This document is a solicitation for an Indefinite Delivery/Indefinite Quantity (IDIQ) construction contract for mechanical dredging of the Illinois River Basin and Illinois Waterway. The work includes mobilization and demobilization, mechanical dredging and placement, transportation of plant between dredging sites, standby, dredging/excavation at temporary placement sites, and small boat harbor dredging. The contract has a $10 million to $25 million estimated range and is a total small business set-aside. The ordering period is from the date of award through December 31, 2024, with four additional 365-day ordering periods. The minimum contract value is $50,000 and the minimum order value is $2,000. Proposals are due by 2:00 PM Central Time on May 8, 2024. The contract will be awarded to the technically acceptable offeror with the lowest evaluated price.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION NO.: W912EK24R0010
B5IDIQPM202304
US Army Corps of Engineers Rock Island District
ILLINOIS RIVER BASIN
ILLINOIS WATERWAY
MECHANICAL DREDGING
INDEFINITE DELIVERY/INDEFINITE
QUANTITY (IDIQ)
Construction Solicitation and Specifications
APRIL 2024
ILWW Mechanical Dredging
See Section 01 11 00 for Summary of Work
NAICS Code: 237990 Size Standard: $37,000,000 Estimate Range: $10,000,000 - $25,000,000 Peorid of Performance: Ordering Period 1 - Date of Aw ard through 31 December 2024. Ordering Periods 2 through 5 are 365 days each.
Total Small Business Set Aside
All questions shall be addressed in accordance w ith MVR.02 - Questions and Answ er via ProjNet.
A bid bond shall be submitted w ith bid for 20% of the total bid amount. Payment and Performance bonds w ill be required in the full amount for each Task Order.
ERIC J GAUL (309) 794-5093
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS
NEGOTIATED
08-Apr-2024
(RFP)
(IFB)
X
CALL:
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
See Item 7
2. TYPE OF SOLICITATION
SEALED BID
3. DATE ISSUED
9. FOR INFORMATION A. NAME
SOLICITATION
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)
Prescribed by GSA
FAR (48 CFR) 53.236-1(e)
11. The Contractor shall begin performance w ithin _______15 calendar days and complete it w ithin ________ calendar days after receiving aw ard, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________FAR 52.211-10
12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
X YES NO
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and __________1 copies to perform the w ork required are due at the place specif ied in Item 8 by ___________ local time ______________08 May 2024 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.
shall be marked to show the offeror's name and address, the solicitation number, and the date and time of fers are due.
B. An offer guarantee X is, is not required.
C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than _______60 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
7. ISSUED BY CODE
CONTRACTING DIVISION
US ARMY CORPS OF ENGINEERS 1500 ROCK ISLAND D
ROCK ISLAND IL 61201
W912EK
PAGE OF PAGES
1 OF
CODE
(Title, identifying no., date):
12B. CALENDAR DAYS
02:00 PM (hour)
Sealed envelopes containing offers
5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.
8. ADDRESS OFFER TO (If Other Than Item 7)
FAX:TEL: TEL: FAX:
W912EK24R0010 58
20B. SIGNATURE
(REV. 4-85)STANDARD FORM 1442 BACK
TO SIGN
NSN 7540-01-155-3212
SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)
CODE FACILITY CODE
17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.
the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)
AMOUNTS SEE SCHEDULE OF PRICES
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN
OFFER (Type or print)
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
(4 copies unless otherwise specified)
CODE
(Insert any number equal to or greater than
20C. OFFER DATE
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY
(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)
See Item 14
(Include only if different than Item 14)16. REMITTANCE ADDRESS
30B. SIGNATURE
29. AWARD (Contractor is not required to sign this document.)
document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .
gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)
30C. DATE
(Type or print)
TEL: EMAIL:
31B. UNITED STATES OF AMERICA 31C. AWARD DATE
BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this28. NEGOTIATED AGREEMENT
(M ust be fully completed by offeror)OFFER
W912EK24R0010
Section 00010 - Solicitation Contract Form
CONTRACT MINIMUM/MAXIMUM QUANTITY AND CONTRACT VALUE
The minimum quantity and contract value for all orders issued against this contract shall not be less than the minimum quantity and contract value stated in the following table. The maximum quantity and contract value for all orders issued against this contract shall not exceed the maximum quantity and contract value stated in the following table.
MINIMUM
QUANTITY
MINIMUM
AMOUNT
MAXIMUM
QUANTITY
MAXIMUM
AMOUNT
$50,000.00 $25,000,000.00
DELIVERY/TASK ORDER MINIMUM/MAXIMUM QUANTITY AND ORDER VALUE
The minimum quantity and order value for each Delivery/Task Order issued shall not be less than the minimum quantity and order value stated in the following table. The maximum quantity and order value for each Delivery/Task Order issued shall not exceed the maximum quantity and order value stated in the following table.
MINIMUM
QUANTITY
MINIMUM
AMOUNT
MAXIMUM
QUANTITY
MAXIMUM
$2,000.00 $2,000,000.00
CLIN DELIVERY/TASK ORDER MINIMUM/MAXIMUM QUANTITY AND CLIN ORDER VALUE
The minimum quantity and order value for the given Delivery/Task Order issued for this CLIN shall not be less than the minimum quantity and order value stated in the following table. The maximum quantity and order value for the given Delivery/Task Order issued for this CLIN shall not exceed the maximum quantity and order value stated in the following table.
CLIN
MINIMUM
QUANTITY
MINIMUM
AMOUNT
MAXIMUM
QUANTITY
MAXIMUM
$2,000.00
$2,000,000.00
Section 00100 - Bidding Schedule/Instructions to Bidders
SCHEDULE OF PRICES
ITEM
NO.
SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
ORDERING PERIOD NO. 1
(Date of Award to 31 December 2024) Primary Plant 0001 Mobilization and Demobilization 1 JOB XXXXXXXX $____________
0002 Mechanical Dredging and Placement (0 to 4 River Miles) 55,000 CY $___________ $____________
0003 Mechanical Dredging and Placement (4 to 8 River Miles) 20,000 CY $___________ $____________
0004 Mechanical Dredging and Placement (8 to 12 River Miles) 10,000 CY $___________ $____________
0005 Transportation of Plant Between Dredging Site(s) 300 MI $___________ $____________
0006 Standby 10 DY $___________ $____________
0007 Dredging / Excavation at Temporary Placement Site(s) 20,000 CY $___________ $____________
0008 Small Boat Harbor Dredging 2,000 CY $___________ $____________
0009 Mechanical Access Dredging 1 EA $___________ $____________
Secondary Plant 0010 Mobilization and Demobilization 1 JOB XXXXXXXX $____________
0011 Mechanical Dredging and Placement (0 to 4 River Miles) 40,000 CY $___________ $____________
0012 Mechanical Dredging and Placement (4 to 8 River Miles) 15,000 CY $___________ $____________
0013 Mechanical Dredging and Placement (8 to 12 River Miles) 5,000 CY $___________ $____________
0014 Transportation of Plant Between Dredging Site(s) 300 MI $___________ $____________
0015 Standby 10 DY $___________ $____________
0016 Dredging / Excavation at Temporary Placement Site(s) 20,000 CY $___________ $____________
0017 Small Boat Harbor Dredging 2,000 CY $___________ $____________
0018 Mechanical Access Dredging 1 EA $___________ $____________
TOTAL OF ESTIMATED AMOUNTS OF ORDERING PERIOD NO. 1
(ITEM NOS. 0001 THROUGH 0018, INCL.) $____________
ORDERING PERIOD NO. 2
(01 January 2025 through 31 December 2025) Primary Plant 0101 Mobilization and Demobilization 1 JOB XXXXXXXX $____________
0102 Mechanical Dredging and Placement (0 to 4 River Miles) 55,000 CY $___________ $____________
0103 Mechanical Dredging and Placement (4 to 8 River Miles) 20,000 CY $___________ $____________
0104 Mechanical Dredging and Placement (8 to 12 River Miles) 10,000 CY $___________ $____________
0105 Transportation of Plant Between Dredging Site(s) 300 MI $___________ $____________
0106 Standby 10 DY $___________ $____________
0107 Dredging / Excavation at Temporary Placement Site(s) 20,000 CY $___________ $____________
0108 Small Boat Harbor Dredging 2,000 CY $___________ $____________
0109 Mechanical Access Dredging 1 EA $___________ $____________ Secondary Plant
0110 Mobilization and Demobilization 1 JOB XXXXXXXX $____________
0111 Mechanical Dredging and Placement (0 to 4 River Miles) 40,000 CY $___________ $____________
0112 Mechanical Dredging and Placement (4 to 8 River Miles) 15,000 CY $___________ $____________
0113 Mechanical Dredging and Placement (8 to 12 River Miles) 5,000 CY $___________ $____________
0114 Transportation of Plant Between Dredging Site(s) 300 MI $___________ $____________
0115 Standby 10 DY $___________ $____________
0116 Dredging / Excavation at Temporary Placement Site(s) 20,000 CY $___________ $____________
0117 Small Boat Harbor Dredging 2,000 CY $___________ $____________
0118 Mechanical Access Dredging 1 EA $___________ $____________
TOTAL OF ESTIMATED AMOUNTS OF ORDERING PERIOD NO. 2(ITEM NOS. 0101 THROUGH 0118
INCL.) $____________
ORDERING PERIOD NO. 3
(01 January 2026 through 31 December 2026)
Primary Plant 0201 Mobilization and Demobilization 1 JOB XXXXXXXX $____________
0202 Mechanical Dredging and Placement (0 to 4 River Miles) 55,000 CY $___________ $____________
0203 Mechanical Dredging and Placement (4 to 8 River Miles) 20,000 CY $___________ $____________
0204 Mechanical Dredging and Placement (8 to 12 River Miles) 10,000 CY $___________ $____________
0205 Transportation of Plant Between Dredging Site(s) 300 MI $___________ $____________
0206 Standby 10 DY $___________ $____________
0207 Dredging / Excavation at Temporary Placement Site(s) 20,000 CY $___________ $____________
0208 Small Boat Harbor Dredging 2,000 CY $___________ $____________
0209 Mechanical Access Dredging 1 EA $___________ $____________ Secondary Plant
0210 Mobilization and Demobilization 1 JOB XXXXXXXX $____________
0211 Mechanical Dredging and Placement (0 to 4 River Miles) 40,000 CY $___________ $____________
0212 Mechanical Dredging and Placement (4 to 8 River Miles) 15,000 CY $___________ $____________
0213 Mechanical Dredging and Placement (8 to 12 River Miles) 5,000 CY $___________ $____________
0214 Transportation of Plant Between Dredging Site(s) 300 MI $___________ $____________
0215 Standby 10 DY $___________ $____________
0216 Dredging / Excavation at Temporary Placement Site(s) 20,000 CY $___________ $____________
0217 Small Boat Harbor Dredging 2,000 CY $___________ $____________
0218 Mechanical Access Dredging 1 EA $___________ $____________
TOTAL OF ESTIMATED AMOUNTS OF ORDERING PERIOD NO. 3
(ITEM NOS. 0201 THROUGH 0218, INCL.) $____________
