18B0007-0002.pdf
PDF 164 KB Posted
- Attached to
- Mechanical Island Unloading IDIQ
- Solicitation number
- W912ES18B0007
About this file
Amendment 0002
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Bid_Abstract_Mechanical_Island_Unload_18B0007.pdf | ||
| 18B0007-0001.pdf | ||
| W912ES-18-B-0007_Specs.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W81G6780043836
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The reason for this amendment is to update sections 01 35 26 1.5.1.1, and 01 57 20.00 13 of the specifications.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 17-Jul-2018
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912ES18B0007
X 9B. DATED (SEE ITEM 11)
21-Jun-2018
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
17-Jul-2018
CODE
CONTRACTING DIVISION
USACE - ST PAUL
180 5TH STREET EAST
SUITE 700
ST. PAUL MN 55101-1678
W912ES 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912ES18B0007
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00 21 00 - INSTRUCTIONS
The following have been added by full text:
AMENDMENT 0002
AMENDMENT 0002
1.) General Section 01 35 26 Paragraph 1.5.1.1.1 has been changed to read as follows:
“The SSHO is a seperate position, has no other duties, and reports to the CQC Systems Manager.”
2.) SECTION 01 57 20.00 13 Paragraph 3.10 has been changed to read as follows:
“The Contractor shall clean each previously used piece of construction equipment and watercraft prior to placing them into the Mississippi River or its tributaries and prior to removing them from the Mississippi River or its tributaries to prevent the spread of invasive species. The Contractor shall ensure that the equipment and watercraft is free from soil residuals, egg deposits from plant pests, noxious weeds, plant seeds, aquatic plants and animals (including zebra mussels), and residual water. Cleaning of equipment and watercraft shall be in accordance with the Environmental Protection Plan.
If construction equipment or watercraft is found to be contaminated with invasive species, despite implementation of the approved Environmental Protection Plan, the Contractor shall not use the construction equipment or watercraft in its present state. Any contaminated construction equipment or watercraft in water shall immediately be placed on dry land. The Contractor shall follow decontamination protocols as identified in the environmental protection plan. Contaminated equipment shall be decontaminated on site if there is an area that meets decontamination protocols. If this is not possible, the equipment shall be quarantined on site until a decontamination plan is approved by the Contracting Officer. Such equipment shall not be used on site until all invasives have been removed and documentation verifying the results of the cleaning is provided.”
(End of Summary of Changes)
File details come from the government source that posted it.