W912EK-16-T-0011_Refuse_and_Recycling.pdf

PDF 464 KB Posted

Attached to
Refuse and Recycling Services Saylorville Lake
Solicitation number
W912EK-16-T-0011
Issued by

About this file

Solicitation

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REQUEST FOR QUOTATION

PLEASE RETURN TO:

US Army Corps of Engineers

US Army Corps of Engineers W912EK- 16-T-0011 Refuse and Recycling Services Saylorville Lake

Attn: Troy Robbins 1500 Rock Island Drive Rock Island, Illinois 61201 Email: Troy.a.robbins@usace.army.mil

PLEASE INCLUDE THE FOLLOWING INFORMATION:

1. Complete numbers 1-4 below. Include this cover page with your offer, along with the below items that need to be filled out.

2. Complete Block 17a on the SF1449 - Enter Name, Address, and Current Phone Number of Person to Contact Regarding Proposal.

3. Complete and sign Blocks 30a, 30b, and 30c on the SF1449.

4. Complete and submit the the Schedule of Prices (“CLINS”), Technical Capability Statement, and USACE Past Performance Questionnaire.

5. Complete Offeror Representations and Certifications (Clause 52.212-3) if your company has not completed the Representations and Certifications located with your company’s SAM record (https://www.sam.gov).

6. Technical questions must be submitted via email to Troy Robbins at the address below. See

MVR.02 within the solicitation for further instructions.

Contractors must be current in their registration in the System for Award Management (SAM) Database before a Government Contract award can be made.https://www.sam.gov/

Please provide: 1. Taxpayer ID Number: ____________________________

2. CAGE Code (SAM):_______________________________

3. Point of Contact: _________________________________

4. Phone & Email: __________________________________

FOR ADDITIONAL INFORMATION, CONTACT:

Troy Robbins Phone: 309-794-5259 or Email: Troy.a robbins@usace.army.mil

SEE ADDENDUM

(No Collect Calls)

W912EK-16-T-0011 12-Jan-2016

b. TELEPHONE NUMBER

309-794-5259

8. OFFER DUE DATE/LOCAL TIME

02:00 PM 03 Feb 2016

5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

STANDARD FORM 1449 (REV. 2/2012)

Prescribed by GSA – FAR (48 CFR) 53.212

(TYPE OR PRINT)

(SIGNATURE OF CONTRACTING OFFICER)

ADDENDA ARE

26. TOTAL AWARD AMOUNT (For Gov t. Use Only )

23.

CODE 10. THIS ACQUISITION IS

SUCH ADDRESS IN OFFER

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT

BELOW IS CHECKED

TELEPHONE NO.

W912EK9. ISSUED BY

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK

7. FOR SOLICITATION

INFORMATION CALL:

a. NAME

TROY A ROBBINS

2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER

(TYPE OR PRINT)

30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER

30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA

0 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.

25. ACCOUNTING AND APPROPRIATION DATA

1. REQUISITION NUMBER

20.

ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.

OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

96514753142221

ARE NOT ATTACHED

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED

(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

. YOUR OFFER ON SOLICITATION

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN

% FOR:SET ASIDE:UNRESTRICTED OR X

SMALL BUSINESSX

WOMEN-OWNED SMALL

BUSINESS (WOSB)

17a.CONTRACTOR/ CODE FACILITY

OFFEROR CODE

CONTRACTING DIVISION

US ARMY CORPS OF ENGINEERS

1500 ROCK ISLAND DRIVE

ROCK ISLAND IL 61201

18a. PAYMENT WILL BE MADE BY CODE

RATED ORDER UNDER

DPAS (15 CFR 700)

13a. THIS CONTRACT IS A

13b. RATING

CODE15. DELIVER TO CODE 966109 16. ADMINISTERED BY

12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-

TION UNLESS BLOCK IS

MARKED

SEE SCHEDULE

14. METHOD OF SOLICITATION

RFQ IFB RFPX

SAYLORVILLE LAKE PROJECT OFC

CEMVR-OD-S

US ARMY CORPS OF ENGINEERS

5600 NW 78TH AVE

JOHNSTON IA 50131-1941

TEL: 515/276-4656 FAX:

--- --- ---- REF BLOCK 18A)FAX:

TEL: 309-794-5613 (INVOICES SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

8(A)

HUBZONE SMALL

BUSINESS

ECONOMICALLY DISADVANTAGED

WOMEN-OWNED SMALL BUSINESS

(EDWOSB)

SIZE STANDARD:

$38.5 Million

NAICS:

562111

X

OFFER DATED

29. AWARD OF CONTRACT: REF.

DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND

EMAIL:

TEL:

31c. DATE SIGNED

SEE SCHEDULE

SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT

24.22.21.19.

32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

(CONTINUED)

PAGE 2 OF120

ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________

32a. QUANTITY IN COLUMN 21 HAS BEEN

RECEIVED INSPECTED

32b. SIGNATURE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE

37. CHECK NUMBER

FINALPARTIALCOMPLETE

36. PAYMENT35. AMOUNT VERIFIED

CORRECT FOR

34. VOUCHER NUMBER

FINAL

33. SHIP NUMBER

PARTIAL

38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY

41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT

41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE

42a. RECEIVED BY (Print)

42b. RECEIVED AT (Location)

42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS

STANDARD FORM 1449 (REV. 2/2012) BACK

Prescribed by GSA – FAR (48 CFR) 53.212

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

SEE SCHEDULE

20.