ORDERING PERIOD NO. 4
(01 January 2027 through 31 December 2027)
Primary Plant 0301 Mobilization and Demobilization 1 JOB XXXXXXXX $____________
0302 Mechanical Dredging and Placement (0 to 4 River Miles) 55,000 CY $___________ $____________
0303 Mechanical Dredging and Placement (4 to 8 River Miles) 20,000 CY $___________ $____________
0304 Mechanical Dredging and Placement (8 to 12 River Miles) 10,000 CY $___________ $____________
0305 Transportation of Plant Between Dredging Site(s) 300 MI $___________ $____________
0306 Standby 10 DY $___________ $____________
0307 Dredging / Excavation at Temporary Placement Site(s) 20,000 CY $___________ $____________
0308 Small Boat Harbor Dredging 2,000 CY $___________ $____________
0309 Mechanical Access Dredging 1 EA $___________ $____________ Secondary Plant
0310 Mobilization and Demobilization 1 JOB XXXXXXXX $____________
0311 Mechanical Dredging and Placement (0 to 4 River Miles) 40,000 CY $___________ $____________
0312 Mechanical Dredging and Placement (4 to 8 River Miles) 15,000 CY $___________ $____________
0313 Mechanical Dredging and Placement (8 to 12 River Miles) 5,000 CY $___________ $____________
0314 Transportation of Plant Between Dredging Site(s) 300 MI $___________ $____________
0315 Standby 10 DY $___________ $____________
0316 Dredging / Excavation at Temporary Placement Site(s) 20,000 CY $___________ $____________
0317 Small Boat Harbor Dredging 2,000 CY $___________ $____________
0318 Mechanical Access Dredging 1 EA $___________ $____________
TOTAL OF ESTIMATED AMOUNTS OF ORDERING PERIOD NO. 4(ITEM NOS. 0301 THROUGH 0318,
INCL.) $____________
ORDERING PERIOD NO. 5
(01 January 2028 through 31 December 2028)
Primary Plant 0401 Mobilization and Demobilization 1 JOB XXXXXXXX $____________
0402 Mechanical Dredging and Placement (0 to 4 River Miles) 55,000 CY $___________ $____________
0403 Mechanical Dredging and Placement (4 to 8 River Miles) 20,000 CY $___________ $____________
0404 Mechanical Dredging and Placement (8 to 12 River Miles) 10,000 CY $___________ $____________
0405 Transportation of Plant Between Dredging Site(s) 300 MI $___________ $____________
0406 Standby 10 DY $___________ $____________
0407 Dredging / Excavation at Temporary Placement Site(s) 20,000 CY $___________ $____________
0408 Small Boat Harbor Dredging 2,000 CY $___________ $____________
0409 Mechanical Access Dredging 1 EA $___________ $____________ Secondary Plant
0410 Mobilization and Demobilization 1 JOB XXXXXXXX $____________
0411 Mechanical Dredging and Placement (0 to 4 River Miles) 40,000 CY $___________ $____________
0412 Mechanical Dredging and Placement (4 to 8 River Miles) 15,000 CY $___________ $____________
0413 Mechanical Dredging and Placement (8 to 12 River Miles) 5,000 CY $___________ $____________
0414 Transportation of Plant Between Dredging Site(s) 300 MI $___________ $____________
0415 Standby 10 DY $___________ $____________
0416 Dredging / Excavation at Temporary Placement Site(s) 20,000 CY $___________ $____________
0417 Small Boat Harbor Dredging 2,000 CY $___________ $____________
0418 Mechanical Access Dredging 1 EA $___________ $____________
TOTAL OF ESTIMATED AMOUNTS OF ORDERING PERIOD NO. 5
(ITEM NOS. 0401 THROUGH 0418, INCL.) $____________
TOTAL OF ESTIMATED AMOUNTS OF ORDERING PERIOD NO. 1 THROUGH NO. 5
(ITEM NOS. 0001 THROUGH 0418, INCL.) $____________
CY = CUBIC YARD DY = DAYS JOB = LUMP
SUM MI = MILES EA = EACH
ENSURE UNIT PRICE AND AMOUNT LINES FOR ALL ITEMS
ARE COMPLETED.
Note: The totals of estimated amounts per ordering period are not purchased by this contract but will be used by the Government to evaluate offers for award purposes. The total capacity for the first ordering period and four additional ordering period is $25,000,000.00. The Contract minimum guarantee is $50,000.00. The minimum will be considered satisfied for the life of the contract upon the issuance of a Task Order(s) equal to or greater than the minimum guarantee.
***WAGE RATES WILL BE INCORPORATED AT THE TASK ORDER LEVEL FOR EACH COUNTY IN
WHICH WORK IS TO BE PERFORMED.***
CLAUSES INCORPORATED BY FULL TEXT
MVR.02
QUESTION AND ANSWER VIA PROJNET
ALL SUBMITTED QUESTIONS FOR THIS PROJECT AND THE ANSWERS
PROVIDED SHALL BE VIEWED IN BIDDER INQUIRY IN PROJNET AT
(https://www.projnet.org).
Technical inquiries and questions relating to this solicitation are to be submitted via Bidder Inquiry in ProjNet at (https://www.projnet.org) No Later Than (NLT) 2:00 pm Central Time on 22 April 2024.
To submit or review inquiry items, prospective vendors will need to use the Bidder Inquiry Key presented below and follow the instructions listed below the key for access. A prospective vendor who submits a comment /question will receive an acknowledgement of their comment/question via email. Another email to the same address will notify the prospective vendor once the reply is available for viewing.
