11-T-0090.pdf

PDF 290 KB Posted

Attached to
Gull Lake Electrical Upgrade
Solicitation number
W912ES-11-T-0090
Issued by

About this file

SF-1442

View the file

Other files

File Type Posted
Gull Lake Map 2.pdf PDF
11-T-0090.pdf PDF
11-T-0090-0001.pdf PDF
Gull Lake 50AMP.pdf PDF
Gull_Map.pdf PDF
Gull Lake Electrical SoW.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W81G6712166483

Gull Lake Recreation area electrical w ork. Electrical upgrades, Gull Lake Recreation area, Brainerd, MN. Work consists of but is not limited to, replacement of current 30 amp campground pedestals at Gull Lake Recreation area w ith 50 amp campground pedestals, upgrading electrical services as required for the installation of new Midw est 50 amp campground pedestals w ith GE Breakers, balance panelboard circuits for all electrical campground sites, and replacement of existing feed and service conductors to campground sites pedestals. The estimated price range for this project is betw een $25,000.00 and $100,000.00. The NAICS code is 238210 w ith a small business size standard of $14 million.

The Solicitation is issued as a request for quote w ith a Total Small Business Set aside.

JESSE L ONKKA 651-290-5444

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS

NEGOTIATED

31-Aug-2011

(RFP)

(IFB)

CALL:

B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

2. TYPE OF SOLICITATION

SEALED BID

3. DATE ISSUED

9. FOR INFORMATION A. NAME

SOLICITATION

NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)

Prescribed by GSA

FAR (48 CFR) 53.236-1(e)

11. The Contractor shall begin performance w ithin _______5 calendar days and complete it w ithin ________ calendar days after receiving aw ard, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________52.211-10Alt1

12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

X YES NO

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and __________ copies to perform the w ork required are due at the place specified in Item 8 by ___________ local time ______________13 Sep 2011 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.

shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

B. An offer guarantee is, X is not required.

C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than _______30 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NO.

7. ISSUED BY CODE

CONTRACTING DIVISION

USACE - ST PAUL

180 5TH STREET EAST

SUITE 700

ST. PAUL MN 55101-1678

W912ES

PAGE OF PAGES

1 OF

CODE W912ES

(Title, identifying no., date):

12B. CALENDAR DAYS

03:00 PM (hour)

Sealed envelopes containing offers

CONTRACTING DIVISION

USACE - ST PAUL

180 5TH STREET EAST

SUITE 700

ST. PAUL MN 55101-1678

5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.

8. ADDRESS OFFER TO (If Other Than Item 7)

651-290-5706FAX:TEL: 651-290-5425 TEL: 651-290-5425 FAX: 651-290-5706

W912ES-11-T-0090 92

20B. SIGNATURE

(REV. 4-85)STANDARD FORM 1442 BACK

TO SIGN

NSN 7540-01-155-3212

SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)

CODE FACILITY CODE

17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.

the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)

AMOUNTS SEE SCHEDULE OF PRICES

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN

OFFER (Type or print)

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

(4 copies unless otherwise specified)

CODE

(Insert any number equal to or greater than

20C. OFFER DATE

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY

(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)

See Item 14

(Include only if different than Item 14)16. REMITTANCE ADDRESS

30B. SIGNATURE

29. AWARD (Contractor is not required to sign this document.)

document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .

gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)

30C. DATE

(Type or print)

TEL: EMAIL:

31B. UNITED STATES OF AMERICA 31C. AWARD DATE

BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this28. NEGOTIATED AGREEMENT

(M ust be fully completed by offeror)OFFER

W912ES-11-T-0090

Section 00010 - Solicitation Contract Form

SCOPE OF WORK

1. General: The Scope Of Work (SOW) for this project is to replace current 30 amp campground pedestals at Gull Lake Recreation area with 50 amp campground pedestals for campground sites; 1-16, 18-21, 31, 33-38 for a total of 27 campground pedestals. Upgrade the electrical services as required for the installation of new 50 amp campground pedestals. Each 50 amp campground pedestal shall have a 50 amp receptacle, a 30 amp receptacle and 20 amp GFCI receptacle, and a 50 amp, a 30 amp and a 20 amp circuit breaker installed. Circuits for campground pedestals shall not be connected to any other equipment and shall be limited to six (6), 50-amp campground pedestals or less.

Balance panelboard circuits for all electrical campground sites.

Replace existing feed and service conductors to campground sites pedestals complying with cultural protection recommendations of placing the new conductors within the same trench/area as the removed conductors. For location of campground sites at the Gull Lake Recreation Area, 10867 E. Gull Lake Dr, Brainerd, Minnesota, 56401, see campground map (attachment 1). All electrical work shall conform to the (2011) National Electric Code (NEC) and the (2007) National Electric Safety Code (NESC).

Note: Numbering of sites in this scope of work correspond to the numbering of sites on attachment 1.

