Eau Galle Seal Coat and Repair.pdf

PDF 315 KB Posted

Attached to
Seal Coating and Crack Repair
Solicitation number
W912ES-08-T-0071
Issued by

About this file

Solicitation for the Eau Galle Seal Coating and Crack Repair Project

View the file

Other files

File Type Posted
Eau Galle Sealcoat Ammendment0001.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W81G6782381424

The w ork shall consists of but not limited to furnishing all plant, labor, material and equipment for f illing the cracks in the existing asphaltic pavement and placing an asphaltic seal coat w ith an aggregate cover coat over the pavement at the Eau Galle Lake Project w hich is located in Midw estern Wisconsin approximately 50 miles east of the Minneapolis-St. Paul metropolitan area and about 40 miles w est of Eau Claire, Wisconsin. The dam lies immediately north of and adjacent to Spring Valley, Wisconsin. The project lies in both Pierce and St. Croix Counties.

In accordance w ith FAR 19.2407, his Solicitation is set-aside for Service Disabled Veteran Ow ned (SDVOB) small business concerns. The NAICS Code associated w ith this project is 237310 w ith a small business size standard of $33.5 Million dollars. The estimated price of this contract is betw een $25,000 and $75,000

RICHARD J PECORARO 651-290-5422

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS

NEGOTIATED

28-Aug-2008

(RFP)

(IFB)

CALL:

B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

See Item 7

2. TYPE OF SOLICITATION

SEALED BID

3. DATE ISSUED

9. FOR INFORMATION A. NAME

SOLICITATION

NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)

Prescribed by GSA FAR (48 CFR) 53.236-1(e)

11. The Contractor shall begin performance w ithin _______10 calendar days and complete it w ithin ________ calendar days after receiving aw ard, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________52.211-10Alt1

12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

YES X NO

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and __________1 copies to perform the w ork required are due at the place specified in Item 8 by ___________ local time ______________12 Sep 2008 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.

shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

B. An offer guarantee is, X is not required.

C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than _______60 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NO.

7. ISSUED BY CODE

CONTRACTING DIVISION

USACE - ST. PAUL�

190 5TH STREET E

ST. PAUL MN 55101

W912ES

PAGE OF PAGES

1 OF

CODE

(Title, identifying no., date):

12B. CALENDAR DAYS

02:00 PM (hour) Sealed envelopes containing offers

5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.

8. ADDRESS OFFER TO (If Other Than Item 7)

651-290-5706FAX:TEL: 651-290-5419 TEL: FAX:

W912ES-08-T-0071 91

20B. SIGNATURE

(REV. 4-85)STANDARD FORM 1442 BACK

TO SIGN

NSN 7540-01-155-3212

SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)

CODE FACILITY CODE

17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.

the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)

AMOUNTS SEE SCHEDULE OF PRICES

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN

OFFER (Type or print)

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

(4 copies unless otherwise specified)

CODE

(Insert any number equal to or greater than

20C. OFFER DATE

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY

(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)

See Item 14

(Include only if different than Item 14)16. REMITTANCE ADDRESS

30B. SIGNATURE

29. AWARD (Contractor is not required to sign this document.)

document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .

gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)

30C. DATE

(Type or print)

TEL: EMAIL:

31B. UNITED STATES OF AMERICA 31C. AWARD DATE

BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this28. NEGOTIATED AGREEMENT

(M ust be fully completed by offeror)OFFER

Section 00010 - Solicitation Contract Form

NOTES TO OFFERORS

NOTES

Point of contact for this solicitation is:

Richard J. Pecoraro Contract Specialist US Army Corps of Engineers 190 East 5th Street, Suite 401 Saint Paul, MN 55101-1638 Tel; (651) 290-5422 Fax: (651) 290-5706 Email: Richard.J.Pecoraro@usace.army.mil

The Price quoted must include all delivery charges.

As a department in The United States of America federal government, the US Army Corps of Engineers is a Tax-Exempt entity. Its tax exempt status ID is 62- 1642142

Please indicate in your Quote whether or not your company has current Representations and Certifications posted to the www.orca.gov website. If your company does not it must either submit or update its online information or submit Representations and Certifications in accordance with the Clauses in the Solicitation.

Prior to award, contractors must be registered with the Central Contractor Registration Database (CCR). Registration can be accomplished by going to www.ccr.gov

ITEM NO SUPPLIES/SERVICES

PERFORM CRACK FILLING & SEAL COATING

ROADWAY TO DAM AT EAU GALLE DAM; --- PROJECT NO.: 107279

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001AA

5,000

Linear Foot

Crack Filling Crack filling portion of CLIN 0001

NET AMT

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001AB

18,750

Square Yard

Seal Coat Seal coat portion of CLIN 0001

NET AMT

DELIVERY INFORMATION

CLIN PERFORMANCE PERIOD QUANTITY SHIP TO ADDRESS UIC

0001 N/A N/A N/A N/A

0001AA POP 19-AUG-2008 TO

30-JUN-2009

5,000 LF EAU GALLE DAM

US ARMY CORPS OF ENGINEERS

W501 EAU GALLE DAM ROAD

SPRING VALLEY WI 54767

EGD

0001AB POP 19-AUG-2008 TO

30-JUN-2009

18,750 SY EAU GALLE DAM

US ARMY CORPS OF ENGINEERS

W501 EAU GALLE DAM ROAD

SPRING VALLEY WI 54767

EGD

STATEMENT OF WORK

EAU GALLE LAKE PROJECT OVERLOOK

ROAD SEAL COATING

Statement of Work

INDEX

PARAGRAPH DESCRIPTION PAGE NO.

PART 1 GENERAL 1

1.1 SCOPE 1

1.2 RELATED WORK OF OTHER SECTIONS (Not Applicable) 1

1.3 APPLICABLE PUBLICATIONS 1

1.4 SUBMITTALS 2

1.5 MEASUREMENT AND PAYMENT 2

1.6 BIDDING SCHEDULE ITEMS 2

PART 2 PRODUCTS 2

2.1 MATERIALS 2

PART 3 EXECUTION 3

3.1 GENERAL 3

3.2 CONSTRUCTION RESTRICTIONS 3

3.3 CONSTRUCTION ` 3

3.4 CLEANUP 4

3.5 SAFETY 4

ATTACHMENTS 5

EAU GALLE LAKE PROJECT OVERLOOK

ROAD SEAL COATING

SCOPE OF WORK

1. GENERAL.

1.1 SCOPE. The work shall consists of but not limited to furnishing all plant, labor, material and equipment for filling the cracks in the existing asphaltic pavement and placing an asphaltic seal coat with an aggregate cover coat over the pavement in complete accordance with enclosed scope of work and wage determination.

1.1.1 Project Location. Eau Galle Lake Project is located in Midwestern Wisconsin approximately 50 miles east of the Minneapolis-St. Paul metropolitan area and about 40 miles west of Eau Claire, Wisconsin. The dam lies immediately north of and adjacent to Spring Valley, Wisconsin. The project lies in both Pierce and St. Croix Counties.

