A22_-__W912EK18T0008__Amend_0002.pdf

PDF 152 KB Posted

Attached to
ClamShell Dredge Bucket
Solicitation number
W912EK18T0008
Issued by

About this file

Amendment 0002 Updated SOW

View the file

Other files

File Type Posted
W912EK18T0008_amend_0003.pdf PDF
A22_-_W912EK18T0008-0001.pdf PDF
W912EK18T0008.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

96514780163492

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

1. The reason for this Amendment is to provide the follow ing update to the SOW, see summary of changes:

a) Revise the line in the first paragraph to state The new and not used bucket, must be brand name or equivalent as an exact replacement to the existing bucket.

b) Remove the line "All parts are interchangeable w ith existing bucket" on the General Salient Characteristics New Bucket Requirements.

2. All other terms and conditions of the solicitation remain unchanged.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 4

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 16-Mar-2018

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912EK18T0008

X 9B. DATED (SEE ITEM 11)

06-Mar-2018

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

16-Mar-2018

CODE

CONTRACTING DIVISION

US ARMY CORPS OF ENGINEERS

1500 ROCK ISLAND DRIVE

ROCK ISLAND IL 61201

W912EK 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912EK18T0008

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

The following items are applicable to this modification:

AMENDMENT

Scope of Work (SOW)

PURPOSE

The United States Army Corps of Engineers (USACE), Rock Island District, requires the purchase of a material handler’s clamshell bucket. In an ongoing river channel maintenance effort, the bucket will be submerged in river water to remove river sediment that has built-up in the Illinois River’s commercial, navigation channel. The new and not used bucket, must be brand name or equivalent as an exact replacement to the existing bucket. The new bucket must connect to and operate with, upon delivery, the existing material handler’s stick per manufacturers’ requirements and the SOW, without the need for additional purchase or rental by the USACE.

GENERAL SALIENT CHARICTERISTICS NEW BUCKET REQUIREMENTS:

Submerged operational depth rating of 33’ Operating Environment: Illinois River at depths up to 25’ (If the conditions are right, water can remain liquid down to minus 55 degrees Fahrenheit).

Connects to existing Liebherr Material Handler * 360 Degree Continuous Power Rotation Weight with rotation not to exceed 9,500# Capacity Heaped, 4.5 cubic yards Capacity Struck, 4 cubic yards 6 – Each, Bolt on Cutting Edges Mechanically linked to provide even closure Maximum of 2 hydraulic cylinders

24/7/365 Manufactured Certified parts, inspections, repair and other related services in support of operations along the Illinois River from Lockport, IL to Beardstown, IL and the Mississippi River from Dubuque, IA to Hannibal, MO, which can be at a service call location within 5 hours of receiving a service call, in the event of contingency operations.

Upon contract award, the Contractor is to provide, within one week of award, all maintenance;

operations; storage; installation; parts list (if applicable to optional items, but must be provided for new bucket); applicable, parts and service warranties; a list with the location of certified dealers, to include POCs (manufacturer direct for verification purposes of approved dealer and service within the required service area).

EXISTING BUCKET & MATERIAL HANDLER DATA

*Material Handler:

Liebherr-America, Inc.

Model NO. *R974 CEW LITRONIC* Product Identification NO. *WLHZ1084VZC039990*

Clamshell Bucket:

Manufacturer: Young Corporation

Equipment Model No. RS400CBE-SP Serial No. RS400CBE-SP-300

DELIVERY

To be delivered NO LATER THAN Monday, May 14, 2018.

OPTIONS

All parts must be manufactured to original equipment specifications or recommended by the manufacturer as an improvement to the original equipment specifications for the new bucket.

Remanufactured parts are acceptable so long as, they meet the manufactures’ recommendations.

If shelf life of provided parts is less than 3 years, upon FOB Destination receiving, it is to be noted and stated that this item will not be bid due to shelf life restrictions. Provide storage requirements for optional parts.

EVALUATION PROCEDURES

ALL Quotes and Offers must provide, to be considered, Descriptive Literature (DL) such as warranties, service plans, cuts, illustrations, drawings, and brochures that shows a product’s characteristics or construction of a product or explains its operation.

The USACE will not search for information that has not been readily-provided by offerors.

SHIPPING METHOD

Free on Board (FOB) Destination:

U.S. Army Corps of Engineers 257 Grant Street Peoria, IL 61603

All delivery days and times must be verified in writing with the POC by the Contractor prior to delivery. Typical, acceptable delivery day and times are Monday through Thursday 7 AM to 4:30 PM, excluding Government holidays.

TRADE-INs Located at 257 Grant Street, Peoria, IL 61603 All trade-ins will be traded in an as-is condition A total of 4 buckets and associated bucket accessories are scheduled for trade-in quoting, as reference in the (3) photos below. Trade-ins must be an all or nothing transfer to the Contractor.

The Government will provide access to the buckets and bucket accessories for trade-in quoting to responsible contractors. During the quoting process, buckets will not be moved from their resting place during site visit inspections. Schedule trade-in site visit and pick up times with the POC to ensure proper resource availability. The government is not responsible for nongovernment verified scheduling.

The government will only load trade-ins and unload the new bucket with Government personnel and a government furnished crane from the contractor’s delivery truck. The contractor is responsible for all other associated transportation needs and costs to and from the site.

Trade-ins may only be removed from USACE’s property at time of new bucket arrival and no later than 3 weeks after receiving the new bucket.

(end of summary of changes)

File details come from the government source that posted it.