18R0014_Final.pdf

PDF 3 MB Posted

Attached to
USACE MVP Drilling IDIQ
Solicitation number
W912ES18R0014
Issued by

About this file

SF-1449

View the file

Other files

File Type Posted
18R00140001.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SEE ADDENDUM

(No Collect Calls)

W912ES18R0014 04-May-2018

b. TELEPHONE NUMBER

651-290-5444

8. OFFER DUE DATE/LOCAL TIME

03:00 PM 18 May 2018

5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

STANDARD FORM 1449 (REV. 2/2012)

Prescribed by GSA – FAR (48 CFR) 53.212

(TYPE OR PRINT)

(SIGNATURE OF CONTRACTING OFFICER)

ADDENDA ARE

26. TOTAL AWARD AMOUNT (For Gov t. Use Only )

23.

CODE 10. THIS ACQUISITION IS

SUCH ADDRESS IN OFFER

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT

BELOW IS CHECKED

TELEPHONE NO.

W912ES9. ISSUED BY

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK

7. FOR SOLICITATION

INFORMATION CALL:

a. NAME

JESSE L ONKKA

2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER

(TYPE OR PRINT)

30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER

30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA

0 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.

25. ACCOUNTING AND APPROPRIATION DATA

1. REQUISITION NUMBER

20.

ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.

OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

W81G6780876831

ARE NOT ATTACHED

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED

(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

. YOUR OFFER ON SOLICITATION

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN

% FOR:SET ASIDE:UNRESTRICTED OR X

SMALL BUSINESSX

17a.CONTRACTOR/ CODE FACILITY

OFFEROR CODE

CONTRACTING DIVISION

USACE - ST. PAUL

180 5TH STREET E SUITE 700

ST. PAUL MN 55101-1678

18a. PAYMENT WILL BE MADE BY CODE

RATED ORDER UNDER

DPAS (15 CFR 700)

13a. THIS CONTRACT IS A

13b. RATING

CODE15. DELIVER TO CODE B670000 16. ADMINISTERED BY

12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-

TION UNLESS BLOCK IS

MARKED

SEE SCHEDULE

14. METHOD OF SOLICITATION

RFQ IFB RFPX

ULA - LOGISTICS MANAGEMENT OFF

USACE - ST PAUL

180 5TH STREET E SUITE 700

ST PAUL MN 55101-1638

TEL: 651-290-5222 FAX: 651-290-5746

FAX:

TEL: SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

8(A)

HUBZONE SMALL

BUSINESS

SIZE STANDARD:

$15,000,000

NAICS:

238910

X

OFFER DATED

29. AWARD OF CONTRACT: REF.

DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND

EMAIL:

TEL:

31c. DATE SIGNED

SEE SCHEDULE

SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT

24.22.21.19.

WOMEN-OWNED SMALL BUSINESS (WOSB)

ELIGIBLE UNDER THE WOMEN-OWNED

SMALL BUSINESS PROGRAM

EDWOSB

32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

(CONTINUED)

PAGE 2 OF429

ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________

32a. QUANTITY IN COLUMN 21 HAS BEEN

RECEIVED INSPECTED

32b. SIGNATURE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE

37. CHECK NUMBER

FINALPARTIALCOMPLETE

36. PAYMENT35. AMOUNT VERIFIED

CORRECT FOR

34. VOUCHER NUMBER

FINAL

33. SHIP NUMBER

PARTIAL

38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY

41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT

41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE

42a. RECEIVED BY (Print)

42b. RECEIVED AT (Location)

42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS

STANDARD FORM 1449 (REV. 2/2012) BACK

Prescribed by GSA – FAR (48 CFR) 53.212

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

SEE SCHEDULE

20.

SCHEDULE OF SUPPLIES/ SERVICES

21.

QUANTITY UNIT

22. 23.

UNIT PRICE

24.

AMOUNT

19.

ITEM NO.

Section SF 1449 - CONTINUATION SHEET

BASE REQUIREMENT - EAST AREA (See Map in Statement of Work )

Period of Performance: One year from Contract Award

Item Description Quantity U/I Unit Price

Net Amt

0001 RENTAL OF DRILL RIG A

0001AA

Drill Rig A, Geotechnical Drilling Rig ATV, Track- Mounted, Level D as defined by OSHA. See details in Section 2a. 150 Hours

0001AC Mobilization and Demobilization Fees per Task Order 5 Each

0002 RENTAL OF DRILL RIG B

0002AA

Drill Rig B, Flotation-Tire, 4-Wheel-Drive Geotechnical Drilling Rig, ATV, Level D as defined by OSHA. See details in Section 2b 100 Hours

0002AC Mobilization and Demobilization Fees per Task Order 5 each

0003 RENTAL OF DRILL RIG C

0003AA

Drill Rig C, Truck-mounted Geotechnical Drilling Rig, (2-Wheel or 4-Wheel Drive) Level D as defined by OSHA. See details in Section 2c. 200 Hours

0003AC Mobilization and Demobilization Per Task Order 5 Each

0004 RENTAL OF DRILL RIG D

0004AA

Drill Rig D, Winch-Operated Skid Frame, Rotary Drilling Rig, Level D as defined by OSHA. See details in Section 2d. 80 Hours

0004AC Mobilization and Demobilization Per Task Order 2 Each

0005 RENTAL OF DRILL RIG E

0005AA

Drill Rig E, Portable (Hand Carried) Pipe-Driving Winch, Level D as defined by OSHA. See details in Section 2e. 50 Hours

0005AC Mobilization and Demobilization Per Task Order 2 Each

0006 RENTAL OF PIEZOCONE SYSTEM

0006AA

Rental of Piezocone (CPTu) system with operator, Level D as defined by OSHA. See details in section 3 150 Hours

0006AB

Rental of Piezocone (CPTu) system with operator, Level C as Defined by OSHA. See Details in Section 3. 10 Hours

0006AC Mobilization and Demobilization Per Task Order 10 Each

0007 RENTAL OF FLOATING PLANT

0007AA Work Barge. See Details in Section 2. 120 Hours 0007AB Push Boat. See Details in Section 2. 120 Hours 0007AC Mobilization and Demobilization Per Task Order 4 Each 0008 DRILL HELPER 60 Hours 0009 Samples

0009AA 3-inch Thin-Wall Samples 10 Each 0009AB 5-inch Thin Wall Samples 30 Each 0098AC 3-inch Horslev Type Piston Samples 10 Each 0009AD 5-inch Horslev Type Piston Samples 50 Each 0009AE NQ-3 or Equivalent Core Drilling in Rock or Concrete 75 Foot

0009AF HQ-3 or Equivalent Core Drilling in Rock or Concrete 100 Foot 0009AG HQ Wireline Core Drilling in Rock or Concrete 100 Foot

0009AH PQ-3 or Equivalent Core Drilling in Rock or Concrete 100 Foot

0009AJ

Double-tube core barrel (6" x 7 3/4" or equivalent) for Core Drilling in Rock or Concrete 50 Foot

PER DIEM (To be paid in accordance with the Joint Travel

Regulations) 160 Day 0011 Portable Steam Cleaner Rental 10 Day

DOT-Approved Containers (Drums) for Contaminated Soils, Drilling Fluid, or Decontamination Water 10 Each

0013 BACKFILL MATERIAL

0013AA Portland Cement – 94-Pound Bags 100 Bag 0013AB High Solids Bentonite Grout – 50-Pound Bags 100 Bag 0013AC Bentonite Chips – 50-Pound Bags 100 Bag

0013AD

Filter Pack Sand For Piezometers and Monitoring Wells With #10-Slot Screens, 50-Pound Bags 20 Bag

0013AE Barite Drilling Additive – 50-Pound Bags 10 Bag 0014 Monitoring Well, Piezometer and Instrumentation Casing

0014AA

Nominal 1” PVC Flush-Threaded Riser Pipe, Schedule 40, 10-ft. Section Length 140 Each

0014AB

Nominal 1” PVC Flush-Threaded Well Screen, Continuous-Slot, #10-Slot Size, Schedule 40, 5-ft.