SCHEDULE OF SUPPLIES/ SERVICES

21.

QUANTITY UNIT

22. 23.

UNIT PRICE

24.

AMOUNT

19.

ITEM NO.

W912EK-16-T-0011

Section SF 1449 - CONTINUATION SHEET

PERFORMANCE WORK STATEMENT

INSTRUCTIONS: NOTICE TO OFFERORS

REFUSE AND RECYCLING COLLECTION SERVICES

SAYLORVILLE LAKE PROJECT, IOWA

1. REQUIRED SAM REGISTRATION: Prior to submitting an offer, vendors must be actively registered in the System for Award Management (SAM) website. Registration instructions may be obtained, and online registration may be accomplished, at www.sam.gov.

2. SCHEDULE OF PRICES (CLINS): Offeror’s must quote on all items and entire quantities contained in the base period and all options to be considered for award. Offers received not complying with this requirement will be considered non-responsive and will be rejected.

3. WAGE RATES: Prevailing Wage Rates will apply for any award resulting from this solicitation. See the included Wage Determination, and contract clauses 52.222-41, Service Contract Act of 1965 for details

4. LOW PRICE TECHNICALLY ACCEPTABLE PROCUREMENT: This will be a Lowest Price Technically Acceptable (LPTA) acquisition. See contract clause FAR 52.212- 2 “Evaluation – Commercial Items” for evaluation factors and source selection information.

5. DOCUMENTS TO RETURN: In order to be considered responsive, offerors must complete and return all of the following:

� Solicitation Cover Sheet, including taxpayer ID number, CAGE code, point of contact, phone number and email address.

� First page of solicitation, including offeror’s complete mailing address, telephone number, offeror’s name, title, and signature.

� Schedule of Prices (CLINs) � Technical Capability Statement (see 52.212-2 Evaluation – Commerical items) � USACE Past Performance Questionnaire (PPQ)

Offerors must complete all fill-ins and assure all return pages are received by the due date and time shown on page one of the solicitation, at the address indicated below. Please mark the envelope with the Solicitation Number and Project Title. Quotes may also be emailed to troy.a.robbins@usace.army.mil.

US ARMY CORPS OF ENGINEERS

CLOCK TOWER BUILDING – P.O. Box 2004 Attn: Contracting Division – Troy Robbins

ROCK ISLAND, IL 61204-2004

6. TELEPHONE NUMBER: Offerors must provide on the first page of this solicitation a telephone number at which they can be contacted for a period of one week following the due date of this solicitation. Quotes from persons who cannot be contacted by telephone during normal office hours (8:00 a.m. through 4:00 p.m., CST) within the one-week period following closing of this RFQ will be considered non-responsive and will be removed from further consideration.

7. LENGTH OF CONTRACT: This solicitation includes a base and two option periods. See contract clause 52.217-8, Option to Extend Services.

8. SITE VISIT: Offerors who wish a site visit should contact the Project Office at (515) 276-

4656 to schedule an appointment. The point of contact is Jeff Inks, telephone extension #6510 or by email Jeffrey.C.Inks@usace.army.mil.

SECTION B

SCHEDULES OF PRICES (“CLINS”)

ITEM

NO

SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Base Year

Provide Refuse Services, including supplying of collection containers, as specified for Saylorville Lake Project, Johnston, Iowa. Base Year Period of Performance: 1 March 2016 through 28 February 2017.

SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001AA Scheduled Services for Two (2) Yard Dumpsters

340 Each

Services to be performed for two (2) Yard Dumpsters at locations designated in TE #3. Services shall be performed as designated in TE #4.

SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001AB Scheduled Services for Four (4) Yard

265 Each

Services to be performed for four (4) Yard Dumpsters at

SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001AC Scheduled Services for Six (6) Yard

856 Each

Services to be performed for six (6) Yard Dumpsters at locations designated in TE #3. Services shall be performed as designated in TE #4.

SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001AD Additional Services for Two (2) Yard

10 Each

Additional Services to be performed for two (2) Yard Dumpsters at locations designated in TE #3. Services shall be performed as requested.

SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001AE Additional Services for Four (4) Yard

Additional Services to be performed for four (4) Yard Dumpsters at locations designated in TE #3. Services shall be performed as requested.

SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001AF Additional Services for Six (6) Yard Dumpster

16 Each

Additional Services to be performed for six (6) Yard Dumpsters

SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001AG On- Call Services for Twenty (20) Yard Roll Off

12 Each

On-Call Services to be performed for twenty (20) Yard Roll Off Dumpster at locations designated in TE #3. Services shall be performed as requested. Fees such as rental, delivery charges And disposal cost should be incorporated into the Unit Price.

SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001AH Scheduled Services for Two (2) Yard Recycling Container

269 Each

Services to be performed for two (2) Yard Recycling Container

SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001AI On- Call Services for Two (2) Yard Recycling

7 Each

On-Call Services to be performed for two (2) Yard Recycling Container at locations designated in TE #3. On-Call Services shall be performed for the months of January – April and October - December

TOTAL BASE YEAR AMOUNT (ITEM NO’S. 0001AA THRU 0001AI) $_________.____

SUPPLIES/SERVICES

QUANTITY

UNIT

UNIT PRICE AMOUNT

Option Option Year 1

Provide Refuse Collection and Disposal Services, including supplying of collection containers, as specified for Saylorville Lake Project, Johnston, Iowa. Option Year I Period of Performance: 1 March 2017 through 28 February 2018.

SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0101AA Scheduled Services for Two (2) Yard

343 Each

Services to be performed for two (2) Yard Dumpsters at

SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0101AB Scheduled Services for Four (4) Yard

266 Each

Services to be performed for four (4) Yard Dumpsters at

SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0101AC Scheduled Services for Six (6) Yard

869 Each

Services to be performed for six (6) Yard Dumpsters at locations designated in TE #3. Services shall be performed as designated in TE #4.

SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0101AD Additional Services for Two (2) Yard

Additional Services to be performed for two (2) Yard Dumpsters

SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0101AE Additional Services for Four (4) Yard

Additional Services to be performed for four (4) Yard Dumpsters at locations designated in TE #3. Services shall be performed as requested.

SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0101AF Additional Services for Six (6) Yard

16 Each

Additional Services to be performed for six (6) Yard Dumpsters

SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0101AG On- Call Services for Twenty (20) Yard Roll Off

12 Each

On-Call Services to be performed for twenty (20) Yard Roll Off Dumpster at locations designated in TE #3. Services shall be performed as requested. Fees such as rental, delivery charges And disposal cost should be incorporated into the Unit Price.

SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0101AH Scheduled Services for Two (2) Yard Recycling

266 Each

Services to be performed for two (2) Yard Recycling Container

SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0101AI On- Call Services for Two (2) Yard Recycling

7 Each

On-Call Services to be performed for two (2) Yard Recycling Container at locations designated in TE #3. On-Call Services shall be performed for the months of January – April and October – December

TOTAL OPTION YEAR I AMOUNT

(ITEM NO’S. 0101AA THRU 0101AI) $_______________.____

TOTAL AMOUNT BASE YEAR PLUS OPTION YEAR I

(ITEMS NO’S 0001AA THRU 0101AI INCL). $_______________.____

TECHNICAL CAPABILTY STATEMENT

(OFFERORS MUST COMPLETE)

The Offeror SHALL provide sufficient documentation of their technical capability, such as experience of the company and/or the key personnel and crew who will be performing the work, resumes, equipment lists, etc. or other information to enable the Government to determine the company's capability on projects of similar type, size, scope and complexity.

USACE PAST PERFORMANCE QUESTIONNAIRE (PPQ)

(OFFERORS MUST COMPLETE)

AGENCY/COMPANY THAT WORK WAS PERFORMED FOR:_______________________________

POINT OF CONTACT & TELEPHONE NUMBER: __________________________________________

DATES SERVICES PROVIDED: ________________________________________________________

BRIEF DESCRIPTION OF SERVICES PROVIDED: _________________________________________

DATES SERVICES PROVIDED: ________________________________________________________

BRIEF DESCRIPTION OF SERVICES PROVIDED: _________________________________________

DATES SERVICES PROVIDED: ________________________________________________________

BRIEF DESCRIPTION OF SERVICES PROVIDED: _________________________________________

PERFORMANCE WORK STATEMENT

Refuse and Recycling Collection Services

U.S. Army Corps of Engineers Saylorville Lake, Iowa

SECTION TITLE

1 GENERAL INFORMATION

2 GOVERNMENT-FURNISHED ITEMS

3 CONTRACTOR-FURNISHED ITEMS

4 SPECIFIC TASKS

5 CONTRACT REQUIREMENTS PACKAGE

ANTITERRORISM/OPERATIONS SECURITY

6 QUALITY ASSURANCE SURVEILLANCE PLAN.

TECHNICAL EXHIBIT #1 “DUMPSTER LOCATION"

TECHNICAL EXHIBIT #2 “COLLECTION SCHEDULE"

TECHNICAL EXHIBIT #3 “AREA MAPS” (available through internet)

TECHNICAL EXHIBIT #4 “ANNUAL RECREATION AREA SCHEDULES”

1. GENERAL INFORMATION

1.1 BACKGROUND. Saylorville Lake is a flood control reservoir in Des Moines, Iowa, with numerous parks and lake access areas managed by or leased from the U.S. Army Corps of Engineers. Park areas at Saylorville Lake Project offer a wide variety of recreation facilities including boat launching ramps, campgrounds, full service marina, picnic areas, and sand swimming beaches. Award will be a Firm-Fixed-Price (FFP), performance-based service contract.

1.2 SCOPE OF WORK. The Contractor shall provide all manpower, labor, equipment, materials/supplies, transportation, fuel, tools, supervision and other items and services necessary to provide refuse collection and disposal services for designated public use and administrative areas at the Saylorville Lake Project as described in the attached Performance Work Statement (PWS). Services also consist of attending annual pre-work conferences, meetings as necessary, and preparing worksheets and invoices. A map of Saylorville Lake can be found on the Internet at:

http://www.mvr.usace.army.mil/Missions/Recreation/SaylorvilleLake.aspx.

