W38XGR80532281

HARBOR DREDGING-VICINITY OF MCKELLAR LAKE HARBOR, MEMPHIS,TN (MILE 725 AHP)

The project consist of making or enlarging dredge cuts, construction of f ills, construction throughtout Harbors in Arkansas, Kentucky, Missouri and Tennessee under NAICS code 237990. The contractor shall deliver the dredge and attendant plant ready for operation in the vicinity of

McKellar Lake Harbor, Memphis, TN (Mile 725 AHP), or to any w ork site as may be directed. The dredge shall be not less than 24-inch nominal diameter discharge w ith no less than 3,200 contnuous horsepow er rating and no larger than 29-inch nominal diameter w ith a continous horsepow er rating of at less 6,000.

This project w ill be an unrestricted procurement w ith HUBZone Evaluation Preference w ith a total estimated contract amount of not to exceed

(NTE) $28,800,000.00

X

KIMBERLY S DANIEL-RAY 901-544-3358

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS

NEGOTIATED

24-Apr-2018

(RFP)

(IFB)

CALL:

B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

See Item 7

2. TYPE OF SOLICITATION

SEALED BID

3. DATE ISSUED

9. FOR INFORMATION A. NAME

SOLICITATION

NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)

Prescribed by GSA

FAR (48 CFR) 53.236-1(e)

11. The Contractor shall begin performance w ithin _______21 calendar days and complete it w ithin ________ calendar days after receiving aw ard, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________52.211-10

12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

X YES NO

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and __________0 copies to perform the w ork required are due at the place specif ied in Item 8 by ___________ local time ______________07 May 2018 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.

shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

B. An offer guarantee X is, is not required.

C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than _______90 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NO.

7. ISSUED BY CODE

US ARMY ENGINEER DISTRICT, MEMPHIS

167 N MAIN STREET B202

MEMPHIS TN 38103-1894

W912EQ

PAGE OF PAGES

1 OF

CODE

(Title, identifying no., date):

12B. CALENDAR DAYS

01:30 PM (hour)

Sealed envelopes containing offers

5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.

8. ADDRESS OFFER TO (If Other Than Item 7)

FAX:TEL: TEL: FAX:

W912EQ18B0001 265

HARBOR DREDGE W912EQ18B0001

20B. SIGNATURE

(REV. 4-85)STANDARD FORM 1442 BACK

TO SIGN

NSN 7540-01-155-3212

SOLICITATION, OFFER, AND AWARD (Continued)

(Construction, Alteration, or Repair)

CODE FACILITY CODE

17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.

the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)

AMOUNTS SEE SCHEDULE OF PRICES

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN

OFFER (Type or print)

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

(4 copies unless otherwise specified)

CODE

(Insert any number equal to or greater than

20C. OFFER DATE

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY

(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)

See Item 14

(Include only if different than Item 14)16. REMITTANCE ADDRESS

30B. SIGNATURE

29. AWARD (Contractor is not required to sign this document.)

document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .

gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)

30C. DATE

(Type or print)

TEL: EMAIL:

31B. UNITED STATES OF AMERICA 31C. AWARD DATE

BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this28. NEGOTIATED AGREEMENT

(M ust be fully completed by offeror)OFFER

HARBOR DREDGE W912EQ18B0001 Page 2 of 265

Section 00100 - Bidding Schedule/Instructions to Bidders

INSTRUCTIONS TO BIDDERS

BIDDING SCHEDULE

Mississippi River and Harbors Dredge

BID SHEET BASE YEAR

Item Lot One Bid Estimated Unit Estimated

No. Description Quantity Unit Price Amount

0001 Rental of one fully operated hydraulic dredge with 24-inch ID pump discharge and attendant dredge plant including pipeline

0001AA First 1500 hours 1500 Hours $ $ _____

0001AB All over 1500 hours 300 Hours $ $

0001AC Additional Pipeline 8,000 Feet $ $

0002 Rental of dredge and attendant plant when dredging in the State of Missouri based on Missouri wages

0002AA First 200 hours 200 Hours $ $

0002AB All over 200 hours 100 Hours $___________ $____________

0003 Upstream Towing of dredge and attendant plant

0003AA First 170 miles 170 Miles $ $

0003AB All over 170 miles 100 Miles $ $ ______

0004 Downstream Towing of dredge and attendant plant

0004AA First 170 miles 170 Miles $ $

0004AB All over 170 miles 100 Miles $ $

0005 Mobilization and demobilization l Job Job Sum $

TOTAL BASE YEAR BID (24 INCH) $

HARBOR DREDGE W912EQ18B0001 Page 4 of 265

BID SHEET BASE YEAR

Item Lot Two Bid Estimated Unit Estimated

No. Description Quantity Unit Price Amount _

0006 Rental of one fully operated hydraulic dredge with 27-inch ID pump discharge and attendant dredge plant including pipeline

0006AA First 1186 hours 1186 Hours $ $

0006AB All over 1186 hours 237 Hours $ $

0006AC Additional Pipeline 8,000 Feet $ $

0007 Rental of dredge and attendant plant when dredging in the State of Missouri based on Missouri wages

0007AA First158 hours 158 Hours $ $

0007AB All over158 hours 79 Hours $___________ $____________

0008 Upstream Towing of dredge and attendant plant

0008AA First 170 miles 170 Miles $ $

0008AB All over 170 miles 100 Miles $ $

0009 Downstream Towing of dredge and attendant plant

0009AA First 170 miles 170 Miles $ $

0009AB All over 170 miles 100 Miles $ $

0010 Mobilization and demobilization 1 Job Job Sum $

TOTAL BASE YEAR BID (27 INCH) $

HARBOR DREDGE W912EQ18B0001 Page 5 of 265

BID SHEET BASE YEAR

No. Description Quantity Unit Price Amount _

0011 Rental of one fully operated hydraulic dredge with 29-inch ID pump discharge and attendant dredge plant including pipeline

