H01_PLANS.pdf
PDF 10 MB Posted
- Attached to
- Levee Slide Repair Federal contract opportunity
- Solicitation number
- W912EQ-16-B-0009
About this file
Plans for Levee Slide Repair
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Copy_of_Bid_Abstract_FBO.xlsx | XLSX spreadsheet | |
| AMEND_0004.pdf | ||
| AMEND0004.pdf | ||
| Pre-Bid_Site_Visit.pdf | ||
| FBO_Conformed_Levee_Slide.pdf | ||
| AMENDMENT0003.pdf | ||
| Amendment_002.pdf | ||
| A22_Amendement_0002.pdf | ||
| W912EQ-16-B-0009_Levee_Slide.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
LIST
SLIDE
DESIGNATION
COUNTY, STATE LATITUDE LONGITUDE
LEVEE MILE
STATION
RIVERSIDE OR
LANDSIDE SLOPE
APPROXIMATE SLIDE
LENGTH (FT.)
APPROXIMATE LEVEE
HEIGHT (FT.)
APPROXIMATE SLOPE
INCLINATION
ESTIMATED SLIDE
EXCAVATION
QUANTITY (CY)
ESTIMATED
DISTANCE BETWEEN
LEVEE TOE AND
ROW (FT.)
ESTIMATED
BORROW (CY)*
DISTANCE X PARALLEL
TO LEVEE FOR
OBTAINING BORROW
(FT.)**
A 10_1 36.827022 -89.302964 12/42+85 RIVERSIDE 175 23 1V:3.5H 2917 75 438 158
A 10_3 36.81699667 -89.30915833 13/30+00 RIVERSIDE 150 18 1V:3.5H 3611 60 542 244
A 17_3
MISSISSIPPI
COUNTY, AR
35.908033 -89.759328 56/34+00 RIVERSIDE 180 30 1V:3H 4667 75 700 252
A 20_2
PHILLIPS
COUNTY, AR
34.3019333 -90.81681 28/07+75 RIVERSIDE 230 20 1V:2.5H 7156 50 1073 580
A 23_1 34.03344 -91.04932 63/14+00 RIVERSIDE 75 20 1V:3H 1389 60 208 94
A 23_2 34.03308 -91.04893 63/13+00 RIVERSIDE 120 20 1V:3H 2222 50 333 180
A 26_1 34.89658 -90.245922 14/36+60 RIVERSIDE 110 30 1V:3.5H 3707 100 556 150
A 26_2 34.896236 -90.246656 14/38+90 RIVERSIDE 70 30 1V:4H 2074 100 311 84
A 27_2 34.32968 -91.0293 19/32+17 RIVERSIDE 117 30 1V:3H 7800 50 1170 632
A 27_3 34.326839 -91.031819 19/38+30 RIVERSIDE 150 30 1V:3.5H 10000 50 1500 810
A 57_2
SCOTT COUNTY,
MO
37.2364 -89.5466 14/31+20 RIVERSIDE 75 30 1V:3.5H 1500 75 225 81
A 76_1
MISSISSIPPI
COUNTY, MO
36.636194 -89.20975 61/25+50 RIVERSIDE 100 17 1V:3.5H 3500 50 525 284
B 8_1 36.921544 -89.206142 04/07+84 RIVERSIDE 100 25 1V:5H 3704 50 556 300
B 8_2 36.861872 -89.276586 09/52+00 RIVERSIDE 75 25 1V:3.5H 2778 60 417 188
B 17_1
MISSISSIPPI
COUNTY, AR 35.919886 -89.735786
54/60+22 RIVERSIDE 75 20 1V:3H 889 50 133 72
B 17_2
MISSISSIPPI
COUNTY, AR
35.91976 -89.74126 55/15+74 RIVERSIDE 50 30 1V:3H 593 50 89 48
C 23_3
DESHA COUNTY,
AR
34.0443083 -91.05741 64/14+35 RIVERSIDE 320 20 1V:3H 8296 150 1244 224
D 26_3 34.186381 -90.741957 86/41+39 RIVERSIDE 65 25 1V:3.5H 2167 75 325 117
D 26_4 34.18525 -90.744146 86/49+35 RIVERSIDE 115 25 1V:3.5H 3833 75 575 207
D 26_5 34.13278 -90.817514 93/33+80 RIVERSIDE 120 25 1V:3.5H 4000 75 600 216
*REFER TO SKETCH D AND E FOR BORROW MATERIAL INSTRUCTIONS
**REFER TO SKETCH D AND E
TABLE 1: LIST A, B, C AND D SLIDES
MISSISSIPPI
COUNTY, MO
DESHA COUNTY,
AR
PHILLIPS
COUNTY, AR
DESOTO COUNTY,
MS
COAHOMA
COUNTY, MS
MISSISSIPPI
COUNTY, MO
Arkansas
Missouri
Mississippi
Tennessee
Illinois
Kentucky
Texas
White
Lee
Dent
Drew
Iron
Clay
Howell
Bolivar
Butler
Desha
Izard
Shannon Wayne
Shelby
Dyer
Arkansas
Oregon
Lonoke
Ripley
Cross
Prairie
Panola
Sharp
Phillips
Jefferson
Fulton
Poinsett
Tate
Obion
Stoddard
Fayette
Perry
Reynolds
Monroe
Scott
Gibson
Mississippi
Carter
Marshall
Lincoln
Graves
Greene
Jackson
Carroll
Pope
Union
Lafayette
Stone
Bollinger
Dunklin
Tipton
Leflore
Craighead
Calhoun
Tunica
McNairy
Weakley
Tippah
Madison
DeSoto
Randolph
Woodruff
Alcorn
Cleburne
Hardeman
Lawrence
Crittenden
Coahoma
St. Francis
New Madrid
Haywood
Benton
Pemiscot
Saline
Pontotoc
Sunflower
Tallahatchie
Independence
Prentiss
Grenada
Henry
Webster
Pulaski
Phelps
Yalobusha
Quitman
Chickasaw
Lauderdale
Johnson
Williamson
Bradley
Lake
Cleveland
Cape Girardeau
Ballard
Chester
Itawamba
Henderson
Massac
Lowndes
Crockett
Hickman
St. Francois
Carlisle
Alexander
Ozark
Oktibbeha Montgomery
Livingston
Crawford
McCracken
Calloway
Chicot
Washington
Hardin
Douglas
Ste. Genevieve
Choctaw
Baxter
Faulkner
Gallatin
Grant
Tishomingo
Franklin
0 40 8020 Miles
MEMPHIS DISTRICT
Memphis District (Drawing No. 1)
Major Cities
State Boundary
District Boundary
Mississippi
DRAWING NO. 1
Gibson
Clay
Fulton Hickman
Ballard
Carlisle
Dunklin
CrockettLauderdale
Dyer
Obion