1.1.2 Pre-Bid Inspection. Bidders are encouraged to inspect the project site prior to submitting a bid. Inspections can be scheduled during normal business hours. Point of contact: Corrine Hodapp, phone # 715-778-5562.

1.1.3 Commencement, Prosecution, and Completion. The Contracting Officer will notify the Contractor seven calendar days in advance of when the work is to commence. Work shall commence no later than seven calendar days following notification from the Contracting Officer and shall continue on consecutive work days until completed, unless directed otherwise by the Contracting Officer. Work shall be performed between the hours of 7AM and 5PM, Monday through Friday, unless directed otherwise by the Contracting Officer. All crack filling and seal coating work shall be completed by June 30, 2009.

1.2 RELATED WORK OF OTHER SECTIONS (Not Applicable).

1.3 APPLICABLE PUBLICATIONS. The publications listed below form a part of this scope of work to the extent referenced. The publications are referred to in the text by basic designation only.

State of Wisconsin Department Of Transportation (WisDOT), Standard Specifications for Highway and Structure Construction (2006 Edition).

455 Asphaltic Materials.

465 Asphaltic Surface.

475 Seal Coat.

American Society for Testing and Materials (ASTM).

D 3405 Joint Sealants, Hot-Applied, for Concrete & Asphalt Pavements.

U.S. Army Corps of Engineers, Engineers Manual (EM).

EM 385-1-1 Safety and Health Requirements Manual

1.4 SUBMITTALS.

1.4.1 General. The Contractor shall submit the following as required.

Receipt of submittals by the Government will not relieve the Contractor of responsibility to furnish materials or perform the work as required.

1.4.1.1 Certificate of Insurance. The Contractor shall submit proof of insurance for Workman’s Compensation and Liability. All insurance shall be adequate to indemnify the Government from liability for injury to the Contractor’s employees and damage to Government property.

1.4.1.2 Certificates of compliance for asphaltic material and aggregate, certifying that the materials meet the specifications.

1.4.1.3 Safety Plan. A written statement of intended work methods, procedures, equipment, and materials to be used, indicating how the Contractor will comply with all safety requirements.

1.5 MEASUREMENT AND PAYMENT.

1.5.1 Crack filler. Sand-asphalt mixture and pourable crack filler shall be measured for payment by the lineal foot (LF), in place, complete. The unit bid price shall include the cost of all labor, materials, and the use of all equipment and tools required to complete the work.

1.5.2 Seal coat. Asphaltic materials and aggregate required for seal coating, shall be measured for payment by the square yard (SY), in place, complete. The unit bid price shall include the cost of all labor, materials, and the use of all equipment and tools required to complete the work.

1.6 BIDDING SCHEDULE ITEMS. Bidding schedule items applicable to the work of this section are as follows:

Item Unit

Crack Filling LF

Seal Coat SY

2. PRODUCTS.

2.1 MATERIALS.

2.1.1 Sand-asphalt mixture for cracks shall consist of a mix containing fine aggregate and asphaltic material conforming to the following:

2.1.1.1 Sand. WisDOT 401.2.2. Maximum shale content of aggregate shall not exceed 6 percent.

2.1.1.2 Asphaltic material for mixture with sand: WisDOT 455.2.4.3, Cationic Emulsified Asphalt, CRS-2. Asphaltic material shall be 5.0 to 7.0 percent of mixture, by weight.

2.1.1.3 Pourable crack filler for sealing top of sand-asphalt mixture.

WisDOT 455.2, Cationic Emulsified Asphalts, CRS-2.

2.1.2 Pourable crack filler. WisDOT 455.2, Cationic Emulsified Asphalts, CRS-2.

2.1.3 Asphaltic Seal Coat.

2.1.3.1 Seal Coat Aggregate. WisDOT 475.2. Dusty aggregate will not be allowed.

2.1.3.2 Asphaltic material. WisDOT 455.2, Cationic Emulsified Asphalt, CRS- 2, with anti-stripping additive.

2.1.4 Hot-poured elastic type sealant. Material shall conform to the requirements of ASTM D 3405.

3. EXECUTION.

3.1 GENERAL.

3.1.1 Definitions.

3.1.1.1 Engineer. The term “Engineer” referenced in WisDOT Standard Specifications for Highway and Structure Construction shall mean the Contracting Officer.

3.2 CONSTRUCTION RESTRICTIONS.

3.2.1 Protection. The Contractor shall provide measures to protect all existing structures, features and surfaces not designated for seal coating from damage due to the Contractor∋s operations, and shall repair any such damage to its preconstruction condition at no expense to the Government.

3.2.2 Public Access. The Contractor shall maintain, at a minimum, one lane of traffic shall open to the public at all times. On weekends all lanes of traffic shall be open to the public. It shall be the Contractor’s responsibility to ensure the public safety from all Contractor operations at all times.

3.3 CONSTRUCTION.

3.3.1 Preparation of Existing Pavement. The existing asphaltic surface shall be cleared of all objectionable matter and swept clean using power blowers or power brooms immediately prior to the application of the asphaltic material, in accordance with WisDOT 475.

3.3.2 Crack Filling. Clean foreign and loose material including vegetation from the crack with a jet of compressed air or other approved means. Loosened material along spalled edges of cracks shall be removed. Cracks of width less than maximum sand particle size, approximately 1/8”, shall be filled with a pourable crack filling asphalt. Crack widths larger than 1/8” shall have a lean sand-asphalt mixture broomed into the crack until it is full. Pourable crack filling asphalt shall be poured on the sand-asphalt mixture filled cracks in sufficient quantity to seal the top of the sand-asphalt mixture and to tie to the edges of the crack.

3.3.3 Seal Coat. The construction of the seal coat shall be in accordance with WisDOT 475. Rate of application of the asphaltic material shall be 0.25 to 0.40 gallon per square yard. The temperature of the asphaltic material at the time of application shall not be less than 1250F nor more than 1850F.

Rate of application of seal coat aggregate shall be one pound per square yard for each 0.01 gallon of asphaltic material applied. The specified rates of application for asphaltic material and aggregate are approximate and may be varied to suit field conditions at the time of application. If bleeding occurs, such areas shall be lightly recovered with additional aggregate during the construction whenever necessary. Crack filling shall precede seal coating in any given area.

3.3.3.1 Maintenance. All surplus aggregate shall be swept up and removed off-site not less than 24 hours nor more than 4 days after rolling is completed. This operation shall be conducted while the road surface is still cool, and care shall be exercised that the aggregate that has set is not disturbed. After the seal coating has been allowed to cure for 30 days, all remaining surplus aggregate shall be swept up and disposed of off-site by the Contractor.

3.3.5 Correcting Deficient Areas. Any work that is defective, contaminated, damaged, or otherwise unacceptable, shall be removed and replaced at no additional cost to the Government.

3.4 CLEANUP. All equipment, debris, and materials incidental to the crack filling and seal coating project shall be contained during the Contractor=s operations and removed from the site before the work shall be considered complete.