1.3 PERIOD OF PERFORMANCE. The Contractor shall perform services as ordered by the Government. The maximum 2-year duration of the contract includes an option period which may or may not be exercised at the discretion of the Government, not of the Contractor. Following are the period(s) of performance:

BASE PERIOD: 1 March 2016 thru 28 February 2017 OPTION YEAR I: 1 March 2017 thru 28 February 2018

1.4 REQUIRED INSURANCE. In accordance with the FAR Clause 52.228-5 titled

“Insurance-Work on a Government Installation” the Contractor shall obtain and maintain during the period of performance under this contract the following kinds and minimum amounts of insurance*:

Workmen’s Compensation Coverage complying with applicable State statute**

Employer’s Liability Minimum $100,000

Commercial General Liability Minimum $500,000 per occurrence

Commercial Automobile Liability Minimum $200,000 per person Minimum $300,000 per occurrence for bodily injury Minimum $ 20,000 per occurrence for property damage

* Reference FAR 28.307-2 Liability, subparagraphs (a), (b), and (c).

** Iowa Insurance Division, telephone # (515) 281-5705 Iowa Division of Workers Compensation, telephone # (800) 562-4692

NOTE: Coverages listed above are minimums only. If higher limits of coverage are required by State statute, the Contractor shall be responsible for obtaining such additional coverage.

1.5 POST-AWARD (“PRE-WORK”) CONFERENCE. After award, but prior to start of services, the Project Office will arrange a Post-Award/Pre-Work conference to be held at the Project. The purpose of the conference is to discuss contract requirements and details of contract performance, in order to develop a mutual understanding of both.

The Contractor shall be prepared to submit and discuss at this meeting the following items: (a)Insurance certificate, (b)Letter Designating Supervisor and/or Foreman, (c)Accident Prevention Plan and (d)Material Safety Data Sheets. The contractor is encouraged to have the driver(s) that will be servicing the dumpsters under this contract attend the pre-work conference to become familiar with contract requirements and dumpster locations. A Pre-Work conference will likely be held each season prior to start of services under any options that may be exercised. Additional meetings may be held as necessary. The Government reserves the right to schedule meetings with the Contractor. Meetings shall be scheduled to take place at the Project Office as necessary to ensure strict compliance with the terms of the contract, to coordinate work schedules in compliance with the contract specifications, and to arrange a satisfactory operating agreement.

1.51 ACCIDENT PREVENTION PLAN. An accident prevention plan is a safety and health policy and program document that is contract specific.

The accident prevention plan shall comply with the requirements set forth in the Abbreviated Accident Prevention Plan in the USACE EM 385-1-1 in Appendix A. This plan must be submitted and approved by the Contracting Officer Representative (COR) before any work may begin.

1.6 DOCUMENTS AND CORRESPONDENCE. After award, all documents and related correspondence shall be routed through the Contracting Officer’s Representative (COR) located at the Saylorville Lake Project Office.

1.7 PAYMENT. Payment will be made monthly in accordance with the Prompt Payment Act (Public Law #100-496). The Contractor shall submit a monthly invoice for the work completed during the billing period. The invoice shall include all SCHEDULED SERVICES and any ADDITIONAL SERVICES completed at the unit price per size of dumpster (i.e. Number of services per billing period for each size of dumpster). The contractor shall include on the monthly invoice, a total of labor hours worked under this contract, which will be used for a Contractor Man Hour Accident Exposure Report.

Under the terms of this contract, invoices are to be submitted monthly to:

US Army Corps of Engineers Saylorville Lake Project Office 5600 NW 78th Ave.

Johnston, IA 50131

Payment shall be made via Electronic Funds Transfer (EFT) into the Contractor’s banking account. The Contractor will be provided a blank ‘direct deposit’ form at the Pre-Work meeting. This form shall be completed by the Contractor to enable EFT.

Payment will not be made for services not performed.

1.8 CONTRACTOR PERSONNEL.

1.8.1 MINIMUM MANPOWER REQUIREMENT. The Contractor and

employees/staff shall personally perform, or provide personal superintendence of the performance of, duties under this contract (no subcontracting) as specified in this Performance Work Statement (PWS).

The Contractor shall maintain a sufficient number of staff/employees to perform the required services. In the event the Contractor is unable to perform contract duties, the Government reserves the right to terminate the contract.

1.8.2 CONTRACTOR PERSONNEL. Contractor personnel shall present a neat appearance and be fully clothed at all times while performing services ordered under the contract. “Fully clothed” shall be deemed to mean that a sleeved shirt (or T-shirt), trousers, and shoes shall be worn at all times:

except that this requirement shall not be construed to replace or eliminate the necessity for the wearing of appropriate protective clothing or devices as may be required for the safe performance of services or for the application of various approved chemicals (if any). The Contractor shall provide own attire. Contractor personnel shall utilize tact, diplomacy, and courtesy at all times during contact with the public and with Government personnel. Any illegal or criminal activity on the part of the Contractor or staff, employees, or other personnel may result in termination of the contract. In order to assure that the required services be performed at an acceptable level, the Contractor shall designate in writing a supervisor and/or foreman, who shall serve as a contact for matters involving quality, performance, or nonperformance of required services. In the absence of a designated supervisor and/or foreman, or if the designated supervisor and/or foreman is not available, the Contractor warrants that the driver(s) are qualified and fully competent with full authority to act for, and on behalf of, the Contractor, to insure the required work is performed in strict accordance with the contract specifications. The Government reserves the right to discuss matters with the Contractor on-site.

1.9 EQUIPMENT BREAKDOWN. Equipment breakdown shall not relieve the Contractor of the responsibility of performing the work as specified. It shall be the responsibility of the Contractor to assure that he or she has, or can obtain on short notice, sufficient backup equipment to continue the services as specified without interruption in the event of mechanical failure of primary equipment.

