H01_PLANS.pdf

PDF 10 MB Posted

Attached to
Levee Slide Repair Federal contract opportunity
Solicitation number
W912EQ-16-B-0009
Issued by
Department of the Army Corps of Engineers Engineering District Memphis

About this file

Plans for Levee Slide Repair

View the file

Other files for this federal contract opportunity

Other files attached to Levee Slide Repair, newest first.
File Type Posted
Copy_of_Bid_Abstract_FBO.xlsx XLSX spreadsheet
AMEND_0004.pdf PDF
AMEND0004.pdf PDF
Pre-Bid_Site_Visit.pdf PDF
FBO_Conformed_Levee_Slide.pdf PDF
AMENDMENT0003.pdf PDF
Amendment_002.pdf PDF
A22_Amendement_0002.pdf PDF
W912EQ-16-B-0009_Levee_Slide.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

LIST

SLIDE

DESIGNATION

COUNTY, STATE LATITUDE LONGITUDE

LEVEE MILE

STATION

RIVERSIDE OR

LANDSIDE SLOPE

APPROXIMATE SLIDE

LENGTH (FT.)

APPROXIMATE LEVEE

HEIGHT (FT.)

APPROXIMATE SLOPE

INCLINATION

ESTIMATED SLIDE

EXCAVATION

QUANTITY (CY)

ESTIMATED

DISTANCE BETWEEN

LEVEE TOE AND

ROW (FT.)

ESTIMATED

BORROW (CY)*

DISTANCE X PARALLEL

TO LEVEE FOR

OBTAINING BORROW

(FT.)**

A 10_1 36.827022 -89.302964 12/42+85 RIVERSIDE 175 23 1V:3.5H 2917 75 438 158

A 10_3 36.81699667 -89.30915833 13/30+00 RIVERSIDE 150 18 1V:3.5H 3611 60 542 244

A 17_3

MISSISSIPPI

COUNTY, AR

35.908033 -89.759328 56/34+00 RIVERSIDE 180 30 1V:3H 4667 75 700 252

A 20_2

PHILLIPS

COUNTY, AR

34.3019333 -90.81681 28/07+75 RIVERSIDE 230 20 1V:2.5H 7156 50 1073 580

A 23_1 34.03344 -91.04932 63/14+00 RIVERSIDE 75 20 1V:3H 1389 60 208 94

A 23_2 34.03308 -91.04893 63/13+00 RIVERSIDE 120 20 1V:3H 2222 50 333 180

A 26_1 34.89658 -90.245922 14/36+60 RIVERSIDE 110 30 1V:3.5H 3707 100 556 150

A 26_2 34.896236 -90.246656 14/38+90 RIVERSIDE 70 30 1V:4H 2074 100 311 84

A 27_2 34.32968 -91.0293 19/32+17 RIVERSIDE 117 30 1V:3H 7800 50 1170 632

A 27_3 34.326839 -91.031819 19/38+30 RIVERSIDE 150 30 1V:3.5H 10000 50 1500 810

A 57_2

SCOTT COUNTY,

MO

37.2364 -89.5466 14/31+20 RIVERSIDE 75 30 1V:3.5H 1500 75 225 81

A 76_1

MISSISSIPPI

COUNTY, MO

36.636194 -89.20975 61/25+50 RIVERSIDE 100 17 1V:3.5H 3500 50 525 284

B 8_1 36.921544 -89.206142 04/07+84 RIVERSIDE 100 25 1V:5H 3704 50 556 300

B 8_2 36.861872 -89.276586 09/52+00 RIVERSIDE 75 25 1V:3.5H 2778 60 417 188

B 17_1

MISSISSIPPI

COUNTY, AR 35.919886 -89.735786

54/60+22 RIVERSIDE 75 20 1V:3H 889 50 133 72

B 17_2

MISSISSIPPI

COUNTY, AR

35.91976 -89.74126 55/15+74 RIVERSIDE 50 30 1V:3H 593 50 89 48

C 23_3

DESHA COUNTY,

AR

34.0443083 -91.05741 64/14+35 RIVERSIDE 320 20 1V:3H 8296 150 1244 224

D 26_3 34.186381 -90.741957 86/41+39 RIVERSIDE 65 25 1V:3.5H 2167 75 325 117

D 26_4 34.18525 -90.744146 86/49+35 RIVERSIDE 115 25 1V:3.5H 3833 75 575 207

D 26_5 34.13278 -90.817514 93/33+80 RIVERSIDE 120 25 1V:3.5H 4000 75 600 216

*REFER TO SKETCH D AND E FOR BORROW MATERIAL INSTRUCTIONS

**REFER TO SKETCH D AND E

TABLE 1: LIST A, B, C AND D SLIDES

MISSISSIPPI

COUNTY, MO

DESHA COUNTY,

AR

PHILLIPS

COUNTY, AR

DESOTO COUNTY,

MS

COAHOMA

COUNTY, MS

MISSISSIPPI

COUNTY, MO

Arkansas

Missouri

Mississippi

Tennessee

Illinois

Kentucky

Texas

White

Lee

Dent

Drew

Iron

Clay

Howell

Bolivar

Butler

Desha

Izard

Shannon Wayne

Shelby

Dyer

Arkansas

Oregon

Lonoke

Ripley

Cross

Prairie

Panola

Sharp

Phillips

Jefferson

Fulton

Poinsett

Tate

Obion

Stoddard

Fayette

Perry

Reynolds

Monroe

Scott

Gibson

Mississippi

Carter

Marshall

Lincoln

Graves

Greene

Jackson

Carroll

Pope

Union

Lafayette

Stone

Bollinger

Dunklin

Tipton

Leflore

Craighead

Calhoun

Tunica

McNairy

Weakley

Tippah

Madison

DeSoto

Randolph

Woodruff

Alcorn

Cleburne

Hardeman

Lawrence

Crittenden

Coahoma

St. Francis

New Madrid

Haywood

Benton

Pemiscot

Saline

Pontotoc

Sunflower

Tallahatchie

Independence

Prentiss

Grenada

Henry

Webster

Pulaski

Phelps

Yalobusha

Quitman

Chickasaw

Lauderdale

Johnson

Williamson

Bradley

Lake

Cleveland

Cape Girardeau

Ballard

Chester

Itawamba

Henderson

Massac

Lowndes

Crockett

Hickman

St. Francois

Carlisle

Alexander

Ozark

Oktibbeha Montgomery

Livingston

Crawford

McCracken

Calloway

Chicot

Washington

Hardin

Douglas

Ste. Genevieve

Choctaw

Baxter

Faulkner

Gallatin

Grant

Tishomingo

Franklin

0 40 8020 Miles

MEMPHIS DISTRICT

Memphis District (Drawing No. 1)