3.5 SAFETY. The Contractor shall comply with all pertinent provisions of the latest version of the U.S. Army Corps of Engineers Safety and Health Requirements Manual EM 385-1-1.

W912ES-08-T-0071

ATTACHMENTS

Attachment 1 – Location/Vicinity Map.

WAGE RATES

General Decision Number: WI080019 08/22/2008 WI19

Superseded General Decision Number: WI20070019

State: Wisconsin

Construction Type: Heavy

Counties: Wisconsin Statewide.

HEAVY CONSTRUCTION PROJECTS (Excluding Tunnel, Sewer, and Water Lines), AND HOPPER DREDGE PROJECTS

Modification Number Publication Date 0 02/08/2008 1 02/29/2008 2 05/02/2008 3 06/13/2008 4 06/27/2008 5 07/11/2008 6 07/25/2008 7 08/08/2008 8 08/15/2008 9 08/22/2008

BOIL0107-001 07/01/2007

Rates Fringes

BOILERMAKER

Boilermaker.................$ 30.69 18.12 Small Boiler Repair (under 25,000 lbs/hr)..............$ 24.55 13.10

BRWI0001-002 06/04/2007

CRAWFORD, JACKSON, JUNEAU, LA CROSSE, MONROE, TREMPEALEAU, AND

VERNON COUNTIES

Rates Fringes

BRICKLAYER.......................$ 28.08 13.10

BRWI0002-002 06/01/2007

ASHLAND, BAYFIELD, DOUGLAS, AND IRON COUNTIES

BRICKLAYER.......................$ 33.69 12.90

BRWI0002-005 06/01/2008

ADAMS, ASHLAND, BARRON, BROWN, BURNETT, CALUMET, CHIPPEWA,

CLARK, COLUMBIA, DODGE, DOOR, DUNN, FLORENCE, FOND DU LAC,

FOREST, GREEN LAKE, IRON, JEFFERSON, KEWAUNEE, LANGLADE,

LINCOLN, MANITOWOC, MARATHON, MARINETTE, MARQUETTE, MENOMINEE,

OCONTO, ONEIDA, OUTAGAMIE, POLK, PORTAGE, RUSK, ST CROIX, SAUK,

SHAWANO, SHEBOYGAN, TAYLOR, VILAS, WALWORTH, WAUPACA, WAUSHARA,

WINNEBAGO, AND WOOD COUNTIES

CEMENT MASON/CONCRETE FINISHER...$ 28.15 12.80

BRWI0003-002 06/04/2007

BROWN, DOOR, FLORENCE, KEWAUNEE, MARINETTE, AND OCONTO COUNTIES

Rates Fringes

BRICKLAYER.......................$ 27.98 13.20

BRWI0004-002 06/04/2007

KENOSHA, RACINE, AND WALWORTH COUNTIES

Rates Fringes

BRICKLAYER.......................$ 31.38 14.05

BRWI0006-002 06/04/2007

ADAMS, CLARK, FOREST, LANGLADE, LINCOLN, MARATHON, MENOMINEE,

ONEIDA, PORTAGE, PRICE, TAYLOR, VILAS AND WOOD COUNTIES

BRICKLAYER.......................$ 28.23 12.95

BRWI0007-002 06/04/2007

GREEN, LAFAYETTE, AND ROCK COUNTIES

Rates Fringes

BRICKLAYER.......................$ 29.10 13.75

BRWI0008-002 06/01/2008

MILWAUKEE, OZAUKEE, WASHINGTON, AND WAUKESHA COUNTIES

BRICKLAYER.......................$ 32.71 14.54

BRWI0009-001 06/04/2007

GREEN LAKE, MARQUETTE, OUTAGAMIE, SHAWANO, WAUPACA, WASHARA,

AND WINNEBAGO COUNTIES

BRICKLAYER.......................$ 27.98 13.20

BRWI0011-002 06/04/2007

CALUMET, FOND DU LAC, MANITOWOC, AND SHEBOYGAN COUNTIES

Rates Fringes

BRICKLAYER.......................$ 27.98 13.20

BRWI0013-002 06/04/2007

DANE, GRANT, IOWA, AND RICHLAND COUNTIES

Rates Fringes

BRICKLAYER.......................$ 29.46 13.41

BRWI0019-002 06/04/2007

BARRON, BUFFALO, BURNETT, CHIPPEWA, DUNN, EAU CLAIRE, PEPIN,

PIERCE, POLK, RUSK, ST. CROIX, SAWYER AND WASHBURN COUNTIES

BRICKLAYER.......................$ 27.73 13.45

BRWI0021-002 06/04/2007

DODGE AND JEFFERSON COUNTIES

Rates Fringes

BRICKLAYER.......................$ 29.67 13.20

BRWI0034-002 06/04/2007

COLUMBIA AND SAUK COUNTIES

BRICKLAYER.......................$ 29.52 13.35

CARP0087-001 05/01/2007

BURNETT (W. of Hwy 48), PIERCE (W. of Hwy 29), POLK (W. of Hwys 35, 48 & 65), AND ST. CROIX (W. of Hwy 65) COUNTIES

Carpenter & Piledrivermen........$ 26.76 11.61

CARP0252-002 05/27/2007

ADAMS, BARRON, BAYFIELD (Eastern 2/3), BROWN, BUFFALO, BURNETT (E. of Hwy 48), CALUMET, CHIPPEWA, CLARK, COLUMBIA, CRAWFORD, DANE, DODGE, DOOR, DUNN, EAU CLAIRE, FLORENCE (except area bordering Michigan State Line), FOND DU LAC, FOREST, GRANT, GREEN, GREEN LAKE, IOWA, IRON, JACKSON, JEFFERSON, JUNEAU, KEWAUNEE, LA CROSSE, LAFAYETTE, LANGLADE, LINCOLN, MANITOWOC, MARATHON, MARINETTE (except N.E. corner), MARQUETTE, MENOMINEE, MONROE, OCONTO, ONEIDA, OUTAGAMIE, PEPIN, PIERCE (E.

of Hwys 29 & 65), POLK (E. of Hwys 35, 48 & 65), PORTAGE, PRICE, RICHLAND, ROCK, RUSK, SAUK, SAWYER, SHAWANO, SHEBOYGAN, ST CROIX (E. of Hwy 65), TAYLOR, TREMPEALEAU, VERNON, VILAS, WALWORTH, WASHBURN, WAUPACA, WAUSHARA, WINNEBAGO, AND WOOD

COUNTIES

Carpenters Carpenter...................$ 26.11 12.76 Millwright..................$ 27.71 12.76 Piledriver..................$ 26.61 12.76

CARP0252-010 05/27/2007

ASHLAND COUNTY

Rates Fringes

Carpenters Carpenter...................$ 23.82 11.26 Millwright..................$ 27.71 11.26 Pile Driver.................$ 24.81 10.43