1.10 QUALITY CONTROL (CONTRACTOR’S RESPONSIBILITY).

1.10.1 The Contractor shall develop a Quality Control Plan designed to demonstrate how the Contractor will meet the needs of the Project. The Quality Control Plan shall document how the Contractor will identify and correct performance shortfalls. Complete records of all inspection work performed by the Contractor must be maintained and made available to the Government during contract performance.

1.10.2 The Contractor shall designate, in writing, a supervisor and/or foreman who shall serve as a contact for matters involving quality, performance or non-performance of the required work. The supervisor and/or foreman shall have the authority to correct non-performance.

1.10.3 The Contractor shall furnish to the Project office, a telephone number attended during normal business hours of 7:30 a.m. through 4:00 p.m.

CST to which calls concerning performance or other contractual matters can be placed. For the purpose of time and date, a message will be deemed delivered to the Contractor at such time as it is delivered to the number provided by the Contractor.

1.10.4 The Contractor's representative at the job site shall enter the time that each item of work is completed on a Contractor's Daily Worksheet. Completed and signed worksheets shall be delivered each day work is performed..

Contractor Daily Worksheet forms will be furnished by the Government.

These plans must be submitted electronically and approved by the Contracting Officer Representative (COR) before any work may begin.

1.11 SMOKING POLICY. Smoking is not allowed in all Government buildings, including shower buildings, vault toilets, etc. Smoking is not allowed by the Contractor while in direct contact with the public.

1.12 FIREARMS AND WEAPONS. The Contractor shall not possess, during the performance of this contract, any item, including firearms, that can be used as a weapon. 36 CFR 327 regulates firearms on Federal property.

1.13 SAFETY AND SECURITY. Appropriate measures shall be taken to protect the general public from accidental injury. All services shall be performed in accordance with applicable safety requirements set forth in Corps of Engineers Manual EM-385-1- 1, “Safety and Health Requirements Manual” and supplements thereto (copies are available from the Project Office). ANY EQUIPMENT OR MATERIALS NOT IN

CONFORMITY WITH THE SAFETY MANUAL SHALL BE REMOVED FROM

GOVERNMENT PROPERTY IMMEDIATELY. The Contractor will be expected to take a vital interest in safety, hazard, and educate their employees to work and plan their work safely. Proper driving techniques and defensive driving will be practiced to prevent vehicle accidents and property damage. In order to provide safety controls for protection to the life and health of employees and other persons; for prevention of damage to property, materials, supplies and equipment; and for avoidance of work interruptions in the performance of this contract, the Contractor shall comply with all pertinent provisions of the Federal, State, and local regulations and shall take or cause to be taken such additional measures as the Contracting Officer may determine to be reasonable and necessary for the purpose. Any injury, property damage equipment malfunction or safety hazard observed by the Contractor shall be immediately reported to the Project personnel. The Contractor shall open and close gates within the contract boundary areas. The Contractor shall securely lock any gate that is opened by him/her, upon completion of the required work. The Contractor shall safeguard all Government property. Government-furnished keys may be provided to the Contractor. The Contractor shall establish and implement methods of making sure all keys issued by the Government to the Contractor for Contractor’s use are not lost or misplaced, and are not used by unauthorized persons. The Contractor shall immediately report to the Contracting Officer or the COR any occurrences of loss, unauthorized use, or unauthorized duplication of keys. In the event keys, other than master keys, are lost or duplicated, the Contractor may be required upon written direction of the Contracting Officer, to re-key or replace the affected lock or locks without cost to the Government.

The Contractor shall safeguard keys issued to them to perform the services required by this contract. All keys shall be returned to the Government upon request and/or completion of the contract. Failure to return keys can result in withholding of payment.

1.14 ENVIRONMENTAL CONTROLS.

1.14.1 COMPLIANCE WITH LAWS AND REGULATIONS: The Contractor

shall be knowledgeable of, and shall comply with, all applicable Federal, State, and Local laws, environmental requirements, and instructions. The Contractor shall ensure policies and procedures are followed that protect the health and safety of employees and the community to minimize or eliminate the risk of environmental pollution.

1.14.2 HAZARDOUS MATERIALS: The Contractor is responsible for advising his/her employees of all Environmental and Hazardous Materials Handling, and is also required to provide to the COR the Material Safety Data Sheets (MSDS) for all materials used by the Contractor in accordance with Federal and State laws and/or regulations.

1.14.3 NOTIFICATION OF ENVIRONMENTAL SPILLS: If the Contractor or employee(s) of the Contractor spills or releases any substance into the environment, the Contractor shall immediately report the incident in accordance with local procedures, and shall also notify the Contracting Officer’s Representative (COR), or in his or her absence the Contracting Officer. The Contractor shall be liable for containment and environmental cleanup of the spill or release of such substance.

2. GOVERNMENT-FURNISHED PROPERTY & SUPPLIES

The Government shall furnish necessary keys and Contractor Worksheets for the use of the Contractor. The Government will provide designated area(s) for the Contractor's use for storage of dumpsters during periods of non-use.

3. CONTRACTOR-FURNISHED ITEMS & SERVICES

The Contractor shall furnish all equipment, supplies, items, labor, materials, services, etc. to accomplish the services specified in this PWS. All equipment must be approved by the Contracting Officer or the Contracting Officer's Representative prior to initial use. Equipment breakdown shall not relieve the Contractor of the responsibility of performing the work as specified. The Contractor shall assure that he has, or can obtain on short notice, sufficient backup equipment to continue the services as specified without interruption in the event of mechanical failure of his primary equipment.