New Madrid
Pemiscot
Scott
Stoddard
Bollinger
Mississippi Co
Mississippi Co
Arkansas
Illinois
Kentucky
Missouri
Tennessee
Levee Slide Locations
0 1.5 3 Miles
Levee Slides on Segment 10 Location: Segment 10, BirdsPoint- New Madrid Setback 12/32+00 to 36/00+00, Missouri Map created: 12 May 2016 Levee Sponsor: Sam Oliver Phone: (573) 225-1648
LABEL FORMAT: Inspection ID, Point or Line-Item-Rating
PS
PS
PS
PSPS
PS
PS PS PSPS
PS
PS
PS
PS
PS
PS
PS PS
PS
PS
PS
PS
PS
PS
PS
PS
PS
PS
PS
PSPS
PS
PS
PS
PS
PS
PS
PS
PS
PS
PS
PS
PS
Ø
Ø
Slide 10_1 Slide 10_3
MP
10/11
MP 15/16
MP 70/71
MP 75/76
MP 20/21
MP 25/26
MP 30/31
MP
35/36
MP
5/6
MP 5/6
MP 85/86
Sources: Esri, HERE, DeLorme, Intermap, increment P Corp., GEBCO, USGS, FAO, NPS, NRCAN, GeoBase, IGN, Kadaster NL, Ordnance Survey, Esri Japan, METI, Esri China (Hong Kong), swisstopo, MapmyIndia, © OpenStreetMap contributors, and the GIS User Community
0 1 20.5 Miles
Segment 10, BirdsPoint- New Madrid Setback 12/32+00 to 36/00+00
Legend
Mileposts PS Pump Station
Culverts Levee Segment 10 Other Levees (NLD) Floodwall
Levee Slides Ø
List A Slides
2 Slides on Segment 10
DRAWING NO. 2 - LEVEE SLIDE LOCATIONS - LIST A - 10_1 AND 10_3
Poinsett
St.
Francis
Fayette
Craighead
Crittenden
Greene
Lee
DeSoto
Lauderdale
Dyer
Shelby
Tipton
Marshall TateTunica
Arkansas
Mississippi
Tennessee
Levee Slide Locations
0 0.85 1.7 Miles
Levee Slides on Segment 17 Location: Segment 17, MO-AR Line to Mouth of St. Francis River @ MS River Levee- 46/49+60 to 218/0+00 Map created: 12 May 2016
LABEL FORMAT: Inspection ID, Point or Line-Item-Rating
PS
PS
PS
PSPS
PS
PS
PS
PSPS
PS
PS
PS
PS
PS
PS
PS PS
PS
PS
PS
PS
PS
PS
PS
PS
PS
PS
PS
PSPS
PS
PS
PS
PS
PS
PS
PS
PS
PS
PS
PS
PS
Ø
Ø
Ø
MP 50/51
MP 55/56
MP 60/61
Slide 17_1
Slide 17_3
Slide 17_2
Sources: Esri, HERE, DeLorme, Intermap, increment P Corp., GEBCO, USGS, FAO, NPS, NRCAN, GeoBase, IGN, Kadaster NL, Ordnance Survey, Esri Japan, METI, Esri China (Hong Kong), swisstopo, MapmyIndia, © OpenStreetMap contributors, and the GIS User Community
0 1 20.5 Miles
Segment 17, MO-AR Line to Mouth of St. Francis River @ MS River Levee-46/49+60 to 218/0+00
Legend Mileposts Levee Segment 17 Other Levees (NLD)
Levee Slides Ø
List A Slides
Ø
List B Slides
Segment 17
3 Slides on Segment17
DRAWING NO. 3 - LEVEE SLIDE LOCATIONS - LIST A - 17_3 / LIST B - 17_1 AND 17_2
Phillips
Coahoma
Arkansas
Mississippi
Levee Slide Locations
0 0.25 0.5 Miles
Levee Slides on Segment 20 Location: Segment 20, Helena, AR to Elaine, AR Levee 4/10+00 to 28/69+00 Map created: 12 May 2016 Levee Sponsor: Jim Frazier Phone: (870) 338-1561
LABEL FORMAT: Inspection ID, Point or Line-Item-Rating
PS
PS
PS
PSPS
PS
PS
PS
PS
PS
PS
PS
PS
PS
PS
PS
PS PS
PS
PS
PS
PS
PS
PS
PS
PS
PS
PS
PS
PSPS
PS
PS
PS
PS
PS
PS
PS
PS
PS
PS
PS
PS
Ø
MP 27/28
MP 28/29Slide 20_2
Sources: Esri, HERE, DeLorme, Intermap, increment P Corp., GEBCO, USGS, FAO, NPS, NRCAN, GeoBase, IGN, Kadaster NL, Ordnance Survey, Esri Japan, METI, Esri China (Hong Kong), swisstopo, MapmyIndia, © OpenStreetMap contributors, and the GIS User Community
0 0.25 0.5 Miles
Segment 20, Helena, AR to Elaine, AR Levee 4/10+00 to 28/69+00
Legend Levee Slides Ø
List A Slides Mileposts Levee Segment 20 Other Levees (NLD)
Segment 20
Slide Locations on Segment 20
DRAWING NO. 4 - LEVEE SLIDE LOCATIONS - LIST A - 20_2
Phillips
Desha
Bolivar
Coahoma
Arkansas
Mississippi
Levee Slide Locations
0 0.1 0.2 Miles
Location: Segment 23, Elaine, AR to Laconia Circle Levee 48/36+00 to 67/0+00Map created: 13 May 2016Levee Sponsor: L.K. Holt & RonniePankey
LABEL FORMAT: Inspection ID, Point or Line-Item-Rating
Ø
Ø
Ø
MP 63/64
MP 64/65
Slide 23_2
Slide 23_3
Slide 23_1
Sources: Esri, HERE, DeLorme, Intermap, increment P Corp., GEBCO, USGS, FAO, NPS, NRCAN, GeoBase, IGN, Kadaster NL, Ordnance Survey, Esri Japan, METI, Esri China (Hong Kong), swisstopo, MapmyIndia, © OpenStreetMap contributors, and the GIS User Community, Esri, HERE, DeLorme, MapmyIndia, © OpenStreetMap contributors, and the GIS user community
0 500 1,000 Feet
Segment 23, Elaine, AR to Laconia Circle Levee 48/36+00 to 67/0+00
Legend Ø
List A Slides
Ø