Section Length 30 Each

0014AC

Nominal 2” PVC Flush-Threaded Riser Pipe, Schedule 40, 10-ft. Section Length 40 Each

0014AD

Nominal 2” PVC Flush-Threaded Well Screen, Continuous-Slot, #10-Slot Size 10 Each

0014AE 4-Inch Protective Guard Posts 12 Each

0014AF

4-Inch Diameter Monitoring Well Protective Casing with Locking Cover 70 Foot

0014AG

6-Inch Diameter Monitoring Well Protective Casing with Locking 140 Foot

0014AH

8-Inch Diameter Monitoring Well Protective Casing with Locking Cover 35 Foot

East Area Base Year Total

BASE REQUIREMENT - WEST AREA (See Map in Statement of Work )

Period of Performance: One year from Contract Award

Item Description Quantity U/I Unit Price

Net Amt

0015 RENTAL OF DRILL RIG A

0015AA

Drill Rig A, Geotechnical Drilling Rig ATV, Track- Mounted, Level D as defined by OSHA. See details in Section 2a. 150 Hours

0015AC Mobilization and Demobilization Fees per Task Order 5 Each

0016 RENTAL OF DRILL RIG B

0016AA

Drill Rig B, Flotation-Tire, 4-Wheel-Drive Geotechnical Drilling Rig, ATV, Level D as defined by OSHA. See details in Section 2b 100 Hours

0016AC Mobilization and Demobilization Fees per Task Order 5 each

0017 RENTAL OF DRILL RIG C

0017AA

Drill Rig C, Truck-mounted Geotechnical Drilling Rig, (2-Wheel or 4-Wheel Drive) Level D as defined by OSHA. See details in Section 2c. 100 Hours

0017AC Mobilization and Demobilization Per Task Order 2 Each

0018 RENTAL OF DRILL RIG D

0018AA

Drill Rig D, Winch-Operated Skid Frame, Rotary Drilling Rig, Level D as defined by OSHA. See details in section 2d. 80 Hours

0018AC Mobilization and Demobilization Per Task Order 2 Each

0019 RENTAL OF DRILL RIG E

0019AA

Drill Rig E, Portable (Hand Carried) Pipe-Driving Winch, Level D as defined by OSHA. See details in Section 2e. 50 Hours

0019AC Mobilization and Demobilization Per Task Order 2 Each

0020 RENTAL OF PIEZOCONE SYSTEM

0020AA

Rental of Piezocone (CPTu) system with operator, Level D as defined by OSHA. See details in section 3 150 Hours

0020AB

Rental of Piezocone (CPTu) system with operator, Level C as Defined by OSHA. See Details in section 3. 10 Hours

0020AC Mobilization and Demobilization Per Task Order 10 Each

0021 RENTAL OF FLOATING PLANT

0021AA Work Barge. See Details in Section 2. 120 Hours 0021AB Push Boat. See Details in Section 2 120 Hours 0021AC Mobilization and Demobilization Per Task Order 4 Each 0022 DRILL HELPER 60 Hours 0023 Samples 0023AA 3-inch Thin-Wall Samples 10 Each

0023AB 5-inch Thin Wall Samples 30 Each 0023AC 3-inch Horslev Type Piston Samples 10 Each 0023AD 5-inch Horslev Type Piston Samples 50 Each 0023AE NQ-3 or Equivalent Core Drilling in Rock or Concrete 75 Foot

0023AF HQ-3 or Equivalent Core Drilling in Rock or Concrete 100 Foot 0023AG HQ Wireline Core Drilling in Rock or Concrete 100 Foot

0023AH PQ-3 or Equivalent Core Drilling in Rock or Concrete 100 Foot

0023AJ

Double-tube core barrel (6" x 7 3/4" or equivalent) for Core Drilling in Rock or Concrete 50 Foot

PER DIEM (To be paid in accordance with the Joint Travel

Regulations) 160 Day 0025 Portable Steam Cleaner Rental 10 Day

DOT-Approved Containers (Drums) for Contaminated Soils, Drilling Fluid, or Decontamination Water 10 Each

0027 BACKFILL MATERIAL

0027AA Portland Cement – 94-Pound Bags 100 Bag 0027AB High Solids Bentonite Grout – 50-Pound Bags 100 Bag 0027AC Bentonite Chips – 50-Pound Bags 300 Bag

0027AD

Filter Pack Sand For Piezometers and Monitoring Wells With #10-Slot Screens, 50-Pound Bags 20 Bag

0027AE Barite Drilling Additive – 50-Pound Bags 10 Bag 0028 Monitoring Well, Piezometer and Instrumentation Casing

0028AA

Nominal 1” PVC Flush-Threaded Riser Pipe, Schedule 40, 10-ft. Section Length 140 Each

0028AB

Nominal 1” PVC Flush-Threaded Well Screen, Continuous-Slot, #10-Slot Size, Schedule 40, 5-ft.

Section Length 30 Each

0028AC

Nominal 2” PVC Flush-Threaded Riser Pipe, Schedule 40, 10-ft. Section Length 40 Each

0028AD

Nominal 2” PVC Flush-Threaded Well Screen, Continuous-Slot, #10-Slot Size 10 Each

0028AE 4-Inch Protective Guard Posts 12 Each

0028AF

4-Inch Diameter Monitoring Well Protective Casing with Locking Cover 70 Foot

0028AG

6-Inch Diameter Monitoring Well Protective Casing with Locking 140 Foot

0028AH

8-Inch Diameter Monitoring Well Protective Casing

West Area Base Year Total

Option Year One - EAST AREA (See Map in Statement of Work )

Period of Performance: One year from End of Base

Item Description Quantity U/I Unit Price

Net Amt

1001 RENTAL OF DRILL RIG A

1001AA

Drill Rig A, Geotechnical Drilling Rig ATV, Track- Mounted, Level D as defined by OSHA. See details in Section 2a. 150 Hours

1001AC Mobilization and Demobilization Fees per Task Order 5 Each

1002 RENTAL OF DRILL RIG B

1002AA

Drill Rig B, Flotation-Tire, 4-Wheel-Drive Geotechnical Drilling Rig, ATV, Level D as defined by OSHA. See details in Section 2b 100 Hours

1002AC Mobilization and Demobilization Fees per Task Order 5 each

1003 RENTAL OF DRILL RIG C

1003AA

Drill Rig C, Truck-mounted Geotechnical Drilling Rig, (2-Wheel or 4-Wheel Drive) Level D as defined by OSHA. See details in Section 2c. 200 Hours