The Bidder Inquiry Key is: 5DVG74-65YDG5
Specific Instructions for First Time ProjNet Bid Inquiry Access:
1. From the ProjNet home page linked above, click on Quick Add on the upper right side of the screen.
2. Identify the Agency. This should be marked as USACE.
3. Key. Enter the Bidder Inquiry Key listed above.
4. Email. Enter the email address you would like to use for communication.
5. Click Continue. A page will then open saying that a user account was not found and will ask you to create one using the provided form.
6. Enter your First Name, Last Name, Company, City, State, Phone, Email, Secret Question, Secret
Answer, and Time Zone. Make sure to remember your Secret Question and Answer as they will be used from this point on to access the ProjNet system.
7. Click Add User. Once this is completed you are now registered within ProjNet and are currently logged into the system.
Specific Instructions for Future ProjNet Bid Inquiry Access:
1. For future access to ProjNet, you will not be provided any type of password. You will utilize your Secret Question and Secret Answer to log in.
2. From the ProjNet home page linked above, click on Quick Add on the upper right side of the screen.
3. Identify the Agency. This should be marked as USACE.
4. Key. Enter the Bidder Inquiry Key listed above.
5. Email. Enter the email address you used to register previously in ProjNet.
6. Click Continue. A page will then open asking you to enter the answer to your Secret Question.
7. Enter your Secret Answer and click Login. Once this is completed you are now logged into the system.
SOURCE SELECTION PLAN
A. BASIS FOR AWARD
A.1 This acquisition is a total small business set-aside, competitive procurement utilizing Lowest Price Technically Acceptable (LPTA) best value continuum source selection procedures in accordance with FAR 15.101-2.
A.2 A single Firm Fixed Price (FFP), Indefinite Delivery Indefinite Quantity (IDIQ) task order contract award will be made to the Offeror who provides a technically acceptable proposal with the lowest evaluated price.
A.3 Proposed prices will be evaluated but not scored or otherwise combined with the other aspects of the proposal evaluation.
B. FACTORS TO BE EVALUATED
Factor 1: Price Factor 2: Specialized Experience Factor 3: Past Performance Factor 4: Plant and Equipment
C. EVALUATION APPROACH
All proposals will be evaluated by the Source Selection Evaluation Board (SSEB). For any Offeror to be considered for award, the proposal must receive an “Acceptable” rating in every non-price factor. The three non-price factors are Specialized Experience, Past Performance, and Plant and Equipment.
C.1 Factor 1: Price
C.1.1 Price will be evaluated and considered but will not be scored or combined with other aspects of the proposal evaluation. An award will be made to the Offeror with the lowest priced, technically acceptable proposal. The lowest price will be determined by adding up all line items.
Offerors shall complete and submit the Schedule of Prices with their proposal and include a price for each line item. Failure to submit a price for any of the required line items on the Schedule of Prices will render the Offeror’s proposal as ineligible for award.
C.1.2 The Source Selection Evaluation Board will evaluate each Offeror’s price and verify that unbalanced pricing is not present. The Contracting Officer will evaluate each Offeror’s price in accordance with FAR 15.404-1 to determine price reasonableness. Price reasonableness will be determined by comparing all proposed prices, the Independent Government Estimate (IGE), and pricing of previous work that is equivalent or similar to the requirement.
C.1.3 The otherwise technically acceptable, lowest priced Offeror may be required to confirm/validate their offered price. Certified cost and pricing data are not currently required;
however, the Government reserves the right to request such data prior to award.
C.2 Factor 2: Specialized Experience
C.2.1 The Government will evaluate the Specialized Experience on an Acceptable/Unacceptable basis. This factor identifies the minimum requirements that are imperative to successful contract performance.
C.2.2 The Government will use the ratings listed in Table C-1 below to determine an Offeror’s Specialized Experience Acceptable or Unacceptable.
C.2.3 Submission Requirements
a. The Offeror shall submit a contract portfolio with a minimum of two (2) and a maximum of five (5) contracts. If more than five (5) contracts are submitted, only the five (5) most recent contracts will be evaluated.
b. Contract Data
For each contract, Offerors shall submit a completed Appendix D, Enclosure 2 – Experience Information form. All blocks must be filled in and all data should be
Table C-1
Specialized Experience Acceptable/Unacceptable Ratings
Rating Description
ACCEPTABLE The proposal demonstrates experience on at least two Relevant contracts (per Paragraph C.2.4). For an Offeror that is a JV, each party to the JV demonstrates experience on at least one Relevant contract (per Paragraph C.2.3.c).
UNACCEPTABLE The proposal fails to demonstrate experience on at least two Relevant contract (per Paragraph C.2.4). For an Offeror that is a JV, the JV fails to demonstrate that each party to the JV has experience on at least one Relevant contract (per Paragraph C.2.3.c).
accurate, current and complete. Failure to provide accurate, current or complete information may be cause to eliminate an Offeror from consideration in the evaluation.
c. Joint Ventures
If the Offeror is a Joint Venture (JV) and the JV does not have experience working as a JV, each of the parties in the JV may submit experience on behalf of the Offeror.
All references herein to “the Offeror” include all proposed joint venture parties.
Submitted contracts by parties in a joint-venture or from the joint-venture itself will be considered and evaluated if the party or the joint-venture itself was the prime contractor. Information provided as to potential sub-contractors (or those not demonstrated to be a signatory participant to the joint venture agreement) will not be considered or evaluated.
C.2.4 Relevant Contracts: Contracts are considered Relevant if they meet all criteria a., b., c., and d. below.
a. The submitted contract (or task order issued under an IDIQ-type contract) is substantially complete within seven (7) years prior to the date this solicitation was issued. Substantially complete as defined for this solicitation is when the project is sufficient for the use of which it is intended, as of the closing date of this solicitation.
b. The Offeror (or the party to the JV, in the case of an Offeror JV) was the prime contractor.
c. The contract was performed using mechanical dredging from a floating plant.
d. The contract was performed at a minimum production rate of 2,000 cubic yards per day or 10,000 cubic yards per week.
