Amendment_00001_Miscellaneous_Repairs.pdf
PDF 2 MB Posted
- Attached to
- Miscellaneous Repairs Federal contract opportunity
- Solicitation number
- W912EQ-18-R-0002
About this file
Amendment 00001
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| AMND_0005.pdf | ||
| Amendment_00004.pdf | ||
| AMND_003.pdf | ||
| W912EQ18R0002-0002.pdf | ||
| PLANS_Ramsey_Creek_TO.pdf | ||
| Ramsey_Creek_Task_Order_.pdf | ||
| Technical_Specifications.pdf | ||
| Drawings_&_Sketches.pdf | ||
| W912EQ18R0002_Solicitation.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
X
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE PAGE OF PAGES
J 1 34
2. AMENDMENT/MODIFICATION NO.
00001
3. EFFECTIVE DATE
14-Feb-2018
4. REQUISITION/PURCHASE REQ. NO.
W38XGR73471186
5. PROJECT NO.(If applicable)
6. ISSUED BY CODE W912EQ 7. ADMINISTERED BY (Ifother than item 6) CODE
US ARMY ENGINEER DISTRICT, MEMPHIS
KIMBERLY DANIEL-RAY
167 N MAIN STREET
MEMPHIS TN 38103-1894
See Item 6
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) 9A. AMENDMENT OF SOLICITATION NO.
W912EQ18R0002
X 9B. DATED (SEE ITEM 11)
14-Feb-2018
10A. MOD. OF CONTRACT/ORDER NO.
CODE FACILITY CODE
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt ofthis amendment prior to the hour and date specified in the solicitation or as amended by one ofthe following methods:
(a) By completing Items 8 and 15, and returning 1 copies ofthe amendment; (b) By acknowledging receipt ofthis amendment on each copy ofthe offer submitted;
or (c) By separate letter or telegramwhich includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. Ifby virtue ofthis amendment you desire to change an offer already submitted, such change may be made by telegramor letter, provided each telegramor letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Miscellaneous Repairs is amended as follows : Changes to SF 1442 ( Blocks 10, 11, 13A), Section 00010 - Soliciation Contract Form, Instructions to Offerors, Section 00100, Section 00700 - Contract Clauses, Section 00800 - Special Contract Requirement, Technical Specifications and Ramsey Creek Plans.
Except as provided herein, all terms and conditions ofthe document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED
TEL:
16B. UNITED STATES OF AMERICA
EMAIL:
16C. DATE SIGNED
(Signature of person authorized to sign)
BY
(Signature of Contracting Officer)
EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
30-105-04 STANDARD FORM 30 (Rev. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
1. SF 1442 Block 10
MISCELLANEOUS REPAIRS AT VARIOUS LOCATIONS IN THE MISSISSIPPI RIVER DISTRICT to
MISCELLANEOUS REPAIRS AT VARIOUS LOCATIONS IN THE MEMPHIS RIVER DISTRICT
The project is a Multiple Award Task Order Contract (MATOC) for various locations throughout the Memphis
District. Typical construction task orders may include levee embankment repairs, road gravel surfacing, channel bank riprap armoring, culvert installation/replacement and maintenance of existing projects w within the Memphis District. The work on each task order will consist of furnishing all plant, labor and materials for the work to be performed. Specific items of work may include, but not be limited to: clearing, stripping, grubbing; debris disposal; borrow pit development and, channel excavation, stockpiling of material, processing of fill material for moisture control, embankment construction, compaction; placement of geotextile, gravel surfacing, bedding material, riprap (grouted and un-grouted); culvert installation/replacement; establishment of turf and any incidental related work according to the base MATOC specifications and supplemental specifications and plans for each individual Task Order. The project will consist of a base year and four (4) option years. The North American Industry Classification System (NAICS) code for this acquisition is 237990.
The small business size standard is $ 36.5M.The estimated average value of the work, including all Task Orders, Pursuant to Section 8(a) of the Small Business Act (15 U.S.C. 637(a) (1)), the Small Business Administration
(SBA) accepts for competition in the 8(a) program, Multiple Award Task Order Contract (MATOC) at
Multiple locations within the boundaries of the Memphis District which encompass the states of Arkansas, Illinois, Kentucky, Mississippi, Missouri and Tennessee. This project will consist of a base year and four (4) option years. The estimated average value of the work, including all Task Orders, is $3,200,000.00 per year.
2. SF 1442 Block 11
The performance period code has changed from Negotiable to Mandatory.
3. SF 1442 Block 13.A.
A. Sealed offers in original and 4 copies to perform the work required are due at the place specified in Item 8 by 1:30
P.M. local time by 16 MAR 2018.
4. SECTION 00010 - SOLICITATION CONTRACT FORM- Page 3
The following have been modified:
The BID SCHEDULE has been removed in its entirety and this is the new BID
SCEDHULE.
OFFERORS SCHEDULE
MULTIPLE AWARD TASK ORDER CONTRACT (MATOC)
FOR MISCELLANEOUS REPAIRS AT
VARIOUS LOCATIONS WITHIN THE MEMPHIS DISTRICT
This MATOC contract will be awarded based on evaluation factors mentioned in the following announcement. The prices entered in the Offerors schedule will be used as one of the evaluation factors for the MATOC selection.
These unit prices for Miscellaneous Repairs will be used for all task orders awarded under this contract for the entire Memphis District as shown in
Drawings Number 1 of the “Drawings & Sketches.pdf”. A schedule of the unit price work is contained in Standard Form SF 1442, "Solicitation, Offer and
Award."
BID SHEET BASE YEAR
Each Task Order of this MATOC will be awarded as one job with unit prices required for specifically selected work. A schedule of the unit price work is contained in Standard Form SF 1442, "Solicitation, Offer and Award." See
Contract Clauses, "FAR 52.211-18, Variation in Estimated Quantity" and "FAR
52.236-16, Quantity Surveys," "DFARS 52.236-7008, Contract Prices."