0011AA First1028 hours 1028 Hours $ $

0011AB All over 1028 hours 205 Hours $ $

0011AC Additional Pipeline 8,000 Feet $ $

00012 Rental of dredge and attendant plant when dredging in the State of Missouri based on Missouri wages

0012AA First 137 hours 137 Hours $ $

0012AB All over 137 hours 69 Hours $___________ $____________

0013 Upstream Towing of dredge and attendant plant

0013AA First 170 miles 170 Miles $ $

0013AB All over 170 miles 100 Miles $ $

0014 Downstream Towing of dredge and attendant plant

0014AA First 170 miles 170 Miles $ $

0014AB All over 170 miles 100 Miles $ $

0015 Mobilization and demobilization 1 Job Job Sum $

TOTAL BASE YEAR BID (29 INCH) $

HARBOR DREDGE W912EQ18B0001 Page 6 of 265

BID SHEET OPTION YEAR ONE

Item Lot One Bid Estimated Unit Estimated

No. Description Quantity Unit Price Amount

1001 Rental of one fully operated hydraulic dredge with 24-inch ID pump discharge and attendant dredge plant including pipeline

1001AA First 1500 hours 1500 Hours $ $

1001AB All over 1500 hours 300 Hours $ $

1001AC Additional Pipeline 8,000 Feet $ $

1002 Rental of dredge and attendant plant when dredging in the State of Missouri based on Missouri wages

1002AA First 200 hours 200 Hours $ $

1002AB All over 200 hours 100 Hours $___________ $____________

1003 Upstream Towing of dredge and attendant plant

1003AA First 170 miles 170 Miles $ $

1003AB All over 170 miles 100 Miles $ $

1004 Downstream Towing of dredge and attendant plant

1004AA First 170 miles 170 Miles $ $

1004AB All over 170 miles 100 Miles $ $

1005 Mobilization and demobilization l Job Job Sum $

TOTAL OPTION YEAR ONE BID (24 INCH) $

HARBOR DREDGE W912EQ18B0001 Page 7 of 265

No. Description Quantity Unit Price Amount _

1006 Rental of one fully operated hydraulic dredge with 27-inch ID pump discharge and attendant dredge plant including pipeline

1006AA First 1186 hours 1186 Hours $ $

1006AB All over 1186 hours 237 Hours $ $

1006AC Additional Pipeline 8,000 Feet $ $

1007 Rental of dredge and attendant plant when dredging in the State of Missouri based on Missouri wages

1007AA First158 hours 158 Hours $ $

1007AB All over 158 hours 79 Hours $___________ $____________

1008 Upstream Towing of dredge and attendant plant

1008AA First 170 miles 170 Miles $ $

1008AB All over 170 miles 100 Miles $ $

1009 Downstream Towing of dredge and attendant plant

1009AA First 170 miles 170 Miles $ $

1009AB All over 170 miles 100 Miles $ $

1010 Mobilization and demobilization 1 Job Job Sum $

TOTAL OPTION YEAR ONE BID (27 INCH) $

HARBOR DREDGE W912EQ18B0001 Page 8 of 265

No. Description Quantity Unit Price Amount _

1011 Rental of one fully operated hydraulic dredge with 29-inch ID pump discharge and attendant dredge plant including pipeline

1011AA First 1028 hours 1028 Hours $ $

1011AB All over 1028 hours 205 Hours $ $

1011AC Additional Pipeline 8,000 Feet $ $

1012 Rental of dredge and attendant plant when dredging in the State of Missouri based on Missouri wages

1012AA First 137 hours 137 Hours $ $

1012AB All over 137 hours 69 Hours $___________ $____________

1013 Upstream Towing of dredge and attendant plant

1013AA First 170 miles 170 Miles $ $

1013AB All over 170 miles 100 Miles $ $

1014 Downstream Towing of dredge and attendant plant

1014AA First 170 miles 170 Miles $ $

1014AB All over 170 miles 100 Miles $ $

1015 Mobilization and demobilization 1 Job Job Sum $

TOTAL OPTION YEAR ONE BID (29 INCH) $

HARBOR DREDGE W912EQ18B0001 Page 9 of 265

BID SHEET OPTION YEAR TWO

Item Lot One Bid Estimated Unit Estimated

No. Description Quantity Unit Price Amount

2001 Rental of one fully operated hydraulic dredge with 24-inch ID pump discharge and attendant dredge plant including pipeline

2001AA First1500 hours 1500 Hours $ $

2001AB All over 1500 hours 300 Hours $ $

2001AC Additional Pipeline 8,000 Feet $ $

2002 Rental of dredge and attendant plant when dredging in the State of Missouri based on Missouri wages

2002AA First 200 hours 200 Hours $ $

2002AB All over 200 hours 100 Hours $___________ $____________

2003 Upstream Towing of dredge and attendant plan

2003AA First 170 miles 170 Miles $ $

20003AB All over 170 miles 100 Miles $ $

2004 Downstream Towing of dredge and attendant plant

2004AA First 170 miles 170 Miles $ $

2004AB All over 170 miles 100 Miles $ $

2005 Mobilization and demobilization l Job Job Sum $

TOTAL OPTION YEAR TWO BID (24 INCH) $

HARBOR DREDGE W912EQ18B0001 Page 10 of 265

No. Description Quantity Unit Price Amount _

2006 Rental of one fully operated hydraulic dredge with 27-inch ID pump discharge and attendant dredge plant including pipeline