1003AC Mobilization and Demobilization Per Task Order 5 Each

1004 RENTAL OF DRILL RIG D

1004AA

Drill Rig D, Winch-Operated Skid Frame, Rotary Drilling Rig, Level D as defined by OSHA. See details in section 2d. 50 Hours

1004AC Mobilization and Demobilization Per Task Order 2 Each

1005 RENTAL OF DRILL RIG E

1005AA

Drill Rig E, Portable (Hand Carried) Pipe-Driving Winch, Level D as defined by OSHA. See details in Section 2e. 80 Hours

1005AC Mobilization and Demobilization Per Task Order 2 Each

1006 RENTAL OF PIEZOCONE SYSTEM

1006AA

Rental of Piezocone (CPTu) system with operator, Level D as defined by OSHA. See details in section 3 150 Hours

1006AB

Rental of Piezocone (CPTu) system with operator, Level C as Defined by OSHA. See Details in section 3 10 Hours

1006AC Mobilization and Demobilization Per Task Order 10 Each

1007 RENTAL OF FLOATING PLANT

1007AA Work Barge. See Details in Section 2. 120 Hours 1007AB Push Boat. See Details in Section 2. 120 Hours 1007AC Mobilization and Demobilization Per Task Order 4 Each 1008 DRILL HELPER 60 Hours 1009 Samples 1009AA 3-inch Thin-Wall Samples 10 Each 1009AB 5-inch Thin Wall Samples 30 Each

1009AC 3-inch Horslev Type Piston Samples 10 Each 1009AD 5-inch Horslev Type Piston Samples 50 Each

1009AE NQ-3 or Equivalent Core Drilling in Rock or Concrete 75 Foot 1009AF HQ-3 or Equivalent Core Drilling in Rock or Concrete 100 Foot 1009AG HQ Wireline Core Drilling in Rock or Concrete 100 Foot 1009AH PQ-3 or Equivalent Core Drilling in Rock or Concrete 100 Foot

1009AJ

Double-tube core barrel (6" x 7 3/4" or equivalent) for Core Drilling in Rock or Concrete 50 Foot

PER DIEM (To be paid in accordance with the Joint Travel

Regulations) 160 Day 1011 Portable Steam Cleaner Rental 10 Day

DOT-Approved Containers (Drums) for Contaminated Soils, Drilling Fluid, or Decontamination Water 10 Each

1013 BACKFILL MATERIAL

1013AA Portland Cement – 94-Pound Bags 100 Bag 1013AB High Solids Bentonite Grout – 50-Pound Bags 100 Bag 1013AC Bentonite Chips – 50-Pound Bags 100 Bag

1013AD

Filter Pack Sand For Piezometers and Monitoring Wells With #10-Slot Screens, 50-Pound Bags 20 Bag

1013AE Barite Drilling Additive – 50-Pound Bags 10 Bag 1014 Monitoring Well, Piezometer and Instrumentation Casing

1014AA

Nominal 1” PVC Flush-Threaded Riser Pipe, Schedule 40, 10-ft. Section Length 140 Each

1014AB

Nominal 1” PVC Flush-Threaded Well Screen, Continuous-Slot, #10-Slot Size, Schedule 40, 5-ft.

Section Length 30 Each

1014AC

Nominal 2” PVC Flush-Threaded Riser Pipe, Schedule 40, 10-ft. Section Length 40 Each

1014AD

Nominal 2” PVC Flush-Threaded Well Screen, Continuous-Slot, #10-Slot Size 10 Each

1014AE 4-Inch Protective Guard Posts 12 Each

1014AF

4-Inch Diameter Monitoring Well Protective Casing with Locking Cover 70 Foot

1014AG

6-Inch Diameter Monitoring Well Protective Casing with Locking 140 Foot

1014AH

8-Inch Diameter Monitoring Well Protective Casing

East Area Option Year One Total

Option Year One - WEST AREA (See Map in Statement of Work )

Period of Performance: One year from End of Base

Item Description Quantity U/I Unit Price

Net Amt

1015 RENTAL OF DRILL RIG A

1015AA

Drill Rig A, Geotechnical Drilling Rig ATV, Track- Mounted, Level D as defined by OSHA. See details in Section 2a. 150 Hours

1015AC Mobilization and Demobilization Fees per Task Order 5 Each

1016 RENTAL OF DRILL RIG B

1016AA

Drill Rig B, Flotation-Tire, 4-Wheel-Drive Geotechnical Drilling Rig, ATV, Level D as defined by OSHA. See details in Section 2b 100 Hours

1016AC Mobilization and Demobilization Fees per Task Order 5 each

1017 RENTAL OF DRILL RIG C

1017AA

Drill Rig C, Truck-mounted Geotechnical Drilling Rig, (2-Wheel or 4-Wheel Drive) Level D as defined by OSHA. See details in Section 2c. 100 Hours

1017AC Mobilization and Demobilization Per Task Order 2 Each

1018 RENTAL OF DRILL RIG D

1018AA

Drill Rig D, Winch-Operated Skid Frame, Rotary Drilling Rig, Level D as defined by OSHA. See details in section 2d. 50 Hours

1018AC Mobilization and Demobilization Per Task Order 2 Each

1019 RENTAL OF DRILL RIG E

1019AA

Drill Rig E, Portable (Hand Carried) Pipe-Driving Winch, Level D as defined by OSHA. See details in Section 2e. 80 Hours

1019AC Mobilization and Demobilization Per Task Order 2 Each

1020 RENTAL OF PIEZOCONE SYSTEM

1020AA

Rental of Piezocone (CPTu) system with operator, Level D as defined by OSHA. See details in section 3 150 Hours

1020AB

Rental of Piezocone (CPTu) system with operator, Level C as Defined by OSHA. See Details in section 3 10 Hours

1020AC Mobilization and Demobilization Per Task Order 10 Each

1021 RENTAL OF FLOATING PLANT

1021AA Work Barge. See Details in Section 2. 120 Hours 1021AB Push Boat. See Details in Section 2. 120 Hours 1021AC Mobilization and Demobilization Per Task Order 4 Each 1022 DRILL HELPER 60 Hours 1023 Samples 1023AA 3-inch Thin-Wall Samples 10 Each 1023AB 5-inch Thin Wall Samples 30 Each 1023AC 3-inch Horslev Type Piston Samples 10 Each

1023AD 5-inch Horslev Type Piston Samples 50 Each 1023AE NQ-3 or Equivalent Core Drilling in Rock or Concrete 75 Foot 1023AF HQ-3 or Equivalent Core Drilling in Rock or Concrete 100 Foot 1023AG HQ Wireline Core Drilling in Rock or Concrete 100 Foot 1023AH PQ-3 or Equivalent Core Drilling in Rock or Concrete 100 Foot

1023AJ

Double-tube core barrel (6" x 7 3/4" or equivalent) for Core Drilling in Rock or Concrete 50 Foot

PER DIEM (To be paid in accordance with the Joint Travel

Regulations) 160 Day 1025 Portable Steam Cleaner Rental 10 Day

DOT-Approved Containers (Drums) for Contaminated Soils, Drilling Fluid, or Decontamination Water 10 Each

1027 BACKFILL MATERIAL

1027AA Portland Cement – 94-Pound Bags 100 Bag 1027AB High Solids Bentonite Grout – 50-Pound Bags 100 Bag 1027AC Bentonite Chips – 50-Pound Bags 300 Bag

1027AD

Filter Pack Sand For Piezometers and Monitoring Wells With #10-Slot Screens, 50-Pound Bags 20 Bag

1027AE Barite Drilling Additive – 50-Pound Bags 10 Bag 1028 Monitoring Well, Piezometer and Instrumentation Casing

1028AA

Nominal 1” PVC Flush-Threaded Riser Pipe, Schedule 40, 10-ft. Section Length 140 Each

1028AB

Nominal 1” PVC Flush-Threaded Well Screen, Continuous-Slot, #10-Slot Size, Schedule 40, 5-ft.