ITEM DESCRIPTION Estimated
Quantity Unit
Unit
Price Amount
0001 Mobilization and Demobilization XX JA XXX.XX $ XXX.XX
0002 Environmental Protection XX JA XXX.XX $ XXX.XX
0003 Demolition XX JA XXX.XX $ XXX.XX
0004 Remobilization XX MI XXX.XX $ XXX.XX
0005 Storm Water Pollution Prevention
0005A Storm Water Pollution Prevention Plan XX JA XXX.XX $ XXX.XX
0005B Silt Fence 165 LF $
0005C Erosion Control Berm 165 LF $
0005D Temporary Environmental Seeding 3 AC $
0005E Construction Exit XX EA XXX.XX $ XXX.XX
0006 Clearing XX AC XXX.XX $ XXX.XX
0007 Grubbing XX AC XXX.XX $ XXX.XX
0008 Stripping 2 AC $
0009 Excavation 1655 CY $
0010 Geogrid XX SY XXX.XX $ XXX.XX
0011 Geotextile 85 SY $
ITEM DESCRIPTION Estimated
Quantity Unit
Unit
Price Amount
0012 Corrugated Metal Pipe (CMP), XX-inch XX LF XXX.XX $ XXX.XX
0013 Polymer Coated CMP, XX-inch XX LF XXX.XX $ XXX.XX
0014 Flared End Section, XX-inch XX EA XXX.XX $ XXX.XX
0015 Flap Gate, XX-inch XX EA XXX.XX $ XXX.XX
0016 Bedding Material XX TN XXX.XX $ XXX.XX
0017 Aggregate Surfacing XX TN XXX.XX $ XXX.XX
0018 Riprap, R-XXX XX TN XXX.XX $ XXX.XX
0019 Grout XX CY XXX.XX $ XXX.XX
0020 Embankment, Semi-compacted 1335 CY $
0021 Embankment, Compacted 1335 CY $
0022 Additional Borrow XX CY XXX.XX $ XXX.XX
0023 Establishment of Turf 3 AC $
Grand Total Items 0001 thru 0023 $
ITEM DESCRIPTION Estimated Unit
Quantity Unit Price Amount
0024 Mobilization and Demobilization XX JA XXX.XX $ XXX.XX
0025 Environmental Protection XX JA XXX.XX $ XXX.XX
0026 Demolition XX JA XXX.XX $ XXX.XX
0027 Remobilization XX MI XXX.XX $ XXX.XX
0028 Storm Water Pollution Prevention
0028A
0028B
Storm Water Pollution Prevention
Silt Fence
Plan XX
JA
LF
XXX.XX $ XXX.XX
0028C Erosion Control Berm 165 LF $
0028D Temporary Environmental Seeding 3 AC $
0028E Construction Exit XX EA XXX.XX $ XXX.XX
0029 Clearing XX AC XXX.XX $ XXX.XX
0030 Grubbing XX AC XXX.XX $ XXX.XX
0031 Stripping 2 AC $
0032 Excavation 1655 CY $
0033 Geogrid XX SY XXX.XX $ XXX.XX
0034 Geotextile 85 SY $
0035 Corrugated Metal Pipe (CMP), XX-inch XX LF XXX.XX $ XXX.XX
0036 Polymer Coated CMP, XX-inch XX LF XXX.XX $ XXX.XX
0037 Flared End Section, XX-inch XX EA XXX.XX $ XXX.XX
0038 Flap Gate, XX-inch XX EA XXX.XX $ XXX.XX
0039 Bedding Material XX TN XXX.XX $ XXX.XX
0040 Aggregate Surfacing XX TN XXX.XX $ XXX.XX
0041 Riprap, R-XXX XX TN XXX.XX $ XXX.XX
0042 Grout XX CY XXX.XX $ XXX.XX
0043 Embankment, Semi-compacted 1335 CY $
0044 Embankment, Compacted 1335 CY $
0045 Additional Borrow XX CY XXX.XX $ XXX.XX
0046 Establishment of Turf 3 AC $
Grand Total Items 0024 thru 0046 $ unt
0052 Clearing XX AC XXX.XX $ XXX.XX
0053 Grubbing XX AC XXX.XX $ XXX.XX
0054 Stripping 2 AC $
0055 Excavation 1655 CY $
0056 Geogrid XX SY XXX.XX $ XXX.XX
0057 Geotextile 85 SY $
0058 Corrugated Metal Pipe (CMP), XX-inch XX LF XXX.XX $ XXX.XX
0059 Polymer Coated CMP, XX-inch XX LF XXX.XX $ XXX.XX
0060 Flared End Section, XX-inch XX EA XXX.XX $ XXX.XX
0061 Flap Gate, XX-inch XX EA XXX.XX $ XXX.XX
0062 Bedding Material XX TN XXX.XX $ XXX.XX
0063 Aggregate Surfacing XX TN XXX.XX $ XXX.XX
0064 Riprap, R-XXX XX TN XXX.XX $ XXX.XX
ITEM DESCRIPTION Estimated Unit
Quantity Unit Price Amo
0047 Mobilization and Demobilization XX JA XXX.XX $ XXX.XX
0048 Environmental Protection XX JA XXX.XX $ XXX.XX
0049 Demolition XX JA XXX.XX $ XXX.XX
0050 Remobilization XX MI XXX.XX $ XXX.XX
0051 Storm Water Pollution Prevention
0051A Storm Water Pollution Prevention Plan XX JA XXX.XX $ XXX.XX
0051B Silt Fence 165 LF $
0051C Erosion Control Berm 165 LF $
0051D Temporary Environmental Seeding 3 AC $
0051E Construction Exit XX EA XXX.XX $ XXX.XX
ITEM DESCRIPTION Estimated Unit
Quantity Unit Price Amount
0065 Grout XX CY XXX.XX $ XXX.XX
0066 Embankment, Semi-compacted 1335 CY $
0067 Embankment, Compacted 1335 CY $
0068 Additional Borrow XX CY XXX.XX $ XXX.XX
0069 Establishment of Turf 3 AC $
Grand Total Items 0047 thru 0069 $
BID SHEET OPTION YEAR 3
Quantity Unit
Unit
Price Amount
0070 Mobilization and Demobilization XX JA XXX.XX $ XXX.XX
0071 Environmental Protection XX JA XXX.XX $ XXX.XX
0072 Demolition XX JA XXX.XX $ XXX.XX
0073 Remobilization XX MI XXX.XX $ XXX.XX
0074 Storm Water Pollution Prevention
0074A Storm Water Pollution Prevention Plan XX JA XXX.XX $ XXX.XX
0074B Silt Fence 165 LF $
0074C Erosion Control Berm 165 LF $