3.1 EQUIPMENT. The Contractor shall furnish a two-axle (six-wheeled) compactor type truck or compactor type trailer having a gross weight not to exceed 30,000 lbs., suitably equipped and constructed so as to prevent the scattering of refuse along the route. All vehicles used under this contract shall be kept clean and in proper repair so that trash is completely contained without any loss or leakage. In accordance with EM385-1-1, paragraph 18.B.01, all trucks shall be operated with a properly functioning backup alarm while on government property. The vehicles shall be operated and maintained and all trash disposed of in accordance with all state and local regulations.

3.2 CONTAINERS. The Contractor shall furnish and deliver refuse and recycling containers (dumpsters of 2, 4, or 6 cubic yard capacity, roll off dumpster of 20 yard capacity, and recycle containers of 2 yard capacity as specified) in accordance with the service schedule. In addition, all dumpsters furnished by the Contractor must be standard manufactured items meeting the size requirements of this contract and must be new or freshly painted units with brown, green or other neutral color, subject to approval, to aesthetically blend into the public recreation areas in which they will be placed. The Contractor’s name/logo may be displayed on the dumpsters, but no advertising will be allowed. Warning/safety decals may be placed on the dumpsters, with a message that dumpsters are for disposal of waste only with landfill restricted items listed and “No Parking” or “Do Not Obstruct Access to Dumpster” message. The recycling dumpsters shall be clearly marked with decals designating the dumpsters are for recyclable items only. The government will not be responsible for the security or damage to any of the contractor’s equipment. If the dumpsters become damaged, dirty or unsafe the COR will notify the contractor and the contractor shall address the subject dumpster(s) within 48 hours or immediately if a significant safety or health risk is evident. The contractor should anticipate that dumpsters need to be periodically cleaned and should incorporate those costs into the unit price for each quote item. If the Contractor fails to keep the dumpsters clean or respond to the COR’s notification regarding dumpster(s), the Government will issue a Contract Discrepancy Report form (CDR) and a contract credit may be deducted to address the deficiency.

3.3 MANPOWER. The Contractor shall furnish all manpower necessary to accomplish the required work.

4. SPECIFIC TASKS

Refuse collection is directly related to public health and sanitation; therefore, it is essential that all refuse containers be serviced as specified. The Contractor shall assure that he/she has, or can obtain on short notice, sufficient backup equipment to continue the services as specified without interruption in the event of mechanical failure of his primary equipment. The Contractor shall notify the Contracting Officer within eight (8) hours of any such equipment failure and provide an alternate plan for collection of refuse during the repair period. Backup equipment need not be of the same type, nor meet the same requirement of the primary equipment, except as pertains to the scattering of refuse along the route; however, such equipment may be utilized only to accomplish the specified work of the contract while primary equipment is being repaired, for a period not to exceed 14 calendar days without prior approval of the Contracting Officer or his authorized representative. Equipment breakdown shall not relieve the Contractor of the responsibility of performing the work as specified.

4.1 DUMPSTER PLACEMENT. The areas subject to refuse and recycling collection under this procurement, and the approximate number and sizes of receptacles to be serviced, are shown in Technical Exhibit #1, Dumpster and Recycling Container Locations. Beginning 1 March 2016 (or effective date of award), the Contractor shall place dumpsters at the locations as specified in TE #1, Dumpster and Recycling Container Locations. On the last date of service for each area, the Contractor shall remove dumpsters. Beginning 1 March of 2017 and 2018, the Contractor shall again place the dumpsters and remove at the end of service for each year..

4.2 REMOVAL AND DISPOSAL.

4.2.1 COLLECTION. The Contractor shall empty all dumpsters in accordance with Technical Exhibit #2, Collection Schedule. Services shall be performed as scheduled, including all holidays scheduled (the Contractor may service dumpsters one day prior or one day after Federal Holidays occurring in November through March if written COR approval is received prior to the holiday). The Contractor shall pick up all refuse within 10 feet of the refuse containers. The Contractor shall clean up immediately any spillage of refuse, in the course of the handling operations. The Contractor shall return refuse containers, when emptied, to their original position, with the covers closed.

Dumpsters that have been moved by visitors shall be emptied and returned to their proper location by the Contractor.

4.2.2 ADDITIONAL SERVICES. If additional services are required for dumpsters within the recreation and Administration Area the contractor will be notified by a Contracting Officer. These additional services are to be paid at the rate quote for ADDITIONAL SERVICES and included on the Contractor’s monthly invoice as a separate line item with the area and date serviced listed.

A call for additional services will specify the area or areas, the number of dumpsters in each area to be serviced and the required date of service.

4.2.3 CHANGES. Several dumpsters are located in recreation areas that are subject to flooding. If flooding appears imminent, the Contractor will be notified and he/she shall relocate the dumpsters to a safe location and then return them to their original positions when the water recedes.

All costs associated with relocating dumpsters shall be included in the

Contractor unit price for ADDITIONAL SERVICES and separate payment will be authorized on a per dumpster basis for each call to remove or replace the dumpsters. If a call is made for relocation of dumpsters on a day scheduled for regular service the Contractor will only be paid once for the service to empty and relocate the dumpster at the ADDITIONAL SERVICES quoted price.