Section Length 30 Each

1028AC

Nominal 2” PVC Flush-Threaded Riser Pipe, Schedule 40, 10-ft. Section Length 40 Each

1028AD

Nominal 2” PVC Flush-Threaded Well Screen, Continuous-Slot, #10-Slot Size 10 Each

1028AE 4-Inch Protective Guard Posts 12 Each

1028AF

4-Inch Diameter Monitoring Well Protective Casing with Locking Cover 70 Foot

1028AG

6-Inch Diameter Monitoring Well Protective Casing with Locking 140 Foot

1028AH

8-Inch Diameter Monitoring Well Protective Casing

West Area Option Year One Total 0

Option Year Two - EAST AREA (See Map in Statement of Work )

Period of Performance: One year from End of Option 1

Item Description Quantity U/I Unit Price

Net Amt

2001 RENTAL OF DRILL RIG A

2001AA

Drill Rig A, Geotechnical Drilling Rig ATV, Track- Mounted, Level D as defined by OSHA. See details in Section 2a. 150 Hours

2001AC Mobilization and Demobilization Fees per Task Order 5 Each

2002 RENTAL OF DRILL RIG B

2002AA

Drill Rig B, Flotation-Tire, 4-Wheel-Drive Geotechnical Drilling Rig, ATV, Level D as defined by OSHA. See details in Section 2b 100 Hours

2002AC Mobilization and Demobilization Fees per Task Order 5 each

2003 RENTAL OF DRILL RIG C

2003AA

Drill Rig C, Truck-mounted Geotechnical Drilling Rig, (2-Wheel or 4-Wheel Drive) Level D as defined by OSHA. See details in Section 2c. 100 Hours

2003AC Mobilization and Demobilization Per Task Order 5 Each

2004 RENTAL OF DRILL RIG D

2004AA

Drill Rig D, Winch-Operated Skid Frame, Rotary Drilling Rig, Level D as defined by OSHA. See details in section 2d. 80 Hours

2004AC Mobilization and Demobilization Per Task Order 2 Each

2005 RENTAL OF DRILL RIG E

2005AA

Drill Rig E, Portable (Hand Carried) Pipe-Driving Winch, Level D as defined by OSHA. See details in Section 2e. 50 Hours

2005AC Mobilization and Demobilization Per Task Order 2 Each

2006 RENTAL OF PIEZOCONE SYSTEM

2006AA

Rental of Piezocone (CPTu) system with operator, Level D as defined by OSHA. See details in section 3 150 Hours

2006AB

Rental of Piezocone (CPTu) system with operator, Level C as Defined by OSHA. See Details in section 3 10 Hours

2006AC Mobilization and Demobilization Per Task Order 10 Each

2007 RENTAL OF FLOATING PLANT

2007AA Work Barge. See Details in Section 2. 120 Hours 2007AB Push Boat. See Details in Section 2. 120 Hours 2007AC Mobilization and Demobilization Per Task Order 4 Each 2008 DRILL HELPER 60 Hours 2009 Samples 2009AA 3-inch Thin-Wall Samples 10 Each 2009AB 5-inch Thin Wall Samples 30 Each

2009AC 3-inch Horslev Type Piston Samples 10 Each 2009AD 5-inch Horslev Type Piston Samples 50 Each

2009AE NQ-3 or Equivalent Core Drilling in Rock or Concrete 75 Foot 2009AF HQ-3 or Equivalent Core Drilling in Rock or Concrete 100 Foot 2009AG HQ Wireline Core Drilling in Rock or Concrete 100 Foot 2009AH PQ-3 or Equivalent Core Drilling in Rock or Concrete 100 Foot

2009AJ

Double-tube core barrel (6" x 7 3/4" or equivalent) for Core Drilling in Rock or Concrete 50 Foot

PER DIEM (To be paid in accordance with the Joint Travel

Regulations) 160 Day 2011 Portable Steam Cleaner Rental 10 Day

DOT-Approved Containers (Drums) for Contaminated Soils, Drilling Fluid, or Decontamination Water 10 Each

2013 BACKFILL MATERIAL

2013AA Portland Cement – 94-Pound Bags 100 Bag 2013AB High Solids Bentonite Grout – 50-Pound Bags 100 Bag 2013AC Bentonite Chips – 50-Pound Bags 300 Bag

2013AD

Filter Pack Sand For Piezometers and Monitoring Wells With #10-Slot Screens, 50-Pound Bags 20 Bag

2013AE Barite Drilling Additive – 50-Pound Bags 10 Bag 2014 Monitoring Well, Piezometer and Instrumentation Casing

2014AA

Nominal 1” PVC Flush-Threaded Riser Pipe, Schedule 40, 10-ft. Section Length 140 Each

2014AB

Nominal 1” PVC Flush-Threaded Well Screen, Continuous-Slot, #10-Slot Size, Schedule 40, 5-ft.

Section Length 30 Each

2014AC

Nominal 2” PVC Flush-Threaded Riser Pipe, Schedule 40, 10-ft. Section Length 40 Each

2014AD

Nominal 2” PVC Flush-Threaded Well Screen, Continuous-Slot, #10-Slot Size 10 Each

2014AE 4-Inch Protective Guard Posts 12 Each

2014AF

4-Inch Diameter Monitoring Well Protective Casing with Locking Cover 70 Foot

2014AG

6-Inch Diameter Monitoring Well Protective Casing with Locking 140 Foot

2014AH

8-Inch Diameter Monitoring Well Protective Casing

East Area Option Year Two Total

Option Year Two - WEST AREA (See Map in Statement of Work )

Period of Performance: One year from End of Option 1

Item Description Quantity U/I Unit Price

Net Amt

2015 RENTAL OF DRILL RIG A

2015AA

Drill Rig A, Geotechnical Drilling Rig ATV, Track- Mounted, Level D as defined by OSHA. See details in Section 2a. 150 Hours

2015AC Mobilization and Demobilization Fees per Task Order 5 Each

2016 RENTAL OF DRILL RIG B

2016AA

Drill Rig B, Flotation-Tire, 4-Wheel-Drive Geotechnical Drilling Rig, ATV, Level D as defined by OSHA. See details in Section 2b 100 Hours