0074D Temporary Environmental Seeding 3 AC $
0074E Construction Exit XX EA XXX.XX $ XXX.XX
0075 Clearing XX AC XXX.XX $ XXX.XX
0076 Grubbing XX AC XXX.XX $ XXX.XX
0077 Stripping 2 AC $
0078 Excavation 1655 CY $
0079 Geogrid XX SY XXX.XX $ XXX.XX
0080 Geotextile 85 SY $
0081 Corrugated Metal Pipe (CMP), XX-inch XX LF XXX.XX $ XXX.XX
0082 Polymer Coated CMP, XX-inch XX LF XXX.XX $ XXX.XX
0083 Flared End Section, XX-inch XX EA XXX.XX $ XXX.XX
0084 Flap Gate, XX-inch XX EA XXX.XX $ XXX.XX
0085 Bedding Material XX TN XXX.XX $ XXX.XX
0086 Aggregate Surfacing XX TN XXX.XX $ XXX.XX
0087 Riprap, R-XXX XX TN XXX.XX $ XXX.XX
0088 Grout XX CY XXX.XX $ XXX.XX
0089 Embankment, Semi-compacted 1335 CY $
0090 Embankment, Compacted 1335 CY $
0091 Additional Borrow XX CY XXX.XX $ XXX.XX
0092 Establishment of Turf 3 AC $
Grand Total Items 0070 thru 0092 $
BID SHEET OPTION YEAR 4
Quantity Unit
Unit
Price Amount
0093 Mobilization and Demobilization XX JA XXX.XX $ XXX.XX
0094 Environmental Protection XX JA XXX.XX $ XXX.XX
0095 Demolition XX JA XXX.XX $ XXX.XX
0096 Remobilization XX MI XXX.XX $ XXX.XX
0097 Storm Water Pollution Prevention
0097A Storm Water Pollution Prevention Plan XX JA XXX.XX $ XXX.XX
0097B Silt Fence 165 LF $
0097C Erosion Control Berm 165 LF $
0097D Temporary Environmental Seeding 3 AC $
0097E
0097B
Construction Exit
Silt Fence
XX
EA
LF
XXX.XX $ XXX.XX
0097C Erosion Control Berm 165 LF $
0097D Temporary Environmental Seeding 3 AC $
0097E Construction Exit XX EA XXX.XX $ XXX.XX
0098 Clearing XX AC XXX.XX $ XXX.XX
0099 Grubbing XX AC XXX.XX $ XXX.XX
0100 Stripping 2 AC $
0101 Excavation 1655 CY $
0102 Geogrid XX SY XXX.XX $ XXX.XX
0103 Geotextile 85 SY $
0104 Corrugated Metal Pipe (CMP), XX-inch XX LF XXX.XX $ XXX.XX
0105 Polymer Coated CMP, XX-inch XX LF XXX.XX $ XXX.XX
0106 Flared End Section, XX-inch XX EA XXX.XX $ XXX.XX
0107 Flap Gate, XX-inch XX EA XXX.XX $ XXX.XX
0108 Bedding Material XX TN XXX.XX $ XXX.XX
0109 Aggregate Surfacing XX TN XXX.XX $ XXX.XX
0110 Riprap, R-XXX XX TN XXX.XX $ XXX.XX
0111 Grout XX CY XXX.XX $ XXX.XX
0112 Embankment, Semi-compacted 1335 CY $
0113 Embankment, Compacted 1335 CY $
0114 Additional Borrow XX CY XXX.XX $ XXX.XX
0115 Establishment of Turf 3 AC $
Grand Total Items 0093 thru 0115 $
TOTAL CONTRACT AMOUNT $
Note that work items included on each task order will vary. Refer to the task order bid schedule for a complete listing of work items included with that task order. Refer to SECTION 01 22 00.00 11 MEASUREMENT AND PAYMENT for additional information on items listed above.
NOTE 1: Offerors shall furnish unit prices for all items listed on the schedule of offerors items, which require unit prices and have an estimated quantity. If the offeror fails to insert a unit price in the appropriate blank for required items, but does furnish an extended total or an estimated amount for such items, the Government will deem his unit price to be the quotient obtained by dividing the extended estimated amount for that line item by the quantity. IF THE OFFEROR OMITS BOTH THE
UNIT PRICE AND THE EXTENDED ESTIMATED AMOUNT FOR ANY ITEM, THIS OFFER WILL BE
DECLARED NONRESPONSIVE.
In the event there is a difference between a unit price and the extended total, the unit price will be held to be the intended offer. If the offeror shows only the total price but fails to enter a unit price, the total divided by the estimated quantity will be held to be the intended unit price.
Any offer price for items indicated above which are unbalanced as to price may be rejected as non-responsive. An unbalanced offer is one which is based on price significantly less than cost for some work and price which is significantly overstated for other work.
Each task order award will be made as a whole to one offeror.
AC = Acre CF = Cubic Feet CY = Cubic Yard
DH = Miles EA = Each FC = 1000 Cubic Feet
FT = Foot HF = 100 Feet HH = 100 Cubic Feet
HL = 100 Linear Ft HR = Hours HS = 100 Square Feet
HY = 100 Yards LB = Pound LF = Linear Foot
LH = Labor Hour JA = Job (lump sum) LY = Linear Yard
MI = Miles SB = Square Mile SF = Square Foot
SQ = Square SY = Square Yard TL = 1000 Linear Feet
TN = Net Ton UN = Unit YD = Yard
YL = 100 Linear Yards YM = Cubic Yards Per Mile
All quantities are estimated except where unit is given as "JA" or "EA".