C.3 Factor 3: Past Performance
C.3.1 The Government will evaluate the recency, relevancy, and quality of the past performance provided by Offerors in accordance with FAR 15.305. Evaluations of past performance shall be in accordance with this plan while utilizing the Past Performance Questionnaires (PPQ) and forms in Appendix D, Enclosure 1.
C.3.2 Submission Requirements
a. For the contracts submitted under Factor 2 – Specialized Experience, the Government will query the Offeror’s Contract Performance Assessment Reporting System (CPARS) to validate past performance ratings on Department of Defense contracts and any other past performance information the Government deems necessary to evaluate an Offeror’s past performance.
b. For each contract submitted under Factor 2 – Specialized Experience that does not have a CPARS evaluation, the Offeror may send a copy of the Past Performance Questionnaire (PPQ), which is included in Appendix D – Enclosure 2, to the points of contact responsible for monitoring performance under such contracts. The Past Performance Questionnaire included in the solicitation is provided for the Offeror or its team members to submit to the client for each contract the Offeror includes in its proposal for Factor 2 – Specialized Experience. Ensure the name, phone numbers, and e-mail addresses are provided for the client’s point of contact. Completed Past Performance Questionnaires should be submitted with the Offeror’s proposal.
Offerors should follow up with clients/references to ensure timely submittal of questionnaires. The Offeror should explain problems encountered and actions taken for any submitted contract. Offerors shall not incorporate by reference into its proposal PPQs previously submitted for other solicitations. However, this does not preclude the Government from utilizing previously submitted PPQ information in the past performance evaluation. Offerors are not to request past performance questionnaires on contracts that have final CPARS evaluation. If a past performance questionnaire is received on a contract where a final CPARS evaluation exists, the CPARS evaluation will serve as the official rating of record for evaluation purposes.
c. The Government may (but shall not be obligated to) contact references provided as part of Factor 2 – Specialized Experience, for information regarding the Offeror’s past performance on the contract, and for the purposes of assessing and verifying the scope of work performed. Offerors should provide accurate, current, and complete contact information for references provided in the contract descriptions.
d. The Government may review any other sources of information for evaluating past performance. Other sources may include, but are not limited to, past performance information retrieved through the Past Performance Information Retrieval System (PPIRS), using all CAGE/DUNS numbers of team members (partnership, joint venture, teaming agreement, or parent company / subsidiary / affiliate) identified in the Offeror’s proposal; inquiries to owners’ representative(s); Federal Awardee Performance and Integrity Information System (FAPIIS); Electronic Subcontract Reporting System (eSRS); and any other sources not provided by the Offeror.
e. While the Government may elect to consider data from other sources, the burden of providing detailed, current, accurate and complete past performance information rests with the Offeror.
f. Verification. The Government reserves the right to verify the experience record of cited contracts or other recent and relevant contracts not submitted by the Offerors by reviewing Past Performance Information Retrieval System (PPIRS), or other Government appraisal systems, or by contacting owner or references. The Government may verify any or all cited references and supplied information. An Offeror will be afforded the opportunity to reply to or explain adverse past performance information which the Offeror has not previously had an opportunity to address.
C.3.3 Evaluation Criteria
a. First, an Offeror’s past performance will be evaluated to determine how relevant a recent contract is to the requirements of the RFP. The relevancy determination will be based on the submitted contracts for Factor 2 – Specialized Experience, Evaluation Criteria (paragraph C.2.4 above).
b. If any Offeror has multiple functions or divisions, the Government will only evaluate past performance of the division or unit submitting the proposal.
c. In addition to the information provided above, the Government may obtain and evaluate additional past performance information from the Client on the submitted projects, or other relevant projects completed by the Offeror outside the time period of seven (7) years from the date this solicitation was issued. The Government may contact and interview the Client (on a submitted contract) and reserves the right to interview other individuals acting for the listed owners or the owner’s representative listed as a reference if the listed reference is not available. The Government may use personal knowledge or information from other sources in its evaluation of an Offeror’s past performance. In rating past performance, the Government may consider available past performance information that it discovers on predecessor companies. The Government’s evaluation is not limited to past performance information on the submitted example contracts.
d. In the case of an Offeror without a record of past performance or for whom information on past performance is not available or so sparse that no meaningful past performance rating can be reasonably assigned, the Offeror may not be evaluated favorably or unfavorably on past performance (See FAR 15.305(a)(2)(iv)). Therefore, the Offeror shall be determined to have an Unknown past performance. In the context of acceptability / unacceptability, “Unknown” shall be considered “Acceptable”.
C.3.4 The Government will use the ratings in Table C-2 below to determine an Offeror’s Past Performance Acceptable or Unacceptable.
Table C-2. Past Performance Evaluation Ratings
Rating Description
ACCEPTABLE Based on the offeror’s performance record, the Government has a reasonable expectation that the offeror will successfully perform the required effort, or the offeror’s performance record is unknown (see note above).
UNACCEPTABLE Based on the offeror’s performance record, the Government does not have a reasonable expectation that the offeror will be able to successfully perform the required effort.
C.4 Factor 3: Technical - Plant and Equipment
C.4.1 The Offeror's Technical proposal serves as evidence to establish that the Offeror has mechanical dredging equipment and other essential major plant, equipment, support vessels, barges, tugs, etc., required to execute the tasks outlined in this Request for Proposal. The information provided for this Factor must demonstrate the mechanical dredging equipment has the capacity for a minimum production rate of 2,000 cy/day, or 10,000 cy/week.