2016AC Mobilization and Demobilization Fees per Task Order 5 each

2017 RENTAL OF DRILL RIG C

2017AA

Drill Rig C, Truck-mounted Geotechnical Drilling Rig, (2-Wheel or 4-Wheel Drive) Level D as defined by OSHA. See details in Section 2c. 100 Hours

2017AC Mobilization and Demobilization Per Task Order 2 Each

2018 RENTAL OF DRILL RIG D

2018AA

Drill Rig D, Winch-Operated Skid Frame, Rotary Drilling Rig, Level D as defined by OSHA. See details in section 2d. 80 Hours

2018AC Mobilization and Demobilization Per Task Order 2 Each

2019 RENTAL OF DRILL RIG E

2019AA

Drill Rig E, Portable (Hand Carried) Pipe-Driving Winch, Level D as defined by OSHA. See details in Section 2e. 50 Hours

2019AC Mobilization and Demobilization Per Task Order 2 Each

2020 RENTAL OF PIEZOCONE SYSTEM

2020AA

Rental of Piezocone (CPTu) system with operator, Level D as defined by OSHA. See details in section 3 150 Hours

2020AB

Rental of Piezocone (CPTu) system with operator, Level C as Defined by OSHA. See Details in section 3 10 Hours

2020AC Mobilization and Demobilization Per Task Order 10 Each

2021 RENTAL OF FLOATING PLANT

2021AA Work Barge. See Details in Section 2. 120 Hours 2021AB Push Boat. See Details in Section 2 120 Hours 2021AC Mobilization and Demobilization Per Task Order 4 Each 2022 DRILL HELPER 60 Hours 2023 Samples 2023AA 3-inch Thin-Wall Samples 10 Each

2023AB 5-inch Thin Wall Samples 30 Each 2023AC 3-inch Horslev Type Piston Samples 10 Each 2023AD 5-inch Horslev Type Piston Samples 50 Each 2023AE NQ-3 or Equivalent Core Drilling in Rock or Concrete 75 Foot

2023AF HQ-3 or Equivalent Core Drilling in Rock or Concrete 100 Foot 2023AG HQ Wireline Core Drilling in Rock or Concrete 100 Foot 2023AH PQ-3 or Equivalent Core Drilling in Rock or Concrete 100 Foot

2023AJ

Double-tube core barrel (6" x 7 3/4" or equivalent) for Core Drilling in Rock or Concrete 50 Foot

PER DIEM (To be paid in accordance with the Joint Travel

Regulations) 160 Day 2025 Portable Steam Cleaner Rental 10 Day

DOT-Approved Containers (Drums) for Contaminated Soils, Drilling Fluid, or Decontamination Water 10 Each

2027 BACKFILL MATERIAL

2027AA Portland Cement – 94-Pound Bags 100 Bag 2027AB High Solids Bentonite Grout – 50-Pound Bags 100 Bag 2027AC Bentonite Chips – 50-Pound Bags 300 Bag

2027AD

Filter Pack Sand For Piezometers and Monitoring Wells With #10-Slot Screens, 50-Pound Bags 20 Bag

2027AE Barite Drilling Additive – 50-Pound Bags 10 Bag 2028 Monitoring Well, Piezometer and Instrumentation Casing

2028AA

Nominal 1” PVC Flush-Threaded Riser Pipe, Schedule 40, 10-ft. Section Length 140 Each

2028AB

Nominal 1” PVC Flush-Threaded Well Screen, Continuous-Slot, #10-Slot Size, Schedule 40, 5-ft.

Section Length 30 Each

2028AC

Nominal 2” PVC Flush-Threaded Riser Pipe, Schedule 40, 10-ft. Section Length 40 Each

2028AD

Nominal 2” PVC Flush-Threaded Well Screen, Continuous-Slot, #10-Slot Size 10 Each

2028AE 4-Inch Protective Guard Posts 12 Each

2028AF

4-Inch Diameter Monitoring Well Protective Casing with Locking Cover 70 Foot

2028AG

6-Inch Diameter Monitoring Well Protective Casing with Locking 140 Foot

2028AH

8-Inch Diameter Monitoring Well Protective Casing

West Area Option Year two Total

Contents 52.223-17

SCOPE OF WORK

1 GENERAL

2 EQUIPMENT AND SUPPLIES

3 CONE PENETROMETER TESTS

4 MOBILIZATION AND DEMOBILIZATION

5 SITE SAFETY, UTILITY MEETINGS, NOTIFICATIONS, ROAD USE PERMITS, MONITORING WELL PERMITS, BORING and WELL ABANDONMENTS

6 MILEAGE

7 PROJECT LOCATION

8 OPERATING PERSONNEL

9 MAINTENANCE AND REPLACEMENT OF EQUIPMENT

10 OPERATING AND WORKING TIME

11 PER DIEM

12 MONITORING WELL & PIEZOMETER MATERIALS

13 Task ORDERS

CONTRACT MINIMUM/MAXIMUM QUANTITY AND CONTRACT VALUE

DELIVERY/TASK ORDER MINIMUM/MAXIMUM QUANTITY AND ORDER VALUE

CLIN DELIVERY/TASK ORDER MINIMUM/MAXIMUM QUANTITY AND CLIN ORDER VALUE

CLAUSES INCORPORATED BY FULL TEXT

52.203-3 GRATUITIES (APR 1984)

52.204-7 SYSTEM FOR AWARD MANAGEMENT (OCT 2016)

52.204-16 Commercial and Government Entity Code Reporting (JUL 2016)

52.204-18 COMMERCIAL AND GOVERNMENT ENTITY CODE MAINTENANCE (JUL 2016)

52.204-22 Alternative Line Item Proposal (JAN 2017)

52.209-7 INFORMATION REGARDING RESPONSIBILITY MATTERS (JULY 2013)

52.212-1 INSTRUCTIONS TO OFFERORS--COMMERCIAL ITEMS (JAN 2017)

52.212-2 EVALUATION--COMMERCIAL ITEMS (JAN 1999)

52.212-3 OFFEROR REPRESENTATIONS AND CERTIFICATIONS--COMMERCIAL ITEMS (NOV 2017)

ALTERNATE I (OCT 2014)

52.212-4 CONTRACT TERMS AND CONDITIONS-- COMMERCIAL ITEMS (JAN 2017)

52.212-5 CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT STATUTES OR

EXECUTIVE ORDERS--COMMERCIAL ITEMS (JAN 2018)

52.216-19 Order Limitations (OCT 1995)

52.216-22 INDEFINITE QUANTITY. (OCT 1995)

52.216-27 SINGLE OR MULTIPLE AWARDS. (OCT 1995)

52.217-8 OPTION TO EXTEND SERVICES (NOV 1999)

52.217-9 OPTION TO EXTEND THE TERM OF THE CONTRACT (MAR 2000)

252.203-7000 REQUIREMENTS RELATING TO COMPENSATION OF FORMER DOD OFFICIALS (SEP

2011)

252.203-7005 REPRESENTATION RELATING TO COMPENSATION OF FORMER DOD OFFICIALS

(NOV

2011)

252.204-7004 ALTERNATE A, SYSTEM FOR AWARD MANAGEMENT (FEB 2014)

252.204-7011 ALTERNATIVE LINE-ITEM STRUCTURE (SEP 2011)

252.216-7006 ORDERING (MAY 2011)