CARP0264-003 06/01/2006

KENOSHA, MILWAUKEE, OZAUKEE, RACINE, WAUKESHA, AND WASHINGTON

CARPENTER........................$ 28.41 12.84

CARP0361-004 05/01/2007

BAYFIELD (Western 1/3) AND DOUGLAS COUNTIES

Rates Fringes

CARPENTER........................$ 28.62 12.90

CARP2337-001 06/01/2006

ZONE A: MILWAUKEE, OZAUKEE, WAUKESHA AND WASHINGTON

ZONE B: KENOSHA & RACINE

PILEDRIVERMAN

Zone A......................$ 25.76 17.27 Zone B......................$ 22.98 17.27

CARP2337-003 06/01/2006

Rates Fringes

MILLWRIGHT

Zone A......................$ 26.53 16.84 Zone B......................$ 25.38 16.84 Zone C......................$ 25.17 13.78

ZONE DEFINITIONS

ZONE A: MILWAUKEE, OZAUKEE, WAUKESHA AND WASHINGTON COUNTIES

ZONE B: KENOSHA & RACINE COUNTIES

ZONE C: DODGE, JEFFERSON & WALWORTH COUNTIES

ELEC0014-002 06/01/2007

ASHLAND, BARRON, BAYFIELD, BUFFALO, BURNETT, CHIPPEWA, CLARK

(except Maryville, Colby, Unity, Sherman, Fremont, Lynn & Sherwood), CRAWFORD, DUNN, EAU CLAIRE, GRANT, IRON, JACKSON, LA

CROSSE, MONROE, PEPIN, PIERCE, POLK, PRICE, RICHLAND, RUSK, ST

CROIX, SAWYER, TAYLOR, TREMPEALEAU, VERNON, AND WASHBURN

Electricians:....................$ 28.91 27.8%+6.60

ELEC0127-002 06/01/2007

KENOSHA COUNTY

Rates Fringes

Electricians:....................$ 32.53 28%+7.05

ELEC0158-002 06/01/2007

BROWN, DOOR, KEWAUNEE, MANITOWOC (except Schleswig), MARINETTE(Wausuakee and area South thereof), OCONTO, MENOMINEE (East of a ine 6 miles West of the West boundary of Oconto County), SHAWANO (Except Area North of Townships of Aniwa and Hutchins) COUNTIES

Electricians:....................$ 26.75 26.75%+7.12

ELEC0159-003 12/01/2007

COLUMBIA, DANE, DODGE (Area West of Hwy 26, except Chester and Emmet Townships), GREEN, LAKE (except Townships of Berlin, Seneca, and St. Marie), IOWA, MARQUETTE (except Townships of Neshkoka, Crystal Lake, Newton, and Springfield), and SAUK

Electricians:....................$ 30.00 3%+15.07

ELEC0219-004 06/02/2008

FLORENCE COUNTY (Townships of Aurora, Commonwealth, Fern, Florence and Homestead) AND MARINETTE COUNTY (Township of Niagara)

Electricians:

Electrical contracts over $90,000.....................$ 27.61 15.03 Electrical contracts under $90,000.....................$ 25.42 14.96

ELEC0242-005 06/02/2008

DOUGLAS COUNTY

Electricians:....................$ 31.08 59.25%

ELEC0388-002 03/01/2007

ADAMS, CLARK (Colby, Freemont, Lynn, Mayville, Sherman, Sherwood, Unity), FOREST, JUNEAU, LANGLADE, LINCOLN, MARATHON, MARINETTE (Area North of the town of Wausaukee), MENOMINEE (Area West of a line 6 miles West of the West boundary of Oconto County), ONEIDA, PORTAGE, SHAWANO (Area North of the townships of Aniwa and Hutchins), VILAS AND WOOD COUNTIES

Electricians:....................$ 27.68 15.23

ELEC0430-002 06/01/2008

RACINE COUNTY (Except Burlington Township)

Rates Fringes

Electricians:....................$ 32.212 17.18

ELEC0494-005 06/01/2008

MILWAUKEE, OZAUKEE, WASHINGTON, AND WAUKESHA COUNTIES

Rates Fringes

Electricians:....................$ 31.14 14.85%+$13.95

ELEC0494-006 06/01/2008

CALUMET (Township of New Holstein), DODGE (East of Hwy 26 including Chester Township), FOND DU LAC, MANITOWOC (Schleswig), and SHEBOYGAN COUNTIES

Electricians:....................$ 28.33 3%+$17.21

ELEC0577-003 06/01/2007

CALUMET (except Township of New Holstein), GREEN LAKE (N. part including Townships of Berlin, St Marie, and Seneca), MARQUETTE (N. part including Townships of Crystal Lake, Neshkoro, Newton, and Springfield), OUTAGAMIE, WAUPACA, WAUSHARA, AND WINNEBAGO

Electricians:....................$ 26.84 26.3%+7.13

ELEC0890-003 12/01/2007

DODGE (Emmet Township only), GREEN, JEFFERSON, LAFAYETTE, RACINE (Burlington Township), ROCK AND WALWORTH COUNTIES

Electricians:....................$ 28.34 26.45%+8.11

ELEC0953-001 06/01/2006

Rates Fringes

Line Construction:

(1) Lineman.................$ 31.66 4.75+29%

(2) Heavy Equipment Operator....................$ 28.49 4.75+29%

(3) Equipment Operator......$ 25.33 4.75+29%

(4) Heavy Groundman Driver..$ 22.16 4.75+29%

(5) Light Groundman Driver..$ 20.58 4.75+29%

(6) Groundsman..............$ 17.41 4.75+29%

ENGI0139-001 06/01/2008

KENOSHA, MILWAUKEE, OZAUKEE, RACINE, WASHINGTON, AND WAUKESHA

Power Equipment Operator Group 1.....................$ 35.26 16.60 Group 2.....................$ 34.76 16.60 Group 3.....................$ 34.26 16.60 Group 4.....................$ 33.97 16.60 Group 5.....................$ 32.09 16.60 Group 6.....................$ 26.94 16.60

EPA PREMIUMS:

Level "A" Protection: $3.00 per hour Level "B" Protection: $2.00 per hour Level "C" Protection: $1.00 per hour

POWER EQUIPMENT OPERATORS CLASSIFICATIONS

GROUP 1: Cranes, Tower Cranes, Pedestal Tower Cranes and Derricks with or w/o attachments with a lifting capacity of over 100 tons; or Cranes, Tower Cranes, Pedestal Tower Cranes and Derricks with boom, leads, and/or jib lengths measuring 176 feet or longer; Self-Erecting Tower Cranes over 4000 lbs lifting capacity; All Cranes with Boom Dollies; Boring Machines (directional); Master Mechanic.

$0.50 additional per hour per 100 tons or 100 ft of boom over 200 ft or lifting capacity of crane over 200 tons to a maximum of 300 tons or 300 ft. Thereafter an increase of $0.01 per ft or ton, whichever is greater.

GROUP 2: Cranes, Tower Cranes, Pedestal Tower Cranes and Derricks with or without attachments with a lifting capacity of 100 tons or less; or Cranes, Tower Cranes Portable Tower Cranes, Pedestal Tower Cranes and Derricks with boom, leadsand/or jib lengths measuring 175 feet or less; Backhoes (excavators) 130,000 lbs and over; Caisson Rigs; Pile Drivers; Boring Machines (vertical or horizontal), Versi-Lift, Tri-Lift, Gantry 20,000 lbs & over.

