Responses_To_Questions_9.12.13.pdf
PDF 33 KB Posted
- Attached to
- W912ES-13-T-0124 EAU GALLE RIPRAP REPLACEMENT
- Solicitation number
- W912ES-13-T-0124
About this file
Responses To Questions September 12 2013
View the file
Other files
| File | Type | Posted |
|---|---|---|
| AMENDMENT_0001.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Responses To Questions Solicitation W912ES-13-T-0124
September 12, 2013
Q1. I wanted to verify whether the existing rip rap and bedding removed during both Stage I and Stage II needs to be disposed of off site.
A1. Off‐site storage is specified in Section 31 00 00.00 13 EARTHWORK, paragraph
3.3 EXCAVATION.
Q2. I also wanted to verify whether the quantities in the bid reflect all new materials imported to the jobsite for the work that is described, or if some of the existing materials are to be reused/recycled.
A2. Quantities in the Bid Schedule are reflective of the project assuming all new material. The Contractor can only reuse/recycle material if the gradations meet requirements and the proper sorting, cleaning, and stock piling operations are approved as stated in Section 35 31 19.00 13, paragraph 2.2.1 General.
File details come from the government source that posted it. Updated .