252.223-7008 Prohibition of Hexavalent Chromium (JUN 2013)

252.225-7012 PREFERENCE FOR CERTAIN DOMESTIC COMMODITIES (DEC 2017)

252.226-7001 UTILIZATION OF INDIAN ORGANIZATIONS AND INDIAN-OWNED ECONOMIC

ENTERPRISES, AND NATIVE HAWAIIAN SMALL BUSINESS CONCERNS (SEP 2004)

252.232-7010 LEVIES ON CONTRACT PAYMENTS (DEC 2006)

252.237-7010 PROHIBITION ON INTERROGATION OF DETAINEES BY CONTRACTOR PERSONNEL

(JUN

2013)

252.243-7002 REQUESTS FOR EQUITABLE ADJUSTMENT (DEC 2012)

252.244-7000 SUBCONTRACTS FOR COMMERCIAL ITEMS (JUN 2013)

252.247-7023 TRANSPORTATION OF SUPPLIES BY SEA (APR 2014)

252.247-7024 Notification of Transportation of Supplies by Sea (MAR 2000) AT/OPSEC 13: Will be escorted in areas where they may be exposed to classified and/or sensitive materials and/or sensitive or restricted areas

AT/OPSEC 15: Pre‐screen candidates using E‐Verify Program

AT/OPSEC 2: Access and General Protection/Security Policy and Procedures

WAGE RATES

WD 15-4945

WD 15-4965

WD 15-4941

WD 15-4929

WD 15-4939

WD 15-4955

WD 15-4967

WD 15-4971

WD 15-4945

WD 15-4917

WD 15-4953

WD 15-4949

WD 15-4947

WD 15-4951

WD 15-4963

WD 15-4957

WD 15-4987

WD 15-4991

WD 15-5381

WD 15-5385

WD 15-5383

WD 15-4973

WD 15-4969

WD 15-5387

WD 15-4921

WD 15-4889

WD 15-4925

WD 15-4943

WD 15-4897

WD 15-4927

WD 15-5375

WD 15-4907

WD 15-4919

WD 15-4923

WD 15-4931

52.223-17 Affirmative Procurement of EPA-designated Items in Service and Construction Contracts (May 2008)

(a) In the performance of this contract, the Contractor shall make maximum use of products containing recovered materials that are EPA-designated items unless the product cannot be acquired—

(1) Competitively within a timeframe providing for compliance with the contract performance schedule;

(2) Meeting contract performance requirements; or

(3) At a reasonable price.

(b) Information about this requirement is available at EPA’s Comprehensive Procurement Guidelines web site, https://www.epa.gov/smm/comprehensive-procurement-guideline-cpg-program. The list of EPA-designated items is available at https://www.epa.gov/smm/comprehensive-procurement-guideline-cpg-program#products.

SCOPE OF WORK

US ARMY CORPS OF ENGINEERS

DRILL RIG RENTAL AND SUPPORT SERVICES CONTRACT

EASTERN AND WESTERN AREAS, ST. PAUL DISTRICT

PARTS OF: NORTH AND SOUTH DAKOTA, MINNESOTA, WISCONSIN, AND IOWA

DESCRIPTION/SPECIFICATIONS

SECTION NO.:

1 GENERAL/INTRODUCTION

2 EQUIPMENT AND SUPPLIES

3 CONE PENETROMETER TESTS

4 MOBILIZATION AND DEMOBILIZATION (MOB. AND DEMOB.)

5 SITE SAFETY, UTILITY MEETINGS, ROAD USE PERMITS, MONITORING

WELL PERMITS, NOTIFICATIONS, AND BORING ABANDONMENTS

6 MILEAGE

7 PROJECT LOCATION

8 OPERATING PERSONNEL

9 MAINTENANCE AND REPLACEMENT OF EQUIPMENT

10 OPERATING AND WORKING TIME

11 PER DIEM

12 MONITORING WELL & PIEZOMETER MATERIALS

13 TASK ORDERS

1 GENERAL. Rental of Drilling Equipment with Operating Personnel and Supplies. Mileage for all vehicle use necessary to accomplish the work, and that is not covered by mobilization and demobilization, shall be included in payment for Rental of Drilling Equipment. There shall be no separate payment for mileage. A Government Inspector will be on-site to log borings and inspect the work. At the time of the contract award the Contractor shall have all the necessary licenses, registration, etc, for personnel and equipment, to begin work immediately in all the states in which the awarded contract applies. The Contractor shall furnish drilling equipment, support vehicle(s), floating plant, supplies, and operating personnel capable of efficiently performing the following:

a. 4-inch through 8-inch flight auger borings;

b. Borings through cohesionless and cohesive soils with 3-inch through 8-inch diameter fishtail, or tricone roller bits, and a split-spoon sampler using drilling mud in lieu of casing. Upward directed drilling fluid return type bits may be required in engineered embankments;

c. Borings using 4-inch through 8-inch diameter pipe casing;

d. Auger-through and split-spoon sampling of cohesionless and cohesive soils with 3 ¼-inch, 4 ¼-inch, 6 ¼-inch, and 8 ¼-inch I.D. hollow stem augers;

e. Standard Penetration Tests (SPT’s) per ASTM 1586-84 (Re-approved 1992), with automatic drive hammer and cathead driven safety hammer. Split-spoon sampler shall conform to “Standard Split-Barrel Assembly” detailed in ASTM 1586-84;

f. Continuous soil sampling with the SPT barrel and a 2-inch I.D X 2 1/2-inch O.D. X 3-foot-long split-barrel sampler;

g. 3-inch and 5-inch thin wall undisturbed soil sampling;

h. 3-inch and 5-inch Hvorslev-type fixed piston undisturbed sampling;

i. Coring of bedrock and rebar reinforced concrete with NQ-3, HQ-3, HQ-Wireline, PQ-3 and 6-inch x 7 3/4-inch diameter core barrels or equivalent. The appropriate diamond and carbide coring bits shall include internal and bottom discharge type;

j. Abandonment and backfilling of boreholes and CPTu soundings, per appropriate state requirements, by gravity and/or pump and tremie system with cement/bentonite, high solids bentonite, bentonite chips, barite and/or neat cement grout;

k. Rotary borings through rock, reinforced concrete, and cohesionless and cohesive soils. A mud pump, mud pan or tank, mud mixing apparatus, water tank and pump for filling tank, appropriate hoses, and bentonite drilling mud shall be on site for each project;;

W912ES18R0014

l. Well screen and riser installations, for the purpose of constructing observation and monitoring wells (up to 2-inch diameter), direct burial piezometers and/or standpipe piezometers (up to 2-inch diameter), installing inclinometer casing (3.5-inch O.D.), instrument protective casings and covers, and other instrumentation. Borings through cohesive and granular soils, concrete, and rock, to set instrument pipe and casing, to install protective casing, and to backfill instrument installations with selected materials, as requested by the Contracting Officer;

m. All types of soil and rock borings in Level D or Level C personal protective gear as defined by OSHA;

n. Decontamination of all equipment before the Contractor arrives at the drilling site, between the sample intervals, boreholes, or before the Contractor leaves the drilling site as is deemed necessary in the SCOPE OF WORK for the Task Order;

o. Remote drill-site access prior to drilling to include removal of brush and small trees with chainsaw or appropriate methods, snow removal, site leveling as necessary;

p. Worksite restoration to pre-drilling conditions to include, but not limited to, removing auger and drill cuttings and repair ground damage at borehole sites, as requested by the Contracting Officer’s Representatives;

q. Drill the majority of holes to a depth of less than 150 feet using DRILL RIGS A-D listed below. However, the Contractor may be required to drill and sample up to 300 feet in depth using equipment identified as DRILL RIGS B and DRILL RIG C. DRILL RIG A shall be capable to drill and sample to depths of at least 200 feet. DRILL RIG E shall be capable to drill and sample to a depth of 50 feet;