List C Slides Mileposts Levee Segment 23 Other Levees (NLD)
Segment 23
3 Slides Locations on Segment 23
Levee Slides on Segment 23
DRAWING NO. 5 - LEVEE SLIDE LOCATIONS - LIST A AND C - 23_1, 23_2, 23_3
Francis
Panola
Phillips
Lee
Bolivar
Coahoma
DeSoto
Quitman
Tate Tunica
Arkansas
Mississippi
Levee Slide Locations
0 0.25 0.5 Miles
Levee Slides on Segment 26 Location: Segment 26, Yazoo-Delta Levee 0/0+00 to 97/33+38 Map created: 12 May 2016 Levee Sponsor: Bruce Cook Phone: (662) 624-4397
LABEL FORMAT: Inspection ID, Point or Line-Item-Rating
PS
PS
PS
PSPS
PS
PS
PS
PS
PS
PS
PS
PS
PS
PS
PS
PS PS
PS
PS
PS
PS
PS
PS
PS
PS
PS
PS
PS
PSPS
PS
PS
PS
PS
PS
PS
PS
PS
PS
PS
PS
PS
Ø Ø
MP 15/16
MP 14/15
Slide 26_2
Slide 26_1
Sources: Esri, HERE, DeLorme, Intermap, increment P Corp., GEBCO, USGS, FAO, NPS, NRCAN, GeoBase, IGN, Kadaster NL, Ordnance Survey, Esri Japan, METI, Esri China (Hong Kong), swisstopo, MapmyIndia, © OpenStreetMap contributors, and the GIS User Community
0 0.25 0.5 Miles
Segment 26, Yazoo-Delta Levee 0/0+00 to 97/33+38
Legend Levee Slides Ø
List A Slides Mileposts Levee Segment 26 Other Levees (NLD)
Segment 26
2 Slides on Segment 26
DRAWING NO. 6 - LEVEE SLIDE LOCATIONS - LIST A - 26_1 AND 26_2
Arkansas
Chicot
Phillips
Desha
Monroe
Bolivar
Coahoma
Sunflower
Tunica
Washington
Arkansas
Mississippi
Levee Slide Locations
0 0.45 0.9 Miles
Levee Slides on Segment 27 Location: Segment 27, Old Town Lake to Laconia Circle 0/0+00 to 40/44+00 Map created: 12 May 2016 Levee Sponsor: Jim Frazier and Gary Inman Phone: (870) 338-1561
LABEL FORMAT: Inspection ID, Point or Line-Item-Rating
PS
PS
PS
PSPS
PS
PS
PS
PSPS
PS
PS
PS
PS
PS
PS
PS PS
PS
PS
PS
PS
PS
PS
PS
PS
PS
PS
PS
PSPS
PS
PS
PS
PS
PS
PS
PS
PS
PS
PS
PS
PS
Ø
Ø
MP 20/21
Slide 27_2 Slide 27_3
Sources: Esri, HERE, DeLorme, Intermap, increment P Corp., GEBCO, USGS, FAO, NPS, NRCAN, GeoBase, IGN, Kadaster NL, Ordnance Survey, Esri Japan, METI, Esri China (Hong Kong), swisstopo, MapmyIndia, © OpenStreetMap contributors, and the GIS User Community
0 0.5 1 Miles
Segment 27, Old Town Lake to Laconia Circle 0/0+00 to 40/44+00
Legend Levee Segment 27 Other Levees (NLD) Mileposts
Levee Slides Ø
List A Slides
Segment 27
2 Slides on Segment 27
DRAWING NO. 7 - LEVEE SLIDE LOCATIONS - LIST A - 27_2 AND 27_3
Alexander
Scott
Stoddard
Cape Girardeau Illinois
Missouri
Levee Slide Locations
0 1.5 3 Miles
Levee Slides on Segment 57 Location: Segment 57, Little River Headwater Diversion Levee 0/2+00 to 19/36+00 Map created: 12 May 2016 Levee Sponsor: Dustin Boatwright Phone: (573) 335-3439
LABEL FORMAT: Inspection ID, Point or Line-Item-Rating
PS
PS
PS
PSPS
PS
PS PS PSPS
PS
PS
PS
PS
PS
PS
PS PS
PS
PS
PS
PS
PS
PS
PS
PS
PS
PS
PS
PSPS
PS
PS
PS
PS
PS
PS
PS
PS
PS
PS
PS
PS
Ø
MP
15/16MP 10/11
MP 5/6
MP 0/1
Slide 57_2
Sources: Esri, HERE, DeLorme, Intermap, increment P Corp., GEBCO, USGS, FAO, NPS, NRCAN, GeoBase, IGN, Kadaster NL, Ordnance Survey, Esri Japan, METI, Esri China (Hong Kong), swisstopo, MapmyIndia, © OpenStreetMap contributors, and the GIS User Community
0 2.5 51.25 Mi
Segment 57, Little River Headwater Diversion Levee 0/2+00 to 19/36+00
Legend Ø
List A Slide Mileposts Levee Segment 57 Culverts Other Levees (NLD)
Segment 57
DRAWING NO. 8 - LEVEE SLIDE LOCATIONS - LIST A - 57_2
Gibson
Fulton
Hickman
Ballard
Carlisle
Lake
Dyer
Obion
Mississippi
New Madrid
Pemiscot
Scott Illinois
Kentucky
Missouri
Tennessee
Levee Slide Locations
0 2.5 5 Miles
Levee Slides on Segment 76 Location: Segment 76, BPNM Frontline Levee 43/21+00 to 87/0+00 Map created: 16 May 2016
LABEL FORMAT: Inspection ID, Point or Line-Item-Rating
Ø
MP 0/1MP 10/11
MP 10/11
MP 15/16
MP 15/16
MP 70/71MP 75/76
MP 20/21
MP 25/26
MP 30/31
MP
35/36
MP 45/46
MP 5/6
MP 5/6
MP 5/6
MP 50/51
MP 55/56
MP 60/61
MP 65/66
MP 80/81
MP 85/86
Slide 76_1
Sources: Esri, HERE, DeLorme, Intermap, increment P Corp., GEBCO, USGS, FAO, NPS, NRCAN, GeoBase, IGN, Kadaster NL, Ordnance Survey, Esri Japan, METI, Esri China (Hong Kong), swisstopo, MapmyIndia, © OpenStreetMap contributors, and the GIS User Community
0 2.5 5 Miles
Segment 76, BPNM Frontline Levee 43/21+00 to 87/0+00
Legend Mileposts Levee Segment 76 Other Levees (NLD)