Major Cities

State Boundary

District Boundary

Mississippi

DRAWING NO. 1

Gibson

Clay

Fulton Hickman

Ballard

Carlisle

Dunklin

CrockettLauderdale

Dyer

Obion

New Madrid

Pemiscot

Scott

Stoddard

Bollinger

Mississippi Co

Mississippi Co

Arkansas

Illinois

Kentucky

Missouri

Tennessee

Levee Slide Locations

0 1.5 3 Miles

Levee Slides on Segment 10 Location: Segment 10, BirdsPoint- New Madrid Setback 12/32+00 to 36/00+00, Missouri Map created: 12 May 2016 Levee Sponsor: Sam Oliver Phone: (573) 225-1648

LABEL FORMAT: Inspection ID, Point or Line-Item-Rating

PS

PS

PS

PSPS

PS

PS PS PSPS

PS

PS

PS

PS

PS

PS

PS PS

PS

PS

PS

PS

PS

PS

PS

PS

PS

PS

PS

PSPS

PS

PS

PS

PS

PS

PS

PS

PS

PS

PS

PS

PS

Ø

Ø

Slide 10_1 Slide 10_3

MP

10/11

MP 15/16

MP 70/71

MP 75/76

MP 20/21

MP 25/26

MP 30/31

MP

35/36

MP

5/6

MP 5/6

MP 85/86

Sources: Esri, HERE, DeLorme, Intermap, increment P Corp., GEBCO, USGS, FAO, NPS, NRCAN, GeoBase, IGN, Kadaster NL, Ordnance Survey, Esri Japan, METI, Esri China (Hong Kong), swisstopo, MapmyIndia, © OpenStreetMap contributors, and the GIS User Community

0 1 20.5 Miles

Segment 10, BirdsPoint- New Madrid Setback 12/32+00 to 36/00+00

Legend

Mileposts PS Pump Station

Culverts Levee Segment 10 Other Levees (NLD) Floodwall

Levee Slides Ø

List A Slides

2 Slides on Segment 10

DRAWING NO. 2 - LEVEE SLIDE LOCATIONS - LIST A - 10_1 AND 10_3

Poinsett

St.

Francis

Fayette

Craighead

Crittenden

Greene

Lee

DeSoto

Lauderdale

Dyer

Shelby

Tipton

Marshall TateTunica

Arkansas

Mississippi

Tennessee

Levee Slide Locations

0 0.85 1.7 Miles

Levee Slides on Segment 17 Location: Segment 17, MO-AR Line to Mouth of St. Francis River @ MS River Levee- 46/49+60 to 218/0+00 Map created: 12 May 2016

LABEL FORMAT: Inspection ID, Point or Line-Item-Rating

PS

PS

PS

PSPS

PS

PS

PS

PSPS

PS

PS

PS

PS

PS

PS

PS PS

PS

PS

PS

PS

PS

PS

PS

PS

PS

PS

PS

PSPS

PS

PS

PS

PS

PS

PS

PS

PS

PS

PS

PS

PS

Ø

Ø

Ø

MP 50/51

MP 55/56

MP 60/61

Slide 17_1

Slide 17_3

Slide 17_2

Sources: Esri, HERE, DeLorme, Intermap, increment P Corp., GEBCO, USGS, FAO, NPS, NRCAN, GeoBase, IGN, Kadaster NL, Ordnance Survey, Esri Japan, METI, Esri China (Hong Kong), swisstopo, MapmyIndia, © OpenStreetMap contributors, and the GIS User Community

0 1 20.5 Miles

Segment 17, MO-AR Line to Mouth of St. Francis River @ MS River Levee-46/49+60 to 218/0+00

Legend Mileposts Levee Segment 17 Other Levees (NLD)

Levee Slides Ø

List A Slides

Ø

List B Slides

Segment 17

3 Slides on Segment17

DRAWING NO. 3 - LEVEE SLIDE LOCATIONS - LIST A - 17_3 / LIST B - 17_1 AND 17_2

Phillips

Coahoma

Arkansas

Mississippi

Levee Slide Locations

0 0.25 0.5 Miles

Levee Slides on Segment 20 Location: Segment 20, Helena, AR to Elaine, AR Levee 4/10+00 to 28/69+00 Map created: 12 May 2016 Levee Sponsor: Jim Frazier Phone: (870) 338-1561

LABEL FORMAT: Inspection ID, Point or Line-Item-Rating

PS

PS

PS

PSPS

PS

PS

PS

PS

PS

PS

PS

PS

PS

PS

PS

PS PS

PS

PS

PS

PS

PS

PS

PS

PS

PS

PS

PS

PSPS

PS

PS

PS

PS

PS

PS

PS

PS

PS

PS

PS

PS

Ø

MP 27/28

MP 28/29Slide 20_2

Sources: Esri, HERE, DeLorme, Intermap, increment P Corp., GEBCO, USGS, FAO, NPS, NRCAN, GeoBase, IGN, Kadaster NL, Ordnance Survey, Esri Japan, METI, Esri China (Hong Kong), swisstopo, MapmyIndia, © OpenStreetMap contributors, and the GIS User Community

0 0.25 0.5 Miles

Segment 20, Helena, AR to Elaine, AR Levee 4/10+00 to 28/69+00

Legend Levee Slides Ø

List A Slides Mileposts Levee Segment 20 Other Levees (NLD)

Segment 20

Slide Locations on Segment 20

DRAWING NO. 4 - LEVEE SLIDE LOCATIONS - LIST A - 20_2

Phillips

Desha

Bolivar

Coahoma

Arkansas

Mississippi

Levee Slide Locations

0 0.1 0.2 Miles

Location: Segment 23, Elaine, AR to Laconia Circle Levee 48/36+00 to 67/0+00Map created: 13 May 2016Levee Sponsor: L.K. Holt & RonniePankey