GROUP 3: Backhoe (excavator) under 130,000 lbs;Self-erecting Tower Crane 4000 lbs & under lifting capacity;Traveling Crane (bridge type); Skid Rigs; Dredge Operator; Mechanic;

Concrete Paver (over 27E); Concrete Spreader and Distributor; Forklift/ Telehandler (machinery- moving / steel erection); Hydro Blaster, 10,000 psi and over

GROUP 4: Material Hoists; Stack Hoists; Hydraulic Backhoe (tractor or truck mounted); Hydraulic Crane, 5 tons or under (tractor or truck mounted); Hoist (tuggers 5 tons & over); Hydro-Excavators/Daylighters; Concrete Pumps Rotec type Conveyors; Tractor/Bulldozer/End Loader (over 40 hp);

Motor Patrol; Scraper Operator; Sideboom; Straddle Carrier;

Welder; Bituminous Plant and Paver Operator; Roller over 5 tons; Rail Leveling Machine (Railroad); Tie Placer; Tie Extractor; Tie Tamper; Stone Leveler; Rotary Drill Operator and Blaster; Percussion Drill Operator; Air Track Drill and/or Hammers; Gantrys (under 20,000 lbs); Tencher (wheel type or chain type having 8 inch or larger bucket); Milling Machine; Off-Road Material Haulers.

GROUP 5: Backfiller; Concrete Auto Breaker (large); Concrete Finishing Machines (road type); Rubber Tired Roller;

Concrete Batch Hopper; Concrete Conveyor Systems; Grout Pumps; Concrete Mixers (14S or over); Screw Type Pumps and Gypsum Pumps; Tractor, Bulldozer, End Loader (under 40 hp);

Trencher (chain type, bucket under 8 inch); Industrial Locomotives; Rollers under 5 tons; Stump Grinder/Chipper (Large); Timber Equipment; Firemen (pile drivers and derricks); Personnel Hoist, Telehandler over 8000 lbs;

Robotic Tool Carrier with or without attachments

GROUP 6: Tampers - Compactors (riding type); Assistant Engineer; A-Frames and Winch Trucks; Concrete Auto Breaker;

Hydrohammers (small); Brooms and Sweepers; Hoist (tuggers under 5 tons); Boats (Tug, Safety, Work Barges, Launch);

Shouldering Machine Operator; Prestress Machines; Screed Operator; Stone Crushers and Screening Plants; Screed Operators (milling machine), Farm or Industrial Tractor Mounted Equipment; Post Hole Digger; Fireman (asphalt plants); Air Compressors over 400 CFM; Generators, over 150 KW; Augers (vertical and horizontal); Air, Electric, Hydraulic Jacks (slipform); Skid Steer Loaders (with or without attachments); Boiler Operators (temporary heat);

Refrigeration Plant/Freeze Machines; Power Pack Vibratory/Ultra Sound Drivers and Extractors; Welding Machines; Heaters (mechanical); Pumps; Winches (small electric); Oiler and Greaser; Rotary Drill Tender;

Conveyor; Forklifts/Telehandler 8000 lbs & under;

Elevators: Automatic Hoists; Pumps (well points);

Combination Small Equipment Operators

* ENGI0139-003 06/01/2008

STATEWIDE (Except Kenosha, Milwaukee, Ozaukee, Racine, Washington, and Waukesha)

Power Equipment Operator Group 1.....................$ 32.12 16.20 Group 2.....................$ 31.12 16.20 Group 3.....................$ 30.42 16.20 Group 4.....................$ 29.89 16.20 Group 5.....................$ 27.82 16.20 Group 6.....................$ 27.19 16.20

EPA PREMIUMS:

Level "A" Protection: $3.00 per hour Level "B" Protection: $2.00 per hour Level "C" Protection: $1.00 per hour

POWER EQUIPMENT OPERATORS CLASSIFICATIONS

GROUP 1: Cranes, Tower Cranes and Derricks with or without attachments with a lifting capacity of over 100 tons;

Cranes, Tower Cranes, and Derricks with boom, leads and/or jib lengths 176 ft or longer.

GROUP 2: Backhoes (Excavators) weighing 130,00 lbs and over;

Cranes, Tower Cranes and Derricks with or without attachments with a lifting capacity of 100 tons or less;

Cranes, Tower Cranes, and Derricks with boom, leads, and/or jib lengths 175 ft or less; Caisson Rigs; Pile Driver

GROUP 3: Backhoes (Excavators) weighing under 130,000 lbs;

Travelling Crane (bridge type); Milling Machine; Concrete Paver over 27 E; Concrete Spreader and Distributor;

Concrete Laser Screed; Concrete Grinder and Planing

Machine; Slipform Curb and Gutter Machine; Boring Machine (Directional); Dredge Operator; Skid Rigs; over 46 meter Concrete Pump.

GROUP 4: Hydraulic Backhoe (tractor or truck mounted);

Hydraulic Crane, 10 tons or less; Tractor, Bulldozer, or End Loader (over 40 hp); Motor Patrol; Scraper Operator;

Bituminous Plant and Paver Operator; Screed-Milling Machine; Roller over 5 tons; Concrete pumps 46 meter and under; Grout Pumps; Rotec type machine; Hydro Blaster, 10,000 psi and over; Rotary Drill Operator; Percussion Drilling Machine; Air Track Drill with or without integral hammer; Blaster; Boring Machine (vertical or horizontal);

Side Boom; Trencher, wheel type or chain type having 8 inch or larger bucket; Rail Leveling Machine (Railroad); Tie Placer; Tie Extractor; Tie Tamper; Stone Leveler; Straddle Carrier; Material Hoists; Stack Hoist; Man Hoists; Mechanic and Welder; Off Road Material Haulers.

GROUP 5: Tractor, Bulldozer, or Endloader (under 40 hp);

Tampers -Compactors, riding type; Stump Chipper, large;

Roller, Rubber Tire; Backfiller; Trencher, chain type (bucket under 8 inch); Concrete Auto Breaker, large;

Concrete Finishing Machine (road type); Concrete Batch Hopper; Concrete Conveyor Systems; Concrete Mixers, 14S or over; Pumps, Screw Type and Gypsum); Hydrohammers, small;

Brooms and Sweeeprs; Lift Slab Machine; Roller under 5 tons; Industrial Locomotives; Fireman (Pile Drivers and Derricks); Pumps (well points); Hoists, automatic; A-Frames and Winch Trucks; Hoists (tuggers); Boats (Tug, Safety, Work Barges and Launches); Assistant Engineer

GROUP 6: Shouldering Machine Operator; Farm or Industrial Tractor mounted equipment; Post Hole Digger; Auger (vertical and horizontal); Skid Steer Loader with or without attachments; Robotic Tool Carrier with or without attachments; Power Pack Vibratory/Ultra Sound Driver and Extractor; Fireman (Asphalt Plants); Screed Operator; Stone Crushers and Screening Plants; Air, Electric, Hydraulic Jacks (Slip Form); Prestress Machines; Air Compressor, 400 CFM or over; Refrigeration Plant/Freese Machine; Boiler Operators (temporary heat); Forklifts; Welding Machines;