C.4.2 The Offeror shall provide documentation for all major pieces of equipment being proposed which will be utilized to perform mechanical dredging, transport material, haul and dispose of the dredge material. Offerors are cautioned to include all of their dredges as well as other major plant, equipment, support vessels, barges, tugs, etc. in responding to this evaluation factor.
C.4.3 The Government will evaluate the Technical factor on an Acceptable/Unacceptable basis based on the descriptions outlined in Table C-3. Offerors who are determined “Unacceptable” will not be eligible for award.
Table C-3. Technical Evaluation Ratings
Rating Description
ACCEPTABLE The Offeror has demonstrated that they have the equipment to mechanically dredge at least 2,000 cy/day, or 10,000 cy/week.
UNACCEPTABLE The Offeror has not demonstrated that they have the equipment to mechanically dredge at least 2,000 cy/day, or 10,000 cy/week.
C.4.4 The Government reserves the right to inspect the working plant and operating equipment of the apparent lowest priced technically acceptable offeror. This inspection is to confirm that the equipment aligns with the equipment being proposed and is in good operating condition. This inspection would be conducted prior to award of the contract.
D. PROPOSAL SUBMISSION
D.1 GENERAL INSTRUCTIONS TO OFFERORS
This is an all-electronic solicitation release. No hard copies of the solicitation will be mailed.
Notifications and Amendments to the solicitations will be posted to https://sam.gov/. It is the responsibility of each Offeror to review the webpage for notice of amendments, updates, or changes to current information. Responsibility for source selection resides with the Government.
Proprietary information submitted in response to this solicitation will be protected from unauthorized disclosure as required by Subsection 27 of the Office of Procurement Policy Act as amended (41 U.S.C. Sections 210-2107) and as implemented in the FAR. Proposals shall be unclassified and treated as Source Selection Sensitive Information (see FAR 2.101 and 3.204).
D.2 PROPOSAL FORMAT
D.2.1 File Organization: Each file must be clearly indexed and logically assembled. Text size must be no smaller than what is equivalent to Microsoft Word, Times New Roman, 11 point. A page is defined as one 8 ½ x 11-inch paper with printing on one side of the paper. Line spacing settings must be at least one and one-half (1 ½) line spacing. Margins on all four (4) edges of each page must be at least 1-inch. The proposal must be in a narrative format, organized and titled so that each section of the proposal follows the order and format of the volumes. The information presented should be organized to pertain to only the evaluation factor in the volume that the information is presented.
D.2.2 Each Volume must be organized in the following order and submitted as a single file with the expectation of volume attachments and/or size limitations:
a. Cover Sheet. The cover sheet must be clearly marked as to Volume number, title, solicitation identification, and the Offeror’s name. The cover sheet will not count against page counts.
b. Table of Contents. The table of contents must include all charts, illustrations, tables and any attachments for the Volume. The table of contents will not count against page counts.
c. Glossary. The glossary must contain all abbreviations and acronyms used in the volume with an explanation for each. The glossary will not count against page counts.
D.2.3 File Size Limitation: Offerors are advised to limit email attachments to a limit of 10MB in total per email. If needed, Offerors are advised to break files down into smaller sections to ensure file delivery.
D.2.4 File Naming Convention: To ensure an Offeror’s submission is received and processed appropriately, it is important that interested parties carefully ensure their electronic files adhere to the following naming convention:
W912EK24R0010-FIRM_NAME_VOL 1
W912EK24R0010-FIRM_NAME_VOL 2
W912EK24R0010-FIRM_NAME_VOL 3
W912EK24R0010-FIRM_NAME_VOL 4
D.2.5 The following Volumes will be submitted and evaluated:
Volume 1: Price (Factor 1) Volume 2: Specialized Experience (Factor 2)
Volume 3: Past Performance (Factor 3) Volume 4: Plant and Equipment (Factor 4)
D.2.6 Joint Venture Proposal Requirements: When proposing as joint venture, all members of the Joint Venture must sign the SF 1442 and prove bonding capability of both firms, unless a written agreement by the joint venture is furnished designating one firm with the authority to bind the other member(s) of the joint venture. In addition, a copy of the joint venture agreement must be submitted with the proposal. Failure to comply with the foregoing requirements may result in the joint venture’s proposal being excluded from further consideration for award.
D.3 PROPOSAL SUBMITTALS
D.3.1 Offerors submitting proposals for this project should limit submissions to data essential for evaluation of proposals so that a minimum of time and monies will have been expended in preparing information required herein. However, to be effectively and equitably evaluated, the proposals must include information sufficiently detailed to clearly describe the Offeror’s specialized experience necessary for successful completion of the solicitated project.
Requirements stated in this RFP are minimums. Proposals should follow in the order of sequence set forth in the RFP. Information provided out of sequence may not be evaluated and may result in the Offeror’s proposal being excluded from further consideration for award.
D.3.2 Offerors must submit their proposals electronically via email to eric.j.gaul@usace.army.mil and Jeffrey.r.voss@usace.army.mil of the U.S. Army Corps of Engineers, Contracting Division no later than the time and date specified in Block 13 of the Standard Form 1442.
NOTE: The Rock Island District is in the Central Time Zone. No hard copies will be accepted.
D.3.3 Proposal Submission and Deadline: Interested Offerors must submit proposals no later than the time and date specific on the SF 1442. The time and date of proposal receipt will be the delivery time and date recorded upon email receipt. Do not assume that electronic submission will occur instantaneously; it usually takes at least a few minutes. Large files will take some time to transmit, potentially up to one hour or longer. Offerors should time their submission effort with prudence by not waiting until the last few minutes – this will allow for unexpected delays in the transmittal process and email receipt. Offerors are encouraged to keep a copy of their submission for their record. Submissions after the deadline will be considered late and will be processed in accordance with FAR 15.208.