LABEL FORMAT: Inspection ID, Point or Line-Item-Rating

Ø

Ø

Ø

MP 63/64

MP 64/65

Slide 23_2

Slide 23_3

Slide 23_1

Sources: Esri, HERE, DeLorme, Intermap, increment P Corp., GEBCO, USGS, FAO, NPS, NRCAN, GeoBase, IGN, Kadaster NL, Ordnance Survey, Esri Japan, METI, Esri China (Hong Kong), swisstopo, MapmyIndia, © OpenStreetMap contributors, and the GIS User Community, Esri, HERE, DeLorme, MapmyIndia, © OpenStreetMap contributors, and the GIS user community

0 500 1,000 Feet

Segment 23, Elaine, AR to Laconia Circle Levee 48/36+00 to 67/0+00

Legend Ø

List A Slides

Ø

List C Slides Mileposts Levee Segment 23 Other Levees (NLD)

Segment 23

3 Slides Locations on Segment 23

Levee Slides on Segment 23

DRAWING NO. 5 - LEVEE SLIDE LOCATIONS - LIST A AND C - 23_1, 23_2, 23_3

Francis

Panola

Phillips

Lee

Bolivar

Coahoma

DeSoto

Quitman

Tate Tunica

Arkansas

Mississippi

Levee Slide Locations

0 0.25 0.5 Miles

Levee Slides on Segment 26 Location: Segment 26, Yazoo-Delta Levee 0/0+00 to 97/33+38 Map created: 12 May 2016 Levee Sponsor: Bruce Cook Phone: (662) 624-4397

LABEL FORMAT: Inspection ID, Point or Line-Item-Rating

PS

PS

PS

PSPS

PS

PS

PS

PS

PS

PS

PS

PS

PS

PS

PS

PS PS

PS

PS

PS

PS

PS

PS

PS

PS

PS

PS

PS

PSPS

PS

PS

PS

PS

PS

PS

PS

PS

PS

PS

PS

PS

Ø Ø

MP 15/16

MP 14/15

Slide 26_2

Slide 26_1

Sources: Esri, HERE, DeLorme, Intermap, increment P Corp., GEBCO, USGS, FAO, NPS, NRCAN, GeoBase, IGN, Kadaster NL, Ordnance Survey, Esri Japan, METI, Esri China (Hong Kong), swisstopo, MapmyIndia, © OpenStreetMap contributors, and the GIS User Community

0 0.25 0.5 Miles

Segment 26, Yazoo-Delta Levee 0/0+00 to 97/33+38

Legend Levee Slides Ø

List A Slides Mileposts Levee Segment 26 Other Levees (NLD)

Segment 26

2 Slides on Segment 26

DRAWING NO. 6 - LEVEE SLIDE LOCATIONS - LIST A - 26_1 AND 26_2

Arkansas

Chicot

Phillips

Desha

Monroe

Bolivar

Coahoma

Sunflower

Tunica

Washington

Arkansas

Mississippi

Levee Slide Locations

0 0.45 0.9 Miles

Levee Slides on Segment 27 Location: Segment 27, Old Town Lake to Laconia Circle 0/0+00 to 40/44+00 Map created: 12 May 2016 Levee Sponsor: Jim Frazier and Gary Inman Phone: (870) 338-1561

LABEL FORMAT: Inspection ID, Point or Line-Item-Rating

PS

PS

PS

PSPS

PS

PS

PS

PSPS

PS

PS

PS

PS

PS

PS

PS PS

PS

PS

PS

PS

PS

PS

PS

PS

PS

PS

PS

PSPS

PS

PS

PS

PS

PS

PS

PS

PS

PS

PS

PS

PS

Ø

Ø

MP 20/21

Slide 27_2 Slide 27_3

Sources: Esri, HERE, DeLorme, Intermap, increment P Corp., GEBCO, USGS, FAO, NPS, NRCAN, GeoBase, IGN, Kadaster NL, Ordnance Survey, Esri Japan, METI, Esri China (Hong Kong), swisstopo, MapmyIndia, © OpenStreetMap contributors, and the GIS User Community

0 0.5 1 Miles

Segment 27, Old Town Lake to Laconia Circle 0/0+00 to 40/44+00

Legend Levee Segment 27 Other Levees (NLD) Mileposts

Levee Slides Ø

List A Slides

Segment 27

2 Slides on Segment 27

DRAWING NO. 7 - LEVEE SLIDE LOCATIONS - LIST A - 27_2 AND 27_3

Alexander

Scott

Stoddard

Cape Girardeau Illinois

Missouri

Levee Slide Locations

0 1.5 3 Miles

Levee Slides on Segment 57 Location: Segment 57, Little River Headwater Diversion Levee 0/2+00 to 19/36+00 Map created: 12 May 2016 Levee Sponsor: Dustin Boatwright Phone: (573) 335-3439

LABEL FORMAT: Inspection ID, Point or Line-Item-Rating

PS

PS

PS

PSPS

PS

PS PS PSPS

PS

PS

PS

PS

PS

PS

PS PS

PS

PS

PS

PS

PS

PS

PS

PS

PS

PS

PS

PSPS

PS

PS

PS

PS

PS

PS

PS

PS

PS

PS

PS

PS

Ø

MP

15/16MP 10/11

MP 5/6

MP 0/1

Slide 57_2

Sources: Esri, HERE, DeLorme, Intermap, increment P Corp., GEBCO, USGS, FAO, NPS, NRCAN, GeoBase, IGN, Kadaster NL, Ordnance Survey, Esri Japan, METI, Esri China (Hong Kong), swisstopo, MapmyIndia, © OpenStreetMap contributors, and the GIS User Community

0 2.5 51.25 Mi

Segment 57, Little River Headwater Diversion Levee 0/2+00 to 19/36+00

Legend Ø

List A Slide Mileposts Levee Segment 57 Culverts Other Levees (NLD)

