W912EK18B0004-0001.pdf

PDF 182 KB Posted

Attached to
ILLINOIS RIVER BASIN; PEORIA PROJECT OFFICE; SHEETPILE WALL REPAIRS
Solicitation number
W912EK18B0004
Issued by

About this file

W912EK18B0004 Amendment 0001

View the file

Other files

File Type Posted
Bid_Summary_Sheet_-_W912EK18B0004.pdf PDF
W912EK18B0004-0001_-_Drawings.pdf PDF
W912EK18B0004.pdf PDF
W912EK18B0004_Drawings.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The reason for this amendment is to modify the Schedule of Prices, Section 01 22 00, Section 09 97 02, the Draw ings, and the required response date/time has changed from 14-Aug-2018 02:00 PM to 16-Aug-2018 02:00 PM.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 5

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 07-Aug-2018

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912EK18B0004

X 9B. DATED (SEE ITEM 11)

11-Jul-2018

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

07-Aug-2018

CODE

CONTRACTING DIVISION

US ARMY CORPS OF ENGINEERS

1500 ROCK ISLAND DRIVE

ROCK ISLAND IL 61201

W912EK 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912EK18B0004

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00010 - SOLICITATION CONTRACT FORM

The required response date/time has changed from 14-Aug-2018 02:00 PM to 16-Aug-2018 02:00 PM.

The following have been modified:

SCHEDULE OF PRICES

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

BASE BID - ARMORED WALL REPAIR

0001 Mobilization and Demobilization

1 JOB XXXXXXXX $

0002 Demolish Sheet Pile Wall

0003 Diaphragm Cells

0004 Electrical Work

0005 Aggregate and Grade

0006 Storm Sewer Extension

TOTAL OF ESTIMATED AMOUNTS - BASE BID

(ITEM NOS. 0001 THROUGH 0006, INCL.)

OPTION A - MODIFIED DIAPHRAGM WALL

0101 Diaphragm Cells

0102 Sand Work

0103 Aggregate and Grade

0104 Electrical Work

0105 Storm Sewer Extension

TOTAL OF ESTIMATED AMOUNTS - OPTION A

(ITEM NOS. 0101 THROUGH 0105, INCL.)

OPTION B - MOORING POST

0201 Marine Mobilization and Demobilization 1 JOB XXXXXXXX $

0202 Mooring Posts

0203 Deadmen

TOTAL OF ESTIMATED AMOUNTS - OPTION B

(ITEM NOS. 0201 THROUGH 0203, INCL.)

OPTION C - WALL ARMOR

0301 Wall Armor

XXXX Deleted

XXXXXXXX XXXXXXXX

TOTAL OF ESTIMATED AMOUNT - OPTION C

(ITEM NO. 0301)

TOTAL OF ESTIMATED AMOUNTS - BASE BID AND OPTION A

(ITEM NOS. 0001 THROUGH 0105, INCL.)

TOTAL OF ESTIMATED AMOUNTS - BASE BID, OPTION A, AND OPTION B

(ITEM NOS. 0001 THROUGH 0203, INCL.)

TOTAL OF ESTIMATED AMOUNTS - BASE BID, OPTION A, OPTION B AND OPTION C

(ITEM NOS. 0001 THROUGH 0301, INCL.)

JOB = LUMP SUM

ENSURE UNIT PRICE AND AMOUNT LINES FOR ALL ITEMS ARE COMPLETED.

THE GOVERNMENT RESERVES THE RIGHT TO EXERCISE

ANY OR ALL

OPTIONS UP TO 200 DAYS AFTER NOTICE TO PROCEED.

IF "OPTION A" IS EXERCISED, THE CONTRACT WILL BE EXTENDED BY

200 DAYS.

IF "OPTION B" IS EXERCISED, THE CONTRACT WILL BE EXTENDED BY 100 DAYS.

IF "OPTION C" IS EXERCISED, THE CONTRACT WILL BE EXTENDED BY 100 DAYS.

(End of Summary of Changes)

The following items are applicable to this modification:

AMENDMENT 0001

The following modifications are made to the SCHEDULE OF PRICES, Section 01 22 00, Section 09 97 02, and the DRAWINGS.

SCHEDULE OF PRICES

a. SCHEDULE OF PRICES. Delete the Schedule of Prices in its entirety, and substitute therefor revised

Schedule of Prices, Amendment 0001, dated August 3, 2018, attached hereto.