1.1 Local Utility Company: The local utility company in the Gull Lake area is Minnesota Power, 218-722-2625.

2. Measurement and Payment: The payment provided for in the contract shall constitute full compensation for furnishing all materials and for performing all work under the contract in a complete and acceptable manner. The contract work shall include design, providing plant, equipment, tools, supplies, labor, supervision, incidental materials, quality control, environmental protection, testing and meeting safety requirements, and for performing all work required for which separate payment is not otherwise provided. Compensation for all work shown, specified, or essential to completion of the project (whether or not the specific material or operation is indicated) shall be included on the bidding schedule. The payment provided for in the contract includes compensation for all risk, loss, damage, and expense arising out of the nature of the work or its prosecution, subject to conditions of the contract. Payment will constitute full compensation for furnishing the materials and constructing the work complete in place as specified. Prior to submitting a bid, the Contractor shall verify all conductor distances. Adjustments to pricing shall not be made after contract award for conductor distances that differ from those estimated in this Scope of Work.

3. Scope of Work

3.1 New Loop Conductors: All loop conductors shall be, one set of three (3) 250 MCM AL conductors with a #3/0 AL Ground minimum, unless otherwise required by the NEC or to reduce the voltage drop. Contractor shall calculate voltage drops. Voltage drop shall not exceed 5% from any campground pedestal to service transformer.

3.1.1 Existing Loop Modifications: Existing loop modifications will not be measured for payment. Payment will be made on a lump sum (LS) basis at the contract price and will constitute full compensation for all materials, labor, equipment and incidentals required for modification of the existing campground electrical service, equipment and loop conductors as required.

3.1.2 Electrical Design: The electrical design will not be

measured for payment. Payment will be made on a lump sum (LS) basis at the contract price and will constitute full compensation for all materials, labor, equipment and incidentals required for the electrical design for the Gull Lake Recreation Area Campground service upgrades campground circuit balancing and campground pedestal upgrades.

3.1.3, South Loop Meter (Meter # - 321225), (Account # 1846108500) Campsites: 2, 3, 4, 6, 8.

All sites have one 30 amp pedestal. The South loop meter does not feed any other facilities.

South Loop Meter (Meter # - 321225), (Account #1846108500).

Pedestals will be measured for payment by each pedestal supplied and mounted adjacent to the existing site pedestal. Payment will be made at the contract unit price for the provision of all materials, labor, equipment and incidentals for the satisfactory installation of each new pedestal supplied and mounted in place.

The price bid shall include providing and mounting the new pedestals, all testing for proper operation of each pedestal, and removal and disposal of the replaced existing pedestals. Payment for connection of the pedestal to the new conductor shall be made under bid item: Existing Loop Modification.

3.1.4, Northeast Loop Meter (Meter # - 325923), (Acct # 1846108500) Campsites: 21, 20, 19, 18, 16, 15.

All sites have one 30 amp pedestal. The Northeast Loop Meter also feeds 17, 22-30, 39.

Northeast Loop Meter (Meter # - 325923),(Acct #1846108500.

Pedestals will be measured for payment by each pedestal supplied and mounted adjacent to the existing site pedestal. Payment will be made at the contract unit price for the provision of all materials, labor, equipment and incidentals for the satisfactory installation of each new pedestal supplied and mounted in place.

The price bid shall include providing and mounting the new pedestals, all testing for proper operation of each pedestal, and removal and disposal of the replaced existing pedestals. Payment for connection of the pedestal to the new conductor shall be made under bid item: Existing Loop Modification.

3.1.5, Southwest, South Center, Southeast Meter (Meter #300888), (Acct #1846108500) Campsites: Southwest: 5, 1, 38, 37, 34, 36.

South Center: 7, 10, 13, 31, 33, 35. Southeast: 14, 12, 11, 9.

All sites have 30 amp pedestals.

Southwest, South Center, Southeast Meter (Meter #300888), (Acct #1846108500). Pedestals will be measured for payment by each pedestal supplied and mounted adjacent to the existing site pedestal. Payment will be made at the contract unit price for the provision of all materials, labor, equipment and incidentals for the satisfactory installation of each new pedestal supplied and mounted in place. The price bid shall include providing and mounting the new pedestals, all testing for proper operation of each pedestal, and removal and disposal of the replaced existing pedestals. Payment for connection of the pedestal to the new conductor shall be made under bid item: Existing Loop Modification.

4. Site Visit. Contractors are encouraged to visit the site prior to submitting a quote. Contact Mary Kay Larson at Gull Lake Recreation Area (phone number (218) 829-3334).

5. Safety Plan. The Contractor shall submit a safety plan for performing the work. Safety plan shall be in conformance with the Safety and Health Requirements Manual, US Army Corps of Engineers EM 385-1-1 (latest edition). The safety plan shall be reviewed by the Corps and discussed at the initial pre-construction meeting to be held at the Gull Lake Office. The “Safety Plan” shall be approved prior to start of work. The web site for the 2008 “Safety and Health Requirements Manual”, USACE EM 385-1-1 (latest edition) is www.usace.army.mil/CESO/Pages/EM385-1- 1,2008NEW!.aspx.

6. Schedule. All work shall be in accordance with Clause 52.211-

10. In addition, the campground area will remain functional during the construction.

7. Power Outages to Campsites. To the maximum extent possible, campsites shall remain energized. The contractor shall obtain approval from the Gull Lake staff prior to de-energizing power to campsites. Power outages to each circuit shall be kept to a minimum and not to exceed 2 days.

8. Minnesota One Call Excavation Notice System. For contract work performed within the State of Minnesota, the Contractor shall meet the requirements of Minnesota Statutes, Chapter 216D "One Call Excavation Notice System."