Segment 57

DRAWING NO. 8 - LEVEE SLIDE LOCATIONS - LIST A - 57_2

Gibson

Fulton

Hickman

Ballard

Carlisle

Lake

Dyer

Obion

Mississippi

New Madrid

Pemiscot

Scott Illinois

Kentucky

Missouri

Tennessee

Levee Slide Locations

0 2.5 5 Miles

Levee Slides on Segment 76 Location: Segment 76, BPNM Frontline Levee 43/21+00 to 87/0+00 Map created: 16 May 2016

LABEL FORMAT: Inspection ID, Point or Line-Item-Rating

Ø

MP 0/1MP 10/11

MP 10/11

MP 15/16

MP 15/16

MP 70/71MP 75/76

MP 20/21

MP 25/26

MP 30/31

MP

35/36

MP 45/46

MP 5/6

MP 5/6

MP 5/6

MP 50/51

MP 55/56

MP 60/61

MP 65/66

MP 80/81

MP 85/86

Slide 76_1

Sources: Esri, HERE, DeLorme, Intermap, increment P Corp., GEBCO, USGS, FAO, NPS, NRCAN, GeoBase, IGN, Kadaster NL, Ordnance Survey, Esri Japan, METI, Esri China (Hong Kong), swisstopo, MapmyIndia, © OpenStreetMap contributors, and the GIS User Community

0 2.5 5 Miles

Segment 76, BPNM Frontline Levee 43/21+00 to 87/0+00

Legend Mileposts Levee Segment 76 Other Levees (NLD)

Levee Slides Ø

List A

Segment 76

1 Slide on Segment 76

DRAWING NO. 9 - LEVEE SLIDE LOCATIONS - LIST A - 76_1

Hickman

Ballard

CarlisleMississippi

New Madrid

Scott

Illinois

Kentucky

Missouri

Levee Slide Locations

0 1.5 3 Miles

Levee Slides on Segment 8 Location: Segment 8, Commerce to Birds Point Levee 17/49+00 to Birds-Point New Madrid Setback 12/32+00 Map created: 12 May 2016 Levee Sponsor: Homer Oliver Phone: (573) 380-1417

LABEL FORMAT: Inspection ID, Point or Line-Item-Rating

PS

PS

PS

PSPS

PS

PS

PS PSPS

PS

PS

PS

PS

PS

PS

PS PS

PS

PS

PS

PS

PS

PS

PS

PS

PS

PS

PS

PSPS

PS

PS

PS

PS

PS

PS

PS

PS

PS

PS

PS

Ø

Ø

Slide 8_2

Slide 8_1

MP 0/1

MP 10/11

MP 10/11

MP 20/21

MP 25/26

MP 30/31

MP 45/46

MP 5/6

Sources: Esri, HERE, DeLorme, Intermap, increment P Corp., GEBCO, USGS, FAO, NPS, NRCAN, GeoBase, IGN, Kadaster NL, Ordnance Survey, Esri Japan, METI, Esri China (Hong Kong), swisstopo, MapmyIndia, © OpenStreetMap contributors, and the GIS User Community, Source: Esri, DigitalGlobe, GeoEye, Earthstar Geographics, CNES/Airbus DS, USDA, USGS, AEX, Getmapping, Aerogrid, IGN, IGP, swisstopo, and the GIS User CommunityMap Produced by Tech Services Support Branch

0 1 20.5 Miles

Segment 8, Commerce to Birds Point Levee 17/49+00 to Birds-Point New Madrid Setback 12/32+00

Legend Mileposts

PS Pump Station Culverts Levee Segment 8 Other Levees (NLD) Floodwall

Levee Slides Ø

List A Slides

Ø

List B Slides

2 Slides on Segment 8

DRAWING NO. 10 - LEVEE SLIDE LOCATIONS - LIST B - 8_1 AND 8_2

Panola

Phillips

Lee

Bolivar

Coahoma

DeSoto

Quitman

Tate Tunica

Arkansas

Mississippi

Levee Slide Locations

0 0.35 0.7 Miles

Levee Slides on Segment 26 Location: Segment 26, Yazoo-Delta Levee 0/0+00 to 97/33+38 Map created: 12 May 2016 Levee Sponsor: Bruce Cook Phone: (662) 624-4397

LABEL FORMAT: Inspection ID, Point or Line-Item-Rating

PS

PS

PS

PSPS

PS

PS

PS

PS

PS

PS

PS

PS

PS

PS

PS

PS PS

PS

PS

PS

PS

PS

PS

PS

PS

PS

PS

PS

PSPS

PS

PS

PS

PS

PS

PS

PS

PS

PS

PS

PS

PS

Ø

Ø

MP 89/90

MP 88/89

MP 87/88

MP 86/87

MP 85/86

Slide 26_3

Slide 26_4

Sources: Esri, HERE, DeLorme, Intermap, increment P Corp., GEBCO, USGS, FAO, NPS, NRCAN, GeoBase, IGN, Kadaster NL, Ordnance Survey, Esri Japan, METI, Esri China (Hong Kong), swisstopo, MapmyIndia, © OpenStreetMap contributors, and the GIS User Community

0 0.5 1 Miles

Segment 26, Yazoo-Delta Levee 0/0+00 to 97/33+38

Legend Mileposts Levee Segment 26 Other Levees (NLD)

Levee Slides Ø

List D Slides

DRAWING NO. 11 - LEVEE SLIDE LOCATIONS - LIST D - 26_3 AND 26_4

Panola

Phillips

Lee

Bolivar

Coahoma

DeSoto

Quitman

Tate Tunica

Arkansas

Mississippi

Levee Slide Locations

0 0.85 1.7 Miles

Levee Slides on Segment 26 Location: Segment 26, Yazoo-Delta Levee 0/0+00 to 97/33+38 Map created: 12 May 2016 Levee Sponsor: Bruce Cook Phone: (662) 624-4397

LABEL FORMAT: Inspection ID, Point or Line-Item-Rating

PS

PS

PS

PSPS

PS

PS

PS

PSPS

PS

PS

PS

PS

PS

PS

PS PS

PS

PS

PS

PS

PS

PS

PS

PS

PS

PS

PS

PSPS

PS

PS

PS

PS

PS

PS

PS

PS

PS

PS

PS

PS

Ø

MP 90/91

MP 89/90

MP 99/100

MP 98/99

MP 97/98

MP 95/96MP 96/97

MP 94/95

MP 93/94

MP 92/93

MP 91/92

Slide 26_5

Sources: Esri, HERE, DeLorme, Intermap, increment P Corp., GEBCO, USGS, FAO, NPS, NRCAN, GeoBase, IGN, Kadaster NL, Ordnance Survey, Esri Japan, METI, Esri China (Hong Kong), swisstopo, MapmyIndia, © OpenStreetMap contributors, and the GIS User Community

