSULATION.

REMOVE BALLAST

STONE, SEE NOTE

EPDM TO EXTEND UP

AND OVER PEAK NEAR

EXTERIOR OF PARAPET

WALL

METAL COPING TO

BE REPLACED

REMOVE BALLAST

STONE, SEE NOTE 2.

REMOVE ALL EXISTING

ROOFING ASSEMBLY,

SEE NOTE 4.

REMOVE BALLAST

STONE, SEE NOTE 2

EPDM TO EXTEND UP

AND OVER PEAK TO

EXTERIOR OF PARAPET

WALL

REPLACE DAMAGED GUTTER

SECTIONS

INSTALL NEW ICE

GUARD/SNOW BAR

LOCK AND DAM NO 10 GENERAL NOTES:

1. ALL DIMENSIONS ARE TO FACE OF CONRETE, MASONARY, AND PLYWOOD UNLESS OTHERWISE NOTED.

2. REMOVE AND STOCKPILE BALLAST STONE, CONCRETE PAVERS AND PAVER PADS AS SPECIFIED.

3. FURNISH AND INSTALL NEW EPDM ROOF WALKWAY PADS TO REPLACE CONCRETE PAVER PATHWAY TO BUILDING EQUIPMENT AND REGUALARLY SERVICED POINTS.

4. REMOVE AND DISPOSE OF EXISTING ROOFING ASSEMBLY INCLUDING BUT NOT LIMITED TO, EPDM MEMBRANE, TAPERED INSULATION, PERLITE, FLASHING, CLAMPING, CONNECTIONS, CAULKING, ADHESIVES, AND SEALANTS DOWN TO THE METAL ROOF DECK AND CONCRETE PARAPET WALL PER EPDM MANUFACTURER'S REQUIREMENTS

AS SPECIFIED.

5. FURNISH AND INSTALL NEW ROOFING ASSEMBLY INCLUDING BUT NOT LIMITED TO, EPDM MEMBRANE, TAPERED INSULATION, COVER BOARD, TREATED PLYWOOD AND BLOCKING, FLASHING, CLAMPING, CONNECTIONS, CAULKING, ADHESIVES, AND SEALANTS PER EPDM MANUFACTURER'S REQUIREMENTS AS SPECIFIED.

6. ROOF BUILT-INS SHALL BE PROPERLY PROTECTED, FLASHED AND FINISHED PER EPDM MANUFACTURER'S REQUIREMENTS.

7. REMOVE AND DISPOSE OF EXISTING EQUIPMENT PADS BELOW A/C UNITS.

8. FURNISH AND INSTALL NEW 3X3' EQUIPMENT PADS BELOW A/C UNITS.

9. FURNISH AND INSTALL NEW ICE GUARD/SNOW BAR ON METAL ROOF TO MATCH EXISTING. ICE GUARD/SNOW BAR TO BE INSTALLED.

File details come from the government source that posted it.