Levee Slides Ø
List A
Segment 76
1 Slide on Segment 76
DRAWING NO. 9 - LEVEE SLIDE LOCATIONS - LIST A - 76_1
Hickman
Ballard
CarlisleMississippi
New Madrid
Scott
Illinois
Kentucky
Missouri
Levee Slide Locations
0 1.5 3 Miles
Levee Slides on Segment 8 Location: Segment 8, Commerce to Birds Point Levee 17/49+00 to Birds-Point New Madrid Setback 12/32+00 Map created: 12 May 2016 Levee Sponsor: Homer Oliver Phone: (573) 380-1417
LABEL FORMAT: Inspection ID, Point or Line-Item-Rating
PS
PS
PS
PSPS
PS
PS
PS PSPS
PS
PS
PS
PS
PS
PS
PS PS
PS
PS
PS
PS
PS
PS
PS
PS
PS
PS
PS
PSPS
PS
PS
PS
PS
PS
PS
PS
PS
PS
PS
PS
Ø
Ø
Slide 8_2
Slide 8_1
MP 0/1
MP 10/11
MP 10/11
MP 20/21
MP 25/26
MP 30/31
MP 45/46
MP 5/6
Sources: Esri, HERE, DeLorme, Intermap, increment P Corp., GEBCO, USGS, FAO, NPS, NRCAN, GeoBase, IGN, Kadaster NL, Ordnance Survey, Esri Japan, METI, Esri China (Hong Kong), swisstopo, MapmyIndia, © OpenStreetMap contributors, and the GIS User Community, Source: Esri, DigitalGlobe, GeoEye, Earthstar Geographics, CNES/Airbus DS, USDA, USGS, AEX, Getmapping, Aerogrid, IGN, IGP, swisstopo, and the GIS User CommunityMap Produced by Tech Services Support Branch
0 1 20.5 Miles
Segment 8, Commerce to Birds Point Levee 17/49+00 to Birds-Point New Madrid Setback 12/32+00
Legend Mileposts
PS Pump Station Culverts Levee Segment 8 Other Levees (NLD) Floodwall
Levee Slides Ø
List A Slides
Ø
List B Slides
2 Slides on Segment 8
DRAWING NO. 10 - LEVEE SLIDE LOCATIONS - LIST B - 8_1 AND 8_2
Panola
Phillips
Lee
Bolivar
Coahoma
DeSoto
Quitman
Tate Tunica
Arkansas
Mississippi
Levee Slide Locations
0 0.35 0.7 Miles
Levee Slides on Segment 26 Location: Segment 26, Yazoo-Delta Levee 0/0+00 to 97/33+38 Map created: 12 May 2016 Levee Sponsor: Bruce Cook Phone: (662) 624-4397
LABEL FORMAT: Inspection ID, Point or Line-Item-Rating
PS
PS
PS
PSPS
PS
PS
PS
PS
PS
PS
PS
PS
PS
PS
PS
PS PS
PS
PS
PS
PS
PS
PS
PS
PS
PS
PS
PS
PSPS
PS
PS
PS
PS
PS
PS
PS
PS
PS
PS
PS
PS
Ø
Ø
MP 89/90
MP 88/89
MP 87/88
MP 86/87
MP 85/86
Slide 26_3
Slide 26_4
Sources: Esri, HERE, DeLorme, Intermap, increment P Corp., GEBCO, USGS, FAO, NPS, NRCAN, GeoBase, IGN, Kadaster NL, Ordnance Survey, Esri Japan, METI, Esri China (Hong Kong), swisstopo, MapmyIndia, © OpenStreetMap contributors, and the GIS User Community
0 0.5 1 Miles
Segment 26, Yazoo-Delta Levee 0/0+00 to 97/33+38
Legend Mileposts Levee Segment 26 Other Levees (NLD)
Levee Slides Ø
List D Slides
DRAWING NO. 11 - LEVEE SLIDE LOCATIONS - LIST D - 26_3 AND 26_4
Panola
Phillips
Lee
Bolivar
Coahoma
DeSoto
Quitman
Tate Tunica
Arkansas
Mississippi
Levee Slide Locations
0 0.85 1.7 Miles
Levee Slides on Segment 26 Location: Segment 26, Yazoo-Delta Levee 0/0+00 to 97/33+38 Map created: 12 May 2016 Levee Sponsor: Bruce Cook Phone: (662) 624-4397
LABEL FORMAT: Inspection ID, Point or Line-Item-Rating
PS
PS
PS
PSPS
PS
PS
PS
PSPS
PS
PS
PS
PS
PS
PS
PS PS
PS
PS
PS
PS
PS
PS
PS
PS
PS
PS
PS
PSPS
PS
PS
PS
PS
PS
PS
PS
PS
PS
PS
PS
PS
Ø
MP 90/91
MP 89/90
MP 99/100
MP 98/99
MP 97/98
MP 95/96MP 96/97
MP 94/95
MP 93/94
MP 92/93
MP 91/92
Slide 26_5
Sources: Esri, HERE, DeLorme, Intermap, increment P Corp., GEBCO, USGS, FAO, NPS, NRCAN, GeoBase, IGN, Kadaster NL, Ordnance Survey, Esri Japan, METI, Esri China (Hong Kong), swisstopo, MapmyIndia, © OpenStreetMap contributors, and the GIS User Community
0 1 2 Miles
Segment 26, Yazoo-Delta Levee 0/0+00 to 97/33+38
Legend Mileposts Levee Segment 26 Other Levees (NLD)
Levee Slides Ø
List D Slides
DRAWING NO. 12 - LEVEE SLIDE LOCATIONS - LIST D - 26_5
SKETCH A
SKETCH B
SKETCH C
SKETCH D
SKETCH E
| PROJECT TABLE OF CONTENTS |
| DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS |
| DEPARTMENT OF THE ARMY |
| DEPARTMENT OF THE ARMY |
| U.S. ARMY CORPS OF ENGINEERS |
| INSTRUCTIONS, CONDITIONS, AND NOTICES TO BIDDERS |
| INSTRUCTIONS, CONDITIONS, AND NOTICES TO BIDDERS |
| PART 1 GENERAL INFORMATION |
| 1.1 Contract Information |
| BIDDING SCHEDULE |
| BIDDING SCHEDULE |
| PART 1 BIDDING SCHEDULE |
| 1.1 LINE ITEMS |
| 1.2 NOTES |
| CONTRACT CLAUSE INSERTS |
| CONTRACT CLAUSE INSERTS |
| PART 1 GENERAL |
| 1.1 SUBMITTALS |
| 1.2 FAR 52.204-7 SYSTEM FOR AWARD MANAGEMENT JUL 2013 |