0 1 2 Miles

Segment 26, Yazoo-Delta Levee 0/0+00 to 97/33+38

Legend Mileposts Levee Segment 26 Other Levees (NLD)

Levee Slides Ø

List D Slides

DRAWING NO. 12 - LEVEE SLIDE LOCATIONS - LIST D - 26_5

SKETCH A

SKETCH B

SKETCH C

SKETCH D

SKETCH E

PROJECT TABLE OF CONTENTS
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
DEPARTMENT OF THE ARMY
DEPARTMENT OF THE ARMY
U.S. ARMY CORPS OF ENGINEERS
INSTRUCTIONS, CONDITIONS, AND NOTICES TO BIDDERS
INSTRUCTIONS, CONDITIONS, AND NOTICES TO BIDDERS
PART 1 GENERAL INFORMATION
1.1 Contract Information
BIDDING SCHEDULE
BIDDING SCHEDULE
PART 1 BIDDING SCHEDULE
1.1 LINE ITEMS
1.2 NOTES
CONTRACT CLAUSE INSERTS
CONTRACT CLAUSE INSERTS
PART 1 GENERAL
1.1 SUBMITTALS
1.2 FAR 52.204-7 SYSTEM FOR AWARD MANAGEMENT JUL 2013
1.3 FAR 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK APR
1.4 FAR 52.211-12 LIQUIDATED DAMAGES CONSTRUCTION SEP 2000
1.5 FAR 52.211-18 VARIATION IN ESTIMATED QUANTITIES APR 1984
1.6 FAR 52.228-5 INSURANCE - WORK ON A GOVERNMENT INSTALLATION JAN 1997
1.7 FAR 52.236-1 PERFORMANCE OF WORK BY THE CONTRACTOR APR 1984
1.8 FAR 52.236-5 MATERIAL AND WORKMANSHIP APR 1984
1.9 FAR 52.236-4 PHYSICAL DATA APR 1984
1.10 FAR 52.236-16 QUANTITY SURVEYS-ALTERNATE I APR 1984
1.11 FAR 52.236-21 SPECIFICATION AND DRAWING FOR CONSTRUCTION FEB 1997
1.12 FAR 52.246-21 WARRANTY OF CONSTRUCTION MAR 1994
1.13 FAR 52.249-10 DEFAULT FIXED-PRICE CONSTRUCTIONAPR 1984
1.14 UAI 52.249-5000 BASIS FOR SETTLEMENT OF PROPOSALS MAR 2013
1.15 DFARS 252.236-7001 CONTRACT DRAWINGS AND SPECIFICATIONS AUG 2000
1.16 DFARS 52.236-7004 PAYMENT FOR MOBILIZATION AND DEMOBILIZATION DEC
PART 2 PRODUCTS Not Used
PART 3 EXECUTION Not Used
SPECIAL CONTRACT REQUIREMENTS
SPECIAL CONTRACT REQUIREMENTS
PART 1 GENERAL
1.1 REFERENCES
1.2 SUBMITTALS
1.3 EXCLUSION PERIODS IN COMPUTING COMPLETION SCHEDULES
1.4 EXCEPTION TO LIQUIDATED DAMAGES
1.5 RIGHTS-OF-WAY
1.6 LAYOUT OF WORK
1.7 PROGRESS CHART
1.8 SAFETY RELATED SPECIAL REQUIREMENTS
1.9 CERTIFICATES OF COMPLIANCE
1.10 CONTRACTOR'S CERTIFICATE
1.11 AS-BUILT DRAWINGS
1.12 DAMAGE TO WORK
1.13 NOTIFICATION OF AREA ENGINEER BEFORE BEGINNING WORK
1.14 RETESTING OF CONSTRUCTION MATERIALS
1.15 VEHICLE WEIGHT LIMITATIONS
1.16 OBSTRUCTIONS
1.17 NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM NPDES
1.18 ACCEPTANCE SECTIONS
1.19 TIME EXTENSIONS FOR UNUSUALLY SEVERE WEATHER 31 OCT 1989
1.20 STONE SOURCES
1.21 TEMPORARY PROJECT FENCING
1.22 COOPERATION WITH OTHERS
1.23 HOURS OF WORK
1.24 SUNDAY, HOLIDAY AND NIGHT WORK
1.25 SECURITY REQUIREMENTS
1.26 STORAGE OF EQUIPMENT AND MATERIALS
1.27 WORK ON OR ADJACENT TO RAILROAD PROPERTY
1.28 INSURANCE REQUIREMENTS FOR WORK ON OR ADJACENT TO RAILROAD PROPERTY
1.29 CONTROL OF WATER LEVELS NOT USED
1.30 FLOOD EMERGENCY
1.31 PATENTS, PROPRIETARY RIGHTS
1.32 PROTECTION OF MATERIALS AND WORK
1.33 EXISTING FLOOD PROTECTION
1.34 FINAL ACCEPTANCE
1.35 INSPECTION
1.36 DESIGNATED BILLING OFFICE
PART 2 PRODUCTS Not Used
PART 3 EXECUTION Not Used
DIVISION 01 - GENERAL REQUIREMENTS
SUMMARY OF WORK
SUMMARY OF WORK
PART 1 GENERAL
1.1 WORK COVERED BY CONTRACT DOCUMENTS
1.1.1 Project Description
1.1.2 Location
1.2 EXISTING WORK
1.3 LOCATION OF UNDERGROUND FACILITIES
PART 2 PRODUCTS Not Used
PART 3 EXECUTION Not Used
MEASUREMENT AND PAYMENT
MEASUREMENT AND PAYMENT
PART 1 GENERAL
1.1 JOB PAYMENT ITEMS
1.1.1 Mobilization and Demobilization
1.1.2 Environmental Protection
1.2 Stormwater Pollution Prevention Plan
1.3 UNIT PRICE PAYMENT ITEMS
1.3.1 Storm Water Pollution Prevention
1.3.1.1 Silt Fence
1.3.1.2 Erosion Control Berm
1.3.1.3 Temporary Environmental Seeding
1.3.2 Slide Excavation
1.3.3 Geogrid Transport and Installation
1.3.4 Compacted Backfill
1.3.5 Additional Borrow
1.3.6 Establishment of Turf
1.3.7 Aggregate Surfacing
PART 2 PRODUCTS Not Used
PART 3 EXECUTION Not Used
SUBMITTAL PROCEDURES
SUBMITTAL PROCEDURES
PART 1 GENERAL