During the progress of the contract, it may be necessary to change the number and/or frequency of services due to construction, maintenance repairs, variations in public use, complete or partial closure of recreation areas, National Security or other reasons. In the event changes occur the Contractor will be furnished in writing, a notice of change. Any reductions in the number and/or frequency of services will require a deduction in the contract amount on the basis of unit quote price.

4.2.4 TRANSPORT AND DISPOSAL. The Contractor shall transport and dispose of all refuse from dumpsters off Government property to a State-approved sanitary landfill or disposal point. The Contractor shall bear all cost in connection with this work.

4.2.5 CLEANING OF EQUIPMENT. The Contractor shall thoroughly clean equipment used for hauling to keep it free of residue and odor and to present a clean appearance. In the event of a disagreement relating to the need for cleaning equipment, the Contracting Officer's Representative's decision shall represent a final decision.

4.2.6 DISPOSAL OF TIRES AND BATTERIES. Tires and batteries which are left in and around dumpster units by the public may be left beside the dumpsters for disposal by others, but all non-hazardous debris must be removed and properly disposed of by the Contractor.

4.3 DUMPSTER TYPE AND CONDITION.

4.3.1 DUMPSTER TYPE. The Contractor shall furnish dumpsters equipped with plastic or rubber type lids. All dumpsters shall be of the same color, and must be approved by the COR.

4.3.2 CLEANING OF DUMPSTERS. The Contractor shall clean containers so they are free of stains and odors. Contractor employees who service the dumpsters shall have with them approved odor control chemical(s), a broom, shovel or other equipment which may be used to clean up spills and control odors.

Dumpsters which have a noticeable odor, even after they have been emptied, shall be treated by the Contractor with approved chemicals and/or cleaned by the Contractor.

4.3.4 CONDITION OF DUMPSTERS. The Contractor shall deliver and place dumpsters at locations designated by the Contracting Officer, and shall maintained them in good repair and appearance. The Contractor shall remove and replace damaged or unsightly dumpsters with like units in good repair.

All Contractor furnished dumpsters shall be so constructed and equipped as to prevent accidental tip over by the public. In the event dumpster(s) are vandalized and/or moved by the public, the Contractor bears the responsibility of retrieving, repairing and/or replacing the dumpster(s).

5. ANTITERRORISM (AT) AND OPERATIONS SECURITY (OPSEC).

5.1. Access and General Protection Policy and Procedures. Per ENG FORM 6055, September 2014, the Contractor must comply with the following Operational Security Requirements.

All Contractor and subcontractor employees to comply with installation and facility access guidelines and rules as stated herein. Contractor workforce must comply with all personal identity verification requirements as directed by Department of Defense (DoD), Department of the Army Headquarters, Rock Island District, and/or local policy. In addition to the changes otherwise authorized by the CHANGES clause of this Contract, should the Force Protection Condition (FPCON) at any installation or facility change, the Government may require changes in Contractor security matters or processes.

In support of Rock Island District evaluation of personnel authorized for access to federal facilities, the Contractor to submit background checks that have been conducted by a bonded third party within the last 6 months of the Notice to Proceed date and authorize reports to be mailed to the Rock Island District Security and Law Enforcement Office by the third party, see paragraph SUBMITTALS for address and other requirements. The background check will cover, at a minimum, the last seven years covering the states the employee had/has lived in, national crime records check which includes felony and misdemeanor offenses, Department of Motor Vehicles (DMV) records, and a national sex offender registry check, submitted 14 days prior to accessing the project site.

Identification Badges: The Contractor to be responsible for furnishing a photo identification badge/card to each employee prior to the employee's work on-site, and for requiring each employee engaged on the work to display identification. At a minimum, the badge to have the following items shown, the employee's picture, employee's name, and company name working for. The badge will be prominently displayed unless restricted for safety concerns, in which case it will be available for immediate display upon request (carried on person).

As employees are added or deleted from the submitted and approved Access Control List (ACL), this information will be reported immediately to the Contracting Officer. Added employees will not be permitted on-site until requirements of this paragraph are completed, submitted, and approved.

Disqualifying factors include, but are not limited to:

a. Criminal conduct, in particular, violent crime and sex offenders;

b. Habitual use of intoxicating beverages to excess as evidenced by Driving Under the Influence (DUI) or public intoxication records; or

c. Any illegal activity or other disqualification which makes the individual unfit for service (e.g., drug trafficking or procurement fraud).

In addition to the submitted background checks, supplemental agency checks may be performed at the discretion of the Rock Island District security personnel. The Contractor agrees to cooperate and ensure that Contractor employees provide any documentation required to complete these checks. Any employee lacking proper identification credentials or deemed a security threat may be denied access to the project. Such action in no way relieves the Contractor from performance of the contract. The Rock Island District retains the right to deny any Contractor and sub-contractor employee(s) from working on this Contract awarded by the Rock Island District based on final background investigation results. All information received as a result of a background check will be handled according to Privacy Act regulation.

In the event that an unexpected change in personnel is required, due to sudden absence of a critical path employee, the Contractor to immediately contact the Contracting Officer to coordinate obtaining written approval from the Security and Law Enforcement Office for new/additional personnel to be brought on-site prior to background check acceptance. The Contractor to submit ATTACHMENT A - Personnel Change Request Form and will receive written authorization from the Security and Law Enforcement Office prior to bringing new personnel on-site, and will ensure a background check is sent to the Rock Island District Security and Law Enforcement Office no later than 10 days from written notice of approval. The Rock Island District reserves the right to terminate access of the employee upon completion of the

Government's review of the background check and the Contractor to be notified immediately of any such Government decision.