Generators; Pumps over 3"; Heaters, Mechanical; Combination small equipment operator; Winches, small electric; Oiler;

Greaser; Rotary Drill Tender; Conveyor; Elevator Operator

IRON0008-002 06/01/2008

BROWN, CALUMET, DOOR, FOND DU LAC, KEWAUNEE, MANITOWOC,

MARINETTE, OCONTO, OUTAGAMI, SHAWANO, SHEBOYGAN, AND WINNEBAGO

COUNTIES:

IRONWORKER.......................$ 27.73 19.04

IRON0008-003 06/01/2007

KENOSHA, MILWAUKEE, OZAUKEE, RACINE, WALWORTH (N.E. 2/3),

WASHINGTON, AND WAUKESHA COUNTIES

IRONWORKER.......................$ 28.96 17.89

IRON0383-001 06/01/2007

ADAMS, COLUMBIA, CRAWFORD, DANE, DODGE, FLORENCE, FOREST,

GRANT, GREENE, (Excluding S.E. tip), GREEN LAKE, IOWA, JEFFERSON, JUNEAU, LA CROSSE, LAFAYETTE, LANGLADE, MARATHON, MARQUETTE, MENOMINEE, MONROE, PORTAGE, RICHLAND, ROCK (Northern area, vicinity of Edgerton and Milton), SAUK, VERNON, WAUPACA, WAUSHARA, AND WOOD COUNTIES

IRONWORKER.......................$ 29.30 14.74

IRON0512-008 05/01/2008

BARRON, BUFFALO, CHIPPEWA, CLARK, DUNN, EAU CLAIRE, JACKSON,

PEPIN, PIERCE, POLK, RUSK, ST CROIX, TAYLOR, AND TREMPEALEAU

IRONWORKER.......................$ 32.80 19.42

IRON0563-004 05/01/2008

ASHLAND, BAYFIELD, BURNETT, DOUGLAS, IRON, LINCOLN, ONEIDA,

PRICE, SAWYER, VILAS AND WASHBURN COUNTIES

IRONWORKER.......................$ 28.66 18.50

LABO0113-002 06/01/2007

MILWAUKEE AND WAUKESHA COUNTIES

Laborers:

Group 1.....................$ 22.51 13.43 Group 2.....................$ 22.66 13.43 Group 3.....................$ 22.86 13.43 Group 4.....................$ 23.01 13.43 Group 5.....................$ 23.16 13.43 Group 6.....................$ 19.00 13.43

LABORERS CLASSIFICATIONS

GROUP 1: General Laborer; Tree Trimmer; Conduit Layer;

Demolition and Wrecking Laborer; Guard Rail, Fence, and Bridge Builder; Landscaper; Multiplate Culvert Assembler;

Stone Handler; Bituminous Worker (Shoveler, Loader, and Utility Man); Batch Truck Dumper or Cement Handler;

Bituminous Worker (Dumper, Ironer, Smoother, and Tamper);

Concrete Handler

GROUP 2: Air Tool Operator; Joint Sawer and Filler (Pavement); Vibrator or Tamper Operator (Mechanical Hand Operated); Chain Saw Operator; Demolition Burning TOrch Laborer

GROUP 3: Bituminous Worker (Raker and Luteman); Formsetter (Curb, Sidewalk, and Pavement); Strike Off Man

GROUP 4: Line and Grade Specialist

GROUP 5: Blaster and Powderman

GROUP 6: Flagperson; traffic control person

LABO0113-003 06/01/2007

OZAUKEE AND WASHINGTON COUNTIES

Rates Fringes

Laborers:

Group 1.....................$ 21.76 13.43 Group 2.....................$ 21.86 13.43 Group 3.....................$ 21.91 13.43 Group 4.....................$ 22.11 13.43 Group 5.....................$ 21.96 13.43 Group 6.....................$ 18.85 13.43

LABORERS CLASSIFICATIONS

GROUP 1: General Laborer; Tree Trimmer; Conduit Layer;

Demolition and Wrecking Laborer; Guard Rail, Fence, and Bridge Builder; Landscaper; Multiplate Culvert Assembler;

Stone Handler; Bituminous Worker (Shoveler, Loader, and Utility Man); Batch Truck Dumper or Cement Handler;

Bituminous Worker (Dumper, Ironer, Smoother, and Tamper);

Concrete Handler

GROUP 2: Air Tool Operator; Joint Sawer and Filler (Pavement); Vibrator or Tamper Operator (Mechanical Hand Operated);

GROUP 3: Bituminous Worker (Raker and Luteman); Formsetter (Curb, Sidewalk, and Pavement); Strike Off Man

GROUP 4: Line and Grade Specialist

GROUP 5: Blaster; powderman

GROUP 6: Flagperson and Traffic Control Person

LABO0140-002 06/01/2007

ADAMS, ASHLAND, BARRON, BAYFIELD, BROWN, BUFFALO, BURNETT,

CALUMET, CHIPPEWA, CLARK, COLUMBIA, CRAWFORD, DODGE, DOOR,

DOUGLAS, DUNN, EAU CLAIRE, FLORENCE, FOND DU LAC, FOREST,

GRANT, GREEN, GREEN LAKE, IRON, JACKSON, JUNEAU, IOWA,

JEFFERSON, KEWAUNEE, LA CROSSE, LAFAYETTE, LANGLADE, LINCOLN,

MANITOWOC, MARATHON, MARINETTE, MARQUETTE, MENOMINEE, MONROE,

OCONTO, ONEIDA, OUTAGAMIE, PEPIN, PIERCE, POLK, PORTAGE, PRICE,

RICHLAND, ROCK, RUSK, SAUK, SAWYER, SHAWANO, SHEBOYGAN, ST.

CROIX, TAYLOR, TREMPEALEAU, VERNON, VILLAS, WALWORTH, WASHBURN,

WAUPACA, WAUSHARA, WINNEBAGO, AND WOOD COUNTIES

Group 1.....................$ 22.97 11.15 Group 2.....................$ 23.07 11.15 Group 3.....................$ 23.12 11.15 Group 4.....................$ 23.32 11.15 Group 5.....................$ 23.17 11.15 Group 6.....................$ 19.60 11.15

LABORERS CLASSIFICATIONS

GROUP 1: General Laborer; Tree Trimmer; Conduit Layer;

Demolition and Wrecking Laborer; Guard Rail, Fence, and Bridge Builder; Landscaper; Multiplate Culvert Assembler;

Stone Handler; Bitminous Worker (Shoveler, Loader, and Utility Man); Batch Truck Dumper or Cement Handler;

Bituminous Worker (Dumper, Ironer, Smoother and Tamper);

Concrete Handler

GROUP 2: Air Tool Operator; Joint Sawer and Filler (Pavement); Vibrator or Tamper Operator (Mechanical Hand Operated)

