W912EK19R0004-0003.pdf.pdf
PDF 46 KB Posted
- Attached to
- Coralville Lake Control Tower Crane Replacement
- Solicitation number
- W912EK19R0004
About this file
See attached Amendment for details.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W912EK19R0004-0002.pdf.pdf | ||
| A22._W912EK19R0004-0001.pdf | ||
| A22._Attachment_0002_-_As_Built_Drawings.pdf | ||
| A22._Attachment_1_-_Crane_Pictures.pdf | ||
| A22._W912EK19R0004(Final).pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
96514782497845
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this Amendment is to revise the Scope of Work and extend the solicitation to 19 December 2018.
All other terms and conditions remain unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 9
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 12-Dec-2018
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912EK19R0004
X 9B. DATED (SEE ITEM 11)
08-Nov-2018
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
12-Dec-2018
CODE
CONTRACTING DIVISION
US ARMY CORPS OF ENGINEERS
1500 ROCK ISLAND DRIVE
ROCK ISLAND IL 61201
W912EK 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912EK19R0004
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 1449 - CONTINUATION SHEET
The following have been modified:
SCOPE OF WORK
CORALVILLE LAKE CONTROL TOWER CRANE REPLACEMENT
Coralville Lake Control Tower Structure
CORALVILLE LAKE PROJECT, CORALVILLE, IOWA
DESCRIPTION OF WORK: The Contractor shall furnish all labor, supervision, permits, tools, equipment, fuel, materials and supplies necessary to replace and install the new components of an overhead bridge crane block system and wire rope for operation of control gates and service gate.
Minimum Requirements:
- 57 ton working load limit.
- 6 piece sheave system to operate.
- 7/8” Wire line of stainless steel construction.
- Minimum 6” throat opening on the lifting hook
- Hook may be fixed but must be in turn key position for existing gate structures. (Pre-bid visit recommended)
- Block and Hook shall be painted in “Safety” (Brilliant) Yellow Enamel with black diagonal striping. (2” Spacing)
- Replace existing wire rope to operate at full distance with minimum of two full wraps around the rope drum at full extension. Estimated 1300 feet required.
- Shall meet or exceed current EM385-1-1 Requirements, ANSI B30.17 Standards, and/or OSHA standards, whichever is most strict.
- Shall be load tested in accordance with ANSI, EM385-1-1 and the manufacturer and verified prior to turn over to USACE.
- Operational training and maintenance manuals are to be provided. Employee training shall be conducted for staff upon completion of the project.
PICTURES: See Attachment 1
DRAWINGS: See Attachment 2
DELIVERY: Work shall be completed NLT June 1st, 2019 with turnkey operations and all testing completed and signed off. Coordination for the project completion will need to be done in advance for a certified crane inspector from the safety office to accept the project for the U.S. Army Corps of Engineers.
SITE VISIT: Site inspections are strongly encouraged. Arrangements for inspecting the site and/or questions concerning the specifications may be addressed to Assistant Operations Manager Jonathan Wuebker at (319)338-3543 x6310 or email at:
jonathan.d.wuebker@usace.army.mil.
PROTECTION OF EXISTING FACILITIES AND AMENITIES: Contractor shall use care to avoid damaging any existing buildings, equipment, utilities, embankments, turf and facilities on the Government installation. If the Contractor's actions result in damage to any government property, the Contractor shall replace or repair the damage to the satisfaction of the COR at no expense to the Government. If the Contractor fails or refuses to make such repair or replacement, the Contractor shall be liable for the cost which may be deducted from the contract price or the Contracting Officer may have the necessary work performed and charge the cost to the Contractor.
FINAL CLEAN-UP: Disposal of all scrap and pieces of removed crane and components shall be done in accordance with all applicable laws and regulations. Upon completing the work, all materials, debris, tools and equipment shall be removed and the Contractor shall leave the work area in a clean, neat, and orderly condition satisfactory to the Government.
WORK PLAN/PRE-WORK MEETING: Contractor is responsible for verifying site conditions and submitting a work plan (subject to Government approval) a minimum of 15 days prior to scheduled on site work. The government will have three business days to review/approve/request corrections to the plan. The plan shall address how the equipment will be removed, new equipment installed, and any temporary storage of equipment/material during the process of installation. An adjacent parking area may be used for staging along with the bridge area. Operations of the existing gate system shall not be hindered and daily gate changes will be completed by on-site government staff. A pre-work site visit with the Contractor’s site superintendent shall be conducted a minimum of 7 days prior to beginning operations to receive any remaining required documents, discuss safety and other coordination activities. No on site work will be permitted on Saturdays or Sundays or any day between the hours of 6:00pm and 7:00am.
ACCIDENT PREVENTION: The Contractor shall provide and maintain work environment in a manner that will safeguard the public and Government personnel, property, materials, supplies, and equipment exposed to Contractor operations and activities. Contractor shall comply with all pertinent provisions of the latest version of U.S. Army Corps of Engineers Safety & Health Requirements Manual, EM 385-1-1, 30 November 2014. USACE Safety Manual Link:
http://www.usace.army.mil/CESO/Pages/Home.aspx mailto:jonathan.d.wuebker@usace.army.mil http://www.usace.army.mil/CESO/Pages/Home.aspx
SECURITY
**NOTE: To protect the privacy of the Contractor, all Contractor employees, and all sub-contractor employees, background checks, OPSEC SOPs, E-verify, and I-9 forms shall be submitted with a coversheet stating the contract number (e.g. W912EK-15-C-XXXX), title of project, and the company's point of contact information, in a sealed envelope/container and mail:
Security Office U.S. Army Corps of Engineers Rock Island District 1500 Rock Island Drive Rock Island, IL 61201
Security Clause 2(b).