| 1.3 FAR 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK APR |
| 1.4 FAR 52.211-12 LIQUIDATED DAMAGES CONSTRUCTION SEP 2000 |
| 1.5 FAR 52.211-18 VARIATION IN ESTIMATED QUANTITIES APR 1984 |
| 1.6 FAR 52.228-5 INSURANCE - WORK ON A GOVERNMENT INSTALLATION JAN 1997 |
| 1.7 FAR 52.236-1 PERFORMANCE OF WORK BY THE CONTRACTOR APR 1984 |
| 1.8 FAR 52.236-5 MATERIAL AND WORKMANSHIP APR 1984 |
| 1.9 FAR 52.236-4 PHYSICAL DATA APR 1984 |
| 1.10 FAR 52.236-16 QUANTITY SURVEYS-ALTERNATE I APR 1984 |
| 1.11 FAR 52.236-21 SPECIFICATION AND DRAWING FOR CONSTRUCTION FEB 1997 |
| 1.12 FAR 52.246-21 WARRANTY OF CONSTRUCTION MAR 1994 |
| 1.13 FAR 52.249-10 DEFAULT FIXED-PRICE CONSTRUCTIONAPR 1984 |
| 1.14 UAI 52.249-5000 BASIS FOR SETTLEMENT OF PROPOSALS MAR 2013 |
| 1.15 DFARS 252.236-7001 CONTRACT DRAWINGS AND SPECIFICATIONS AUG 2000 |
| 1.16 DFARS 52.236-7004 PAYMENT FOR MOBILIZATION AND DEMOBILIZATION DEC |
| PART 2 PRODUCTS Not Used |
| PART 3 EXECUTION Not Used |
| SPECIAL CONTRACT REQUIREMENTS |
| SPECIAL CONTRACT REQUIREMENTS |
| PART 1 GENERAL |
| 1.1 REFERENCES |
| 1.2 SUBMITTALS |
| 1.3 EXCLUSION PERIODS IN COMPUTING COMPLETION SCHEDULES |
| 1.4 EXCEPTION TO LIQUIDATED DAMAGES |
| 1.5 RIGHTS-OF-WAY |
| 1.6 LAYOUT OF WORK |
| 1.7 PROGRESS CHART |
| 1.8 SAFETY RELATED SPECIAL REQUIREMENTS |
| 1.9 CERTIFICATES OF COMPLIANCE |
| 1.10 CONTRACTOR'S CERTIFICATE |
| 1.11 AS-BUILT DRAWINGS |
| 1.12 DAMAGE TO WORK |
| 1.13 NOTIFICATION OF AREA ENGINEER BEFORE BEGINNING WORK |
| 1.14 RETESTING OF CONSTRUCTION MATERIALS |
| 1.15 VEHICLE WEIGHT LIMITATIONS |
| 1.16 OBSTRUCTIONS |
| 1.17 NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM NPDES |
| 1.18 ACCEPTANCE SECTIONS |
| 1.19 TIME EXTENSIONS FOR UNUSUALLY SEVERE WEATHER 31 OCT 1989 |
| 1.20 STONE SOURCES |
| 1.21 TEMPORARY PROJECT FENCING |
| 1.22 COOPERATION WITH OTHERS |
| 1.23 HOURS OF WORK |
| 1.24 SUNDAY, HOLIDAY AND NIGHT WORK |
| 1.25 SECURITY REQUIREMENTS |
| 1.26 STORAGE OF EQUIPMENT AND MATERIALS |
| 1.27 WORK ON OR ADJACENT TO RAILROAD PROPERTY |
| 1.28 INSURANCE REQUIREMENTS FOR WORK ON OR ADJACENT TO RAILROAD PROPERTY |
| 1.29 CONTROL OF WATER LEVELS NOT USED |
| 1.30 FLOOD EMERGENCY |
| 1.31 PATENTS, PROPRIETARY RIGHTS |
| 1.32 PROTECTION OF MATERIALS AND WORK |
| 1.33 EXISTING FLOOD PROTECTION |
| 1.34 FINAL ACCEPTANCE |
| 1.35 INSPECTION |
| 1.36 DESIGNATED BILLING OFFICE |
| PART 2 PRODUCTS Not Used |
| PART 3 EXECUTION Not Used |
| DIVISION 01 - GENERAL REQUIREMENTS |
| SUMMARY OF WORK |
| SUMMARY OF WORK |
| PART 1 GENERAL |
| 1.1 WORK COVERED BY CONTRACT DOCUMENTS |
| 1.1.1 Project Description |
| 1.1.2 Location |
| 1.2 EXISTING WORK |
| 1.3 LOCATION OF UNDERGROUND FACILITIES |
| PART 2 PRODUCTS Not Used |
| PART 3 EXECUTION Not Used |
| MEASUREMENT AND PAYMENT |
| MEASUREMENT AND PAYMENT |
| PART 1 GENERAL |
| 1.1 JOB PAYMENT ITEMS |
| 1.1.1 Mobilization and Demobilization |
| 1.1.2 Environmental Protection |
| 1.2 Stormwater Pollution Prevention Plan |
| 1.3 UNIT PRICE PAYMENT ITEMS |
| 1.3.1 Storm Water Pollution Prevention |
| 1.3.1.1 Silt Fence |
| 1.3.1.2 Erosion Control Berm |
| 1.3.1.3 Temporary Environmental Seeding |
| 1.3.2 Slide Excavation |
| 1.3.3 Geogrid Transport and Installation |
| 1.3.4 Compacted Backfill |
| 1.3.5 Additional Borrow |
| 1.3.6 Establishment of Turf |
| 1.3.7 Aggregate Surfacing |
| PART 2 PRODUCTS Not Used |
| PART 3 EXECUTION Not Used |
| SUBMITTAL PROCEDURES |
| SUBMITTAL PROCEDURES |
| PART 1 GENERAL |
| 1.1 DEFINITIONS |
| 1.1.1 Submittal |
| 1.1.2 Submittal Descriptions SD |
| 1.1.3 Approving Authority |
| 1.1.4 Work |
| 1.2 SUBMITTALS |
| 1.3 SUBMITTAL REGISTER |
| 1.4 CONTRACTOR USE OF SUBMITTAL REGISTER |
| 1.5 APPROVING AUTHORITY USE OF SUBMITTAL REGISTER |
| 1.6 COPIES DELIVERED TO THE GOVERNMENT |
| 1.7 PROCEDURES FOR SUBMITTALS |
| 1.7.1 Reviewing, Certifying, Approving Authority |
| 1.7.2 Constraints |
| 1.7.3 Scheduling |
| 1.7.4 Variations |
| 1.7.4.1 Considering Variations |
| 1.7.4.2 Proposing Variations |
| 1.7.4.3 Warranting That Variations Are Compatible |
| 1.7.4.4 Review Schedule Is Modified |
| 1.8 CONTRACTOR'S RESPONSIBILITIES |