SECTION 01 22 00

b. PAGES 1 and 5. Delete Section 01 22 00 Pages 1 and 5, in their entirety, and substitute therefor revised

Section 01 22 00 Pages 1 and 5, Amendment 0001, dated August 3, 2018, attached hereto.

SECTION 09 97 02

c. PAGE 33. Delete Section 09 97 02 Page 33 in its entirety, and substitute therefor revised Section 09 97 02 Page 33, Amendment 0001, dated August 3, 2018, attached hereto.

DRAWINGS (SUPERSEDED)

d. Revised drawings bearing the revision numbers and dates listed below are being issued with this

Amendment. Such revised drawings supersede those of the same sheet identification numbers listed in the INDEX OF DRAWINGS included in the set of drawings furnished with Solicitation No. W912EK18B0004, dated July 16, 2018.

SHEET IDENTIFICATION NO. BASE G-002, Revision Mark 1 dated AUGUST 3, 2018.

SHEET IDENTIFICATION NO. BASE G-101, Revision Mark 1 dated AUGUST 3, 2018.

SHEET IDENTIFICATION NO. BASE G-102, Revision Mark 1 dated AUGUST 3, 2018.

SHEET IDENTIFICATION NO. BASE G-402, Revision Mark 1 dated AUGUST 3, 2018.

SHEET IDENTIFICATION NO. BASE C-105, Revision Mark 1 dated AUGUST 3, 2018.

SHEET IDENTIFICATION NO. BASE C-110, Revision Mark 1 dated AUGUST 3, 2018.

SHEET IDENTIFICATION NO. BASE C-115, Revision Mark 1 dated AUGUST 3, 2018.

SHEET IDENTIFICATION NO. BASE C-501, Revision Mark 1 dated AUGUST 3, 2018.

SHEET IDENTIFICATION NO. BASE C-502, Revision Mark 1 dated AUGUST 3, 2018.

SHEET IDENTIFICATION NO. BASE C-503, Revision Mark 1 dated AUGUST 3, 2018.

SHEET IDENTIFICATION NO. BASE C-504, Revision Mark 1 dated AUGUST 3, 2018.

SHEET IDENTIFICATION NO. BASE S-101, Revision Mark 1 dated AUGUST 3, 2018.

SHEET IDENTIFICATION NO. BASE S-201, Revision Mark 1 dated AUGUST 3, 2018.

SHEET IDENTIFICATION NO. BASE E-102, Revision Mark 1 dated AUGUST 3, 2018.

SHEET IDENTIFICATION NO. BASE E-103, Revision Mark 1 dated AUGUST 3, 2018.

SHEET IDENTIFICATION NO. BASE E-501, Revision Mark 1 dated AUGUST 3, 2018.

SHEET IDENTIFICATION NO. OPTION A C-115, Revision Mark 1 dated AUGUST 3, 2018.

SHEET IDENTIFICATION NO. OPTION A C-301, Revision Mark 1 dated AUGUST 3, 2018.

SHEET IDENTIFICATION NO. OPTION A S-101, Revision Mark 1 dated AUGUST 3, 2018.

SHEET IDENTIFICATION NO. OPTION A E-102, Revision Mark 1 dated AUGUST 3, 2018.

SHEET IDENTIFICATION NO. OPTION A E-103, Revision Mark 1 dated AUGUST 3, 2018.

SHEET IDENTIFICATION NO. OPTION A E-501, Revision Mark 1 dated AUGUST 3, 2018.

SHEET IDENTIFICATION NO. OPTION B S-401, Revision Mark 1 dated AUGUST 3, 2018.

SHEET IDENTIFICATION NO. OPTION B S-402, Revision Mark 1 dated AUGUST 3, 2018.

SHEET IDENTIFICATION NO. OPTION B S-510, Revision Mark 1 dated AUGUST 3, 2018.

SHEET IDENTIFICATION NO. OPTION B S-515, Revision Mark 1 dated AUGUST 3, 2018.

SHEET IDENTIFICATION NO. OPTION C S-520, Revision Mark 1 dated AUGUST 3, 2018.

ATTACHMENTS: Schedule of Prices; Section 01 22 00 Pages 1 and 5; Section 09 97 02 Page 33; BASE G-002;

BASE G-101; BASE G-102; BASE G-402; BASE C-105; BASE C-110; BASE C-115; BASE C-501; BASE C-502;

BASE C-503; BASE C-504; BASE S-101; BASE S-201; BASE E-102; BASE E-103; BASE E-501; OPTION A C-

115; OPTION A C-301; OPTION A E-102; OPTION A E-103; OPTION A E-501; OPTION A S-101; OPTION B

S-401; OPTION B S-402; OPTION B S-510; OPTION B S-515; OPTION C S-520.

