Amendment 0002
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W912EQ19B0001-ABSTRACT.pdf | ||
| Amendment0004.pdf | ||
| Site_Visits_for_Miston-Ridgely_Berm_18B0001.pdf | ||
| MistonBerm_Quantities-Contractor_1-16-19.xlsx | XLSX spreadsheet | |
| Amend_0003.pdf | ||
| amendment0001.pdf | ||
| A22-_Plans-Miston_-_Ridgely.pdf | ||
| A22-Specifications-Miston-Ridgely.pdf | ||
| A22-Solicitation-.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
This amendment is to change the Bidder Inquiry Key to 8E3YR8-8GI653.
1. CONTRACT ID CODE PAGE OF PAGES
1 7
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 04-Jan-2019
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912EQ19B0001
X 9B. DATED (SEE ITEM 11)
18-Dec-2018
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
04-Jan-2019
CODE
US ARMY ENGINEER DISTRICT, MEMPHIS
167 N MAIN STREET B202
MEMPHIS TN 38103-1894
W912EQ 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912EQ19B0001
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00100 - INSTRUCTIONS TO BIDDERS
The following have been modified:
INSTRUCTIONS TO BIDDERS
CONDITIONS AND NOTICES TO BIDDERS
A. BIDDING MATERIAL – Copies of the Solicitation, Specifications, and drawings forms are available by INTERNET ACCESS ONLY. All solicitation documents will be posted through the
(FedBizOpps) website at: https://www.fbo.gov. Prospective Bidders should submit technical questions concerning this Invitation for Bid via Bidder Inquiry in ProjNet at www.projnet.org/projnet. (See Paragraph M Below). All other inquiries should be emailed to the
Contract Specialist, BID DOCUMENTS: The following documents must be submitted with a bid:
1. SF 1442, Solicitation, Offer and Award
2. Schedule of bids/prices
3. Representations and Certifications (Section 00600)
4. All amendments must be acknowledged
5. Bid Bond (Standard Form 24), if over $150,000
B. REQUIRED SYSTEM FOR AWARD MANAGEMENT REGISTRATION - By submission of a bid, the bidder acknowledges the requirement that a prospective awardee must be registered in the SAM database prior to award, during performance, and through final payment of any contract resulting from this solicitation. Lack of registration in the SAM database will make a bidder ineligible for award. Bidders and contractors may obtain information on registration and annual confirmation requirements by calling 1-866-606-8220, or at:
http://www.sam.gov See Section 00700, clause 252.204-7004 Alt A, “System for Award
Management”.
(1) Lack of registration in the SAM database will make a bidder ineligible for award. SEE
CONTRACT CLAUSE 52.204-7 ENTITLED "System for Award Management”.
(2) Attention to bidder/offers contractor(s): Effective March 22, 2018, you must submit a notarized letter appointing the authorized entity administrator before your registration will be activated. This requirement now applies to both new and existing entities. Make sure your SAM profile includes “all awards” and not just “Federal Assistance Awards” as this option is only for grants and cooperative agreements. Please visit www.sam.gov for more information.
C. SITE VISITS – Bidders should inspect the job site prior to submitting a bid. Site Visits may be coordinated by mail or telephone (COLLECT CALLS NOT ACCEPTED) between the hours of 7:30 AM and 3:00 PM, exclusive of Federal holidays. The point of contact to schedule a site http://www.sam.gov/ visit for this Invitation for Bids Mr. Daimon McNew, Area Engineer. See Section 00100, clause
52.236-27 Alt I, entitled “Site Visit (Construction)”.
D. CONDITIONS AFFECTING THE WORK - Bidders should visit the site and take such other steps as may be reasonably necessary to ascertain the nature and location of the work and the general and local conditions that can affect the work or the cost thereof. Failure to do so will not relieve bidders from the responsibility for estimating properly the difficulty or cost of successfully performing the work. The Government will assume no responsibility for any understanding or representations concerning conditions made by any of its officers or agents prior to the execution of the contract, unless included in the Invitation for Bids, the specifications or related documents. See Section 00700, clause 52.236-3, entitled “Site Investigation and
Conditions Affecting the Work”.
E. PUBLIC OPENING OF BIDS - Bids will be publicly opened at the time set for opening in the Invitation for Bids. Their content will be made public for the information of bidders and others interested, who may be present. As soon as practicable after bid opening, an abstract of bids will be available through our web page at: www.fbo.gov under Bid Results.
