Responses To Questions Solicitation W912ES-13-T-0124

September 12, 2013

Q1. I wanted to verify whether the existing rip rap and bedding removed during both Stage I and Stage II needs to be disposed of off site.

A1. Off‐site storage is specified in Section 31 00 00.00 13 EARTHWORK, paragraph

3.3 EXCAVATION.

Q2. I also wanted to verify whether the quantities in the bid reflect all new materials imported to the jobsite for the work that is described, or if some of the existing materials are to be reused/recycled.

A2. Quantities in the Bid Schedule are reflective of the project assuming all new material. The Contractor can only reuse/recycle material if the gradations meet requirements and the proper sorting, cleaning, and stock piling operations are approved as stated in Section 35 31 19.00 13, paragraph 2.2.1 General.