D.4 PROPOSAL SUBMISSION REQUIREMENTS
D.4.1 Each volume shall be submitted as a separate PDF file. Each volume shall be clearly labeled with its title.
Table D-1 illustrates the volumes of material that shall be submitted:
Table D-1: Proposal Submission Requirements
VOLUME TITLE
DIGITAL
COPIES
MAXIMUM
PAGES
Volume 1 - Price 1 N/A
Signed SF1442 and Acknowledgement of Amendments
Schedule of Prices
Representations, Certifications, and other Solicitation, Offer and Award Documents
Bid Guarantee (Bid Bonds)
Joint Venture and/or Articles of Organization for LLC, if applicable
Volume 2 – Specialized Experience 1 10
Volume 3 – Past Performance 1 10
Volume 4 – Plant and Equipment 1 20
Note: Pages that exceed the required page limitations will not be evaluated. Additional pages over the maximum allowed will be removed or not read and will not be evaluated by the Government. Pages submitted for organization purpose to include cover sheets, title pages, and indexes do not count toward to page limitations. Past Performance Questionnaires do not count toward page limitations.
D.4.2 CONTENT ORGANIZATION
All information shall be confined to the appropriate file. The Offeror shall confine submissions to essential matters, sufficient to define the proposal in a concise manner, to permit a complete and accurate evaluation of each proposal. Proprietary information shall be clearly marked. Each volume of the proposal shall consist of a Table of Contents.
APPENDIX D
Enclosure 1
USACE Past Performance Questionnaire (PPQ)
CONTRACT INFORMATION (Contractor to complete Blocks 1-4)
1. Contractor Information
Firm Name: CAGE Code:
Address: DUNs Number:
Phone Number:
Email Address:
Point of Contact: Contact Phone Number:
2. Work Performed as: Prime Contractor Sub Contractor Joint Venture Other (Explain)
Percent of project work performed:
If subcontractor, who was the prime (Name/Phone #):
3. Contract Information
Contract Number:
Delivery/Task Order Number (if applicable):
Contract Type: Firm Fixed Price Cost Reimbursement Other (Please specify):
Contract Title:
Contract Location:
Award Date (mm/dd/yy):
Contract Completion Date (mm/dd/yy):
Actual Completion Date (mm/dd/yy):
Explain Differences:
Original Contract Price (Award Amount):
Final Contract Price (to include all modifications, if applicable):
Explain Differences:
4. Project Description:
Complexity of Work: High Med Routine
How is this project relevant to project of submission? (Please provide details such as similar equipment, requirements, conditions, etc.)
CLIENT INFORMATION (Client to complete Blocks 5-8)
5. Client Information
Name:
Title:
Phone Number:
Email Address:
6. Describe the client’s role in the project:
7. Date Questionnaire was completed (mm/dd/yy):
8. Client’s Signature:
NOTE: USACE requests that the client completes this questionnaire and submits directly back to the Offeror.
The Offeror will submit the completed questionnaire to USACE with their proposal and may duplicate this questionnaire for future submission on USACE solicitations. Clients are highly encouraged to submit questionnaires directly to the Offeror. However, questionnaires may be submitted directly to USACE. Please contact the Offeror for USACE POC information. The Government reserves the right to verify any and all information on this form.
USACE Past Performance Questionnaire (PPQ)
TO BE COMPLETED BY CLIENT
ADJECTIVE RATINGS AND DEFINITIONS TO BE USED TO BEST REFLECT YOUR EVALUATION OF THE
CONTRACTOR’S PERFORMANCE
Form PPQ -0
RATING DEFINITION
NOTE
(E) Exceptional
Performance met contractual requirements and exceeded many to the Government/Owner’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with few minor problems for which corrective actions taken by the contractor was highly effective.
An Exceptional rating is appropriate when the Contractor successfully performed multiple significant events that were of benefit to the Government/Owner. A singular benefit, however, could be of such magnitude that it alone constitutes an Exceptional rating. Also, there should have been NO significant weaknesses identified.
(VG) Very Good
Performance met contractual requirements and exceeded some to the Government’s/Owner’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with some minor problems for which corrective actions taken by the contractor were effective.
A Very Good rating is appropriate when the Contractor successfully performed a significant event that was a benefit to the Government/Owner. There should have been no significant weaknesses identified.
(S) Satisfactory
Performance met minimum contractual requirements. The contractual performance of the element or sub-element contained some minor problems for which corrective actions taken by the contractor were satisfactory.
A Satisfactory rating is appropriate when there were only minor problems, or major problems that the contractor recovered from without impact to the contract. There should have been no significant weaknesses identified. Per DOD policy, a fundamental principle of assigning ratings is that contractors will not be assessed a rating lower than Satisfactory solely for not performing beyond the requirements of the contract.
(M) Marginal
Performance did not meet some contractual requirements. The contractual performance of the element or sub-element being assessed reflected a serious problem for which the contractor did not perform satisfactory corrective actions. The contractor's corrective actions were only marginally effective or were not fully implemented.
A Marginal is appropriate when a significant event occurred that the contractor had trouble overcoming which impacted the Government/Owner.
(U) Unsatisfactory
Performance did not meet most contractual requirements and recovery was not made in a timely manner. The contractual performance of the element or sub-element contained serious problem(s) for which the contractor's corrective actions, if any, were ineffective.
An Unsatisfactory rating is appropriate when multiple significant events occurred that the contractor had trouble overcoming and which impacted the Government/Owner. A singular problem, however, could be of such serious magnitude that it alone constitutes an unsatisfactory rating.