9. Electrical Design. Contractor shall submit a design that details the electrical installation. The electrical design shall be submitted within 14 calendar days of notice to proceed. The “Electrical Design” shall be accepted by the Contracting Officer prior to start of work and shall contain the following information:

a. Layout drawing of new electrical service.

b. New CT cabinets, meter socket, and electrical service equipment.

c. New panel boards.

d. New 50 amp pedestals with Breakers.

e. New underground service conduit and wiring.

f. New distribution wiring and conduit.

g. Circuit runs and cable lengths.

h. Circuit voltage drop calculations.

10. Work Plan. Contractor shall submit a work plan that details the sequence and scheduling of the proposed work. The work plan shall be submitted within 10 days of “Electrical Design” acceptance. The work plan shall be discussed at the initial pre-construction meeting to be held at the Gull Lake site. The “Work Plan” shall be accepted prior to start of work.

11. Pavement Removal and Replacement. Where roads are cut, removed, or otherwise damaged in the prosecution of the work, the Contractor shall replace all pavements or other surfacing removed or damaged to their preconstruction condition, unless otherwise specified or agreed to by the contracting officer. After backfill is completed on paved streets, a temporary surface shall be laid down and the street opened to the traffic in order to provide access to abutting property. Restoration of the original street surface construction shall be completed no later than the 1st of May.

12. Shop Drawings. The work plan and safety plan shall be submitted as noted above. Both of these items shall be submitted prior to the pre-construction meeting. Other shop drawing submittals will include items listed in section 9 “Electrical Design”.

13. Clean Up. Contractor shall be responsible for removal and disposal of all construction debris. Disposal of debris shall be off-site and meet all local and state codes.

14. Coordination. All work shall be coordinated with the Contracting Officer Representative.

15. Initial Meeting. A pre-construction meeting shall be held at Gull Lake before commencing work. The safety plan, work plan, schedule, and coordination issues shall be discussed. The contractor shall submit the safety plan and work plan for review prior to the meeting.

16. Experience. Contractor shall be an experienced electrical contractor and licensed by the State of Minnesota.

17. Power. Electrical power is available, at the facility for Contractor’s use during construction; contact the Gull Lake staff for use. Electricity provided shall be limited to that which is available without modification to the existing system.

18. Sanitary Facilities. Outdoor restrooms are available on site;

however, contractor is encouraged to provide his own sanitary facilities during construction.

19. Disposition of Removed Equipment and Material. All removed material and equipment shall become the property of the contractor unless otherwise directed by the Contracting Officer.

Material and equipment shall be disposed of per local, state and federal regulation. If a conflict exists among regulations, the more stringent shall take precedence.

Exhibit/Attachment Table of Contents

DOCUMENT TYPE DESCRIPTION PAGES DATE

Attachment 1 Gull Lake 50 AMP 1 04-AUG-2011 Attachment 2 Gull Lake Map 1 04-AUG-2011

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 1 Lump Sum

GULL LAKE REC AREA ELECTRICAL UPGRADE

FFP

FOB: Destination

MILSTRIP: W81G6712166483

PURCHASE REQUEST NUMBER: W81G6712166483

NET AMT

CLAUSES INCORPORATED BY FULL TEXT

52.236-12 CLEANING UP (APR 1984)

The Contractor shall at all times keep the work area, including storage areas, free from accumulations of waste materials. Before completing the work, the Contractor shall remove from the work and premises any rubbish, tools, scaffolding, equipment, and materials that are not the property of the Government. Upon completing the work, the Contractor shall leave the work area in a clean, neat, and orderly condition satisfactory to the Contracting Officer.

(End of clause)

Section 00100 - Bidding Schedule/Instructions to Bidders

WAGE RATES

General Decision Number: MN100151 07/22/2011 MN151

Superseded General Decision Number: MN20080151

State: Minnesota

Construction Type: Heavy Heavy including Water and Sewer Lines

Counties: Beltrami, Cass, Clearwater, Cook, Crow Wing, Hubbard, Itasca, Koochiching, Lake, Lake of the Woods, Mahnomen, Mille Lacs, Morrison and Pine Counties in Minnesota.

HEAVY CONSTRUCTION PROJECTS (including sewer/water construction).

Modification Number Publication Date 0 03/12/2010 1 03/19/2010 2 06/04/2010 3 07/02/2010 4 08/13/2010 5 09/03/2010 6 09/24/2010 7 12/03/2010 8 02/04/2011 9 04/15/2011 10 05/13/2011 11 06/03/2011 12 07/22/2011

CARP0361-010 05/01/2009

COOK, ITASCA, KOOCHICHING, LAKE, PINE

Rates Fringes

CARPENTER (Form Work Only).......$ 30.12 14.65

CARP0606-023 05/01/2009

BELTRAMI, CASS, CLEARWATER, CROW WING, HUBBARD, LAKE OF THE

WOODS, MAHNOMEN

Rates Fringes

CARPENTER (Form Work Only).......$ 23.25 13.69

CARP0606-024 05/01/2009

MORRISON

Rates Fringes

CARPENTER (Form Work Only).......$ 23.45 14.21

CARP0930-015 05/01/2009

MILLE LACS

CARPENTER (Form Work Only).......$ 25.53 16.09

ELEC0110-020 05/01/2010

MILLE LACS (South of Bradbury, Lewis & Onamia Townships), Rates Fringes

ELECTRICIAN......................$ 35.55 20.37

ELEC0110-029 05/01/2010

PINE (South of Arione, Barry, Clover, Hinckley & Ogema Townships)