2006AA First 1186 hours 1186 Hours $ $

2006AB All over 237 hours 237 Hours $ $

2006AC Additional Pipeline 8,000 Feet $ $

2007 Rental of dredge and attendant plant when dredging in the State of Missouri based on Missouri wages

2007AA First 158 hours 158 Hours $ $

2007AB All over 158 hours 79 Hours $___________ $____________

2008 Upstream Towing of dredge and attendant plant

2008AA First 170 miles 170 Miles $ $

2008AB All over 170 miles 100 Miles $ $

2009 Downstream Towing of dredge and attendant plant

2009AA First 170 miles 170 Miles $ $

2009AB All over 170 miles 100 Miles $ $

2010 Mobilization and demobilization 1 Job Job Sum $

TOTAL OPTION YEAR TWO BID (27 INCH) $

HARBOR DREDGE W912EQ18B0001 Page 11 of 265

No. Description Quantity Unit Price Amount _

2011 Rental of one fully operated hydraulic dredge with 29-inch ID pump discharge and attendant dredge plant including pipeline

2011AA First 1028 hours 1028 Hours $ $

2011AB All over 1028 hours 205 Hours $ $

2011AC Additional Pipeline 8,000 Feet $ $

2012 Rental of dredge and attendant plant when dredging in the State of Missouri based on Missouri wages

2012AA First 137 hours 137 Hours $ $

2012AB All over 137 hours 69 Hours $___________ $____________

2013 Upstream Towing of dredge and attendant plant

2013AA First 170 miles 170 Miles $ $

2013AB All over 170 miles 100 Miles $ $

2014 Downstream Towing of dredge and attendant plant

2014AA First 170 miles 170 Miles $ $

2014AB All over 170 miles 100 Miles $ $

2015 Mobilization and demobilization 1 Job Job Sum $

TOTAL OPTION YEAR ONE BID (29 INCH) $

TOTAL FOR ALL BID SCHEDULES $__________________________

HARBOR DREDGE W912EQ18B0001 Page 12 of 265

BIDDING SCHEDULE - Mississippi River, Harbors Dredge

NOTE: Bidders shall furnish unit prices for all items listed on the schedule of bid items which require unit prices. If the bidder fails to insert a unit price in the appropriate blank for required items, but does furnish an extended total or an estimated amount for such items, the Government will deem his unit price to be the quotient obtained by dividing the extended estimated amount for that line item by the quantity. IF THE

BIDDER OMITS BOTH THE UNIT PRICE AND THE EXTENDED ESTIMATED

AMOUNT FOR ANY ITEM, HIS BID WILL BE DECLARED NONRESPONSIVE.

Award will be made as a whole to one bidder.

All quantities are estimated except where unit is given as "job" or "each."

If a bid or modification to a bid based on unit prices is submitted and provides for a job sum adjustment to the total estimated cost, the application of the job sum adjustment to each unit price, including job sum units, in bid schedule must be stated, or, if it is not stated, the bidder agrees that the job sum adjustment shall be applied on a pro rate basis to every unit price in the bid schedules.

HARBOR DREDGE W912EQ18B0001 Page 13 of 265

Bid Data Sheet for Lease of One Cutterhead, Hydraulic, Pipeline Dredge, Fully Operated, with Attendant

Plant - Mississippi River and Harbors Dredge.

U.S. Army Corps of Engineers, Memphis District

167 North Main Street, B202

Memphis TN 38103-1894

In compliance with the above Invitation for Bids, the undersigned hereby proposes to furnish, deliver, and operate the following plant in strict accordance with the attached specifications:

One Cutterhead Hydraulic Pipeline Dredge and Attendant Plant with the following characteristics:

DREDGE NAME or NUMBER:________________________________________

a. Hull length (feet)

b. Draft (feet)

c. Length of dredge spuds (feet)

d. Maximum and Minimum dredging depth (feet)

e. Maximum effective dredge swing (feet)

f. Ladder length (feet)

g. Cutter motor, brake horsepower (hp)

DISCHARGE SIZE:

a. Discharge line, inside diameter (inches)

b. Pump discharge, inside diameter (inches)

MAIN ENGINE: Continuous brake horsepower applied to pump impeller (hp)

Model and Serial # _____________________________________

ATTENDANT PLANT:

Derrick Barge - Type

Dimensions - length, width, draft (feet)

Boom length ______ (feet)

Crane Barge - Type

Boom length _______(feet)

Spill Barge Dimensions - length, width, draft (feet)

Fuel Barge Dimensions - length, width, draft (feet)

BULLDOZERS(2) DOZER NO.1 DOZER NO.2

Make

Model

HARBOR DREDGE W912EQ18B0001 Page 14 of 265

Bid Data Sheet for Lease of One Cutterhead, Hydraulic, Pipeline Dredge, Fully Operated, with Attendant

Plant - Mississippi River and Harbors Dredge.

TENDERS (3)

Tender No.1

Name PROPELLING

Year Built ENGINES: PORT STBD

HULL: Make ______

Length (feet) Model ______

Molded Beam (feet) Serial No

Draft (feet) Brake HP

Tender No.2

Year Built ENGINES: PORT STBD

HULL: Make ______

Length (feet) Model ______

Tender No.3

Year Built ENGINES: PORT STBD

HULL: Make _____

Length (feet) Model ______

SURVEY/CREW BOAT (1)

OUTBOARD MOTORS (3) Motor 1 Motor 2 Motor 3

Horsepower

The plant was last operated at (location), in (month/year).

The plant may be inspected at (location).

The plant offered is owned by

HARBOR DREDGE W912EQ18B0001 Page 15 of 265

SECTION 00100

CONDITIONS AND NOTICES TO BIDDERS

A. BIDDING MATERIAL – Copies of the Solicitation, Specifications, and drawings forms are available by INTERNET ACCESS ONLY. All solicitation documents will be posted through the

(FedBizOpps) website at: https://www.fbo.gov. Prospective Bidders should submit technical questions concerning this Invitation for Bid via Bidder Inquiry in ProjNet at www.projnet.org/projnet. (See Paragraph M Below). All other inquiries should be emailed to the

Contract Specialist, Kimberly.S.Danielray@usace.army.mil

Submission of Bid

Mail to the USACE, Memphis District, 167 North Main, BLDG 202, Memphis TN 38103. Bid sent by commercial carrier shall be clearly marked on the outer envelope as containing a “Seal

Bid”. BIDS MUST BE RECEIVED PRIOR TO THE EXACT TIME SET FOR BID OPENING.

