AMENDMENT0003.pdf
PDF 1 MB Posted
- Attached to
- Ditch 19 Channel Cleanout, Missouri
- Solicitation number
- W912EQ-16-B-0007
About this file
AMENDMENT 0003-DITCH 19 CHANNEL CLEANOUT
View the file
Other files
| File | Type | Posted |
|---|---|---|
| B07_Official_Bid_Abstract_Ditch_19_.pdf | ||
| Ditch_19_Amendment_001.pdf | ||
| A22_Ditch_19_Plans_Amendment.pdf | ||
| Amendment_Ditch_19.pdf | ||
| A22_Amend_Ditch_19.pdf | ||
| A22_Ditch_19_Solicitation.pdf | ||
| H01_Ditch19_Final_Plans.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W38XGR61337043
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
NOTE: THE ADVERTISED NUMBERING FOR THE PREVIOUS POSTED AMENDMENTS IS INCORRECT. THIS IS AMENDMENT 0003 ALTHOUGH
ANOTHER AMENDMENT WAS ADVERTISED AS 0003.
The required response date/time has changed from 02 Sep 2016 at 1:30pm to 6 Sep 2016 at 1:30pm.
The Pre-Bid Site Vist Attendance Record has been attached.
SEE SUMMARY OF CHANGES
1. CONTRACT ID CODE PAGE OF PAGES
J 1 4
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 01-Sep-2016
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912EQ-16-B-0007
X 9B. DATED (SEE ITEM 11)
02-Aug-2016
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
01-Sep-2016
CODE
US ARMY ENGINEER DISTRICT, MEMPHIS
167 N MAIN STREET B202
MEMPHIS TN 38103-1894
W912EQ 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912EQ-16-B-0007
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
AMENDMENT 0003
W912EQ-16-B-0007
AMENDMENT 0003
DITCH 19 CHANNEL CLEANOUT
DESCRIPTION OF CHANGES
SPECIFICATION CHANGE
1. Section 01 22 00.00 11, Paragraph 1.2.1.3 – Updated to provide the correct State Department for
Environmental Quality.
DITCH 19, MISSOURI, CHANNEL CLEANOUT
Berm or Equivalent" as broken down by the percentages in the "sub-item list" above. Price and payment shall constitute full compensation for furnishing all plant, labor, materials and equipment, and performing all operations necessary for the installation and maintenance of the Erosion Control Berm or Equivalent structure throughout the contract period, including final removal, dressing and cleanup. Lateral or point erosion control structures such as check dams will be considered incidental to this item. No additional payment will be made when other BMPs are used in lieu of those
BMPs indicated in the plans and specifications.
c. Unit of measure, Linear Foot: LF.
1.2.1.2 Construction Entrance/Exit (Item 0003B)
a. Measurement
Measurement for Construction Entrance/Exit will be for each satisfactorily designed, constructed and maintained by the Contractor during construciton and completely removed by the Contractor at the completion of construction.
b. Payment
Payment for Construction Entrance/Exit as specified herein will be made at the contract unit price per each satisfactorily placed for "Construction
Entrance/Exit". Price and payment shall constitute full compensation for furnishing all plant, labor, materials, equipment, traffic control measures and for performing all operations necessary for the installation and maintenance of the Construction Entrance/Exit throughout the contract period, including final removal, dressing and cleanup.
c. Unit of measure, Each: EA.
1.2.1.3 Write/Amend and Maintain SWPPP (Item 0003C)
a. Measurement
Measurement for NPDES application preparation, submission, and obtaining a general permit from the Missouri Department of Natural Resources (DNR), as well as preparing and maintaining the SWPPP, will be per each NPDES application accepted to include an acceptable SWPPP and maintaining same.
b. Payment
Payment for development of the SWPPP, amending as required, and maintaining;
and obtaining a construction general permit for erosion prevention and sediment control will be made at the contract unit price for Write/Amend and
Maintain SWPPP. Price and payment shall constitute full compensation for furnishing all plant, labor, equipment, and material to complete the work of writing and maintaining the SWPPP, submitting the NPDES application to DNR, conducting any and all storm water inspections, and obtaining a construction general permit for erosion prevention and sediment control from DNR. Payment will not be made for any permit application rejected by DNR or revision of the SWPPP required by DNR. SWPPP will be written in accordance with all rules and regulations outlined by DNR.
SECTION 01 22 00.00 11 Page 4
SECTION 00010 - SOLICITATION CONTRACT FORM
The required response date/time has changed from 02-Sep-2016 01:30 PM to 06-Sep-2016 01:30 PM.
(End of Summary of Changes)
B1CORJES
Typewritten Text
File details come from the government source that posted it. Updated .