NOTE 2: If a offer or modification to an offer based on unit prices is submitted and provides for a job adjustment to the total estimated cost, the application of the job adjustment to each unit price, including job units, in bid schedule must be stated, or, if it is not stated, the offeror agrees that the job adjustment shall be applied on a pro rata basis to every unit price in the bid schedule.
NOTE 3: Bidders are cautioned to read Contract Clause entitled "DFAR 252.204-7004, Alternate A, System for Award Management (FEB 2014) located in Section 00 70 00.00
11 CONTRACT CLAUSES.
5. Instructions to Offerors ( all changes are highlighted in red)
INSTRUCTIONS TO OFFERORS
PROPOSAL SUBMISSION REQUIREMENTS, EVALUATION CRITERIA, AND BASIS OF AWARD – LOWEST
PRICE TECHNICALLY ACCEPTABLE (Multiple Award)
PROPOSAL FORMAT AND SUBMITTAL REQUIREMENTS
1.0 OVERVIEW
1.1 This Request for Proposal (RFP) solicits for a Multiple Award Task Order Construction Contract (MATOC) for Miscellaneous
Repairs in support of the Corps of Engineers. This solicitation is issued for a competitive 8(a) set- aside acquisition. USACE, Memphis
District, intends to award at least 2 and no more than 3 contracts. The total estimated contract capacity is $16,000,000. The minimum task order limitation is $20,000 and the maximum task order limitation is $2,000,000.00. The duration of the MATCO contract, including options, will be either five years or whenever the maximum overall contract capacity is reached.
1.2 The result of this solicitation will be establishment of a MATOC with a single pool up to 3 awards. All task orders will be firm-fixed-price task orders. The geographic area for this contract will be within the following states: Arkansas, Illinois, Kentucky, Mississippi, Missouri, and Tennessee, and it is that the preponderance of the task orders will be within those states.
Therefore, this contract will be issued to contractors only within the above mentioned states. However, all MVD District may use this contract, which may include work outside of the above identified states. The seed project for this contract will be to the
Memphis District.
1.3 The purpose of these instructions are to establish uniform evaluation procedures by the Source Selection Evaluation Team for the development of a decision by the Source Selection Authority using the lowest-price technically acceptable (LPTA) process. In as much as the proposal shall describe the capability of the offeror to perform the resulting contract, the proposal shall be specific and complete in every detail as well as be prepared simply and economically, providing straightforward, concise delineation of capabilities to perform the contract. The proposal should be practical, legible, clear and coherent.
1.4 The Government will evaluate proposals submitted in accordance with the criteria described herein. The Government intends to select for the contract awards, without discussions, those responsible offerors whose proposals conform to this solicitation and are determined to be the lowest priced, technically acceptable offers. Award will be made on the basis of the lowest evaluated price of those proposals meeting or exceeding the acceptability standards for n o n -price technical factors.
1.5 The Government has scheduled a site visit for 27 February 2018 at 10:30 a.m. the POC: Mr. Damien McNew, Area
Engineer, Caruthersville, MO Area Office, contact number (901) 579-4708.
2.1 GENERAL PROPOSAL SUBMISSION INSTRUCTIONS
2.1.1. All offerors shall be required to submit a proposal with the minimum content as specified herein. Proposals without the minimum content may be rejected. Proposals must be received at the date and time indicated on Standard Form 1442 at the following address:
U.S. Army Engineer District, Memphis
ATTN: CECT-MVM- C /O Kimberly Daniel-Ray
167 N. Main St., Rm 669
Memphis, Tennessee 38103-1894
2.2 PROPOSAL FORMAT AND SUBMITTAL REQUIREMENTS
2.2.1. Printed Matter Submissions. Written material shall be on 8 ½ x 11 inch paper printed in Times New Roman, 12 point font. All text shall be typed single-spaced. Margins (1-inch) shall be clean and clear. If fold-out charts are unavoidable, and a r e to be utilized, all sheets shall be reproduced on no larger than 11 x 17 inch paper, and folded to an 8 ½ x 11 inch size with the title clearly visible at the bottom right corner.
2.2.2. Binders. Proposals shall be submitted in tabbed, three ring binders.
2.2.3. Electronic Submission. In addition to the required hard copies, all offerors shall also submit their proposal on a CD- ROM.
Written portions of the proposal should be in MS Word or Adobe Acrobat PDF format. The electronic version shall be either a single file tabbed in the same order as the hard copy or multiple files hyperlinked to a single table of contents. Drawings should be in
Microstation DGN. The schedule should be in a .xer format. Any portion of the proposal not available in electronic format, i.e. cut sheets, should be scanned in Adobe Acrobat PDF format, thus making it available electronically. The CD-ROM must be clearly labeled by solicitation number, project name, and offeror’ s name. The CD-ROM shall be marked with a label stating
“Unclassified//Controlled Unclassified Info.” In the event of any conflict between the electronic submission and the hard copy submission, the hard copy submission will govern and will be the material upon which the Government bases its evaluation and ultimately, its decision. Electronic media may be submitted in an un- editable Format.
2.2.4. Volume 1 and 2 shall be contained within separate binders and a CD ROM copy submitted in the following quantities.
2.2.5. Number of Sets of the Technical Proposal. Submit the ORIGINAL and FOUR (4) additional sets of the written
Technical Proposal, with each set separately packaged.
2.2.6. Format and Contents of the Technical Proposal and List of Tabs. The original and all copies of the technical proposal will be appropriately labeled as such. Each set shall be organized using the tabs specified in the following chart. Note: The main tabs directly correlate to the evaluation factors identified in section 2.2.7.
2.2.7. In order to be considered for award of a contract for the requirements of this solicitation, the offeror must submit a Technical Proposal with its offer. Failure to submit a complete Technical Proposal may result in the entire offer being rejected.