2 EQUIPMENT AND SUPPLIES. Equipment requirements will vary from job to job as requested in individual TASK ORDERS and defined in their respective SCOPE OF WORK. A typical SCOPE OF WORK will define the project requirements and will request the rig that can access the most remote boring. The majority of the projects involve continuous split-spoon sampling using Hollow Stem Auger to advance and clean the hole between samples, and mud-rotary drilling for maintaining an open borehole below the water table. A support vehicle (pickup truck or cargo truck) shall be included in the rental of each Drill Rig or CPTu SYSTEM. No separate payment will be made for a support vehicle. Some projects may require more than one type drill rig and operating crew at the same time. Individual task orders will specify the project requirements. The five different drill rig types and CPTu system required for this contract and detailed in section 2a. through 2e. are: DRILL RIG A (All-Terrain Vehicle, Track-Mounted); DRILL RIG B (All-Terrain Vehicle, with large Balloon or Flotation Tires);

DRILL RIG C, (Truck-Mounted 2 or 4-Wheel-Drive); DRILL RIG D (Skid Rig with Rotary Drilling Capability); DRILL RIG E (Portable, Hand-Carried) Pipe-Driving Winch Rig; and CPTu SYSTEM (See section 3 for details of CPTu System) pushed by one of the above Drill Rigs. The equipment will be used on all types of terrain including but not limited to woods, steep hills, bogs, frozen lakes and swamps, and site conditions, dry, wet, or muddy. It will be used in all weather conditions; snow, rain, ice, sub-zero temperatures.

Drilling equipment may be used on Government-owned or Contractor provided rented floating plant(s) on rivers, harbors, and lakes. Contractor provided rental work barge(s) shall, at a minimum, have 2 working spuds capable of holding the barge in place at a water depth of 40-feet. Rental barge(s) will be of sufficient size to be appropriate for the loading conditions and allow safe and stable access around all sides of the drilling equipment. A rental boat (push boat) to position the work barge may be necessary. A Contractor provided rental boat shall be equivalent to a 200 horse power, twin engine array with “push knees” to facilitate work barge to push boat connection. Depending upon work location both barge and boat may need to be transported over the road. The Contractor shall provide a competent boat pilot with the rental boat. Appropriate water safety gear to include personal flotation device for each crew member shall be included in the rental.

The Contractor shall furnish all equipment and supplies necessary to perform the required drilling to include, but not limited to, the following:

a. DRILL RIG A: All-Terrain Vehicle (ATV), Track-Mounted Rig with rotary drill and accessory equipment, designed for geotechnical drilling, rock coring, hollow stem augering, and split-spoon sampling, with automatic driven hammer AND cathead-driven safety hammer, for conducting SPT’s per ASTM 1586-84. Drill rig must be designed for accessing remote sites, traveling over uneven terrain, over snow, and on very soft and/or wet ground. It should have a ground pressure variant of 4 psi or less with proper weight distribution and stability. Two hydraulic leveling jacks shall be fitted at the rear of the vehicle and at least one on the front. The drill mast shall be operated hydraulically, and shall be fitted with sheaves for at least three (3) cables and one (1) rope. The drill rig shall be transported on a trailer between sites. The drill rig shall also be equipped with an attached or attachable water tank of at least 100 gallons that can be brought into remote mud-rotary drill sites that trailered water tanks or support vehicles with water tanks cannot access. The drill rig shall also be equipped with a pump capable to pump bentonite drilling fluid required to keep the holes open and remove cuttings, as well as cementitious grout mixes to abandon the borings or wells.

b. DRILL RIG B: All-Terrain Vehicle (ATV), Flotation-Tired, Four-Wheel-Drive Rig with rotary drill and accessory equipment; designed for geotechnical drilling, rock coring, hollow stem augering, and split-spoon sampling, with automatic drive hammer AND cathead-driven safety hammer for conducting SPT’s per ASTM 1586-84. Drill rig must be designed for accessing remote sites traveling over uneven terrain, over snow, and on soft and/or wet ground.

It should have a ground pressure of 7.5 psi or less with weight evenly distributed. Two hydraulic leveling jacks shall be fitted at the rear of the ATV and at least one on the front. The drill mast shall be operated hydraulically, and shall be fitted with sheaves for at least three (3) cables and one (1) rope. Power winches of not less than 12-ton capacity and with not less than 150 feet of 3/4-inch diameter steel cable shall be mounted on the front of the ATV. The drill rig must have the rotary capabilities of operating at a forward speed from 0 to 650 rpm. The rotary drive shall have a reverse gear and a maximum drill spindle torque of not less than 7,000 ft./lbs. The vertical drive shall have a stroke of at least 72 inches, downward thrust of not less than 16,000 lbs., and retraction of at least 24,000 lbs. Weight of the drill rig and tools shall not exceed 24,000 lbs. Length of rig from bumper to bumper shall not exceed 24 feet. The drill rig shall also be equipped with an attached or attachable water tank of at least 100 gallons that can be brought into remote mud-rotary drill sites that trailered water tanks or support vehicles with water tanks cannot access. The drill rig shall also be equipped with a pump capable of pumping bentonite drilling fluid required to keep the holes open and remove cuttings, as well as cementitious grout mixes to abandon the borings or wells.

c. DRILL RIG C: Truck-Mounted (Two-Wheel-Drive or Four-Wheel-Drive) with rotary drill and accessory equipment; designed for geotechnical drilling, rock coring, hollow stem augering, and split-spoon sampling, with automatic drive hammer AND cathead-driven safety hammer for conducting SPT’s per ASTM 1586-84. Drill rig must be designed for driving up to sites with roadway or firm ground access. It shall be ready to set up and drill using hollow stem auger and mud rotary drilling. Two hydraulic leveling jacks shall be fitted at the rear of the vehicle and at least one on the front. The drill mast shall be operated hydraulically, and shall be fitted with sheaves for at least three (3) cables and one (1) rope. Power winches of not less than 12-ton capacity and with not less than 150 feet of 3/4-inch diameter steel cable shall be mounted on front of the truck. The drill rig must have the rotary capabilities of operating at a forward speed from 0 to 650 rpm. The rotary drive shall have a reverse gear and a maximum drill spindle torque of not less than 7,000 ft./lbs. The vertical drive shall have a stroke of at least 60 inches, downward thrust of not less than 16,000 lbs., and retraction of at least 24,000 lbs. Weight of the drill rig and tools shall not exceed 24,000 lbs., and length of rig from bumper to bumper shall not exceed 24 feet. The drill rig shall also be equipped with a pump capable of pumping bentonite drilling fluid required to keep the holes open and remove cuttings, as well as cementitious grout mixes to abandon the borings or wells.