ELECTRICIAN......................$ 35.55 20.37

ELEC0242-003 05/29/2011

CASS (Bounded on the north by the south line of Leech Lake, Minnesota Island, Could, Bay River & Salem Townships), COOK, CROW WING, HUBBARD (Except Rockwood, Helga, Farden, Lake Hattie, Schoolcraft, Guthrie, Hart Lake, Lake Alice, Lake George, Hendrickson & Lakeport), ITASCA (Southerly 12 Townships, including Harris, Feely, Blackberry, Spang, Coodland, Sago & Wawina), LAKE, MILLE LACS (Including Northerly Townships of Kathio, South Harbor, Isle, East Side, Onamia & Harbor), MORRISON, PINE (Excluding southerly Townships of Brook Park, Mission Creek, Munch, Crosby, Pokegama, Cross Lake, Chengwatana, ELECTRICIAN......................$ 30.39 22.90

* ELEC0294-007 05/29/2011

KOOCHICHING (East of a line extending North and South from the easternmost point of the City limits of Grand Rapids)

ELECTRICIAN......................$ 33.38 73.6%

* ELEC0294-013 05/29/2011

HUBBARD (North part bounded on the south by a line extending east & west of the south line of Lake Alice & Lake George Townships)

ELECTRICIAN

Projects $3,500,000.00 and under.......................$ 22.82 18.43 Projects over $3,500,000.00.$ 31.68 73.6%

* ELEC0294-015 05/29/2011

BELTRAMI,CASS (Northern part bounded on the South by a line extending east and west of the south line of Boy River and Salem Twps.), CLEARWATER, HUBBARD (Northern part bounded on the south by a line extending east and west of the south line of Lake Alice and Lake George Twp), ITASCA (Remainder of County, Excluding the section south of a line extending east & west of the south line of Grand Rapids & Trout Lake Townships), KOOCHICHING (Western part bounded on the east by a line extending north and south from the easternmost point of the city limits of Grand Rapids) ITASCA (Western part bounded on the east by a line extending north and south from the easternmost point of the city limits of Grand Rapids) & LAKE OF THE WOODS (Excluding extreme Northwest part) COUNTIES

ELECTRICIAN......................$ 33.38 73.6%

ELEC1426-020 06/01/2010

MAHNOMEN

Rates Fringes

ELECTRICIAN......................$ 25.41 10.92

* ENGI0049-076 05/01/2011

AREA 1 (METRO): COOK, LAKE

AREA 2 (EASTERN): MILLE LACS, PINE, CASS (South of the ANorthern right of way of Hwy #2 A& East of the Western right of way of Hwy #371), CASS (South of the northern right-of-way of U.S. Hwy #2 & east of the Western right-of-way of U.S. Hwy #371), CROW WING (East of the western right-of-way of U.S. Hwy #371), ITASCA (East of the western right-of-way of MN Hwy #6), KOOCHICHING (East of a north-south line from the Canadian border to Pelland, the western right-of-way of U.S. Hwy #71 from Pelland to Big Falls & MN Hwy #6), MORRISON (East of the western right-of-way of U.S. Hwy #371 & U.S. Hwy #10 from Little Falls to the Morrison-Benton County line)

AREA 3 (WESTERN): BELTRAMI, CLEARWATER, HUBBARD, LAKE OF THE

WOODS, MAHNOMEN and the remaining portions of CASS, CROW WING, ITASCA, KOOCHICHING, MORRISON

OPERATOR: Power Equipment

AREA 1

GROUP 2....................$ 31.82 16.60

GROUP 3....................$ 31.27 16.60

GROUP 4....................$ 30.97 16.60

GROUP 5....................$ 27.93 16.60

GROUP 6....................$ 26.72 16.60

AREA 2

GROUP 2....................$ 29.36 16.60

GROUP 3....................$ 28.91 16.60

GROUP 4....................$ 28.61 16.60

GROUP 5....................$ 26.04 16.60

GROUP 6....................$ 25.17 16.60

AREA 3

GROUP 2....................$ 24.45 16.60

GROUP 3....................$ 23.52 16.60

GROUP 4....................$ 23.21 16.60

GROUP 5....................$ 21.50 16.60

GROUP 6....................$ 20.90 16.60

POWER EQUIPMENT OPERATOR CLASSIFICATIONS

GROUP 2: Crane with over 135' Boom, excluding jib; Dragline & Hydraulic Backhoe with shovel-type controls 3 cubic yards and over; Grader/Blade finishing earthwork and bituminous.

GROUP 3: Dragline & Hydraulic Backhoe with shovel-type controls up to 3 cubic yards; Loader 5 cu yd and over;

Mechanic; Tandem Scraper; Truck Crane; Crawler Crane

GROUP 4: Bituminous Roller 8 tons & over; Elevating Grader;

Bobcat/Skid Steer Loader over 1 cu yd; Loader over 1 cu yd;

Grader; Scraper up; to 32 cu yd; Farm Tractor with Backhoe attachment; Skid Steer Loader over 1 cu yd with Backhoe attachment; Tractor over 50 hp; Bulldozer over 50 hp.

GROUP 5: Bituminous Roller under 8 tons; Bituminous Rubber Tire Roller; Bobcat/Skid Steer Loader up to 1 cu yd; Loader up to 1 cu yd; Tractor 50 hp or less; Bulldozer 50 hp or less.