Hand carried bids must be carried USACE, Memphis District, 167 North Main, BLDG 681, Memphis TN 38103. All bids must be received prior to the exact time set for bid opening.

In an effort to reduce paperwork and reduce cost, all proposals shall be submitted electronically using the AMRDEC SAFE website located at: https://safe.amrdec.army.mil/safe/.

At the AMRDEC SAFE website, select the box "Click Here" on the side for Non-CAC Users.

The website will require offeror to enter Personal Information, upload files (PDF format required), and include a brief description with the IFB/RFP number. In Recipient Information type in the Contract Specialist and the Contracting Officer’s email address (see below) and click the “Add” tab. No other boxes are required to be checked. Click Upload, click I Agree to the SAFE Usage Policy, and you should see the spinning wheel that says “uploading”. Once uploading is complete, the website will tell you that your files were successfully (or unsuccessfully) uploaded. In order to complete the proposal submission you must check your email for further instructions. Once you verify your email address the Government will then be able to download the files. Contract Specialist, Ms. Kimberly Daniel-Ray, email:

Kimberly.S.Danielray@usace.army.mil, Contracting Officer, Priscilla G. Sweeney, email:priscilla.g.sweeney@usace.army.mil

NOTE: Save all emails received from SAFE.Team@amrdec.army.mil for your records.

AMRDEC SAFE WEBSITE IS NOT DESIGNED FOR LAST MINUTE SUMISSIONS OF

PROPSALS. YOU ARE ADVISED TO NOT WAIT UNTIL THE LAST MINUTE.

BID DOCUMENTS: The following documents must be submitted with a bid:

1. SF 1442, Solicitation, Offer and Award

2. Schedule of bids/prices

3. Representations and Certifications (Section 00600)

4. All amendments must be acknowledged

5. Bid Bond (Standard Form 24), if over $150,000

HARBOR DREDGE W912EQ18B0001 Page 16 of 265 https://www.fbo.gov/ http://www.projnet.org/projnet mailto:Kimberly.S.Danielray@usace.army.mil mailto:Kimberly.S.Danielray@usace.army.mil mailto:SAFE.Team@amrdec.army.mil

B. SITE VISITS – Bidders should inspect the job site prior to submitting a bid. Site Visits may be coordinated by mail or telephone (COLLECT CALLS NOT ACCEPTED) between the hours of 7:30 AM and 3:00 PM, exclusive of Federal holidays. The point of contact to schedule a site visit for this Invitation for Bids will vary depending on location of each task order. Christopher D.

Burroughs, Area Engineer, at 870-238-2983 or email Christopher.D.Burroughs@usace.army.mil.

There will be no organized site visits prior to the public opening of bids. See Section 00100, clause

52.236-27 Alt I, entitled “Site Visit (Construction)”.

C. CONDITIONS AFFECTING THE WORK - Bidders should visit the site and take such other steps as may be reasonably necessary to ascertain the nature and location of the work and the general and local conditions that can affect the work or the cost thereof. Failure to do so will not relieve bidders from the responsibility for estimating properly the difficulty or cost of successfully performing the work. The Government will assume no responsibility for any understanding or representations concerning conditions made by any of its officers or agents prior to the execution of the contract, unless included in the Invitation for Bids, the specifications or related documents. See Section 00700, clause 52.236-3, entitled “Site Investigation and

Conditions Affecting the Work”.

D. PUBLIC OPENING OF BIDS - Bids will be publicly opened at the time set for opening in the Invitation for Bids. Their content will be made public for the information of bidders and others interested, who may be present. As soon as practicable after bid opening, an abstract of bids will be available through our web page at: www.fbo.gov under Bid Results.

E. BIDDER'S ADDRESS - Prospective bidders should indicate in the offer, the address to which payment and/or correspondence should be mailed, if such address is different from that shown for the bidder on Standard Form 1442 Block 14.

F. AMENDMENTS PRIOR TO DATE SET FOR OPENING BIDS - The right is reserved as the interest of the Government may require, to revise or amend the specifications or drawings or both prior to the date set for opening bids. Such revisions and amendments, if any, will be announced by an amendment or amendments to this Invitation for Bids. If the revisions and amendments are of a nature which requires material changes in quantities or prices bid or both, the date set for opening bids may be postponed by such number of days as in the opinion of the issuing officer will enable bidders to revise their bids. In such cases, the amendment will include an announcement of the new date for opening bids. See Section 00100, clause 52.214-3, “Amendments to Invitations for Bids”.

G. NOTICE TO BIDDERS - NINETY DAY OFFER GUARANTEE (See SF 1442 Block 13d)

H. EXPLANATION OF PROVISION/CLAUSE NUMBERS UTILIZED IN THIS

SOLICITATION –

(1) Federal Acquisition Regulation (FAR) provisions/clauses are numbered as follows: 52.252-1.

(2) Defense Acquisition Regulation Supplement (DFARS) provisions/clauses are numbered as follows: 252.204-7000.

HARBOR DREDGE W912EQ18B0001 Page 17 of 265 mailto:Christopher.D.Burroughs@usace.army.mil http://www.fbo.gov/

(3) Army Federal Acquisition Regulation Supplement (AFARS), provisions/clauses are numbered as follows: 5152.237-9000.

(4) USACE Acquisition Instruction (UAI) provisions/clauses are numbered as follows: 52.249-

9000.