GROUP 3: Bituminous Worker (Raker and Luteman); Formsetter

(Curb, Sidewalk and Pavement); Strike Off Man

GROUP 4: Line and Grade Secialist

GROUP 5: Blaster; powderman

GROUP 6: Flagperson; Traffic Control

LABO0237-002 06/01/2007

KENOSHA AND RACINE COUNTIES

Rates Fringes

Laborers:

Group 1.....................$ 20.72 14.28 Group 2.....................$ 20.87 14.28 Group 3.....................$ 21.07 14.28 Group 4.....................$ 21.04 14.28 Group 5.....................$ 21.37 14.28 Group 6.....................$ 17.86 14.28

LABORERS CLASSIFICATIONS:

GROUP 1: General laborer; Tree Trimmer; Conduit Layer;

Demolition and Wrecking Laborer; Guard Rail, Fence, and Bridge Builder; Landscaper; Multiplate Culvert Assembler;

Stone Handler; Bituminous Worker (Shoveler, Loader, and Utility Man); Batch Truck Dumper or Cement Handler;

Bituminous worker (Dumper, Ironer, Smoother, and Tamper);

Concrete Handler

GROUP 2: Air Tool Operator; Joint Sawer and Filler (Pavement); Vibrator or Tamper Operator (Mechanical Hand Operated); Chain Saw Operator; Demolition Burning Torch Laborer

GROUP 3: Bituminous Worker (Raker and Luteman); Formsetter (Curb, Sidewalk, and Pavement); Strike Off Man

GROUP 4: Line and Grade Specialist

GROUP 5: Blaster and Powderman

GROUP 6: Flagman; traffic control person

LABO0464-003 06/01/2007

DANE COUNTY

Rates Fringes

Group 1.....................$ 23.25 11.15

Group 2.....................$ 23.35 11.15 Group 3.....................$ 23.40 11.15 Group 4.....................$ 23.60 11.15 Group 5.....................$ 23.45 11.15 Group 6.....................$ 19.60 11.15

LABORERS CLASSIFICATIONS:

GROUP 1: General Laborer; Tree Trimmer; Conduit Layer;

Demolition and Wrecking Laborer; Guard Rail, Fence, and Bridge Builder; Landscaper; Multiplate Culvert Assembler;

Stone Handler; Bituminous Worker (Shoveler, Loader, and Utility Man); Batch Truck Dumper or Cement Handler;

Bituminious Worker (Dumper, Ironer, Smoother, and Tamper);

Concrete Handler

GROUP 2: Air Tool Operator; Joint Sawer and Filler (Pavement); Vibrator or Tamper Operator (Mechanical Hand Operated); Chain Saw Operator; Demolition Burning Torch Laborer

GROUP 3: Bituminous Worker (Raker and Luteman); Formsetter (Curb, Sidewalk, and Pavement); Strike Off Man

GROUP 4: Line and Grade Specialist

GROUP 5: Blaster; Powderman

GROUP 6: Flagperson and Traffic Control Person

PAIN0106-008 05/01/2008

ASHLAND, BAYFIELD, BURNETT, AND DOUGLAS COUNTIES

Rates Fringes

Painters:

New:

Brush, Roller..............$ 27.41 12.52 Spray, Sandblast, Steel....$ 28.01 12.52 Repaint:

Brush, Roller..............$ 25.91 12.52 Spray, Sandblast, Steel....$ 26.51 12.52

PAIN0108-002 06/01/2008

RACINE COUNTY

Rates Fringes

Painters:

Brush, Roller...............$ 27.10 14.14 Spray & Sandblast...........$ 28.10 14.14

PAIN0259-002 05/01/2008

BARRON, CHIPPEWA, DUNN, EAU CLAIRE, PEPIN, PIERCE, POLK, RUSK,

SAWYER, ST. CROIX, AND WASHBURN COUNTIES

PAINTER..........................$ 24.11 12.15

PAIN0259-004 05/01/2008

BUFFALO, CRAWFORD, JACKSON, LA CROSSE, MONROE, TREMPEALEAU, AND

PAINTER..........................$ 20.43 8.40

PAIN0781-002 06/01/2008

JEFFERSON, MILWAUKEE, OZAUKEE, WASHINGTON, AND WAUKESHA COUNTIES

Rates Fringes

Painters:

Bridge......................$ 27.47 14.09 Brush.......................$ 27.12 14.09 Spray & Sandblast...........$ 27.87 14.09

PAIN0802-002 06/01/2008

COLUMBIA, DANE, DODGE, GRANT, GREEN, IOWA, LAFAYETTE, RICHLAND,

ROCK, AND SAUK COUNTIES

Painters:

Brush.......................$ 25.00 12.15 Structural Steel, Spray, Bridges.....................$ 26.00 12.15

PAIN0802-003 06/01/2008

ADAMS, BROWN, CALUMET, CLARK, DOOR, FOND DU LAC, FOREST, GREEN

LAKE, IRON, JUNEAU, KEWAUNEE, LANGLADE, LINCOLN, MANITOWOC,

MARATHON, MARINETTE, MARQUETTE, MENOMINEE, OCONTO, ONEIDA,

OUTAGAMIE, PORTAGE, PRICE, SHAWANO, SHEBOYGAN, TAYLOR, VILAS,

WAUSHARA, WAUPACA, WINNEBAGO, AND WOOD COUNTIES

Painters:........................$ 21.32 9.07

PAIN0934-001 06/01/2008

KENOSHA AND WALWORTH COUNTIES

Rates Fringes

Painters:

Brush.......................$ 27.10 14.14 Spray.......................$ 28.10 14.14 Structural Steel............$ 27.15 14.14

PAIN1011-002 06/01/2008

FLORENCE COUNTY

Rates Fringes

Painters:........................$ 22.60 8.20

PLAS0599-010 06/01/2007

Rates Fringes

CEMENT MASON/CONCRETE FINISHER

Area 1......................$ 28.27 12.73 Area 2 (BAC)................$ 28.15 12.80 Area 3......................$ 26.10 13.65 Area 4......................$ 26.82 12.93 Area 5......................$ 26.97 12.78 Area 6......................$ 24.08 15.67