GROUP 6: Oiler, Crane Oiler

CRANE OVER 135' BOOM, EXCLUDING JIB - $ .25 PREMIUM;

CRANE OVER 200' BOOM, EXCLUDING JIB - $ .50 PREMIUM

UNDERGROUND WORK:

UNNELS, SHAFTS, ETC. - $ .25 PREMIUM

UNDER AIR PRESSURE - $ .50 PREMIUM

HAZARDOUS WASTE PROJECTS (PPE Required):

LEVEL A - $1.25 PREMIUM

LEVEL B - $ .90 PREMIUM

LEVEL C - $ .60 PREMIUM

IRON0512-026 05/01/2011

BELTRAMI, CASS, CLEARWATER, COOK, CROW WING, HUBBARD, ITASCA,

KOOCHICHING, LAKE, LAKE OF THE WOODS, MAHNOMEN, PINE

IRONWORKER, STRUCTURAL AND

REINFORCING......................$ 29.51 20.00

IRON0512-043 05/01/2011

MILLE LACS, MORRISON

Rates Fringes

IRONWORKER, STRUCTURAL AND

REINFORCING......................$ 34.05 20.37

LABO0132-037 05/01/2010

Rates Fringes

LABORER (LANDSCAPE)..............$ 18.79 9.75

LABO0563-036 05/01/2010

AREA 1: PINE

AREA 2A: COOK, LAKE

AREA 2B: ITASCA

AREA 3A: MILLE LACS

AREA 4: BELTGRAMI, CASS, CLEARWATER,CROW WING, HUBBARD,

KOOCHICHING, LAKE OF THE WOODS, MAHNOMEN, MORRISON

LABORERS

AREA 1:

(1) Common or General Laborer....................$ 28.42 12.93

(2) Mason Tender - Cement/Concrete............$ 28.62 12.93

(6) Pipelayer..............$ 30.42 12.93

AREA 2A:

(1) Common or General Laborer....................$ 27.64 12.64

(2) Mason Tender - Cement/Concrete............$ 27.84 12.64

(6) Pipelayer..............$ 29.64 12.64

AREA 2B:

(1) Common or General Laborer....................$ 26.64 13.64

(2) Mason Tender - Cement/Concrete............$ 26.84 13.64

(6) Pipelayer..............$ 28.64 13.64

AREA 3A:

(1) Common or General Laborer....................$ 23.97 12.18

(2) Mason Tender - Cement/Concrete............$ 24.17 12.18

(6) Pipelayer..............$ 25.97 12.18

AREA 4:

(1) Common or General Laborer....................$ 20.61 10.69

(2) Mason Tender - Cement/Concrete............$ 20.81 10.69

(6) Pipelayer..............$ 22.61 10.69

SUMN2009-089 09/28/2009

Rates Fringes

TRUCK DRIVER: Straight Truck....$ 16.05 0.00

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29 CFR 5.5(a)(1)(ii)).

In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7).

Write to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION

52.214-34 SUBMISSION OF OFFERS IN THE ENGLISH LANGUAGE (APR 1991)

Offers submitted in response to this solicitation shall be in the English language. Offers received in other than English shall be rejected.

(End of provision)

52.214-35 SUBMISSION OF OFFERS IN U.S. CURRENCY (APR 1991)

Offers submitted in response to this solicitation shall be in terms of U.S. dollars. Offers received in other than U.S.

dollars shall be rejected.

52.214-4001 INQUIRIES - BID INFORMATION

(a) Inquiries:

Any questions regarding this solicitation should be directed to Jesse Onkka, Contract Specialist, at telephone number (651) 290-5444 (collect calls not accepted). It is requested that all technical questions on the plans and specifications be submitted to the Contract Specialist by facsimile transmission to (651) 290-5706.

The quote results can be found on Federal Business Opportunities web site at http://www.fbo.gov for that solicitation..

(b) quote Depository

Quotes must be deposited or emailed prior to the date and time set in the solicitation. The quote depository is located in the Contracting Division, 7th Floor, of the U.S. Army Corps of Engineers - St. Paul District, 180 Fifth Street East, Suite 700, St. Paul, Minnesota 55101-1678.

52.222-5 DAVIS-BACON ACT--SECONDARY SITE OF THE WORK (JUL 2005)

(a)(1) The offeror shall notify the Government if the offeror intends to perform work at any secondary site of the work, as defined in paragraph (a)(1)(ii) of the FAR clause at 52.222-6, Davis-Bacon Act, of this solicitation.

(2) If the offeror is unsure if a planned work site satisfies the criteria for a secondary site of the work, the offeror shall request a determination from the Contracting Officer.

(b)(1) If the wage determination provided by the Government for work at the primary site of the work is not applicable to the secondary site of the work, the offeror shall request a wage determination from the Contracting Officer.

(2) The due date for receipt of offers will not be extended as a result of an offeror's request for a wage determination for a secondary site of the work.

52.225-10 NOTICE OF BUY AMERICAN ACT REQUIREMENT--CONSTRUCTION MATERIALS (FEB

2009)

(a) Definitions. “Commercially available off-the-shelf (COTS) item,” “construction material,” “domestic construction material,” and “foreign construction material,” as used in this provision, are defined in the clause of this solicitation entitled “Buy American Act--Construction Materials” (Federal Acquisition Regulation (FAR) clause 52.225-9).