The Technical Proposal shall address of the following three factors:
TAB CONTENTS OF TECHNICAL PROPOSAL
Factor 1 Technical Plan
Factor 2 Experience
Factor 3 Past Performance
2.2.7.1. Volume I, Technical and Past Performance.
a. Factor 1, Technical Plan -50 page limit
b. Factor 2, Experience -30 page limit
c. Factor 3, Past Performance-20 page limit
2.2.7.1.1. The Technical Proposal narrative shall be written in a way to demonstrate a clear understanding of each of the contract requirements, but should not parrot the specifications.
2.2.7.1.2. The Proposal’s clarity, organization and cross referencing are mandatory. No material shall be incorporated by reference. General cross-references or cross referencing guides will not be considered appropriate.
2.2.7.1.3. The Technical Proposal shall not refer the reviewer to information contained in the Price proposal.
2.2.7.1.4. Past Performance - For each project submitted under Factor 3 Past Performance without a CPARS evaluation, the offeror shall provide a Past Performance Questionnaire. Each offeror shall provide a m i n i mu m of three (3) acceptable past performance ratings within the past 5 years. The Past Performance Questionnaire included in the solicitation is provided for the offeror or its team members to submit to the client for each project the offeror includes in its proposal for “Factor 3 -Past Performance”.
2.2.7.2. Volume II, Financials and Other Submissions
a. Price/Cost (No page limitations): Offeror must provide Bid Sheet for the contract and for Ramsey Creek Task Order reflecting each CLIN item cost and back-up data in sufficient detail for the Government to determine how the Offeror derived its final CLIN item cost. Additionally, the Offeror should list its Overhead, Profit and Bond rates.
b. Financial Data Form – (See Attached Form): Offeror must submit a completed form for itself and for each major subcontractor.
c. Table of contents, proposal cover letters, and tabs between proposal information do not count toward any page limitations in the proposal.
d. Detailed Submission Requirements for the Technical Proposal. The following is a detailed description of the information to be submitted under each TAB.
ADDITIONAL INFORMATION TO BE PROVIDED IN VOLUME 2.
2.2.7.2.1 Additional Requirements. The following information should be in a separate tab labeled “Additional
Requirements”:
a. A cover letter containing:
(1) Solicitation number, Name, address, federal tax identification, e-mail, and telephone and fax numbers of the
Offeror.
(2) Names, title, email, and telephone and fax numbers of persons authorized to negotiate on the Offeror’s behalf with t h e
Government in connection with this RFP.
(3) Name, title and signature of the person authorized to sign the proposal.
b. A statement specifying agreement with all terms, conditions and provisions included in the RFP. This must be signed by the offeror substantially as follows:
“Statement of Compliance. This offeror hereby certifies this proposal is in compliance with the solicitation and its requirements. There are no exceptions, deviations or differences.”
c. The Offer (the SF1442) duly executed with an original signature by an official authorized to bind the company. Include the Offeror’ s DUNS number in block 14.
d. Acknowledgement of all amendments to the RFP in accordance with the instructions on the Standard Form 30
(amendment form).
e. Completed Representations and Certifications section of the RFP. Contractors must be registered in the Systems for
Award Management at https://www.sam.gov/portal/public/SAM.
f. A financial statement and bank letter that verify that sufficient funds will be available to finance the work.
g. A Bond Surety Letter. Offeror must provide a letter or other documentation from a surety appearing on the Department of
Treasury Circular 570 (list of approved sureties) stating that the offeror is able to provide a bid bond and obtain performance and payment bonds should they win a contract. The letter should include the single bonding limit as well as the aggregate amount of bonding available to the offeror.
The minimum bonding requirements are as follows: Single: $500K Aggregate: $3.2M
Note: Anticipated projects range from $250K to $2M. Each task order will require payment and performance bonds for the full value of the task order.
2.2.7.2. 2.3. I A W FAR 19.809, the contracting officer may request a prewar survey of the 8(a) participant whenever considered useful. If the results of the preward survey or other information available to the contracting officer raise substantial doubt as to the participant’s ability to perform, the contracting officer must refer the matter to SBA for Certificate of Competency consideration under subpart 19.6. Note the 8(a) Program is outlined at www.sba.gov/8a to be an 8(a) small business concern.
2.4 INQUIRIES/QUESTIONS
2.4.1 Technical inquiries and questions relating to this solicitation are to be submitted via Bidder Inquiry in ProjNet at
(https://www.projnet.org) 7 calendar days prior to the date established for receipt of proposal. To submit and review inquiry items, prospective v e n d o r s will need to use the Bidder Inquiry Key presented below and follow the instructions listed below the key for access. A prospective vendor who submits a comment /question will receive an acknowledgement of their comment/question via email. Another email to the same address will notify the prospective vendor once the reply is available for viewing.
https://www.sam.gov/portal/public/SAM https://www.acquisition.gov/sites/default/files/current/far/html/Subpart%2019_6.html#wp1089863 http://www.sba.gov/8a http://www.sba.gov/8a
The Bidder Inquiry Key is: 63FN3G-7M2W2B
1. From the ProjNet home page linked above, click on Quick Add on the upper right side of the screen. Identify the
Agency. This should be marked as USACE.
2. Key. Enter the Bidder Inquiry Key listed above.
3. Email. Enter the email address you would like to use for communication.
4. Click Continue. A page will then open saying that a user account was not found and will ask you to create one using the provided form.
5. Enter your First Name, Last Name, Company, City, State, Phone, Email, Secret Question, Secret Answer, and Time
Zone. Make sure to remember your Secret Question and Answer as they will be used from this point on to access the
ProjNet system.
6. Click Add User. Once this is completed you are now registered within ProjNet and are currently logged into the system.
Offerors are requested to review the specification in its entirety, and review the Bidder Inquiry System for answers to questions prior to submission of a new inquiry.
The ProjNet call center operates weekdays from 8AM to 5PM U.S. Central Time Zone (Chicago) or by appointment for OCONUS. The telephone number for the Call Center is 1-800-428-HELP. Email to staff@rcesupport.com.
2.5. VOLUME I, SECTION I – TECHNICAL.
2.5.1. FACTOR 1, TECHNICAL PLAN: Sub factor (a) – Technical Approach - The offeror must submit a Technical Plan describing the offeror’s management and technical approach to complete the work, based upon the accompanying Task Order –
Ramsey Creek Scour Repair, Scott Co, Missouri and the sample slide repair described below.
2.5.1.1. The Technical Plan should address the offeror’ s plan to perform a typical levee slide repair in accordance with Sketch
(A) Geogrid Restoration and Sketch (C) Geogrid Restoration as shown ( FBO attachment labeled Drawings & Sketches.pdf)
Offerors may assume the following project description for developing their Technical Plan
a. Shallow slide on riverside levee slope
b. Slide mass consists primarily of high-plasticity ("fat") clays (classifying as CH under the Unified Soil Classification
System)
c. Slide approximately 150 feet in length (measured parallel to levee centerline)
d. Scarp face of slide located within 2 feet (horizontal) of levee crown
e. Toe of slide located within 1 foot (vertical) of levee toe
f. Estimated quantity of material to be excavated is approx. 2,600 cubic yards
g. Estimated quantity of geogrid to be installed is approx. 5,500 square yards
h. Performance Period and Monthly Anticipated Adverse Weather Delay assumed to be the same as stated in the
Accompanying Task Order – Ramsey Creek Scour Repair, Scott Co, Missouri.
2.5.1.2. Assume items 2.5.1. And 2.5.1.1. Described above are to be performed concurrently.
2.5.1.3. The Technical Plan shall include the offeror’ s management plan describing its (1) approach for providing sufficient technical resources to successfully complete multiple projects; and (2) description of the work that the prime contractor offeror intends to self-perform. This description shall be clearly stated, complete and accurate. Per FAR Part 52.219- 14(c) (3), the offeror shall perform at least 15% of the cost of the contract, not including the cost of materials, with its own employees. The management plan must clearly state how the offeror intends to perform at least 15% of the contract work. If the offeror is part of a joint venture or partnership, then this description shall include a clearly stated, complete and accurate description of the work to be performed by each member of that joint venture or partnership; (3) a plan for providing in a timely manner appropriate resources (labor, equipment and materials) in order to perform the project work in an expeditious, quality and safe manner. This information shall include a project schedule of sufficient detail to illustrate the offeror’s ability to complete the work within the period of performance.
The schedule shall demonstrate the sequence of work, durations, and milestones for completion of the key features of work and completion of all work within the time allowed for completion. This plan shall be specific to this solicitation and address the manner in which the offeror will accomplish the work including riprap placement, handling/processing excavated material, placement & compaction of fill material, installation of geogrid, and other features of work necessary to complete the contract.
Proposed construction methods shall be consistent with standard practices for each item of work.
mailto:staff@rcesupport.com
2.5.1.4. Subfactor (b) – Subcontracting – The offeror must submit the extent of anticipated subcontractor involvement as well as its plan for the integration of subcontracting efforts into the offeror’ s management and technical approaches for successful performance of the project. The offeror shall identify all subcontractors that are to be employed in the performance of work that involves on-site management and work efforts. The types of work that each subcontractor would perform shall be identified.
SUBCONTRACTORS PERFORMING CRITICAL ELEMENTS OF THE WORK MUST BE ADDRESSED IN THE
MANAGEMENT PLAN: To have a subcontractor’s experience and past performance considered during the evaluation process, the offeror must submit a jointly signed, legally binding partnering agreement or Joint V e n t u r e agreement.
Please note, if funding is available, the Government may award the Ramsey Creek Scour Repair Task Order at the end of the Source Selection process, to the Offeror deemed to be the lowest price from the award pool of technically acceptable proposals.
A. Evaluation Criteria
Acceptable: Proposal meets the requirements of the solicitation. The proposal clearly complies with the criteria in the Submission
Requirements above and the requirements of the RFP Statement of Work, providing sufficient detail to demonstrate the feasibility of the offeror’ s approach to coordinate work on the project in general to meet schedule requirements and provide adequate quality construction (sub-item (is)). The proposal also clearly provides a logical and f e a s i b l e approach to demonstrate understanding of the schedule and quality construction requirements for responding to the Ramsey Creek task order as outlined in the proposal submission requirements for this factor.
Unacceptable: Proposal does not meet the requirements of the solicitation. The proposal does not clearly comply with all of the criteria in the Submission Requirements above and the requirements of the RFP Statement of Work, providing insufficient detail to demonstrate the feasibility of the offeror’ s approach to coordinate work on the project to meet schedule requirements and provide adequate quality construction in general.
2.5.2. FACTOR 2, EXPERIENCE: Offeror shall submit past experience with the general features of work as described in Section
01 11 00.00 11 Summary of Work and Section 01 22 00.00 11 Measurement and Payment specifically to include the following:
a. Experience in projects with at least 100 cubic yards of Compacted Embankment placed in lifts with moisture control and field verification testing to ensure the specified Standard Proctor compaction.
b. Experience placing at least 10,000 tons of riprap, any gradation, on a single project.
c. Experience placing at least 2,000 tons of riprap with a maximum stone size of 650 pounds or more on a single project.
2.5.2.1. Offeror shall provide documentation of at least three (3) projects consisting of work that is similar in character and sco p e to the work described in the solicitation. The documentation shall reflect the experience of the offeror and/or proposed team, including sub-contractors, on projects same/similar to that described in the solicitation. Offerors should provide accurate, current, and complete contact information for clients provided in the project descriptions in Factor 2, EXPERIENCE. Data should be accurate, current, and complete. All projects submitted must have been underway or completed within the last 5 years.
A. Evaluation Criteria
Acceptable: Proposal meets the requirements of the solicitation. The proposal clearly complies with the criteria in the Submission
Requirements above and the requirements of the RFP Statement of Work, providing sufficient detail to demonstrate the feasibility of the Offeror’ s approach to coordinate work on the project in general to meet schedule requirements and provide adequate quality construction (sub-item (i)). The proposal also clearly provides a logical and f e a s i b l e approach to demonstrate understanding of the schedule and quality construction requirements for responding to the Ramsey Creek task order as outlined in the proposal submission requirements for this factor.
Unacceptable: Proposal does not meet the requirements of the solicitation. The proposal does not clearly comply with all of the criteria in the Submission Requirements above and the requirements of the RFP Statement of Work, providing insufficient detail to demonstrate the feasibility of the Offeror’ s approach to coordinate work on the project to meet schedule requirements and provide adequate quality construction in general.
2.5.3. FACTOR 3, PAST PERFORMANCE
2.5.3.1. Past Performance pertains to how well an offeror has performed past work related to the features of work in this solicitation. For the purpose of this solicitation, “past performance” is defined as an offeror’ s reputation for satisfying its customers by delivering (i) quality work (ii) in a timely manner (iii) at a reasonable cost (iv) in a safe working environment as well as its reputation for (v) reasonable and cooperative conduct, and (vi) overall commitment to customer satisfaction. The offeror shall complete a DATA SHEET FOR PERFORMANCE SURVEY and Past Performance Questionnaire (FORM PPQ) for a minimum of three (3) projects similar in character and the scope of work described in this solicitation and underway or completed within the last 5 years. (See attached form).
In addition to the above, the Government may review any other sources of information for evaluating past performance. Other sources, may include, but are not limited to, Past Performance information retrieved through the Past Performance Information
Retrieval System (PPIRS), including Contractor Performance Assessment Reporting System (CPARS). Using all CAGE/DUNS number of team members (partnership, joint venture, teaming arrangement, or parent company/subsidiary/affiliate) identifies in the offeror’ s proposal, inquiries of owner representative(s), Federal Awardee Performance and Integrity Information System (FAPIIS).
Electronic Subcontract Reporting System (eSRS), and any other known sources not provided by the offeror.
2.5.3.2. While the Government may elect to consider data from other sources, the burden of providing detailed, current, accurate and complete past performance information rests with the offeror. It is the offeror’s responsibility to ensure that the reference documentation is provided, as the Government may not make additional requests for past performance information from the references. The evaluation form should be provided to the Contract Specialist directly from the reference. The Government may contact references provided as part of the Factor for Experience, for information regarding the offeror’ s past performance on the project and for the purposes of assessing and verifying the scope of work performed.
2.5.3.3. For each project submitted under Factor 3 Past Performance without a CPARS evaluation, the offeror shall provide a Past Performance Questionnaire. Each offeror shall provide a minimum of three (3) acceptable past performance ratings within the past 5 years. The Past Performance Questionnaire included in the solicitation is provided for the offeror or its team members to submit to the client for each project the offeror includes in its proposal for “Factor 3-Past Performance”.
A. Submission Requirements
The Offeror shall submit information describing a minimum of three and a maximum of five examples of relevant experience related to Miscellaneous Repairs construction completed within the last five (5) years. The information must identify which entity performed the work, and describe how the work is relevant to this project. The value of projects included must be a minimum of $1M. The Government will review the sample construction projects provided by the
Offeror and evaluate the recent relevant specialized experience of the Offeror on projects similar in scope, size, and complexity to the projects identified in the solicitation. Offerors are encouraged to choose sample construction projects that closely resemble the scope, size, and complexity of the project identified in this solicitation. The Offeror shall list project experience to include the following criteria:
a. Location of the project
b. Duration of the project
c. Point of Contact for the project
d. Equipment utilized for the work being performed
e. Any work delays due to equipment
B. Evaluation Criteria
The Government will review the recency, as it pertains to past performance information, is a measure of the time that has elapsed since the past performance reference occurred. Recency is generally expressed as a time period during which past performance references are considered relevant. As well as evaluation criteria to the relevancy, as it pertains to past performance information, is a measure of the extent of similarity between the service/support effort, complexity, dollar value, contract type, and subcontract/teaming or other comparable attributes of past performance examples and the source RFP requirements; and a measure of the likelihood that the past performance is an indicator of future performance.
Acceptable: Based on the offeror’s performance record, the Government has a reasonable expectation that the offeror will successfully perform the required effort, or the offeror’s performance record is unknown. The offeror submitted relevant experience from the past 5 years. All past or current performance records must have overall ratings of satisfactory or above. The submitted past performance is relevant and within the past 5 years.
Unacceptable: Based on the offeror’s performance record, the Government has no reasonable expectation that the
Offeror will be able to successfully perform the required effort. The offeror did not submit relevant experience from the past 5 years. All past or current performance records did not receive an overall ratings of satisfactory or above. The submitted past performance is not relevant and within the past 5 years.
SOURCE SELECTION – PROPOSAL EVALUATION AND BASIS OF AWARD
1.1 INFORMAL SOURCE SELECTION PROCESS
All offers received in response to this solicitation will be evaluated in accordance with informal source selection procedures. The principal objective of this process is to select a responsible offeror who submits the
Lowest Price Technically Acceptable (LTPA) offer. The process is designed to ensure the impartial, equitable, and comprehensive evaluation of all technically acceptable, responsible proposals received in response to this particular solicitation.
(1) Source Selection Team
The Source Selection Team is established as a separate organization and management chain of command whose only purpose is to accomplish the objective above. The organization consists of a
Source Selection Authority (SSA) and a Source Selection Evaluation Board (SSEB). The organization is designed to ensure active ongoing involvement of appropriate contracting, technical, l o g is s t is c s, legal, price analysis, small business, and other functional staff management expertise.
(2) Source Selection Procedure
The source selection procedures will begin with an initial review of proposals and continue with a technical and price evaluation conducted by the SSEB. The SSEB shall evaluate the proposals based solely on the evaluation criteria identified above. The results of the SSEB evaluations will be presented to the SSA, who will make the final source selection decision or determine whether it is appropriate to engage in clarifications or communications prior to the establishment of a competitive range, or to establish a competitive range and conduct discussions with those offerors that are included in the competitive range. The Government intends to award without discussions. All communications leading to establishment of the competitive range will be conducted in accordance with FAR Part 15.306(b).
If a competitive range is established, discussions will be conducted with offerors who are included in the competitive range. After conclusion of discussions and receipt of final revised proposals (if applicable), the SSEB will complete the evaluation and establish the final we i g h t ed technical ratings and present them to the SSA. The SSA will then review the proposals based on the established criteria and other factors considered, and make the final source selection decision.
The proposals received in response to this solicitation will be evaluated individually to select the most advantageous proposal. To be considered acceptable, each offeror shall specifically address each of the evaluation factors listed above. Sufficient detail shall be provided, citing specific data as may be required, such that the proposal may be adequately evaluated. The proposal must show clearly that the offeror has an understanding of the work tasks required and has the capability and responsibility to accomplish the work.
The Government is not responsible during the evaluation for information which is not located in the appropriate proposal section. To ensure the evaluation credit is appropriately received for proposal material submitted, do not incorporate by reference documents not contained in the proposal. References to sections of the proposal shall be by specific paragraph number (and name, if applicable), page number, and section.
2.00 BASIS FOR AWARD
The Government intends to select, without discussions, the responsible offeror(s) for contract awards whose proposal conforms to this solicitation and is determined to be the lowest priced, technically acceptable proposals (LPTA).
Award will be made to the offeror(s) submitting the lowest evaluated price from the proposals meeting or exceeding the acceptability standards for the non-price technical factors.
The non-price technical factors to be considered are Technical Plan, Experience, and Past Performance. Each technical factor will receive one of two ratings: Acceptable or Unacceptable. Offerors receiving one Unacceptable rating will be deemed overall Unacceptable and will not be considered for award. Offerors must receive Acceptable on all non-price factors to be considered for award.
CONSTRUCTION CONTRACTOR DATA DATE:
Firm Name and Telephone Number Main Office Address (Street, City, and State)
Branch Offices Services
Rendered
Construction
Design
Organization
Individual Joint Venture
Partnership Corporation
Date Organized Date Incorporated:
State:
Names of Officers and Other Key Personnel
I – PRESENT PAYROLL PERSONNEL (List Number of Each Category Below)
Partners:
Officers:
Other
Remainder: Subtotal Permanent:
Maximum Personnel at Any
Time: Date:
Total:
II—EQUIPMENT OWNED III—FINANCIAL DATA AS
OF (DATE): Present Value ($)
Current Assets:
Acquisition Cost ($) Current Liabilities:
Net Worth:
IV—TOTAL VALUE OF CONSTRUCTION AND DEMOLITION
WORK IN PAST 6 YRS EXCLUSIVE OF JOINT VENTURE (LIST
MOST RECENT FIRST)
V—LARGEST JOB
EVER CONTRACTED
(If Other Than in Past Five Years)
$ LARGEST JOB IN PAST 5 YRS Contract
Amount: Date:
Description:
Owner:
$ Contract
Amount:
Date:
Description:
Owner:
Avg. Annual Income
VI—TYPE OF WORK IN WHICH FIRM SPECIALIZES
NAME AND POSITION/TITLE OF PERSON SIGNING SIGNATURE
See attachment for explanations or detailed description of item(s) reported above.
USACE PAST PERFORMANCE QUESTIONNAIRE (Form PPQ-0)- Attachment 2
CONTRACT INFORMATION (Contractor to complete Blocks 1-4)
1. Contractor Information
Firm Name: CAGE Code:
Address: DUNs Number:
Phone Number:
Email Address:
Point of Contact: Contact Phone Number:
2. Work Performed as: Prime Contractor Sub Contractor Joint Venture Other (Explain)
Percent of project work performed:
If subcontractor, who was the prime (Name/Phone #):
3. Contract Information
Contract Number:
Delivery/Task Order Number (if applicable):
Contract Type: Firm Fixed Price Cost Reimbursement Other (Please specify):
Contract Title:
Contract Location:
Award Date (mm/dd/yy):
Contract Completion Date (mm/dd/yy):
Actual Completion Date (mm/dd/yy):
Explain Differences:
Original Contract Price (Award Amount):
Final Contract Price (to include all modifications, if applicable):
Explain Differences:
4. Project Description:
Complexity of Work High Med Routine
How is this project relevant to project of submission? (Please provide details such as similar equipment, requirements, conditions, etc.
CLIENT INFORMATION (Client to complete Blocks 5-8)
5. Client Information
Name:
Title:
Phone Number:
Email Address:
6. Describe the client’s role in the project:
7. Date Questionnaire was completed (mm/dd/yy):
8. Client’s Signature:
PLEASE CIRCLE THE ADJECTIVE RATING WHICH BEST REFLECTS YOUR
EVALUATION OF THE CONTRACTOR'S PERFORMANCE.
E = EXCELLENT, VG = VERY GOOD, S = SATISFACTORY, M =
MARGINAL, U = UNSATISFACTORY, N= NOT APPLICABLE
1. QUALITY:
a) Quality of technical data/report preparation efforts E VG S M U N
b) Ability to meet quality standards specified for technical performance
E VG S M U N
c) Timeliness/effectiveness of contract problem resolution without extensive customer guidance
E VG S M U N
d) Adequacy/effectiveness of quality control program and adherence to contract quality assurance requirements (without adverse effect on performance)
E VG S M U N
2. SCHEDULE/TIMELINESS OF PERFORMANCE:
a) Compliance with contract delivery/completion schedules including any significant intermediate milestones. (If liquidated damages were assessed or the schedule was not met, please address below)
E VG S M U N
b) Rate the contractor's use of available resources identified in the contract
E VG S M U N
3. CUSTOMER SATISFACTION:
a) To what extent were the end users satisfied with the project? E VG S M U N
b) Contractor was reasonable and cooperative in dealing with your staff
(including the ability to successfully resolve disagreements/disputes;
responsiveness to administrative reports, businesslike and communication)
E VG S M U N
c) To what extent was the contractor cooperative, businesslike, and concerned with the interests of the customer?
E VG S M U N
d) Overall customer satisfaction E VG S M U N
4. MANAGEMENTPERSONEL/LABOR:
a)…
This is the start of the file's text. The full file is on GovTribe.