About this file

Amendment 0002

View the file

Other files for this federal contract opportunity

Other files attached to Sand Hill River Fish Passage, newest first.
File Type Posted
W912ES15B0007_Bid_Abstract.pdf PDF
Amendment_2_Revised_Bid_Schedule.pdf PDF
Amendment_1_Sand_Hill_Revised_Bid_Schedule.pdf PDF
Amendment_1_Protected_Waters_Permit.pdf PDF
Amendment_1_15B0007.pdf PDF
Amendment_1_revised_specification.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W81G6740155878

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

See "Summary of Changes" for the purpose of this amendment.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 09-Sep-2015

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912ES-15-B-0007

X 9B. DATED (SEE ITEM 11)

12-Aug-2015

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

09-Sep-2015

CODE

CONTRACTING DIVISION

USACE - ST. PAUL

180 5TH STREET E SUITE 700

ST. PAUL MN 55101-1678

W912ES 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912ES-15-B-0007

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

AMENDMENT 0002

The purpose of this amendment is as follows:

Note: Specification deletions are shown as strikethrough, additions are shown as underlined.

1. BID SCHEDULE

a. Replace: 0026AB BEDDING GRADATION B3 OVER – 325 TON 325 TON

With: BEDDING GRADATION B3 OVER – 980 TON 325 TON

See attached revised bid schedule.

2. SECTION 01 14 00.00 13 WORK RESTRICTIONS

a. Revise Paragraph 1.7 as follows:

1.7 TEMPORARY BANK PROTECTION NOT USED

In the event the fishways are not constructed by the interim completion date, the contractor shall provide alternate temporary bank protection measures at no additional cost to the government. The contractor shall be responsible for the design, construction, and removal of any temporary measures required. All designs shall be prepared and signed by a Registered Professional Engineer and submitted to the Contracting Officer for approval prior to construction of the temporary measures.

Examples of temporary measures may include but are not limited to, Hesco baskets, Trap bags, and/or rock berms. If required, designs shall be submitted to the Contracting Officer by 1 November 2016.

Temporary measures shall be placed within the limits of work and be complete by 1 April 2017.

3. SECTION 35 31 19.00 13 STONE PROTECTION (RIPRAP AND BEDDING)

a. Revise Paragraph 2.5 as follows:

2.5 BOULDERS

Boulders shall be reasonably rounded smooth fieldstone gathered from area fields or gravel pits of natural stone deposits or quarried stone obtained from blasting operations or cut from rock formations. Boulders shall not be comprised of limestone, dolomite or schist. Stone for boulders shall have a specific gravity not less than 2.65. The minimum dimension of any boulder shall not have a diameter less than 3-feet. The sum of the diameters in the XYZ dimensions shall not be less than 9 feet nor greater than 12 feet. The nominal diameter of a boulder, as specified on the drawings, shall be considered its largest diameter. Boulders shall be of a suitable quality to ensure permanence in the structure and in the climate in which it is to be used.

All other terms and conditions remain unchanged.

SECTION 00010 - SOLICITATION CONTRACT FORM

W912ES-15-B-0007

SUBCLIN 0026AB

The CLIN description has changed from Bedding Gradation B3 Over 325 Ton to Bedding Gradation B3 Over 980 Ton.