(b) Requests for determinations of inapplicability. An offeror requesting a determination regarding the inapplicability of the Buy American Act should submit the request to the Contracting Officer in time to allow a determination before submission of offers. The offeror shall include the information and applicable supporting data required by paragraphs (c) and (d) of the clause at FAR 52.225-9 in the request. If an offeror has not requested a determination regarding the inapplicability of the Buy American Act before submitting its offer, or has not received a response to a previous request, the offeror shall include the information and supporting data in the offer.

(c) Evaluation of offers. (1) The Government will evaluate an offer requesting exception to the requirements of the Buy American Act, based on claimed unreasonable cost of domestic construction material, by adding to the offered price the appropriate percentage of the cost of such foreign construction material, as specified in paragraph (b)(3)(i) of the clause at FAR 52.225-9.

(2) If evaluation results in a tie between an offeror that requested the substitution of foreign construction material based on unreasonable cost and an offeror that did not request an exception, the Contracting Officer will award to the offeror that did not request an exception based on unreasonable cost.

(d) Alternate offers.

(1) When an offer includes foreign construction material not listed by the Government in this solicitation in paragraph (b)(2) of the clause at FAR 52.225-9, the offeror also may submit an alternate offer based on use of equivalent domestic construction material.

(2) If an alternate offer is submitted, the offeror shall submit a separate Standard Form 1442 for the alternate offer, and a separate price comparison table prepared in accordance with paragraphs (c) and (d) of the clause at FAR 52.225-9 for the offer that is based on the use of any foreign construction material for which the Government has not yet determined an exception applies.

(3) If the Government determines that a particular exception requested in accordance with paragraph (c) of the clause at FAR 52.225-9 does not apply, the Government will evaluate only those offers based on use of the equivalent domestic construction material, and the offeror shall be required to furnish such domestic construction material. An offer based on use of the foreign construction material for which an exception was requested--

(i) Will be rejected as nonresponsive if this acquisition is conducted by sealed bidding; or

(ii) May be accepted if revised during negotiations.

52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)

This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es):

EFARS: http://www.usace.army.mil/cect/pages/efars.aspx DFARS: http://farsite.hill.af.mil/VFDFARA.HTM AFARS: http://farsite.hill.af.mil/vfafara.htm FAR: http://farsite.hill.af.mil/vffara.htm

(End of provision

Section 00600 - Representations & Certifications

52.204-8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAY 2011)

(a)(1) The North American Industry Classification System (NAICS) code for this acquisition is 238210

(2) The small business size standard is $14 Million.

(3) The small business size standard for a concern which submits an offer in its own name, other than on a construction or service contract, but which proposes to furnish a product which it did not itself manufacture, is 500 employees.

(b)(1) If the clause at 52.204-7, Central Contractor Registration, is included in this solicitation, paragraph (d) of this provision applies.

(2) If the clause at 52.204-7 is not included in this solicitation, and the offeror is currently registered in CCR, and has completed the ORCA electronically, the offeror may choose to use paragraph (d) of this provision instead of completing the corresponding individual representations and certifications in the solicitation. The offeror shall indicate which option applies by checking one of the following boxes:

(__) Paragraph (d) applies.

(__) Paragraph (d) does not apply and the offeror has completed the individual representations and certifications in the solicitation.

(c)(1) The following representations or certifications in ORCA are applicable to this solicitation as indicated:

(i) 52.203-2, Certificate of Independent Price Determination. This provision applies to solicitations when a firm-fixed-price contract or fixed-price contract with economic price adjustment is contemplated, unless--

(A) The acquisition is to be made under the simplified acquisition procedures in Part 13;

(B) The solicitation is a request for technical proposals under two-step sealed bidding procedures; or

(C) The solicitation is for utility services for which rates are set by law or regulation.

(ii) 52.203-11, Certification and Disclosure Regarding Payments to Influence Certain Federal Transactions. This provision applies to solicitations expected to exceed $150,000.

(iii) 52.204-3, Taxpayer Identification. This provision applies to solicitations that do not include the clause at 52.204-7, Central Contractor Registration.

(iv) 52.204-5, Women-Owned Business (Other Than Small Business).This provision applies to solicitations that--

(A) Are not set aside for small business concerns;

(B) Exceed the simplified acquisition threshold; and

(C) Are for contracts that will be performed in the United States or its outlying areas.

(v) 52.209-2, Prohibition on Contracting with Inverted Domestic Corporations--Representation. This provision applies to solicitations using funds appropriated in fiscal years 2008, 2009, or 2010.

(vi) 52.209-5, Certification Regarding Responsibility Matters. This provision applies to solicitations where the contract value is expected to exceed the simplified acquisition threshold.

(vii) 52.223-5, Pollution Prevention and Right-to-Know Information (May 2011) (E.O. 13423) (Applies to services performed on Federal facilities).

(viii) 52.215-6, Place of Performance. This provision applies to solicitations unless the place of performance is specified by the Government.

(ix) 52.219-1, Small Business Program Representations (Basic & Alternate I). This provision applies to solicitations when the contract will be performed in the United States or its outlying areas.

(A) The basic provision applies when the solicitations are issued by other than DoD, NASA, and the Coast Guard.

(B) The provision with its Alternate I applies to solicitations issued by DoD, NASA, or the Coast Guard.