In the event of an unforeseen change in work site conditions, which may require a Contract Modification, and the Contractor has to immediately add employees, the Contractor to submit ATTACHMENT A - Personnel Change Request Form and will receive written approval from the Security and Law Enforcement Office prior to bringing new personnel on-site, and ensure a background check is sent to the Rock Island District Security and Law Enforcement Office no later than ten (10) days from written notice of approval. The Rock Island District reserves the right to terminate access of the employee upon completion of the Government's review of the background check and the Contractor to be notified immediately of any such Government decision.

Contractor, Contractor employees, and subcontractor employees not expected to be on the worksite for more than 15 days may be allowed on-site with the following conditions:

a. Employee will be on site a total of 15 days or less, for the duration of the project.

b. Employee is added to the ACL as a short term employee.

c. Employee is escorted while on-site. This is defined as being in the line of sight of an identified Contractor employee who has a background check on file with the Rock Island District (as noted on the ACL).

d. Each Contractor employee can sponsor only up to five short term employees at a time.

Foreign National Employees: Due to a difference in background check procedures for long term foreign national employees, all such employees must provide a photocopy of their passport to the Rock Island District Security and Law Enforcement Office no later than 30 days prior to arrival on-site. Short term foreign national employees (e.g.

specialists with a two week period of performance) may work on site with the following conditions:

a. Foreign national employee will be on-site a total of 15 days or less, for the duration of the project.

b. Foreign national employee will comply with E-Verify requirements (see paragraph "E-Verify Program").

c. Approved and identified Contractor employee to escort the foreign national employee AT ALL TIMES while on-site.

d. Each Contractor employee can sponsor only one short term foreign national at a time.

For all projects located at the Clock Tower and Annex Buildings, all personnel will receive an identification badge or pass for access to either building. This must be accomplished prior to start of work and will be coordinated with the Contractor, Contracting Officer, and Security and Law Enforcement Office.

Personnel Change Request Form Contract #_______________ Date___________ We, _____________________, respectfully request to add/replace (circle one) personnel to the jobsite due to the following situation:

Personnel to be conditionally added to the ACL (escorted by):

Background checks (if required for a long term employee) shall be submitted by close of business on (insert proposed date): ________________

(Insert signature block)

5.2. E-Verify Program. The Contractor must pre-screen candidates using the E-Verify Program website (http://www.uscis.gov/e-verify) to meet the established employment eligibility requirements. The Contractor must ensure that the candidate has two valid forms of Government-issued identification prior to enrollment to ensure the correct information is entered into the E-Verify system. Documentation of company enrollment in E-Verify, via a print screen of the company profile within the E-Verify system, must be submitted to the Security and Law Enforcement Office no later than 3 business days after receiving the Notice to Proceed.

*When Contracts are with individuals, the individuals will be required to complete a Form I-9, Employment Eligibility Verification must be given/coordinated with the Contracting Officer's Representative. This Form will be provided to the Security and Law Enforcement Office after Notice to Proceed is received.

6. QUALITY ASSURANCE SURVEILLANCE PLAN.

Purpose: This Quality Assurance Surveillance Plan (QASP) is a Government developed and applied document used to make sure that systematic quality assurance methods are used in the administration of the Performance Based Service Contract (PBSC) standards included in this contract. The intent is to ensure that the contractor performs in accordance with performance metrics set forth in the contract documents, that the Government receives the quality of services called for in the contract, and that the Government only pays for the acceptable level of services received.

1. Critical performance processes and requirements. Critical to the performance of the contract, the contractor shall provide all personnel equipment, tools, materials, supervision, transportation, other items and services necessary to perform as defined in this Performance Work Statement (PWS). The contractor shall provide accurate transaction processing to ensure that material accountability comply with safety and security requirements, in accordance with this PWS. Additionally, the contractor shall be accountable for all auditable documents, establish/maintain effective quality, and perform required within prescribed timeframes. The performance process is the timely, accurate, and thorough completion of all contract requirements.

2. Performance Standards

a. Schedule. The dates for services and the actual accomplishment of the services in accordance with the schedule will be assessed against original dates of services and milestones established for the contract.

b. Service. The services required to be performed will be assessed against the PWS detailed in the contract, for the required content, quality, timeliness, and accuracy.

c. Past Performance. In addition to schedule and services, and cost aspects of performance discussed above, pursuant to FAR 42.15, the Government will assess the contractor’s record of conforming to contract requirements and to standards of good workmanship, the contractor’s adherence to contract schedules including the administrative aspects of performance, the contractor’s history of reasonable and cooperative behavior and commitment to customer satisfaction, and the contractor’s business-like concern for the interest of the customer.

3. Surveillance methods. The primary methods of surveillance used to monitor performance of this contract will include, but not be limited to: random or planned sampling, periodic inspection, Contractor Self Reporting, and validated customer complaints.

a. Random/Scheduled Monitoring. Random and/or scheduled monitoring will be conducted if and when deemed necessary by the COR to ensure compliance with the terms of the contract. Using the attached matrix the COR will determine whether the contractor is in compliance with the terms of the contract.

b. Contractor Self-Reporting. The contractor shall provide as needed status reports that document significant problems/issues and potential resolutions.

c. Customer Feedback. Customer feedback will be obtained from valid customer complaints.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .