AMEND_0004.pdf
PDF 176 KB Posted
- Attached to
- Levee Slide Repair Federal contract opportunity
- Solicitation number
- W912EQ-16-B-0009
About this file
Amendment 0004 to 52.211-10 1.42 Order of Work and Paragraph 1.3.6 sub paragraph. b.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Copy_of_Bid_Abstract_FBO.xlsx | XLSX spreadsheet | |
| AMEND0004.pdf | ||
| Pre-Bid_Site_Visit.pdf | ||
| FBO_Conformed_Levee_Slide.pdf | ||
| AMENDMENT0003.pdf | ||
| Amendment_002.pdf | ||
| A22_Amendement_0002.pdf | ||
| H01_PLANS.pdf | ||
| W912EQ-16-B-0009_Levee_Slide.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W38XGR61397152
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
PLEASE SEE ATTACHMENT
1. CONTRACT ID CODE PAGE OF PAGES
J 1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912EQ-16-B-0009
X 9B. DATED (SEE ITEM 11)
25-Aug-2016
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
U0004
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
16-Sep-2016
CODE
ADDRESS SAME AS BLOCK 7.
HAND DELIVERED BIDS RECEIVED IN
RM 681, CLIFFORD DAVIS FEDERAL BUILDING, 167
MEMPHIS TN 38103-1894
W912EQ 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SECTION SF30 - BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00700 - CONTRACT CLAUSES
The following have been modified:
52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)
The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and(c) complete the entire work in base contract (List A Slides) ready for use not later than 300 calendar days.
If options are exercised additional calendar days will be added to the 300 calendar days as follows:
Option 1 (List B Slides) ‐ 60 calendar days Option 2 (List C Slides) ‐ 40 calendar days Option 3 (List D Slides) ‐ 40 calendar days
(End of clause)
W912EQ-16-B-0009
The time stated for completion shall include final cleanup of the premises.
W912EQ-16-B-0009
The contractor shall work diligently at each slide location until the slide repair is complete. The Contractor may work the slides in the base contract and in any and all options exercised in any order as determined by the Contractor. Concurrent work on slides from each list will not be required but will be at the Contractor's option. The Contractor will submit a work plan to the Contracting Officer for approval prior to starting work. The work plan will include the order of work proposed by the Contractor. The time stated for completion shall include final cleanup of the premises.
In Paragraph 1.3.6 sub paragraph b
Payment for Establishment of Turf, measured as specified in the MEASUREMENT paragraph above, will be made at the contract unit price per acre for "Establishment of Turf," which price and payment shall constitute full compensation for stripping of topsoil and placement of topsoil within the borrow areas;
furnishing all plant, labor, equipment, and materials, and performing all operations necessary for establishment of turf as specified in SECTION 32 92 32.00 11 - ESTABLISHMENT OF TURF.
(End of Summary of Changes)
1.42 Order of Work
The following have been added by full text:
SECTION 00800-Special Requirements
File details come from the government source that posted it. Updated .