Amend_0002.pdf

PDF 21 KB Posted

Attached to
Exhaust Insulation Blankets
Solicitation number
W912ES-14-T-0028
Issued by

About this file

AMENDMENT 0002

View the file

Other files

File Type Posted
Amendment_0001._Revised_Attachment.pdf PDF
Amend_0001.pdf PDF
Request_For_Quotation_W912ES-14-T-0028.pdf PDF
Attachments.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W912ES-14-T-0028

W81G6740216159

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this Amendment is to:

1. Revise paragraph 1, General, of the Performance Work Statement. (See attached underlined revisions.)

2. Extend the required response due date/time from 06-Mar-2014 10:00 AM to 07-Mar-2014 02:00 PM.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 05-Mar-2014

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912ES-14-T-0028

X 9B. DATED (SEE ITEM 11)

20-Feb-2014

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

04-Mar-2014

CODE

CONTRACTING DIVISION

USACE - ST PAUL

180 5TH STREET EAST

SUITE 700

ST. PAUL MN 55101-1678

W912ES 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 1449 - CONTINUATION SHEET

SOLICITATION/CONTRACT FORM

The required response date/time has changed from 06-Mar-2014 10:00 AM to 07-Mar-2014 02:00 PM.

The following have been modified:

PERFORMANCE WORK STATEMENT

1. GENERAL

The contractor shall provide exhaust insulation blankets for three tenders that are 800 HP diesel powered motor vessels located in Fountain City, Wisconsin. The exhausts are typically made of schedule 40 steel pipes of varying sizes. The exhaust blankets shall cover the exhaust piping from the turbocharger bale/outlet to the outlet of the exhaust silencer on the Tender Butler only.

All other Tenders shall be wrapped to the silencer flange. The contractor shall be responsible for obtaining measurements of the exhaust systems, the design work, manufacturing, and delivery.

Drawings for identifying locations for installing each blanket shall be sent to the technical points of contact provided. Government labor shall be used for exhaust wrap installations.

2. TENDERS THAT REQUIRE EXHAUST WRAPS

Tenders that shall require exhaust insulation blankets are located in Fountain City, WI. These shall include:

Tender Butler Tender Lyon Tender Wells Tender Fogiphol

3. EXHAUST INSULATION WRAP DESIGN

The following shall be required for exhaust insulation wrap manufacture.

3.1. All seams shall be sewn with stainless steel wire

3.2. Gusset construction shall be employed for end terminations to ensure maximum installation thickness throughout

3.3. No staples or hog rings shall be used

3.4. Accurate measurements of the exhaust systems shall be obtained by the contractor to ensure proper fit. General measurements which include pipe length, size, diameter, and elbows are included in the reference drawings in attachment E.

3.5. Expansion joints shall be covered with exhaust wraps

3.6. Exhaust wraps shall be manufactured to withstand exhaust pipe systems that have 1100 deg Fahrenheit inner skin temperature and 400 degrees Fahrenheit outer skin temperature. There are no restrictions on surface temperatures.

4. MATERIALS

The materials listed below shall be used at a minimum for manufacturing the exhaust insulation wraps.

Inner Casing: .008"x 60# Density.Type 304 stainless Steel wire mesh Inner Jacketing: 18oz/sq.yd Pure fiberglass cloth Outer Jacketing: 17oz/sq.yd Silicone impregnated fiberglass cloth Insulation: 2.000" THK 6# Density Ceramic wool Thread: Type 304 Stainless steel, 10-ply thread Attachments: Silicone cloth belts with stainless steel double D-rings I.D. Tags: Stainless steel tags marked with blanket location, your company name & phone number.

5. DELIVERY

All exhaust insulation wraps shall be new and custom fabricated and be delivered on or before 30 April 2014. Government labor will be used for unloading wraps from the contractor’s delivery vehicle. The delivery address is:

US ARMY CORPS OF ENGINEERS

ATTN: DREDGE GOETZ

431 NORTH SHORE DRIVE

FOUNTAIN CITY, WI 54629

6. TECHNICAL POINT OF CONTACT

Drawings for identifying locations for installing each blanket shall be sent to the technical point of contacts provided. Government labor will be used for exhaust wrap installations.

Jake Bernhardt, Chief Engineer 651-249-6068 Joe Kupietz, 651-290-5985, Cell – 612-801-6075

US ARMY CORPS OF ENGINEERS

431 NORTH SHORE DRIVE

FOUNTAIN CITY, WI 54629

Attachments:

Attachment A – Photographs, Tender Butler Attachment B – Photographs, Tender Lyon Attachment C – Photographs, Tender Wells Attachment D – Photographs, Tender Fogiphol Attachment E – Reference drawings

(End of Summary of Changes)

File details come from the government source that posted it. Updated .