(x) 52.219-2, Equal Low Bids. This provision applies to solicitations when contracting by sealed bidding and the contract will be performed in the United States or its outlying areas.

(xi) 52.222-22, Previous Contracts and Compliance Reports. This provision applies to solicitations that include the clause at 52.222-26, Equal Opportunity.

(xii) 52.222-25, Affirmative Action Compliance. This provision applies to solicitations, other than those for construction, when the solicitation includes the clause at 52.222-26, Equal Opportunity.

(xiii) 52.222-38, Compliance with Veterans' Employment Reporting Requirements. This provision applies to solicitations when it is anticipated the contract award will exceed the simplified acquisition threshold and the contract is not for acquisition of commercial items.

(xiv) 52.223-1, Biobased Product Certification. This provision applies to solicitations that require the delivery or specify the use of USDA-designated items; or include the clause at 52.223-2, Affirmative Procurement of Biobased Products Under Service and Construction Contracts.

(xv) 52.223-4, Recovered Material Certification. This provision applies to solicitations that are for, or specify the use of, EPA-designated items.

(xvi) 52.225-2, Buy American Act Certificate. This provision applies to solicitations containing the clause at 52.225-1.

(xvii) 52.225-4, Buy American Act--Free Trade Agreements—Israeli Trade Act Certificate. (Basic, Alternate I, and Alternate II) This provision applies to solicitations containing the clause at 52.225-3.

(A) If the acquisition value is less than $25,000, the basic provision applies.

(B) If the acquisition value is $25,000 or more but is less than $50,000, the provision with its Alternate I applies.

(C) If the acquisition value is $50,000 or more but is less than $67,826, the provision with its Alternate II applies.

(xviii) 52.225-6, Trade Agreements Certificate. This provision applies to solicitations containing the clause at 52.225-5.

(xix) 52.225-20, Prohibition on Conducting Restricted Business Operations in Sudan--Certification. This provision applies to all solicitations.

(xx) 52.225-25, Prohibition on Engaging in Sanctioned Activities Relating to Iran--Certification. This provision applies to all solicitations.

(xxi) 52.226-2, Historically Black College or University and Minority Institution Representation. This provision applies to--

(A) Solicitations for research, studies, supplies, or services of the type normally acquired from higher educational institutions; and

(B) For DoD, NASA, and Coast Guard acquisitions, solicitations that contain the clause at 52.219-23, Notice of Price Evaluation Adjustment for Small Disadvantaged Business Concerns.

(2) The following certifications are applicable as indicated by the Contracting Officer:

(Contracting Officer check as appropriate.)

------(i) 52.219-22, Small Disadvantaged Business Status.

------(A) Basic.

------(B) Alternate I.

------(ii) 52.222-18, Certification Regarding Knowledge of Child Labor for Listed End Products.

------(iii) 52.222-48, Exemption from Application of the Service Contract Act to Contracts for Maintenance, Calibration, or Repair of Certain Equipment Certification.

------(iv) 52.222-52 Exemption from Application of the Service Contract Act to Contracts for Certain Services-- Certification.

------(v) 52.223-9, with its Alternate I, Estimate of Percentage of Recovered Material Content for EPA-Designated Products (Alternate I only).

------(vi) 52.223-13, Certification of Toxic Chemical Release Reporting.

------(vii) 52.227-6, Royalty Information.

------ (A) Basic.

------ (B) Alternate I.

------(viii) 52.227-15, Representation of Limited Rights Data and Restricted Computer Software.

(d) The offeror has completed the annual representations and certifications electronically via the Online Representations and Certifications Application (ORCA) website at https://orca.bpn.gov/. After reviewing the ORCA database information, the offeror verifies by submission of the offer that the representations and certifications currently posted electronically have been entered or updated within the last 12 months, are current, accurate, complete, and applicable to this solicitation (including the business size standard applicable to the NAICS code referenced for this solicitation), as of the date of this offer, and are incorporated in this offer by reference (see FAR 4.1201); except for the changes identified below [offeror to insert changes, identifying change by clause number, title, date]. These amended representation(s) and/or certification(s) are also incorporated in this offer and are current, accurate, and complete as of the date of this offer.

FAR/DFARS Clause # Title Date Change

Any changes provided by the offeror are applicable to this solicitation only, and do not result in an update to the representations and certifications posted on ORCA.

(End of Provision)

252.209-7001 DISCLOSURE OF OWNERSHIP OR CONTROL BY THE GOVERNMENT OF A TERRORIST

COUNTRY (JAN 2009)

(a) "Definitions."

As used in this provision --

(a) "Government of a terrorist country" includes the state and the government of a terrorist country, as well as any political subdivision, agency, or instrumentality thereof.

(2) "Terrorist country" means a country determined by the Secretary of State, under section 6(j)(1)(A) of the Export Administration Act of 1979 (50 U.S.C. App. 2405(j)(i)(A)), to be a country the government of which has repeatedly provided support for such acts of international terrorism. As of the date of this provision, terrorist countries subject to this provision include: Cuba, Iran, Sudan, and Syria.

(3) "Significant interest" means --

(i) Ownership of or beneficial interest in 5 percent or more of the firm's or subsidiary's securities. Beneficial interest includes holding 5 percent or more of any class of the firm's securities in "nominee shares," "street names," or some other method of holding securities that does not disclose the beneficial owner;

(ii) Holding a management position in the firm, such as a director or officer;

(iii) Ability to control or influence the election, appointment, or tenure of directors or officers in the firm;

(iv) Ownership of 10 percent or more of the assets of a firm such as equipment, buildings, real estate, or other tangible assets of the firm; or

(v) Holding 50 percent or more of the indebtness of a firm.