(1)Mail in bids to the Memphis District, Contracting Office 167 North Main, Room 681, Memphis TN 38103.Bids sent by commercial carrier shall be clearly marked on the outer envelope as containing a “Seal Bid”. Bids must be received prior to the exact time set for Bid Opening.
(2)Hand Carried bids must be delivered to the Memphis District, Contracting Office
167 North Main Room 681, Memphis TN 38103. All bids must be received prior to the exact time set for bid opening. NOTE: Bids delivered later than 15 minutes prior to the time set for the bid opening shall be delivered directly to the room designed for the bid opening room.
(3) Bids will not be accepted nor shall bids be withdrawn telegraphically or by electronic commerce.
F. BIDDER'S ADDRESS - Prospective bidders should indicate in the offer, the address to which payment and/or correspondence should be mailed, if such address is different from that shown for the bidder on Standard Form 1442 Block 14.
G. AMENDMENTS PRIOR TO DATE SET FOR OPENING BIDS - The right is reserved as the interest of the Government may require, to revise or amend the specifications or drawings or both prior to the date set for opening bids. Such revisions and amendments, if any, will be announced by an amendment or amendments to this Invitation for Bids. If the revisions and amendments are of a nature which requires material changes in quantities or prices bid or both, the date set for opening bids may be postponed by such number of days as in the opinion of the issuing officer will enable bidders to revise their bids. In such cases, the amendment will include an announcement of the new date for opening bids. See Section 00100, clause 52.214-3, “Amendments to Invitations for Bids”.
H. NOTICE TO BIDDERS - NINETY DAY OFFER GUARANTEE (See SF 1442 Block 13d)
I. EXPLANATION OF PROVISION/CLAUSE NUMBERS UTILIZED IN THIS
SOLICITATION –
(1) Federal Acquisition Regulation (FAR) provisions/clauses are numbered as follows: 52.252-1.
(2) Defense Acquisition Regulation Supplement (DFARS) provisions/clauses are numbered as follows: 252.204-7000.
(3) Army Federal Acquisition Regulation Supplement (AFARS), provisions/clauses are numbered as follows: 5152.237-9000.
(4) USACE Acquisition Instruction (UAI) provisions/clauses are numbered as follows:
5152.249-9000.
J. BIDDER’S QUALIFICATIONS - To establish its responsibility, the bidder may be requested by the Government to submit a statement regarding his previous experience in performing comparable work, his business and technical organization, financial resources
(including recent financial statements or audits), plant available to be used in performing the work and, if applicable, an approved sub-contracting plan in accordance with FAR 9.104-1. All documents relevant to establish a bidder’s responsibility shall be made available as soon as practicable after bid opening; but, not later than 3 days after request by the Contracting Officer or the authorized Representative of the Contracting Officer.
(1). Business Integrity-The apparent successful bidder as a condition for award of any contract resulting from this solicitation may be required to execute a certificate related to
Business Integrity.
(2). In accordance with the provisions of provisions of Subpart 36.201 (Evaluation of
Contractor Performance) of the Federal Acquisition Regulation (FAR), Construction
Contractor’s performance shall be evaluated throughout the performance or the contract.
The United States Army Corps of Engineers (USACE) follows the procedures outlined in
Engineering Regulation 415-1-17 to fulfill this FAR requirement. For construction contracts awarded at or above $100,000.00, USACE will evaluate Contractor’s
Performance and prepare a performance report using the construction contractor appraisal support system (CPAR), which is now a web-based system. After an evaluation (interim or final) is written up by the USACE, the contractor will have the ability to access, review and comment on the evaluation for a period of 30 days. Accessing and using
CPAR requires specific software, called PKI certification, which is installed on the user’s computer. The certification is a Department of Defense requirement and was implemented to provide security in electronic transactions. The certification software could cost approximately $110-$125 per certification per year and is purchase from an external certification authorities (ECA) vendor, current information about the PKI certification process and for contacting vendors can be found on the website:
http://www.cpars.navy.mil/. If the contractor wishes to participate in the performance evaluation process, access to CPAR and PKI certification is the sole responsibility of the contractor.
http://www.cpars.navy.mil/
K. NOTICE OF BONDS AND INSURANCE - The following bid/contract information is applicable only if the bid/contract is over one hundred fifty thousand dollars ($150,000):
(1) BID BONDS: This is applicable only if proposal is over one hundred fifty thousand dollars ($150,000). Each bidder shall submit with his bid a Bid Bond (Standard Form 24) with good and sufficient surety or sureties acceptable to the Government in the form of twenty percent
(20%) of the bid price or three million dollars ($3,000,000) whichever is lesser. The bid bond penalty may be expressed in terms of a percentage or may be expressed in dollars and cents. See
Section 00700, clause 52.228-1, entitled “Bid Guarantee”.