1.1 DEFINITIONS
1.1.1 Submittal
1.1.2 Submittal Descriptions SD
1.1.3 Approving Authority
1.1.4 Work
1.2 SUBMITTALS
1.3 SUBMITTAL REGISTER
1.4 CONTRACTOR USE OF SUBMITTAL REGISTER
1.5 APPROVING AUTHORITY USE OF SUBMITTAL REGISTER
1.6 COPIES DELIVERED TO THE GOVERNMENT
1.7 PROCEDURES FOR SUBMITTALS
1.7.1 Reviewing, Certifying, Approving Authority
1.7.2 Constraints
1.7.3 Scheduling
1.7.4 Variations
1.7.4.1 Considering Variations
1.7.4.2 Proposing Variations
1.7.4.3 Warranting That Variations Are Compatible
1.7.4.4 Review Schedule Is Modified
1.8 CONTRACTOR'S RESPONSIBILITIES
1.9 GOVERNMENT'S RESPONSIBILITIES
1.10 FORMAT OF SUBMITTALS
1.10.1 Transmittal Sheet
1.10.2 Identifying Submittals
1.11 SUBMISSION AND CONTROL OF SUBMITTALS
1.11.1 Submittals Required from the Contractor
1.11.1.1 Submittal Procedures and Deviations
1.11.1.2 Control of Submittals
1.11.1.3 O&M Data
1.12 SUBMITTAL CLASSIFICATION
1.12.1 Government Approved
1.12.2 Information Only
1.13 APPROVED SUBMITTALS
1.14 DISAPPROVED SUBMITTALS
1.15 WITHHOLDING OF PAYMENT
1.16 GENERAL
1.17 SUBMITTAL REGISTER
1.18 SCHEDULING
1.19 TRANSMITTAL SHEET ENG FORM 4025
1.20 GOVERNMENT APPROVED SUBMITTALS
1.21 INFORMATION ONLY SUBMITTALS
1.22 STAMPS
PART 2 PRODUCTS Not Used
PART 3 EXECUTION Not Used
SOURCES FOR REFERENCE PUBLICATIONS
SOURCES FOR REFERENCE PUBLICATIONS
PART 1 GENERAL
1.1 REFERENCES
1.2 ORDERING INFORMATION
QUALITY CONTROL SYSTEM QCS
QUALITY CONTROL SYSTEM QCS
PART 1 GENERAL
1.1 SUBMITTALS
1.2 CONTRACT ADMINISTRATION
1.2.1 Correspondence and Electronic Communications
1.2.2 Other Factors
1.3 QCS SOFTWARE
1.4 SYSTEM REQUIREMENTS
1.5 RELATED INFORMATION
1.5.1 QCS User Guide
1.5.2 Contractor Quality Control CQC Training
1.6 CONTRACT DATABASE
1.7 DATABASE MAINTENANCE
1.7.1 Administration
1.7.1.1 Contractor Information
1.7.1.2 Subcontractor Information
1.7.1.3 Correspondence
1.7.1.4 Equipment
1.7.1.5 Management Reporting
1.7.1.6 Request For Information RFI
1.7.2 Finances
1.7.2.1 Pay Activity Data
1.7.2.2 Payment Requests
1.7.3 Quality Control QC
1.7.3.1 Daily Contractor Quality Control CQC Reports.
1.7.3.2 Deficiency Tracking.
1.7.3.3 QC Requirements
1.7.3.4 Three-Phase Control Meetings
1.7.3.5 Labor and Equipment Hours
1.7.3.6 Accident/Safety Reporting
1.7.3.7 Features of Work
1.7.4 Submittal Management
1.7.5 Schedule
1.7.6 Import/Export of Data
1.8 IMPLEMENTATION
1.9 DATA SUBMISSION VIA CD-ROM
1.9.1 File Medium
1.9.2 CD-ROM Labels
1.9.3 File Names
1.10 MONTHLY COORDINATION MEETING
1.11 NOTIFICATION OF NONCOMPLIANCE
PART 2 PRODUCTS Not Used
PART 3 EXECUTION Not Used
CONTRACTOR QUALITY CONTROL
CONTRACTOR QUALITY CONTROL
PART 1 GENERAL
1.1 SUBMITTALS
1.2 PAYMENT
PART 2 PRODUCTS Not Used
PART 3 EXECUTION
3.1 GENERAL REQUIREMENTS
3.2 QUALITY CONTROL PLAN
3.2.1 Content of the CQC Plan
3.2.2 Acceptance of Plan
3.2.3 Notification of Changes
3.3 COORDINATION MEETING
3.4 QUALITY CONTROL ORGANIZATION
3.4.1 Personnel Requirements
3.4.2 CQC System Manager
3.4.3 Additional Requirement
3.4.4 Organizational Changes
3.5 SUBMITTALS AND DELIVERABLES
3.6 CONTROL
3.6.1 Preparatory Phase
3.6.2 Initial Phase
3.6.3 Follow-up Phase
3.6.4 Additional Preparatory and Initial Phases
3.7 TESTS
3.7.1 Testing Procedure
3.7.2 Testing Laboratories
3.7.2.1 Laboratory Validation
3.7.2.2 Capability Check
3.7.2.3 Capability Recheck
3.7.3 Onsite Laboratory
3.7.4 Furnishing or Transportation of Samples for Testing
3.8 COMPLETION INSPECTION
3.8.1 Punch-Out Inspection
3.8.2 Pre-Final Inspection
3.8.3 Final Acceptance Inspection
3.9 DOCUMENTATION
3.10 NOTIFICATION OF NONCOMPLIANCE
ENVIRONMENTAL PROTECTION
ENVIRONMENTAL PROTECTION
PART 1 GENERAL
1.1 REFERENCES
1.2 SUBMITTALS
1.3 DEFINITIONS
1.3.1 Environmental Pollution and Damage
1.3.2 Environmental Protection
1.3.3 Contractor Generated Hazardous Waste
1.3.4 Project Pesticide Coordinator
1.3.5 Land Application for Discharge Water
1.3.6 Pesticide
1.3.7 Pests
1.3.8 Surface Discharge
1.3.9 Waters of the United States
1.3.10 Wetlands
1.3.11 Spill or Hazardous Substance Release of "Reportable Quantity"
1.4 GENERAL REQUIREMENTS
1.5 SUBCONTRACTORS
1.6 ENVIRONMENTAL PROTECTION PLAN
1.6.1 Compliance
1.6.2 Contents
1.6.3 Appendix
1.7 PROTECTION FEATURES
1.8 SPECIAL ENVIRONMENTAL REQUIREMENTS
1.9 ENVIRONMENTAL ASSESSMENT OF CONTRACT DEVIATIONS
1.10 NOTIFICATION
PART 2 PRODUCTS NOT USED
PART 3 EXECUTION
3.1 ENVIRONMENTAL PERMITS AND COMMITMENTS
3.2 LAND RESOURCES
3.2.1 Work Area Limits
3.2.2 Landscape
3.2.3 Reduction of Exposure of Unprotected Erodible Soils
3.2.4 Temporary Protection of Disturbed Areas
3.2.5 Erosion and Sediment Controls
3.2.6 Contractor Facilities and Work Areas
3.2.7 Borrow Areas Provided by the Government
3.3 WATER RESOURCES
3.3.1 Cofferdams, Diversions, and Dewatering Operations
3.3.2 Stream Crossings
3.3.3 Wetlands
3.4 AIR RESOURCES
3.4.1 Particulates
3.4.2 Odors
3.4.3 Sound Intrusions
3.4.4 Burning
3.4.5 Hydrocarbons and Carbon Monoxide
3.4.6 Monitoring Air Quality
3.5 WASTE DISPOSAL
3.5.1 Disposal Areas
3.5.2 Temporary Excavation and Embankments
3.5.3 Solid Wastes
3.5.4 Chemicals and Chemical Wastes
3.5.5 Contractor Generated Hazardous Wastes/Excess Hazardous Materials
3.5.6 Fuel and Lubricants
3.5.7 Waste Water
3.6 REPORTING OF POLLUTION SPILLS
3.7 WASTE MINIMIZATION AND RECYCLING
3.8 NON-HAZARDOUS SOLID WASTE DIVERSION REPORT
3.9 HISTORICAL, ARCHAEOLOGICAL, AND CULTURAL RESOURCES
3.10 BIOLOGICAL RESOURCES
3.11 INTEGRATED PEST MANAGEMENT
3.11.1 Pesticide Delivery and Storage
3.11.2 Qualifications
3.11.3 Pesticide Handling Requirements
3.11.4 Application
3.12 PREVIOUSLY USED EQUIPMENT
3.13 MAINTENANCE OF POLLUTION FACILITIES
3.14 MILITARY MUNITIONS
3.15 TRAINING OF CONTRACTOR PERSONNEL
3.16 INSPECTION
3.17 POST CONSTRUCTION CLEANUP
3.18 RESTORATION OF LANDSCAPE DAMAGE
STORM WATER POLLUTION PREVENTION PLAN
STORM WATER POLLUTION PREVENTION PLAN
PART 1 GENERAL
1.1 REFERENCES
1.2 GENERAL
1.3 SUBMITTALS
1.4 EROSION AND SEDIMENT CONTROLS
1.4.1 Stabilization Practices
1.4.1.1 Unsuitable Conditions
1.4.1.2 No Activity for Less Than 14 Days
PART 2 STORMWATER POLLUTION PREVENTION PLAN FOR CONSTRUCTION ACTIVITY
2.1 Site Description
2.2 Responsible Parties
2.3 Receiving Waters
2.4 Documentation of Permit Eligibility Related to the 303d list and
2.5 Attainment of Water Quality Standards After Authorization
2.6 Site Map Requirements See Site Map on Sheet G-002
2.7 Stormwater Controls
2.8 Other Controls
2.9 Non-Stormwater Discharges
2.10 Post-Construction Stormwater Management Establishment of Turf
2.11 Applicable State or Local Programs
2.12 INSPECTIONS
2.12.1 GENERAL INSPECTION GUIDELINES
2.12.2 DISTURBED AREAS AND AREAS USED FOR MATERIAL STORAGE
2.12.3 MODIFICATION OF POLLUTION PLAN
2.12.4 REPORTS
2.13 Maintenance
2.14 Employee Training
PART 3 CONTROL OF POLLUTANTS DURING CONSTRUCTION
3.1 NON-STRUCTURAL MEASURES
3.1.1 General
3.1.2 Reduction of Exposure of Unprotected Erodible Soils
3.1.3 General Buffer Zone
3.1.3.1 Improvement of the General Buffer
3.1.3.2 Maintenance of the General Buffer
3.1.4 Disturbed Area Stabilization with Mulch
3.1.4.1 Installation of Mulch
3.1.4.2 Maintenance of Mulch
3.2 STRUCTURAL MEASURES
3.2.1 General
3.2.2 Silt Fences
3.2.2.1 Components for Silt Fences
3.2.2.2 Installation of Silt Fences
3.2.2.3 Maintenance of Silt Fences
3.2.3 Sediment Basins
3.2.4 Chemicals and Chemical Wastes
3.3 Contractor Generated Hazardous Wastes/Excess Hazardous Materials
3.4 Fuels and Lubricants
3.5 Solid Wastes
3.6 REPORTING OF POLLUTION SPILLS
3.7 WASTE MINIMIZATION AND RECYCLING
3.8 NON-HAZARDOUS SOLID WASTE DIVERSION REPORT
3.9 HISTORICAL, ARCHAEOLOGICAL, AND CULTURAL RESOURCES
3.10 BIOLOGICAL RESOURCES
3.11 INTEGRATED PEST MANAGEMENT
3.11.1 Pesticide Delivery and Storage
3.11.2 Qualifications
3.11.3 Pesticide Handling Requirements
3.11.4 Application