(N) Not Applicable
No information or did not apply to your contract Rating will be neither positive nor negative.
PLEASE CIRCLE THE ADJECTIVE RATING WHICH BEST
REFLECTS YOUR EVALUATION OF THE CONTRACTOR’S
PERFORMANCE.
1. QUALITY:
a) Quality of technical work completed E VG S M U N
b) Ability to meet quality standards specified for technical performance
E VG S M U N
c) Timeliness/effectiveness of contract problem resolution without extensive customer guidance
E VG S M U N
d) Adequacy/effectiveness of quality control program and adherence to contract quality assurance requirements (without adverse effect on performance)
2. SCHEDULE/TIMELINESS OF PERFORMANCE:
a) Compliance with contract delivery/completion schedules including any significant intermediate milestones. (If liquidated damages were assessed or the schedule was not met, please address below)
b) Rate the contractor’s use of available resources to accomplish tasks identified in the contract
3. CUSTOMER SATISFACTION:
a) To what extent were the end users satisfied with the project? E VG S M U N
b) Contractor was reasonable and cooperative in dealing with your staff (including the ability to successfully resolve disagreements/disputes)
c) To what extent was the contractor cooperative, businesslike, and concerned with the interests of the customer?
d) Overall customer satisfaction E VG S M U N
4. MANAGEMENT/ PERSONNEL/LABOR
a) Effectiveness of on-site management, including management of subcontractors, suppliers, materials, and/or labor force?
b) Ability to hire, apply, and retain a qualified workforce to this effort E VG S M U N
c) Government Property Control (if applicable) E VG S M U N
d) Knowledge/expertise demonstrated by contractor personnel E VG S M U N
e) Utilization of Small Business concerns E VG S M U N
f) Ability to simultaneously manage multiple disciplines within the project E VG S M U N
g) Ability to assimilate and incorporate changes in requirements and/or priority, including planning, execution and response to requested changes
h) Effectiveness of overall management (including ability to effectively lead, manage and control the program)
5. COST/FINANCIAL MANAGEMENT
a) Ability to meet the terms and conditions within the contractually agreed price(s)?
b) Contractor proposed innovative alternative methods/processes that reduced cost, improved maintainability or other factors that benefited the client
c) If this is/was a Government cost type contract, please rate the Contractor’s timeliness and accuracy in submitting monthly invoices with appropriate back-up documentation, monthly status reports/budget variance reports, compliance with established budgets and avoidance of significant and/or unexplained variances (under runs or overruns)
d) Is the Contractor’s accounting system adequate for management and tracking of costs? If no, please explain in Remarks section.
Yes No
e) If this is/was a Government contract, has/was this contract been partially or completely terminated for default or convenience or are there any pending terminations? Indicate if show cause or cure notices were issued, or any default action in comment section below.
f) Have there been any indications that the contractor has had any financial problems? If yes, please explain below.
6. SAFETY/SECURITY
a) To what extent was the contractor able to maintain an environment of safety, adhere to its approved safety plan, and respond to safety issues? (Includes:
following the users rules, regulations, and requirements regarding housekeeping, safety, correction of noted deficiencies, etc.)
b) Contractor complied with all security requirements for the project and personnel security requirements.
7. GENERAL
a) Ability to successfully respond to emergency and/or surge situations (including notifying COR, PM or Contracting Officer in a timely manner regarding urgent contractual issues).
b) Compliance with contractual terms/provisions (explain if specific issues) E VG S M U N
c) Would you hire or work with this firm again? (If no, please explain below) Yes No
d) In summary, provide an overall rating for the work performed by this contractor.
Please provide responses to the questions above (if applicable) and/or additional remarks. Furthermore, please provide a brief narrative addressing specific strengths, weaknesses, deficiencies, or other comments which may assist our office in evaluating performance risk (please attach additional pages if necessary)
APPENDIX D
Enclosure 2
EXPERIENCE INFORMATION
(To be completed by Contractor)
If the Offeror is in a Joint Venture, identify which contractor in the Joint Venture Completed the contract.
1. Contractor: Name:
DUNS:
CAGE Code:
2. Contract /Task Order(TO) /Purchase Order (PO) Number:
3. Contract/TO/PO Award Amount:
4. Contract/TO /PO Status: Period of Performance:
Original Completion Date: Percent Complete: % Actual Completion Date (with time extensions):
Award Date: Final Contract Price: Percent of work performed by Prime:
Contract Title and Location (city, state):
Type of Contract (Design-Build, Design-Bid-Build, Work Plan Construct, Firm Fixed-Price, Cost Plus, etc.):
Contract Description (Narrative Description) -- to include the role of the contractor on the contract and specific responsibilities of the contractor in performance of the effort:
Type / scope of work performed by the Offeror:
Type / scope of work performed by Subcontractors:
Quality Awards, Letters of Appreciation, etc.
7. Project Owner or Project Manager for the Client – provide:
Name:
Telephone Number and E-mail:
CLAUSES INCORPORATED BY REFERENCE
52.204-16 Commercial and Government Entity Code Reporting AUG 2020 52.204-22 Alternative Line Item Proposal JAN 2017 52.222-5 Construction Wage Rate Requirements--Secondary Site of the
Work
MAY 2014
52.225-10 Notice of Buy American Requirement--Construction Materials
MAY 2014
52.216-1 TYPE OF CONTRACT (APR 1984)
The Government contemplates award of a Firm Fixed Price Indefinite Delivery Indefinite Quantity contract resulting from this solicitation.
(End of provision)
52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE EQUAL
EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION (FEB 1999)
(a) The offeror's attention is called to the Equal Opportunity clause and the Affirmative Action Compliance…