For Access and General Protection Policy and Procedures. All Contractors and sub-contractor employees shall comply with installation and facility access guidelines and rules as stated herein. Contractor workforce must comply with all personal identity verification requirements as directed by Department of Defense, Department of the Army Headquarters, Rock Island District and/or local policy. In addition to the changes otherwise authorized by the Changes clause of this contract, should the Force Protection Condition (FPCON) at any installation or facility change, the Government may require changes in Contractor security matters or processes.
In support of Rock Island District evaluation of personnel authorized for access to federal facilities, the Contractor shall submit background checks that have been conducted by a bonded third party within the last 6 months of Notice to Proceed date and authorize reports to be provided to the Rock Island District Security and Law Enforcement Office by the third party.
The background check will cover, at a minimum, the ten years covering states the employee has lived in, national criminal records check which includes felony and misdemeanor offenses, Department of Motor Vehicles records, and a national sex offender registry check, submitted 14 days prior to accessing the project site.
Identification Badges: The Contractor shall be responsible for furnishing a photo identification badge/card to each employee prior to the employee's work on-site, and for requiring each employee engaged on the work to display identification. At a minimum, the badge shall have the following items shown, the employee’s picture, employee’s name, and company name working for. The badge will be prominently displayed unless restricted for safety concerns, in which case it will be available for immediate display upon request (carried on person).
As employees are added or deleted from the submitted and approved Access Control List (ACL), this information will be reported immediately to the Contracting Officer (KO). Added employees will not be permitted on-site until requirements of this paragraph are completed, submitted, and approved.
Disqualifying factors include, but are not limited to:
(1) Criminal conduct, in particular violent crime and sex offenders;
(2) Habitual use of intoxicating beverages to excess as evidenced by Driving under the influence or public intoxication records; or
(3) Any illegal activity or other disqualification which makes the individual unfit for service (e.g.
drug trafficking or procurement fraud).
In addition to the submitted background checks, supplemental agency checks may be performed at the discretion of the Rock Island District security personnel. The Contractor agrees to cooperate and ensure that Contractor personnel provide any documentation required to complete these checks. Any person lacking proper identification credentials or deemed a security threat may be denied access to the project. Such action in no way relieves the Contractor from performance of the Contract. The Rock Island District retains the right to deny any Contractor and sub-contractor employee from working on a contract awarded by the Rock Island District based on final background investigation results. All information received as a result of a background check will be handled according to Privacy Act regulation.
In the event that an unexpected change in personnel is required, due to sudden absence of a critical path employee, the Contractor shall immediately contact the Contracting Officer to coordinate obtaining written approval from the Security Office for new/additional personnel to be brought on site prior to background check acceptance. Contractor shall submit Personnel Change Request Form and will receive written authorization from the Security Office prior to bringing new personnel on site, and ensure a background check is sent to the Rock Island District Security Office no later than ten days from written notice of approval. The Rock Island District reserves the right to terminate access of the employee upon completion of the Government’s review of the background check and the Contractor shall be notified immediately of any such Government decision.
In the event of an unforeseen change in work site conditions which may require a contract modification, and the contractor is required to immediately add personnel, a Personnel Change Request Form will be submitted to and approved by the Security Office prior to bringing new personnel on site, and ensure a background check is sent to the Rock Island District Security Office no later than ten days from written notice of approval. The Rock Island District reserves the right to terminate access of the employee upon completion of the Government’s review of the background check and the Contractor shall be notified immediately of any such Government decision.
Subcontractor personnel not expected to be on the worksite for more than 15 days may be allowed on site with the following conditions:
1) Employee will be on site a total of 15 days or less, for the duration of the project.
2) Employee is added to the ACL as a short term employee.
3) Employee is escorted while on site. This is defined as being in the line of sight of an identified contractor employee who has a background check on file with the Rock Island District (as noted on the ACL).
4) Each contractor employee can sponsor only five short term employees at a time.
Foreign National employees: Due to a difference in background check procedures for long term foreign national employees, all such employees must provide a photocopy of their passport to the Rock Island District Security Office NLT 30 days prior to arrival on site. Short term foreign national employees (e.g. specialists with a two week period of performance) may work on site with the following conditions:
1) Foreign national employee will be on site a total of 15 days or less, for the duration of the project.
2) Foreign national employee will comply with E-verify requirements E-verify paragraph).
3) Approved and identified contractor employee shall escort the foreign national employee at ALL times while on site.
4) Each contractor employee can sponsor only one short term foreign national at a time.
Personnel Change Request Form Contract #_______________ Date___________ We, _____________________, respectfully request to add/replace (circle one) personnel to the jobsite due to the following situation:
Personnel to be conditionally added to the ACL (escorted by):
Background checks (if required for a long term employee) shall be submitted by close of business on (insert proposed date): ________________
(Insert signature block)
Security Clause 15.
Pre-screen candidates using E-Verify Program. The Contractor must pre-screen Candidates using the E-verify Program website (http://www.uscis.gov/e-verify) to meet the established employment eligibility requirements. The Contractor must ensure that the Candidate has two valid forms of Government issued identification prior to enrollment to ensure the correct information is entered into the E-verify system. Documentation of company enrollment in E-verify, via a print screen of the company profile within the E-verify system, must be submitted to the Security Office no later than 3 business days after the initial Notice to Proceed.
*When contracts are with individuals, the individuals will be required to complete a Form I-9, Employment Eligibility Verification must be given/coordinated with the designated Government representative. This Form will be provided to the Security Office after Notice to Proceed is given.
(End of Summary of Changes) http://www.uscis.gov/e-verify