| 1.9 GOVERNMENT'S RESPONSIBILITIES |
| 1.10 FORMAT OF SUBMITTALS |
| 1.10.1 Transmittal Sheet |
| 1.10.2 Identifying Submittals |
| 1.11 SUBMISSION AND CONTROL OF SUBMITTALS |
| 1.11.1 Submittals Required from the Contractor |
| 1.11.1.1 Submittal Procedures and Deviations |
| 1.11.1.2 Control of Submittals |
| 1.11.1.3 O&M Data |
| 1.12 SUBMITTAL CLASSIFICATION |
| 1.12.1 Government Approved |
| 1.12.2 Information Only |
| 1.13 APPROVED SUBMITTALS |
| 1.14 DISAPPROVED SUBMITTALS |
| 1.15 WITHHOLDING OF PAYMENT |
| 1.16 GENERAL |
| 1.17 SUBMITTAL REGISTER |
| 1.18 SCHEDULING |
| 1.19 TRANSMITTAL SHEET ENG FORM 4025 |
| 1.20 GOVERNMENT APPROVED SUBMITTALS |
| 1.21 INFORMATION ONLY SUBMITTALS |
| 1.22 STAMPS |
| PART 2 PRODUCTS Not Used |
| PART 3 EXECUTION Not Used |
| SOURCES FOR REFERENCE PUBLICATIONS |
| SOURCES FOR REFERENCE PUBLICATIONS |
| PART 1 GENERAL |
| 1.1 REFERENCES |
| 1.2 ORDERING INFORMATION |
| QUALITY CONTROL SYSTEM QCS |
| QUALITY CONTROL SYSTEM QCS |
| PART 1 GENERAL |
| 1.1 SUBMITTALS |
| 1.2 CONTRACT ADMINISTRATION |
| 1.2.1 Correspondence and Electronic Communications |
| 1.2.2 Other Factors |
| 1.3 QCS SOFTWARE |
| 1.4 SYSTEM REQUIREMENTS |
| 1.5 RELATED INFORMATION |
| 1.5.1 QCS User Guide |
| 1.5.2 Contractor Quality Control CQC Training |
| 1.6 CONTRACT DATABASE |
| 1.7 DATABASE MAINTENANCE |
| 1.7.1 Administration |
| 1.7.1.1 Contractor Information |
| 1.7.1.2 Subcontractor Information |
| 1.7.1.3 Correspondence |
| 1.7.1.4 Equipment |
| 1.7.1.5 Management Reporting |
| 1.7.1.6 Request For Information RFI |
| 1.7.2 Finances |
| 1.7.2.1 Pay Activity Data |
| 1.7.2.2 Payment Requests |
| 1.7.3 Quality Control QC |
| 1.7.3.1 Daily Contractor Quality Control CQC Reports. |
| 1.7.3.2 Deficiency Tracking. |
| 1.7.3.3 QC Requirements |
| 1.7.3.4 Three-Phase Control Meetings |
| 1.7.3.5 Labor and Equipment Hours |
| 1.7.3.6 Accident/Safety Reporting |
| 1.7.3.7 Features of Work |
| 1.7.4 Submittal Management |
| 1.7.5 Schedule |
| 1.7.6 Import/Export of Data |
| 1.8 IMPLEMENTATION |
| 1.9 DATA SUBMISSION VIA CD-ROM |
| 1.9.1 File Medium |
| 1.9.2 CD-ROM Labels |
| 1.9.3 File Names |
| 1.10 MONTHLY COORDINATION MEETING |
| 1.11 NOTIFICATION OF NONCOMPLIANCE |
| PART 2 PRODUCTS Not Used |
| PART 3 EXECUTION Not Used |
| CONTRACTOR QUALITY CONTROL |
| CONTRACTOR QUALITY CONTROL |
| PART 1 GENERAL |
| 1.1 SUBMITTALS |
| 1.2 PAYMENT |
| PART 2 PRODUCTS Not Used |
| PART 3 EXECUTION |
| 3.1 GENERAL REQUIREMENTS |
| 3.2 QUALITY CONTROL PLAN |
| 3.2.1 Content of the CQC Plan |
| 3.2.2 Acceptance of Plan |
| 3.2.3 Notification of Changes |
| 3.3 COORDINATION MEETING |
| 3.4 QUALITY CONTROL ORGANIZATION |
| 3.4.1 Personnel Requirements |
| 3.4.2 CQC System Manager |
| 3.4.3 Additional Requirement |
| 3.4.4 Organizational Changes |
| 3.5 SUBMITTALS AND DELIVERABLES |
| 3.6 CONTROL |
| 3.6.1 Preparatory Phase |
| 3.6.2 Initial Phase |
| 3.6.3 Follow-up Phase |
| 3.6.4 Additional Preparatory and Initial Phases |
| 3.7 TESTS |
| 3.7.1 Testing Procedure |
| 3.7.2 Testing Laboratories |
| 3.7.2.1 Laboratory Validation |
| 3.7.2.2 Capability Check |
| 3.7.2.3 Capability Recheck |
| 3.7.3 Onsite Laboratory |
| 3.7.4 Furnishing or Transportation of Samples for Testing |
| 3.8 COMPLETION INSPECTION |
| 3.8.1 Punch-Out Inspection |
| 3.8.2 Pre-Final Inspection |
| 3.8.3 Final Acceptance Inspection |
| 3.9 DOCUMENTATION |
| 3.10 NOTIFICATION OF NONCOMPLIANCE |
| ENVIRONMENTAL PROTECTION |
| ENVIRONMENTAL PROTECTION |
| PART 1 GENERAL |
| 1.1 REFERENCES |
| 1.2 SUBMITTALS |
| 1.3 DEFINITIONS |
| 1.3.1 Environmental Pollution and Damage |
| 1.3.2 Environmental Protection |
| 1.3.3 Contractor Generated Hazardous Waste |
| 1.3.4 Project Pesticide Coordinator |
| 1.3.5 Land Application for Discharge Water |
| 1.3.6 Pesticide |
| 1.3.7 Pests |
| 1.3.8 Surface Discharge |
| 1.3.9 Waters of the United States |
| 1.3.10 Wetlands |
| 1.3.11 Spill or Hazardous Substance Release of "Reportable Quantity" |
| 1.4 GENERAL REQUIREMENTS |
| 1.5 SUBCONTRACTORS |
| 1.6 ENVIRONMENTAL PROTECTION PLAN |
| 1.6.1 Compliance |
| 1.6.2 Contents |
| 1.6.3 Appendix |
| 1.7 PROTECTION FEATURES |
| 1.8 SPECIAL ENVIRONMENTAL REQUIREMENTS |
| 1.9 ENVIRONMENTAL ASSESSMENT OF CONTRACT DEVIATIONS |
| 1.10 NOTIFICATION |
| PART 2 PRODUCTS NOT USED |
| PART 3 EXECUTION |
| 3.1 ENVIRONMENTAL PERMITS AND COMMITMENTS |
| 3.2 LAND RESOURCES |
| 3.2.1 Work Area Limits |
| 3.2.2 Landscape |
| 3.2.3 Reduction of Exposure of Unprotected Erodible Soils |
| 3.2.4 Temporary Protection of Disturbed Areas |
| 3.2.5 Erosion and Sediment Controls |
| 3.2.6 Contractor Facilities and Work Areas |
| 3.2.7 Borrow Areas Provided by the Government |
| 3.3 WATER RESOURCES |
| 3.3.1 Cofferdams, Diversions, and Dewatering Operations |
| 3.3.2 Stream Crossings |
| 3.3.3 Wetlands |
| 3.4 AIR RESOURCES |
| 3.4.1 Particulates |
| 3.4.2 Odors |
| 3.4.3 Sound Intrusions |
| 3.4.4 Burning |
| 3.4.5 Hydrocarbons and Carbon Monoxide |
| 3.4.6 Monitoring Air Quality |
| 3.5 WASTE DISPOSAL |
| 3.5.1 Disposal Areas |
| 3.5.2 Temporary Excavation and Embankments |
| 3.5.3 Solid Wastes |
| 3.5.4 Chemicals and Chemical Wastes |
| 3.5.5 Contractor Generated Hazardous Wastes/Excess Hazardous Materials |
| 3.5.6 Fuel and Lubricants |
| 3.5.7 Waste Water |
| 3.6 REPORTING OF POLLUTION SPILLS |
| 3.7 WASTE MINIMIZATION AND RECYCLING |
| 3.8 NON-HAZARDOUS SOLID WASTE DIVERSION REPORT |
| 3.9 HISTORICAL, ARCHAEOLOGICAL, AND CULTURAL RESOURCES |
| 3.10 BIOLOGICAL RESOURCES |
| 3.11 INTEGRATED PEST MANAGEMENT |
| 3.11.1 Pesticide Delivery and Storage |
| 3.11.2 Qualifications |
| 3.11.3 Pesticide Handling Requirements |
| 3.11.4 Application |
| 3.12 PREVIOUSLY USED EQUIPMENT |
| 3.13 MAINTENANCE OF POLLUTION FACILITIES |
| 3.14 MILITARY MUNITIONS |
| 3.15 TRAINING OF CONTRACTOR PERSONNEL |
| 3.16 INSPECTION |
| 3.17 POST CONSTRUCTION CLEANUP |
| 3.18 RESTORATION OF LANDSCAPE DAMAGE |
| STORM WATER POLLUTION PREVENTION PLAN |
| STORM WATER POLLUTION PREVENTION PLAN |
| PART 1 GENERAL |
| 1.1 REFERENCES |
| 1.2 GENERAL |
| 1.3 SUBMITTALS |
| 1.4 EROSION AND SEDIMENT CONTROLS |
| 1.4.1 Stabilization Practices |
| 1.4.1.1 Unsuitable Conditions |
| 1.4.1.2 No Activity for Less Than 14 Days |
| PART 2 STORMWATER POLLUTION PREVENTION PLAN FOR CONSTRUCTION ACTIVITY |
| 2.1 Site Description |
| 2.2 Responsible Parties |
| 2.3 Receiving Waters |
| 2.4 Documentation of Permit Eligibility Related to the 303d list and |
| 2.5 Attainment of Water Quality Standards After Authorization |
| 2.6 Site Map Requirements See Site Map on Sheet G-002 |
| 2.7 Stormwater Controls |
| 2.8 Other Controls |
| 2.9 Non-Stormwater Discharges |
| 2.10 Post-Construction Stormwater Management Establishment of Turf |
| 2.11 Applicable State or Local Programs |
| 2.12 INSPECTIONS |
| 2.12.1 GENERAL INSPECTION GUIDELINES |
| 2.12.2 DISTURBED AREAS AND AREAS USED FOR MATERIAL STORAGE |
| 2.12.3 MODIFICATION OF POLLUTION PLAN |
| 2.12.4 REPORTS |
| 2.13 Maintenance |
| 2.14 Employee Training |
| PART 3 CONTROL OF POLLUTANTS DURING CONSTRUCTION |
| 3.1 NON-STRUCTURAL MEASURES |
| 3.1.1 General |
| 3.1.2 Reduction of Exposure of Unprotected Erodible Soils |
| 3.1.3 General Buffer Zone |
| 3.1.3.1 Improvement of the General Buffer |
| 3.1.3.2 Maintenance of the General Buffer |
| 3.1.4 Disturbed Area Stabilization with Mulch |
| 3.1.4.1 Installation of Mulch |
| 3.1.4.2 Maintenance of Mulch |
| 3.2 STRUCTURAL MEASURES |
| 3.2.1 General |
| 3.2.2 Silt Fences |
| 3.2.2.1 Components for Silt Fences |
| 3.2.2.2 Installation of Silt Fences |
| 3.2.2.3 Maintenance of Silt Fences |
| 3.2.3 Sediment Basins |
| 3.2.4 Chemicals and Chemical Wastes |
| 3.3 Contractor Generated Hazardous Wastes/Excess Hazardous Materials |
| 3.4 Fuels and Lubricants |
| 3.5 Solid Wastes |
| 3.6 REPORTING OF POLLUTION SPILLS |
| 3.7 WASTE MINIMIZATION AND RECYCLING |
| 3.8 NON-HAZARDOUS SOLID WASTE DIVERSION REPORT |
| 3.9 HISTORICAL, ARCHAEOLOGICAL, AND CULTURAL RESOURCES |
| 3.10 BIOLOGICAL RESOURCES |
| 3.11 INTEGRATED PEST MANAGEMENT |
| 3.11.1 Pesticide Delivery and Storage |
| 3.11.2 Qualifications |
| 3.11.3 Pesticide Handling Requirements |
| 3.11.4 Application |
3.12 PREVIOUSLY USED EQUIPMENT
| PART 4 OTHER CONSIDERATIONS |
| 4.1 LOCATION OF CONSTRUCTION IN REGARD TO WATERS CLASSIFIED IN 10 CSR |
| 4.2 PROXIMITY OF SITE TO MAJOR RESERVOIRS |
| PART 5 DEFINITIONS |
| 5.1 BEST MANAGEMENT PRACTICES BMPs |
| 5.2 COMMENCEMENT OF CONSTRUCTION |
| 5.3 DRAINAGE SWALE |
| 5.4 FINAL STABILIZATION |
PART 6 CERTIFICATIONS, INSPECTION, AND MAINTENANCE REPORT FORMS
| PROJECT SIGN, BARRICADES, AND TRAFFIC CONTROL SIGNS |
| PROJECT SIGN, BARRICADES, AND TRAFFIC CONTROL SIGNS |
| PART 1 GENERAL |
| 1.1 SCOPE |
| 1.2 PROJECT SIGN |
| 1.3 BARRICADES AND TRAFFIC CONTROL SIGNS |
| 1.4 PAYMENT |
| PART 2 PRODUCTS NOT USED |
| PART 3 EXECUTION NOT USED |
| DIVISION 31 - EARTHWORK |
| EARTHWORK |
| EARTHWORK |
| PART 1 GENERAL |
| 1.1 SCOPE |
| 1.2 QUALITY CONTROL |
| 1.3 REFERENCES |
| 1.4 SUBMITTALS |
| PART 2 PRODUCTS |
| 2.1 Additional Borrow |
| PART 3 EXECUTION |
| 3.1 SLIDE EXCAVATION |
| 3.2 PROCESSING AND TESTING EXCAVATED MATERIAL |
| 3.3 COMPACTED BACKFILL |
| 3.3.1 General |
| 3.3.2 Materials |
| 3.3.3 Placement |
| 3.3.4 Testing and Compaction |
| 3.3.5 Additional Testing |
| 3.4 LEVEE RESTORATION USING GEOGRID |
| 3.4.1 Storage and Handling |
| 3.4.2 Installation |
| 3.4.2.1 Foundation Preparation |
| 3.4.2.2 Anchorage |
| 3.4.2.3 Placement |
| 3.4.2.4 Damaged Geogrid/Unused Geogrid |
| 3.4.2.5 Overlaps and Fasteners |
3.4.3 Cover Soil Placement
3.5 DISPOSITION OF MATERIAL
| DIVISION 32 - EXTERIOR IMPROVEMENTS |
| AGGREGATE SURFACE COURSE |
| AGGREGATE SURFACE COURSE |
| PART 1 GENERAL |
| 1.1 Scope |
| 1.2 REFERENCES |
| 1.3 SUBMITTALS |
| 1.4 QUALITY CONTROL |
| 1.5 EQUIPMENT |
| 1.6 SAMPLING AND TESTING |
| 1.6.1 Contractor Testing |
| 1.6.2 Sampling |
| 1.6.3 Testing |
| 1.6.3.1 Gradation |
| 1.6.3.2 Liquid Limit and Plasticity Index |
| 1.6.3.3 Density Tests |
| 1.6.3.4 Wear Test |
| 1.6.3.5 Smoothness Test |
| 1.6.3.6 Government Testing |
| PART 2 PRODUCTS |
| 2.1 AGGREGATES |
| 2.1.1 Coarse Aggregates |
| 2.1.2 Fine Aggregates |
| 2.1.3 Gradation Requirements |
2.2 LIQUID LIMIT AND PLASTICITY INDEX REQUIREMENTS
| PART 3 EXECUTION |
| 3.1 WEATHER LIMITATIONS |
| 3.2 CLEARING AND DEBRIS REMOVAL |
| 3.3 USE OF HAUL ROADS |
| 3.4 STOCKPILING MATERIALS |
| 3.5 PREPARATION OF UNDERLYING SUBGRADE |
| 3.6 GRADE CONTROL |
| 3.7 MIXING AND PLACING MATERIALS |
| 3.8 PLACEMENT |
| 3.9 LAYER THICKNESS |
| 3.10 THICKNESS CONTROL |
| 3.11 COMPACTION |
| 3.12 EDGES OF AGGREGATE-SURFACED ROAD |
| 3.13 MAINTENANCE |
| ESTABLISHMENT OF TURF |
| ESTABLISHMENT OF TURF |
| PART 1 GENERAL |
| 1.1 SCOPE |
| 1.2 REFERENCES |
| 1.3 SUBMITTALS |
| 1.4 QUALITY CONTROL |
| 1.5 AREAS TO BE TURFED |
| PART 2 PRODUCTS |
| 2.1 MATERIALS |
| 2.1.1 Fertilizer and Limestone |
| 2.1.2 Seed |
| 2.1.3 Mulch |
| 2.1.4 Water |
| 2.1.5 Soil for Repairs |
| 2.1.6 Soil Composition |
| 2.2 SAMPLING, TESTING, AND CERTIFICATES |
| 2.2.1 Seed |
| 2.2.2 Soil Testing |
| 2.2.3 Fertilizer and Limestone Testing |
| 2.2.4 Mulch |
| PART 3 EXECUTION |
| 3.1 COMMENCEMENT, PROSECUTION, AND COMPLETION |
| 3.2 PREPARATION OF GROUND SURFACE |
| 3.2.1 Clearing |
| 3.2.2 Dressing |
| 3.3 SEEDING |
| 3.3.1 Planting Dates |
| 3.3.2 Seed Mixtures |
| 3.3.3 Damage to Seeding |
| 3.4 APPLICATION OF AN ANCHORING MULCH |
| 3.5 HYDRAULIC SLURRY METHOD |
| 3.6 COMPACTING |
| 3.7 ESTABLISHMENT |
| 3.7.1 General |
| 3.7.2 Maintenance |
| 3.8 Turf Establishment Period |
| 3.9 INSPECTION AND ACCEPTANCE |
| 3.9.1 Areas Requiring Returfing |
| 3.10 Sequence of Work |
| 3.11 PREPARATION OF GROUND SURFACE |
| 3.11.1 Clearing |
| 3.11.2 Dressing |
| 3.12 APPLICATION OF FERTILIZER AND/OR LIMESTONE |
| 3.13 SPOT SODDING |
| 3.14 SPRIGGING |
| 3.15 SEEDING |
| 3.15.1 Planting Dates |
| 3.15.2 Seed Mixtures |
| 3.15.3 Broadcast Seeding |
| 3.15.4 Hydroseeding |
| 3.15.5 Damage to Seeding |
| 3.16 APPLICATION OF AN ANCHORING MULCH |
| 3.17 HYDRAULIC SLURRY METHOD |
| 3.18 COMPACTING |
| 3.19 ESTABLISHMENT |
| 3.19.1 General |
| 3.19.2 Watering |
| 3.19.3 Maintenance |
| 3.19.4 Turf Establishment Period |
| 3.20 INSPECTION AND ACCEPTANCE |
| 3.20.1 Areas Requiring Returfing |
| SLIDES_COMPLETE_LIST.pdf |
| LIST A,B and C FOR CONTRACT |
File details come from the government source that posted it. Updated .