(b) "Prohibition on award."

In accordance with 10 U.S.C. 2327, no contract may be awarded to a firm or a subsidiary of a firm if the government of a terrorist country has a significant interest in the firm or subsidiary or, in the case of a subsidiary, the firm that owns the subsidiary, unless a waiver is granted by the Secretary of Defense.

(c) "Disclosure."

If the government of a terrorist country has a significant interest in the Offeror or a subsidiary of the Offeror, the Offeror shall disclosure such interest in an attachment to its offer. If the Offeror is a subsidiary, it shall also disclose any significant interest the government of a terrorist country has in any firm that owns or controls the subsidiary.

The disclosure shall include --

(1) Identification of each government holding a significant interest; and

(2) A description of the significant interest held by each government.

Section 00700 - Contract Clauses

52.204-10 REPORTING EXECUTIVE COMPENSATION AND FIRST-TIER SUBCONTRACT AWARDS

(JUL 2010)

(a) Definitions. As used in this clause:

Executive means officers, managing partners, or any other employees in management positions.

First-tier subcontract means a subcontract awarded directly by a Contractor to furnish supplies or services (including construction) for performance of a prime contract, but excludes supplier agreements with vendors, such as long-term arrangements for materials or supplies that would normally be applied to a Contractor's general and administrative expenses or indirect cost.

Total compensation means the cash and noncash dollar value earned by the executive during the Contractor's preceding fiscal year and includes the following (for more information see 17 CFR 229.402(c)(2)):

(1) Salary and bonus.

(2) Awards of stock, stock options, and stock appreciation rights. Use the dollar amount recognized for financial statement reporting purposes with respect to the fiscal year in accordance with the Statement of Financial Accounting Standards No. 123 (Revised 2004) (FAS 123R), Shared Based Payments.

(3) Earnings for services under non-equity incentive plans. This does not include group life, health, hospitalization or medical reimbursement plans that do not discriminate in favor of executives, and are available generally to all salaried employees.

(4) Change in pension value. This is the change in present value of defined benefit and actuarial pension plans.

(5) Above-market earnings on deferred compensation which is not tax-qualified.

(6) Other compensation, if the aggregate value of all such other compensation (e.g., severance, termination payments, value of life insurance paid on behalf of the employee, perquisites or property) for the executive exceeds $10,000.

(b) Section 2(d)(2) of the Federal Funding Accountability and Transparency Act of 2006 (Pub. L. 109-282), as amended by section 6202 of the Government Funding Transparency Act of 2008 (Pub. L. 110-252), requires the Contractor to report information on subcontract awards. The law requires all reported information be made public, therefore, the Contractor is responsible for notifying its subcontractors that the required information will be made public.

(c)(1) Unless otherwise directed by the contracting officer, by the end of the month following the month of award of a first-tier subcontract with a value of $25,000 or more, (and any modifications to these subcontracts that change previously reported data), the Contractor shall report the following information at http://www.fsrs.gov for each first-tier subcontract. (The Contractor shall follow the instructions at http://www.fsrs.gov to report the data.)

(i) Unique identifier (DUNS Number) for the subcontractor receiving the award and for the subcontractor's parent company, if the subcontractor has a parent company.

(ii) Name of the subcontractor.

(iii) Amount of the subcontract award.

(iv) Date of the subcontract award.

(v) A description of the products or services (including construction) being provided under the subcontract, including the overall purpose and expected outcomes or results of the subcontract.

(vi) Subcontract number (the subcontract number assigned by the Contractor).

(vii) Subcontractor's physical address including street address, city, state, and country. Also include the nine-digit zip code and congressional district.

(viii) Subcontractor's primary performance location including street address, city, state, and country. Also include the nine-digit zip code and congressional district.

(ix) The prime contract number, and order number if applicable.

(x) Awarding agency name and code.

(xi) Funding agency name and code.

(xii) Government contracting office code.

(xiii) Treasury account symbol (TAS) as reported in FPDS.

(xiv) The applicable North American Industry Classification System code (NAICS).

(2) By the end of the month following the month of a contract award, and annually thereafter, the Contractor shall report the names and total compensation of each of the five most highly compensated executives for the Contractor's preceding completed fiscal year at http://www.ccr.gov, if--

(i) In the Contractor's preceding fiscal year, the Contractor received--

(A) 80 percent or more of its annual gross revenues from Federal contracts (and subcontracts), loans, grants (and subgrants) and cooperative agreements; and

(B) $25,000,000 or more in annual gross revenues from Federal contracts (and subcontracts), loans, grants (and subgrants) and cooperative agreements; and

(ii) The public does not have access to information about the compensation of the executives through periodic reports filed under section 13(a) or 15(d) of the Securities Exchange Act of 1934 (15 U.S.C. 78m(a), 78o(d)) or section 6104 of the Internal Revenue Code of 1986. (To determine if the public has access to the compensation information, see the U.S. Security and Exchange Commission total compensation filings at http://www.sec.gov/answers/execomp.htm.)

(3) Unless otherwise directed by the contracting officer, by the end…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .