Attachment 4 - Gradation Forms
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 16-T-0020-01.pdf | ||
| Attachment_1.pdf | ||
| Attachment_6.pdf | ||
| 16-T-0020.pdf | ||
| Attachment_2-1.pdf | ||
| Attachment_3.pdf | ||
| Attachment_5.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 4 - Gradation Forms
Riprap Gradation Curves b6edbmm2 Typewritten Text
ROCK SUPPLY CONTRACT
b6edbmm2 Typewritten Text
R45 RIPRAP
b6edbmm2 Typewritten Text b6edbmm2 Polygonal Line b6edbmm2 Typewritten Text b6edbmm2 Typewritten Text b6edbmm2 Typewritten Text b6edbmm2 Typewritten Text b6edbmm2 Typewritten Text b6edbmm2 Typewritten Text b6edbmm2 Typewritten Text b6edbmm2 Typewritten Text b6edbmm2 Typewritten Text b6edbmm2 Polygonal Line b6edbmm2
ROCK SUPPLY CONTRACT
b6edbmm2 Typewritten Text
R80 RIPRAP
b6edbmm2 Typewritten Text b6edbmm2 Polygonal Line b6edbmm2 Polygonal Line b6edbmm2 Typewritten Text b6edbmm2 Typewritten Text b6edbmm2 Typewritten Text b6edbmm2 Typewritten Text b6edbmm2 Typewritten Text b6edbmm2 Typewritten Text b6edbmm2 Typewritten Text b6edbmm2 Typewritten Text b6edbmm2 Typewritten Text b6edbmm2 Typewritten Text b6edbmm2 Typewritten Text b6edbmm2 Typewritten Text b6edbmm2 Typewritten Text
Riprap Gradation Analysis Worksheet
WORK SHEET FOR GRADATION ANALYSIS OF RIPRAP
METHOD A
Project Name: Date:
Riprap Type: Test No.
Source, Quarry, or Pit:
Sample Location: Test Made By:
Part 1. Weigh all stones larger than 5 pounds and record.
(1) PASSING WT. 5 lbs.
(2) RETAINED WT. 5 lbs. PAN
(3) ------- -------
(4) TOTALS
Rows (1) & (2) Enter 5 to 7 weight classes to yield approx. 75%, 50%, 30%, and 15% finer points.
Row (3) List weight of each stone. Attach additional sheets if necessary.
Row (4) Add all individual stone weights listed in each column.
Part 2. Summary Table.
(5) WEIGHT CLASSES (6) (7) (8)
PASSING RETAINED TOTAL WEIGHT CUMMULATIVE TOTAL PERCENT
(stone wt. (stone wt. EACH CLASS WEIGHT PASSING PASSING in lbs.) in lbs.) (lbs.) (lbs.) (%)
5 lbs.
5 lbs. PAN
SAMPLE TOTAL -------- --------
Column (5) Enter same weight classes used in Rows (1) and (2).
Column (6) Enter weights of material from Row (4) Column (7) Add column (6) from bottom up to get cumulative weight passing.
Column (8) Divide column (7) by sample total to get total percent passing.
WORK SHEET FOR GRADATION ANALYSIS OF RIPRAP
METHOD B
Project Name: Date:
Riprap Type: Test No.
Source, Quarry, or Pit:
Sample Location: Test Made By:
Part 1. Separate rock into 5 to 7 piles, ordered by size. The largest pile should contain 2 to 5 stones. Intermediate piles between the largest stones and those smaller than 5 pounds should be approximately equal in total weight. Separate all stones before weighing.
Part 2. Summary Table.
(1) WEIGHT CLASSES (2) (3) (4)
PASSING RETAINED TOTAL WEIGHT CUMMULATIVE TOTAL PERCENT
(stone wt. (stone wt. EACH CLASS WEIGHT PASSING PASSING in lbs.) in lbs.) (lbs.) (lbs.) (%)
5 lbs.
5 lbs. PAN
SAMPLE TOTAL -------- --------
Column (1) Weight the smallest and largest stone in each pile. If weight classes overlap, adjust stones as necessary and repeat.
Column (2) Weigh the total amount of rock in each pile and record.
Column (3) Add column (2) from bottom up to get cumulative weight passing.
Column (4) Divide column (3) by sample total to get total percent passing.
Rock Supply Contract 2015 - SCOPE OF WORK (4).pdf