AREA DESCRIPTIONS

AREA 1: BAYFIELD, DOUGLAS, PRICE, SAWYER, AND WASHBURN

COUNTIES

AREA 2: ADAMS, ASHLAND, BARRON, BROWN, BURNETT, CALUMET,

CHIPPEWA, CLARK, COLUMBIA, DODGE, DOOR, DUNN, FLORENCE,

FOND DU LAC, FOREST, GREEN LAKE, IRON, JEFFERSON, KEWAUNEE,

LANGLADE, LINCOLN, MANITOWOC, MARATHON, MARINETTE,

MARQUETTE, MENOMINEE, OCONTO, ONEIDA, OUTAGAMIE, POLK,

PORTAGE, RUSK, ST CROIX, SAUK, SHAWANO, SHEBOYGAN, TAYLOR,

VILAS, WALWORTH, WAUPACA, WAUSHARA, WINNEBAGO, AND WOOD

COUNTIES

AREA 3: BUFFALO, CRAWFORD, EAU CLAIRE, JACKSON, JUNEAU, LA

CROSSE MONROE, PEPIN, PIERCE, RICHLAND, TREMPEALEAU, AND

AREA 4: MILWAUKEE, OZAUKEE, WASHINGTON, AND WAUKESHA COUNTIES

AREA 5: DANE, GRANT, GREEN, IOWA, LAFAYETTE, AND ROCK

AREA 6: KENOSHA AND RACINE COUNTIES

PLUM0011-003 05/01/2007

ASHLAND, BAYFIELD, BURNETT, DOUGLAS, IRON, SAWYER, AND WASHBURN

PLUMBER..........................$ 32.15 14.05

PLUM0075-002 06/01/2007

MILWAUKEE, OZAUKEE, WASHINGTON, AND WAUKESHA COUNTIES

Rates Fringes

PLUMBER..........................$ 33.65 12.59

PLUM0075-004 06/01/2007

DODGE (Watertown), GREEN, JEFFERSON, LAFAYETTE, AND ROCK

PLUMBER/PIPEFITTER...............$ 33.90 12.59

PLUM0075-009 06/01/2007

COLUMBIA, DANE, IOWA, MARQUETTE, RICHLAND AND SAUK COUNTIES

Rates Fringes

PLUMBER..........................$ 33.50 11.84

PLUM0118-002 06/01/2008

KENOSHA, RACINE, AND WALWORTH COUNTIES

Rates Fringes

Plumber and Steamfitter..........$ 34.31 14.84

PLUM0400-003 06/01/2007

ADAMS,BROWN, CALUMET, DODGE (except Watertown), DOOR, FOND DU LAC, GREEN LAKE,KEWAUNEE, MANITOWOC, MARINETTE (except

Niagara), MENOMINEE, OCONTO, OUTAGAMIE, SHAWANO, SHEBOYGAN, WAUPACA, WAUSHARA, AND WINNEBAGO COUNTIES

PLUMBER/PIPEFITTER...............$ 30.16 12.98

PLUM0434-002 06/01/2008

BARON, BUFFALO, CHIPPEWA, CLARK, CRAWFORD, DUNN, EAU CLAIRE,

FLORENCE, FOREST, GRANT, JACKSON, JUNEAU, LA CROSSE, LANGLADE,

LINCOLN, MARATHON, MONROE, ONEIDA, PEPIN, PIERCE, POLK,

PORTAGE, PRICE, RUSK, ST. CROIX, TAYLOR, TREMPEALEAU, VERNON,

VILAS, AND WOOD COUNTIES

PIPEFITTER.......................$ 31.39 13.38

PLUM0506-007 06/01/2003

MARINETTE COUNTY (Niagara only)

Rates Fringes

PLUMBER/PIPEFITTER

(1) Jobs where plumbing bid is $50,000 or less......$ 20.56 12.05

(2) All other work..........$ 25.71 12.05

TEAM0039-002 05/01/2008

Rates Fringes

TRUCK DRIVER

1 & 2 Axle Trucks...........$ 22.59 14.30 3 or more axles; Euclids or Dumptor, Articulated Truck, Mechanic.............$ 22.35 13.24

SELF-PROPELLED HOPPER DREDGE:

Drag Tender $ 8.78 $4.23+A

FOOTNOTE:

A. Paid Holidays: New years Day, Washington's Birthday, Memorial Day, Independence Day, Labor Day, Paul Hall's Birthday (August 20), Veteran,s Day, Thanksgiving Day, and Christmas Day

WELL DRILLER $16.52 $3.70

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).

In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION

Section 00100 - Bidding Schedule/Instructions to Bidders

CLAUSES INCORPORATED BY FULL TEXT

52.214-34 SUBMISSION OF OFFERS IN THE ENGLISH LANGUAGE (APR 1991)

Offers submitted in response to this solicitation shall be in the English language. Offers received in other than English shall be rejected.

(End of provision)

52.214-35 SUBMISSION OF OFFERS IN U.S. CURRENCY (APR 1991)

Offers submitted in response to this solicitation shall be in terms of U.S. dollars. Offers received in other than U.S.

dollars shall be rejected.

52.214-4001 INQUIRIES – QUOTE INFORMATION

(a) Inquiries:

Any questions regarding this solicitation should be directed to Mr. Richard J. Pecoraro Contract Specialist, at telephone number (651) 290-5422 (collect calls not accepted). It is requested that all technical questions on the plans and specifications be submitted to the Contract Specialist by facsimile transmission to (651) 290-5706

The Interested Parties List and Quote results can be found on Federal Business Opportunities web site at http://www.fbo.gov for that solicitation..

(b) Quote Depository/Quote Opening Information:

If using the US Amil, send Quotes to: Mr. Richard J. Pecoraro, Contracting Division, 6th Floor, of the U.S. Army Corps of Engineers - St. Paul District, 190 Fifth Street East, St. Paul, Minnesota 55101-1638.

Quotes may also be emailed to: richard.j.pecoraro@usace.army.mil

52.214-4002 ALL OR NONE QUALIFICATIONS (APR 1984) FAR 14.404-5

A bidder/offeror must quote on all items in this solicitation to be eligible for award. The Government will award on a “All or None” basis. Evaluation of bids/offers will be based, among other factors, upon the total price quoted for all items.

52.222-5 DAVIS-BACON ACT--SECONDARY SITE OF THE WORK (JUL 2005)

(a)(1) The offeror shall notify the Government if the offeror intends to perform work at any secondary site of the work, as defined in paragraph (a)(1)(ii) of the FAR clause at 52.222-6, Davis-Bacon Act, of this solicitation.

(2) If the offeror is unsure if a planned work site satisfies the criteria for a secondary site of the work, the offeror shall request a determination from the Contracting Officer.

(b)(1) If the wage determination provided by the Government for work at the primary site of the work is not applicable to the secondary site of the work, the offeror shall request a wage determination from the Contracting Officer.

(2) The due date for receipt of offers will not be extended as a result of an offeror's request for a wage determination for a secondary site of the work.

52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE EQUAL

EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION (FEB 1999)

(a) The offeror's attention is called to the Equal Opportunity clause and the Affirmative Action Compliance Requirements for Construction clause of this solicitation.

(b) The goals for minority and female participation, expressed in percentage terms for the Contractor's aggregate workforce in each trade on all construction work in the covered area, are as follows:

Goals for minority participation for each trade

Goals for female participation for each trade

2.9% 6.9%

These goals are applicable to all the Contractor's construction work performed in the covered area. If the Contractor performs construction work in a geographical area located outside of the covered area, the Contractor shall apply the goals established for the geographical area where the work is actually performed. Goals are published periodically in the Federal Register in notice form, and these notices may be obtained from any Office of Federal Contract Compliance Programs office.

(c) The Contractor's compliance with Executive Order 11246, as amended, and the regulations…

This is the start of the file's text. The full file is on GovTribe.