d. DRILL RIG D: Winch-Operated, Skid-Frame-Type Drill with rotary capability and automatic OR cathead-driven safety hammer for conducting SPT’s per ASTM 1586-84. The rig shall be designed for geotechnical split-spoon sampling, rock and concrete coring and drilling in tight quarters or from floating plants. The drill rig shall be capable of being set up on drill platform such as a barge or a pontoon with horizontal set up space as small as 7-feet by 7-feet.

e. DRILL RIG E: Portable (Hand-Carried) Pipe Driving Winch with automatic hammer OR cathead driven safety hammer for conducting borings up to 50-feet deep including SPT’s (per ASTM 1586-84). Rig shall be designed to perform portable geotechnical drilling in tight quarters, wetlands, or from floating plants with horizontal set up space as small as 7- feet by 7-feet.

f. ‘AW’ size and ‘N’ or ‘NW’ size drill rods;

g. Rotary tri-cone and drag-type drill bits, and split-spoon & split-barrel samplers, to perform 3-inch through 8-inch borings;

h. Flight augers (4-inch through 8-inch), hollow stem augers ("3-1/4", "4-1/4", "6-5/8" I.D.), and iron pipe casing (4-inch through 10-inch);

i. Triple-tube core barrels (NQ-3, HQ-3, and PQ-3) and appropriate bits to include diamond and carbide surfaced as well as bottom and internal discharge. Double-tube core barrel (6" x 7 3/4" or equivalent) and appropriate bits to include diamond and carbide surfaced as well as bottom and internal discharge. HQ Wireline core barrel system with a split-inner tube and appropriate bits to include diamond and carbide surfaced as well as bottom and internal discharge;

j. 3-inch and 5-inch undisturbed thin wall sample tubes;

k. 3-inch and 5-inch Hvorslev type, fixed piston undisturbed samplers and sample tubes;

l. Powdered bentonite that meets the requirements of American Petroleum Institute (API) Specification 13A, section 9, Type I or Type II Portland cement, medium high yield bentonite chips, and barite drilling fluid additive;

m. Mud pumps, grout pumps, auxiliary pumps, tremie pipe, hoses, mud pan or tank, mud mixing apparatus, and water tanks. One water tank must have a minimum size of 300 gallons. The mud pump and/or grout pumps shall have the capacity for, and be designed for, the type of work listed in this STATEMENT OF WORK and in the individual project SCOPE OF WORK included in each task order upon issuance;

n. All hand tools needed to complete subsurface exploration work, routine maintenance, and set-up and cleanup of the drill site;

o. Portable propane torches for winter work and to heat wax for sealing undisturbed samples;

p. Sample inspection table measuring at least 3 feet x 3 feet x 42 inches high with a pipe vise mounted on one end;

q. Bailers suitable for removing water, drilling mud, or sand from boreholes or instruments;

r. Portable steam-cleaner;

s. Precise survey equipment to determine elevations of bore holes and stadia distances, including a transit or level with a tripod and a leveling survey rod. The survey rod shall be legible and read in feet, be graduated in 10ths and 100ths of a foot, and be capable of telescoping, or otherwise accurately extending, to at least 25 feet;

t. Adapters, tools, and related items, which are not specifically listed herein, but are necessary for use with the equipment in achieving the performance requirements set forth in section 1 (GENERAL) shall be furnished or made available for use as required;

2.1 Projects likely to encounter contaminated soils, water, and rock or requiring subsurface samples for chemical analysis may require the following:

a. Level C or D personal protective equipment as defined by OSHA;

b. Containerizing contaminated soils and/or drilling fluids;

c. Decontamination equipment and supplies sufficient to enable all drilling and sampling equipment to be satisfactorily cleaned before the Contractor arrives at the drilling site, and between each sample if such equipment or supplies are deemed necessary in the SCOPE OF WORK for the Task Order.

2.2 The Government will furnish appropriate containers for all soil and rock samples, except undisturbed samples, which will be retained in the sampling tube provided by the Contractor.

3 CONE PENETROMETER TESTS. The following criteria must be met for Cone Penetrometer testing procedure (cone testing will be completed in conjunction with the rental of one of the drill rigs above):

(a) The CPT test should be conducted in accordance with ASTM D 5778-95, "Standard Test Method for Electronic Friction Cone and Piezocone Penetration Testing of Soils". If CPTu (Piezocone) tests are being conducted, the cone shall have the pore pressure element location immediately behind the cone tip (u2) with a new saturated filter element prior to each test.

(b) Prior to penetration, the cone temperature should be adjusted to the anticipated soil temperature, as reasonably possible.

(c) Routine profiling is to be conducted with a 10-ton capacity cone.

(d) Calibration of the cone will be done in accordance with ASTM D 5778-95. There will be a piezometric calibration chamber to test the cone prior to starting a task order and then calibration will be completed every tenth probe hole.

3.1 CPT Data Reporting must fulfill the following requirements:

(a) The data report for the cone penetration tests, as a minimum, shall meet the reporting requirements outlined by ASTM D5778-95. These data must include the raw data taken during penetration.

(b) The graphical data shall be supplied in a format produced by the program DIGITAL CONEPLOT available from ARA/Vertek or Rapid CPT by Dataforensics.

(c) CPT data should be presented in the following units:

Depth - feet Tip resistance (qc) – tons/sq ft. (tsf.)

Sleeve friction (fs) – tsf.

Pore Pressure (u2) – psi.

Inclination – degrees from vertical Temperature – degrees Fahrenheit

3.2 Graphical (x-y) plots shall be submitted for each cone test with the test report. The format of the plots should be as follows:

(a) CPTU sounding qc (x-axis) vs. depth (y-axis) Rf (x-axis) vs. depth (y-axis) u2 (x-axis) vs. depth (y-axis) Soil behavior type vs. depth (y-axis)

4 MOBILIZATION AND DEMOBILIZATION

a. Mobilization and Demobilization (Mob and Demob) covers all costs incurred in moving the drilling equipment, personnel (to include all travel expenses - including per diem for travel days), support vehicles, and supplies to the work site and returning them to the Contractor's permanent facility when the job is completed. Initial and final cleaning and decontamination of the drilling equipment and tools, by steaming if necessary, shall also be included in the mobilization and demobilization costs. Mobilization shall end when setting-up the drill equipment for drilling begins. Demobilization begins once the last boring is grouted or the Contracting Officer designates the job is complete. This payment will be the same for each job within the specific area called for in the task order, regardless of its location within the area, according to the amounts stated in the bid schedule. Per diem while at the work site is covered by the per diem CLIN and is not included under Mobilization and Demobilization.

b. Only one Mob and Demob charge per drill rig and/or per floating plant (barge unit) per task order will be allowed unless approved by the Contracting Officer.

5 SITE SAFETY, UTILITY MEETINGS, NOTIFICATIONS, ROAD USE PERMITS,

MONITORING WELL PERMITS, BORING and WELL ABANDONMENTS

a. All drilling operations shall be conducted per the current version of the Corps of Engineers Safety Manual (EM 385-1-1). Section 18-H “Drilling Equipment” will serve as the primary reference source for safety during drilling operations.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.