Solicitation No. W912EK18B0004

SECTION TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

SECTION 01 22 00

MEASUREMENT AND PAYMENT

PART 1 GENERAL

1.1 SUBMITTALS

1.2 JOB PAYMENT ITEMS

1.2.1 Mobilization and Demobilization

1.2.1.1 Payment

1.2.1.2 Unit of Measure

1.2.2 Demolish Sheet Pile Wall

1.2.2.1 Payment

1.2.2.2 Unit of Measure

1.2.3 Modified Diaphragm Cells

1.2.3.1 Payment

1.2.3.2 Unit of Measure

1.2.4 Electrical Work

1.2.4.1 Payment

1.2.4.2 Unit of Measure

1.2.5 Aggregate and Grade

1.2.5.1 Payment

1.2.5.2 Unit of Measure

1.2.6 Storm Sewer Extension

1.2.6.1 Payment

1.2.6.2 Unit of Measure

1.2.7 Sand Work

1.2.7.1 Payment

1.2.7.2 Unit of Measure

1.2.8 Mooring Posts

1.2.8.1 Payment

1.2.8.2 Unit of Measure

1.2.9 Deadmen

1.2.9.1 Payment

1.2.9.2 Unit of Measure

1.2.10 Wall Armor

1.2.10.1 Payment

1.2.10.2 Unit of Measure

1.2.11 Deleted

1.2.11.1 Deleted

1.2.11.2 Deleted

PART 2 MATERIALS

PART 3 EXECUTION

-- End of Section Table of Contents --

SECTION 01 22 00 Page 1 AMEND. 0001

03 AUG 2018

B5ECDSCM

Text Box

1.2.9.2 Unit of Measure

Unit of measure: job.

1.2.10 Wall Armor

1.2.10.1 Payment

Payment for all costs associated with providing wall armor will be made at the Contract job price for Item No. 0301, "Wall Armor," of Option C.

1.2.10.2 Unit of Measure

Unit of measure: job.

1.2.11 Deleted

1.2.11.1 Deleted

1.2.11.2 Deleted

PART 2 MATERIALS

Not Used

PART 3 EXECUTION

Not Used

-- End of Section --

SECTION 01 22 00 Page 5 AMEND. 0001

03 AUG 2018

B5ECDSCM

Text Box

B5ECDSCM

Text Box

B5ECDSCM

Text Box

B5ECDSCM

Text Box

B5ECDSCM

Text Box

3.5 PAINTING SCHEDULES

SYSTEM NO. 5-E-Z

Items or surfaces to be coated:

1. Mooring Post Assembly anchor frame

2. Mooring Post exposed surfaces not in contact with concrete (including submerged surfaces)

3. Mooring Post Assembly Wales

4. Checkpost (yellow) exposed surfaces

5. Wall Armor exposed surfaces not in contact with concrete (including submerged surfaces)

All ferrous items supplied under this contract which will be exposed to atmospheric conditions, submerged, or otherwise noted, which are not galvanized or made of corrosion resistant materials. This excludes reinforcing bars and the embedded portions of embedded metals.

Machined faces that have designated tolerances to mate to adjacent components not to be painted.

SURFACE

PREPARATION

1st COAT 2nd COAT 3rd COAT 4th COAT

White metal blast cleaning

Vinyl zinc-rich VZZ-108d (double spray coat)

Gray Vinyl V-766e (double spray coat)

White Vinyl V-766e (double spray coat)

Gray Vinyl V-766e (double spray coat)

COAL TAR EPOXY

Items or surfaces to be coated:

1. River side of modified diaphragm wall (from top of rock to top of wall) and the landward side of the modified diaphragm wall that is above the top of the final grade. Field welded connections below water are not required to be coated.

2. PZ-22 Mooring Post Assembly anchor walls

-- End of Section --

SECTION 09 97 02 Page 33 AMEND. 0001

03 AUG 2018

B5ECDSCM

Text Box

B5ECDSCM

Text Box

W912EK18B0004-0001
B5ILPO1701-SPEC-2018-08-06-AMEND0001

File details come from the government source that posted it.