(2) PERFORMANCE BONDS. The penal amount of the performance bond shall equal one hundred percent (100%) of the contract price. Bonds shall be received within ten (10) days after receipt of contract award. See Section 00700, clause 52.228-15, entitled “Performance and
Payment Bonds – Construction”.
(3) PAYMENT BONDS: Within ten (10) days after receipt of contract award to the bidder whom award is made, one (1) bond, with good and sufficient surety or sureties acceptable to the
Government, shall be furnished; namely a Payment Bond (Standard Form 25A). The penal amount of such bonds shall equal one hundred percent (100%) of the contract price. See Section
00700, clause 52.228-15, entitled “Performance and Payment Bonds – Construction”.
(4) INSURANCE: The accepted bidder shall provide adequate insurance, within ten (10) days after receipt of contract award. See Section 00800, entitled Insurance Requirements and
Section 00 80 00.00 11, Special Contract Requirements --- Additional Insurance References.
L. POST AWARD SUBMITTAL REQUIREMENTS - Within ten (10) days after receipt of contract award, the contractor shall submit an acceptable performance bond, payment bond and certificate of insurance. Within fifteen (15) days after receipt of notice of award, the contractor shall provide an approved Accident Prevention Plan, Environmental Protection Plan and Quality
Control Plan. (See Sections 00 80 00.00 11, 01 57 20.00 11, and 01 45 04.00 11) Within ten
(10) days prior to commencement of work under this contract, the contractor shall submit to the
Contracting Officer’s Chief of Security, a list of all Personnel, Vehicles and Equipment that may be used during the construction work under this contract. (See Sections 00800)
M. PROJNET BIDDER INQUIRY
1. Prospective Bidders should submit questions concerning this Invitation for Bid via Bidder
Inquiry in ProjNet at www.projnet.org/projnet.
a. To submit and review inquiry items, prospective bidders will need to use the Bidder Inquiry
Key presented below and follow the instructions listed below the key for access. A prospective bidder who submits a comment /question will receive an acknowledgement of their comment/question via email. Another email to the same address will notify the prospective bidder once the reply is available for viewing.
b. The Solicitation Number is: W912EQ-19-B-0001 http://www.projnet.org/projnet
The Bidder Inquiry Key is: 8E3YR8-8GI653
c. Specific Instructions for First Time ProjNet Bid Inquiry Access:
(1.) From the ProjNet home page linked above, click on Quick Add on the upper right side of the screen.
(2.) Identify the Agency. This should be marked as USACE.
(3.) Key. Enter the Bidder Inquiry Key listed above.
(4.) Email. Enter the email address you would like to use for communication.
(5.) Click Continue. A page will then open saying that a user account was not found and will ask you to create one using the provided form.
(6.) Enter your First Name, Last Name, Company, City, State, Phone, Email, Secret
Question, Secret Answer, and Time Zone. Make sure to remember your Secret Question and Answer as they will be used from this point on to access the ProjNet system.
(7.) Click Add User. Once this is completed you are now registered within ProjNet and are currently logged into the system.
d. Specific Instructions for Future ProjNet Bid Inquiry Access:
(1.) For future access to ProjNet, you will not be provided any type of password. You will utilize your Secret Question and Secret Answer to log in.
(2.) From the ProjNet home page linked above, click on Quick Add on the upper right side of the screen.
(3.) Identify the Agency. This should be marked as USACE.
(4.) Key. Enter the Bidder Inquiry Key listed above.
(5.) Email. Enter the email address you used to register previously in ProjNet.
(6.) Click Continue. A page will then open asking you to enter the answer to your Secret
Question.
(7.) Enter your Secret Answer and click Login. Once this is completed you are now l logged into the system.
2. The Bidder Inquiry System will be unavailable for new inquires Seven (7) business days prior to bid opening in order to ensure adequate time is allotted to form an appropriate response and amend the solicitation if necessary.
3. Bidders are requested to review the specification in its entirety, review the Bidder Inquiry
System for answers to questions prior to submission of a new inquiry.
4. The call center operates weekdays from 8AM to 5PM U.S. Central Time Zone (Chicago). The telephone number for the Call Center is 800-428-HELP.
5. Oral explanations or instructions are not binding. Any information given to a bidder/offeror which impacts the bid/offer will be given in the form of a written amendment to the solicitation.
(End of Summary of Changes)