3.12 PREVIOUSLY USED EQUIPMENT

PART 4 OTHER CONSIDERATIONS
4.1 LOCATION OF CONSTRUCTION IN REGARD TO WATERS CLASSIFIED IN 10 CSR
4.2 PROXIMITY OF SITE TO MAJOR RESERVOIRS
PART 5 DEFINITIONS
5.1 BEST MANAGEMENT PRACTICES BMPs
5.2 COMMENCEMENT OF CONSTRUCTION
5.3 DRAINAGE SWALE
5.4 FINAL STABILIZATION

PART 6 CERTIFICATIONS, INSPECTION, AND MAINTENANCE REPORT FORMS

PROJECT SIGN, BARRICADES, AND TRAFFIC CONTROL SIGNS
PROJECT SIGN, BARRICADES, AND TRAFFIC CONTROL SIGNS
PART 1 GENERAL
1.1 SCOPE
1.2 PROJECT SIGN
1.3 BARRICADES AND TRAFFIC CONTROL SIGNS
1.4 PAYMENT
PART 2 PRODUCTS NOT USED
PART 3 EXECUTION NOT USED
DIVISION 31 - EARTHWORK
EARTHWORK
EARTHWORK
PART 1 GENERAL
1.1 SCOPE
1.2 QUALITY CONTROL
1.3 REFERENCES
1.4 SUBMITTALS
PART 2 PRODUCTS
2.1 Additional Borrow
PART 3 EXECUTION
3.1 SLIDE EXCAVATION
3.2 PROCESSING AND TESTING EXCAVATED MATERIAL
3.3 COMPACTED BACKFILL
3.3.1 General
3.3.2 Materials
3.3.3 Placement
3.3.4 Testing and Compaction
3.3.5 Additional Testing
3.4 LEVEE RESTORATION USING GEOGRID
3.4.1 Storage and Handling
3.4.2 Installation
3.4.2.1 Foundation Preparation
3.4.2.2 Anchorage
3.4.2.3 Placement
3.4.2.4 Damaged Geogrid/Unused Geogrid
3.4.2.5 Overlaps and Fasteners

3.4.3 Cover Soil Placement

3.5 DISPOSITION OF MATERIAL

DIVISION 32 - EXTERIOR IMPROVEMENTS
AGGREGATE SURFACE COURSE
AGGREGATE SURFACE COURSE
PART 1 GENERAL
1.1 Scope
1.2 REFERENCES
1.3 SUBMITTALS
1.4 QUALITY CONTROL
1.5 EQUIPMENT
1.6 SAMPLING AND TESTING
1.6.1 Contractor Testing
1.6.2 Sampling
1.6.3 Testing
1.6.3.1 Gradation
1.6.3.2 Liquid Limit and Plasticity Index
1.6.3.3 Density Tests
1.6.3.4 Wear Test
1.6.3.5 Smoothness Test
1.6.3.6 Government Testing
PART 2 PRODUCTS
2.1 AGGREGATES
2.1.1 Coarse Aggregates
2.1.2 Fine Aggregates
2.1.3 Gradation Requirements

2.2 LIQUID LIMIT AND PLASTICITY INDEX REQUIREMENTS

PART 3 EXECUTION
3.1 WEATHER LIMITATIONS
3.2 CLEARING AND DEBRIS REMOVAL
3.3 USE OF HAUL ROADS
3.4 STOCKPILING MATERIALS
3.5 PREPARATION OF UNDERLYING SUBGRADE
3.6 GRADE CONTROL
3.7 MIXING AND PLACING MATERIALS
3.8 PLACEMENT
3.9 LAYER THICKNESS
3.10 THICKNESS CONTROL
3.11 COMPACTION
3.12 EDGES OF AGGREGATE-SURFACED ROAD
3.13 MAINTENANCE
ESTABLISHMENT OF TURF
ESTABLISHMENT OF TURF
PART 1 GENERAL
1.1 SCOPE
1.2 REFERENCES
1.3 SUBMITTALS
1.4 QUALITY CONTROL
1.5 AREAS TO BE TURFED
PART 2 PRODUCTS
2.1 MATERIALS
2.1.1 Fertilizer and Limestone
2.1.2 Seed
2.1.3 Mulch
2.1.4 Water
2.1.5 Soil for Repairs
2.1.6 Soil Composition
2.2 SAMPLING, TESTING, AND CERTIFICATES
2.2.1 Seed
2.2.2 Soil Testing
2.2.3 Fertilizer and Limestone Testing
2.2.4 Mulch
PART 3 EXECUTION
3.1 COMMENCEMENT, PROSECUTION, AND COMPLETION
3.2 PREPARATION OF GROUND SURFACE
3.2.1 Clearing
3.2.2 Dressing
3.3 SEEDING
3.3.1 Planting Dates
3.3.2 Seed Mixtures
3.3.3 Damage to Seeding
3.4 APPLICATION OF AN ANCHORING MULCH
3.5 HYDRAULIC SLURRY METHOD
3.6 COMPACTING
3.7 ESTABLISHMENT
3.7.1 General
3.7.2 Maintenance
3.8 Turf Establishment Period
3.9 INSPECTION AND ACCEPTANCE
3.9.1 Areas Requiring Returfing
3.10 Sequence of Work
3.11 PREPARATION OF GROUND SURFACE
3.11.1 Clearing
3.11.2 Dressing
3.12 APPLICATION OF FERTILIZER AND/OR LIMESTONE
3.13 SPOT SODDING
3.14 SPRIGGING
3.15 SEEDING
3.15.1 Planting Dates
3.15.2 Seed Mixtures
3.15.3 Broadcast Seeding
3.15.4 Hydroseeding
3.15.5 Damage to Seeding
3.16 APPLICATION OF AN ANCHORING MULCH
3.17 HYDRAULIC SLURRY METHOD
3.18 COMPACTING
3.19 ESTABLISHMENT
3.19.1 General
3.19.2 Watering
3.19.3 Maintenance
3.19.4 Turf Establishment Period
3.20 INSPECTION AND ACCEPTANCE
3.20.1 Areas Requiring Returfing
SLIDES_COMPLETE_LIST.pdf
LIST A,B and C FOR CONTRACT