I. REQUIRED SYSTEM FOR AWARD MANAGEMENT REGISTRATION - By submission of a bid, the bidder acknowledges the requirement that a prospective awardee must be registered in the SAM database prior to award, during performance, and through final payment of any contract resulting from this solicitation. Lack of registration in the SAM database will make a bidder ineligible for award. Bidders and contractors may obtain information on registration and annual confirmation requirements by calling 1-866-606-8220, or at: http://www.sam.gov See

Section 00700, clause 252.204-7004 Alt A, “System for Award Management”.

Immediate Changes in System for Award Management (SAM) Registration

Process

The General Services Administration (GSA) has launched a new security measure (effective immediately) in the System for Award Management

(SAM) which requires every *NEW* contractor registrant to provide a written, notarized letter confirming the entity's Administrator that is authorized to register the entity in the SAM database, or to make changes to its registration.

J. BIDDER’S QUALIFICATIONS - To establish its responsibility, the bidder may be requested by the Government to submit a statement regarding his previous experience in performing comparable work, his business and technical organization, financial resources (including recent financial statements or audits), plant available to be used in performing the work and, if applicable, an approved sub-contracting plan in accordance with FAR 9.104-1. All documents relevant to establish a bidder’s responsibility shall be made available as soon as practicable after bid opening;

but, not later than 3 days after request by the Contracting Officer or the authorized Representative of the Contracting Officer.

K. NOTICE OF BONDS AND INSURANCE - The following bid/contract information is applicable only if the bid/contract is over one hundred fifty thousand dollars ($150,000):

(1) BID BONDS: This is applicable only if proposal is over one hundred fifty thousand dollars

($150,000). Each bidder shall submit with his bid a Bid Bond (Standard Form 24) with good and sufficient surety or sureties acceptable to the Government in the form of twenty percent (20%) of the bid price or three million dollars ($3,000,000) whichever is lesser. The bid bond penalty may be expressed in terms of a percentage or may be expressed in dollars and cents. See Section 00700, clause 52.228-1, entitled “Bid Guarantee”. BID BONDS shall be mailed or delivered prior to BID

OPENING.

(2) PERFORMANCE BONDS. The penal amount of the performance bond shall equal one hundred percent (100%) of the contract price. Bonds shall be received within ten (10) days after receipt of contract award. See Section 00700, clause 52.228-15, entitled “Performance and

Payment Bonds – Construction”.

HARBOR DREDGE W912EQ18B0001 Page 18 of 265 http://www.sam.gov/

(3) PAYMENT BONDS: Within ten (10) days after receipt of contract award to the bidder whom award is made, one (1) bond, with good and sufficient surety or sureties acceptable to the

Government, shall be furnished; namely a Payment Bond (Standard Form 25A). The penal amount of such bonds shall equal one hundred percent (100%) of the contract price. See Section 00700, clause 52.228-15, entitled “Performance and Payment Bonds – Construction”.

(4) INSURANCE: The accepted bidder shall provide adequate insurance, within ten (10) days after receipt of contract award. See Section 00800, entitled Insurance Requirements and Section

00 80 00.00 11, Special Contract Requirements --- Additional Insurance References.

L. POST AWARD SUBMITTAL REQUIREMENTS - Within ten (10) days after receipt of contract award, the contractor shall submit an acceptable performance bond, payment bond and certificate of insurance. Within fifteen (15) days after receipt of notice of award, the contractor shall provide an approved Accident Prevention Plan, Environmental Protection Plan and Quality

Control Plan. (See Sections 00 80 00.00 11, 01 57 20.00 11, and 01 45 04.00 11) Within ten

(10) days prior to commencement of work under this contract, the contractor shall submit to the

Contracting Officer’s Chief of Security, a list of all Personnel, Vehicles and Equipment that may be used during the construction work under this contract. (See Sections 00800)

M. PROJNET BIDDER INQUIRY

1. Prospective Bidders should submit questions concerning this Invitation for Bid via Bidder

Inquiry in ProjNet at www.projnet.org/projnet.

a. To submit and review inquiry items, prospective bidders will need to use the Bidder Inquiry

Key presented below and follow the instructions listed below the key for access. A prospective bidder who submits a comment /question will receive an acknowledgement of their comment/question via email. Another email to the same address will notify the prospective bidder once the reply is available for viewing.

b. The Solicitation Number is: W912EQ-18-B-0002

The Bidder Inquiry Key is: BW269F-6PAYNE

c. Specific Instructions for First Time ProjNet Bid Inquiry Access:

(1.) From the ProjNet home page linked above, click on Quick Add on the upper right side of the screen.

(2.) Identify the Agency. This should be marked as USACE.

(3.) Key. Enter the Bidder Inquiry Key listed above.

(4.) Email. Enter the email address you would like to use for communication.

(5.) Click Continue. A page will then open saying that a user account was not found and will ask you to create one using the provided form.

(6.) Enter your First Name, Last Name, Company, City, State, Phone, Email, Secret Question, Secret Answer, and Time Zone. Make sure to remember your Secret Question and Answer as they will be used from this point on to access the ProjNet system.

(7.) Click Add User. Once this is completed you are now registered within ProjNet and are currently logged into the system.

HARBOR DREDGE W912EQ18B0001 Page 19 of 265 http://www.projnet.org/projnet

d. Specific Instructions for Future ProjNet Bid Inquiry Access:

(1.) For future access to ProjNet, you will not be provided any type of password. You will utilize your Secret Question and Secret Answer to log in.

(2.) From the ProjNet home page linked above, click on Quick Add on the upper right side of the screen.

(3.) Identify the Agency. This should be marked as USACE.

(4.) Key. Enter the Bidder Inquiry Key listed above.

(5.) Email. Enter the email address you used to register previously in ProjNet.

(6.) Click Continue. A page will then open asking you to enter the answer to your Secret

Question.

(7.) Enter your Secret Answer and click Login. Once this is completed you are now logged into the system.

2. The Bidder Inquiry System will be unavailable for new inquires Seven (7) business days prior to bid opening in order to ensure adequate time is allotted to form an appropriate response and amend the solicitation if necessary.

3. Bidders are requested to review the specification in its entirety, review the Bidder Inquiry

System for answers to questions prior to submission of a new inquiry.

4. The call center operates weekdays from 8AM to 5PM U.S. Central Time Zone (Chicago). The telephone number for the Call Center is 800-428-HELP.

5. Oral explanations or instructions are not binding. Any information given to a bidder/offeror which impacts the bid/offer will be given in the form of a written amendment to the solicitation.

HARBOR DREDGE W912EQ18B0001 Page 20 of 265

TABLE OF CONTENTS

52.204-7 System for Award Management OCT 2016

52.214-3 Amendments To Invitations For Bids DEC 2016

52.214-4 False Statements In Bids APR 1984

52.214-5 Submission Of Bids Dec 2016

52.214-6 Explanation To Prospective Bidders APR 1984

52.214-7 Late Submissions, Modifications, and Withdrawals of Bids NOV 1999

52.214-18 Preparation of Bids-Construction APR 1984

52.214-19 Contract Award-Sealed Bidding-Construction AUG 1996

52.214-34 Submission Of Offers In The English Language APR 1991

52.214-35 Submission Of Offers In U.S. Currency APR 1991

52.216-1 Type Of Contract APR 1984

52.217-5 Evaluation Of Options JUL 1990

52.222-5

52.222-23

Construction Wage Rate Requirements--Secondary Site of the

Work

Notice of Requirement for Affirmative Action to Ensure

Equal Employment Opportunity for Construction

MAY 2014

FEB 1999

52.225-12 Notice of Buy American Requirement--Construction

Materials Under Trade Agreements

MAY 2014

52.233-2 Service Of Protest SEP 2006

52.236-27 Site Visit (Construction) FEB 1995

52.252-1 Solicitation Provisions Incorporated By Reference FEB 1998

HARBOR DREDGE W912EQ18B0001 Page 21 of 265

CLAUSES INCORPORATED BY FULL TEXT

52.204-7 SYSTEM FOR AWARD MANAGEMENT (OCT 2016)

(a) Definitions. As used in this provision--

Electronic Funds Transfer (EFT) indicator means a four-character suffix to the unique entity identifier. The suffix is assigned at the discretion of the commercial, nonprofit, or Government entity to establish additional System for

Award Management records for identifying alternative EFT accounts (see subpart 32.11) for the same entity.

Registered in the System for Award Management (SAM) database means that--

(1) The Offeror has entered all mandatory information, including the unique entity identifier and the EFT indicator, if applicable, the Commercial and Government Entity (CAGE) code, as well as data required by the Federal Funding

Accountability and Transparency Act of 2006 (see subpart 4.14) into the SAM database;

(2) The offeror has completed the Core, Assertions, and Representations and Certifications, and Points of Contact sections of the registration in the SAM database;

(3) The Government has validated all mandatory data fields, to include validation of the Taxpayer Identification

Number (TIN) with the Internal Revenue Service (IRS). The offeror will be required to provide consent for TIN validation to the Government as a part of the SAM registration process; and

(4) The Government has marked the record ``Active''.

Unique entity identifier means a number or other identifier used to identify a specific commercial, nonprofit, or

Government entity. See www.sam.gov for the designated entity for establishing unique entity identifiers.

(b)(1) By submission of an offer, the Offeror acknowledges the requirement that a prospective awardee shall be registered in the SAM database prior to award, during performance, and through final payment of any contract, basic agreement, basic ordering agreement, or blanket purchasing agreement resulting from this solicitation.

(2) The Offeror shall enter, in the block with its name and address on the cover page of its offer, the annotation

``Unique Entity Identifier'' followed by the unique entity identifier that identifies the Offeror's name and address exactly as stated in the offer. The Offeror also shall enter its EFT indicator, if applicable. The unique entity identifier will be used by the Contracting Officer to verify that the Offeror is registered in the SAM database.

(c) If the Offeror does not have a unique entity identifier, it should contact the entity designated at www.sam.gov for establishment of the unique entity identifier directly to obtain one. The Offeror should be prepared to provide the following information:

(1) Company legal business name.

(2) Trade style, doing business, or other name by which your entity is commonly recognized.

(3) Company physical street address, city, state, and Zip Code.

(4) Company mailing address, city, state and Zip Code (if separate from physical).

(5) Company telephone number.

(6) Date the company was started.

HARBOR DREDGE W912EQ18B0001 Page 22 of 265

(7) Number of employees at your location.

(8) Chief executive officer/key manager.

(9) Line of business (industry).

(10) Company headquarters name and address (reporting relationship within your entity).

(d) If the Offeror does not become registered in the SAM database in the time prescribed by the Contracting Officer, the Contracting Officer will proceed to award to the next otherwise successful registered Offeror.

(e) Processing time, which normally takes 48 hours, should be taken into consideration when registering. Offerors who are not registered should consider applying for registration immediately upon receipt of this solicitation.

(f) Offerors may obtain information on registration at https://www.acquisition.gov.

(End of clause)

52.214-3 AMENDMENTS TO INVITATIONS FOR BIDS (DEC 2016)

(a) If this solicitation is amended, then all terms and conditions which are not modified remain unchanged.

(b) (1) Bidders shall acknowledge receipt of any amendment to this solicitation--

(i) By signing and returning the amendment;

(ii) By identifying the amendment number and date in space provided for this purpose on the form for submitting a bid;

(iii) By letter;

(iv) By facsimile, if facsimile bids are authorized in the solicitation; or

(v) By email, if email bids are authorized in the solicitation.

(2) The Government must receive the acknowledgement by the time and at the place specified for receipt of bids.

(End of provision)

52.214-4 FALSE STATEMENTS IN BIDS (APR 1984)

Bidders must provide full, accurate, and complete information as required by this solicitation and its attachments.

The penalty for making false statements in bids is prescribed in 18 U.S.C. 1001.

HARBOR DREDGE W912EQ18B0001 Page 23 of 265 https://www.acquisition.gov/

52.214-5 SUBMISSION OF BIDS (DEC 2016)

(a) Bids and bid modifications shall be submitted in sealed envelopes or packages (unless submitted by electronic means) (1) addressed to the office specified in the solicitation, and (2) showing the time and date specified for receipt, the solicitation number, and the name and address of the bidder.

(b) Bidders using commercial carrier services shall ensure that the bid is addressed and marked on the outermost envelope or wrapper as prescribed in subparagraphs (a)(1) and (2) of this provision when delivered to the office specified in the solicitation.

(c) Facsimile bids, modifications, or withdrawals, will not be considered unless authorized by the solicitation.

(d) Bids submitted by electronic commerce shall be considered only if the electronic commerce method was specifically stipulated or permitted by the solicitation.

52.214-6 EXPLANATION TO PROSPECTIVE BIDDERS (APR 1984)

Any prospective bidder desiring an explanation or interpretation of the solicitation, drawings, specifications, etc., must request it in writing soon enough to allow a reply to reach all prospective bidders before the submission of their bids. Oral explanations or instructions given before the award of a contract will not be binding. Any information given a prospective bidder concerning a solicitation will be furnished promptly to all other prospective bidders as an amendment to the solicitation, if that information is necessary in submitting bids or if the lack of it would be prejudicial to other prospective bidders.

52.214-7 LATE SUBMISSIONS, MODIFICATIONS, AND WITHDRAWALS OF BIDS (NOV 1999)

(a) Bidders are responsible for submitting bids, and any modifications or withdrawals, so as to reach the

Government office designated in the invitation for bids (IFB) by the time specified in the IFB. If no time is specified in the IFB, the time for receipt is 4:30 p.m., local time, for the designated Government office on the date that bids are due.

(b)(1) Any bid, modification, or withdrawal received at the Government office designated in the IFB after the exact time specified for receipt of bids is “late” and will not be considered unless it is received before award is made, the

Contracting Officer determines that accepting the late bid would not unduly delay the acquisition; and--

(i) If it was transmitted through an electronic commerce method authorized by the IFB, it was received at the initial point of entry to the Government infrastructure not later than 5:00 p.m. one working day prior to the date specified for receipt of bids; or

HARBOR DREDGE W912EQ18B0001 Page 24 of 265

(ii) There is acceptable evidence to establish that it was received at the Government installation designated for receipt of bids and was under the Government's control prior to the time set for receipt of bids.

(2) However, a late modification of an otherwise successful bid that makes its terms more favorable to the

Government, will be considered at any time it is received and may be accepted.

(c) Acceptable evidence to establish the time of receipt at the Government installation includes the time/date stamp of that installation on the bid wrapper, other documentary evidence of receipt maintained by the installation, or oral testimony or statements of Government personnel.

(d) If an emergency or unanticipated event interrupts normal Government processes so that bids cannot be received at the Government office designated for receipt of bids by the exact time specified in the IFB and urgent

Government requirements preclude amendment of the IFB, the time specified for receipt of bids will be deemed to be extended to the same time of day specified in the solicitation on the first work day on which normal Government processes resume.

(e) Bids may be withdrawn by written notice received at any time before the exact time set for receipt of bids. If the

IFB authorizes facsimile bids, bids may be withdrawn via facsimile received at any time before the exact time set for receipt of bids, subject to the conditions specified in the provision at 52.214-31, Facsimile Bids. A bid may be withdrawn in person by a bidder or its authorized representative if, before the exact time set for receipt of bids, the identity of the person requesting withdrawal is established and the person signs a receipt for the bid.

52.214-18 PREPARATION OF BIDS--CONSTRUCTION (APR 1984)

(a) Bids must be (1) submitted on the forms furnished by the Government or on copies of those forms, and (2) manually signed. The person signing a bid must initial each erasure or change appearing on any bid form.

(b) The bid form may require bidders to submit bid prices for one or more items on various bases, including--

(1) Lump sum bidding;

(2) Alternate prices;

(3) Units of construction; or

(4) Any combination of subparagraphs (1) through (3) above.

(c) If the solicitation requires bidding on all items, failure to do so will disqualify the bid. If bidding on all items is not required, bidders should insert the words "no bid" in the space provided for any item on which no price is submitted.

(d) Alternate bids will not be considered unless this solicitation authorizes their submission.

HARBOR DREDGE W912EQ18B0001 Page 25 of 265

52.214-19 CONTRACT AWARD--SEALED BIDDING--CONSTRUCTION (AUG 1996)

(a) The Government will evaluate bids in response to this solicitation without discussions and will award a contract to the responsible bidder whose bid, conforming to the solicitation, will be most advantageous to the Government, considering only price and the price-related factors specified elsewhere in the solicitation.

(b) The Government may reject any or all bids, and waive informalities or minor irregularities in bids received.

(c) The Government may accept any item or combination of items, unless doing so is precluded by a restrictive limitation in the solicitation or the bid.

(d) The Government may reject a bid as nonresponsive if the prices bid are materially unbalanced between line items or subline items. A bid is materially unbalanced when it is based on prices significantly less than cost for some work and prices which are significantly overstated in relation to cost for other work, and if there is a reasonable doubt that the bid will result in the lowest overall cost to the Government even though it may be the low evaluated bid, or if it is so unbalanced as to be tantamount to allowing an advance payment.

52.214-34 SUBMISSION OF OFFERS IN THE ENGLISH LANGUAGE (APR 1991)

Offers submitted in response to this solicitation shall be in the English language. Offers received in other than

English shall be rejected.

52.214-35 SUBMISSION OF OFFERS IN U.S. CURRENCY (APR 1991)

Offers submitted in response to this solicitation shall be in terms of U.S. dollars. Offers received in other than U.S.

dollars shall be rejected.

52.216-1 TYPE OF CONTRACT (APR 1984)

HARBOR DREDGE W912EQ18B0001 Page 26 of 265

The Government contemplates award of a firm-fixed price contract resulting from this solicitation.

52.217-5 EVALUATION OF OPTIONS (JUL 1990)

Except when it is determined in accordance with FAR 17.206(b) not to be in the Government's best interests, the

Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. Evaluation of options will not obligate the Government to exercise the option(s).

52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS--SECONDARY SITE OF THE WORK (MAY

2014)

(a)(1) The offeror shall notify the Government if the offeror intends to perform work at any secondary site of the work, as defined in paragraph (a)(1)(ii) of the FAR clause at 52.222-6, Construction Wage Rate Requirements, of this solicitation.

(2) If the offeror is unsure if a planned work site satisfies the criteria for a secondary site of the work, the offeror shall request a determination from the Contracting Officer.

(b)(1) If the wage determination provided by the Government for work at the primary site of the work is not applicable to the secondary site of the work, the offeror shall request a wage determination from the Contracting

Officer.

(2) The due date for receipt of offers will not be extended as a result of an offeror's request for a wage determination for a secondary site of the work.

52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE EQUAL

EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION (FEB 1999)

(a) The offeror's attention is called to the Equal Opportunity clause and the Affirmative Action Compliance

Requirements for Construction clause of this solicitation.

(b) The goals for minority and female participation, expressed in percentage terms for the Contractor's aggregate workforce in each trade on all construction work in the covered area, are as follows:

HARBOR DREDGE W912EQ18B0001 Page 27 of 265

Goals for minority participation for each trade

Goals for female participation for each trade

SMSA Counties 32.2 Non-

SMA Counties 26.5

6.9

These goals are applicable to all the Contractor's construction work performed in the covered area. If the Contractor performs construction work in a geographical area located outside of the covered area, the Contractor shall apply the goals established for the geographical area where the work is actually performed. Goals are published periodically in the Federal Register in notice form, and these notices may be obtained from any Office of Federal Contract

Compliance Programs office.

(c) The Contractor's compliance with Executive Order 11246, as amended, and the regulations in 41 CFR 60-4 shall be based on (1) its implementation of the Equal Opportunity clause, (2) specific affirmative action obligations required by the clause entitled "Affirmative Action Compliance Requirements for Construction,'' and (3) its efforts to meet the goals. The hours of minority and female employment and training must be substantially uniform throughout the length of the contract, and in each trade. The Contractor shall make a good faith effort to employ minorities and women evenly on each of its projects. The transfer of minority or female employees or trainees from

Contractor to Contractor, or from project to project, for the sole purpose of meeting the Contractor's goals shall be a violation of the contract, Executive Order 11246, as amended, and the regulations in 41 CFR 60-4. Compliance with the goals will be measured against the total work hours performed.

(d) The Contractor shall provide written notification to the Deputy Assistant Secretary for Federal Contract

Compliance, U.S. Department of Labor, within 10 working days following award of any construction subcontract in excess of $10,000 at any tier for construction work under the contract resulting from this solicitation. The notification shall list the --

(1) Name, address, and telephone number of the subcontractor;

(2) Employer's identification number of the subcontractor;

(3) Estimated dollar amount of the subcontract;

(4) Estimated starting and completion dates of the subcontract; and

(5) Geographical area in which the subcontract is to be performed.

(e) As used in this Notice, and in any contract resulting from this solicitation, the "covered area" is

[Hickman Harbor, KY; New Madrid Harbor, MO; New Madrid County Harbor, MO; Northwest

Tennessee Regional Harbor, TN, Caruthersville Harbor, MO; Osceola Harbor, AR; Wolf River Harbor, TN, Memphis Harbor/McKellar Lake, TN; Helena Harbor, AR and/or Helena Harbor Phillips County, AR or at any point on the Mississippi River between Cape Girardeau MO (Mile 48 UMR) and Greenville, Mississippi (Mile 537 AHP).

52.225-12 NOTICE OF BUY AMERICAN REQUIREMENT-- CONSTRUCTION MATERIALS UNDER

TRADE AGREEMENTS (MAY 2014)

(a) Definitions. “Commercially available off-the-shelf (COTS) item,” “construction material,” “designated country construction material,” “domestic construction material,” and “foreign construction material,” as used in this provision, are defined in the clause of this solicitation entitled “Buy American -- Construction Materials Under

Trade Agreements” (Federal Acquisition Regulation (FAR) clause 52.225-11).

HARBOR DREDGE W912EQ18B0001 Page 28 of 265

(b) Requests for determination of inapplicability. An offeror requesting a determination regarding the inapplicability of the Buy American statute should submit the request to the Contracting Officer in time to allow a determination before submission of offers. The offeror shall include the information and applicable supporting data required by paragraphs (c) and (d) of FAR clause 52.225-11 in the request. If an offeror has not requested a determination regarding the inapplicability of the Buy American statute before submitting its offer, or has not received a response to a previous request, the offeror shall include the information and supporting data in the offer.

(c) Evaluation of offers. (1) The Government will evaluate an offer requesting exception to the requirements of the

Buy American statute, based on claimed unreasonable cost of domestic construction materials, by adding to the offered price the appropriate percentage of the cost of such foreign construction material, as specified in paragraph

(b)(4)(i) of FAR clause 52.225-11.

(2) If evaluation results in a tie between an offeror that requested the substitution…