This document is an amendment to a solicitation for replacement isophase bushing assemblies for three Snake River dams. The contractor shall supply and deliver nine each of three different types of bushing assemblies to the Little Goose, Lower Granite, and Lower Monumental dams no later than March 22, 2021. The assemblies required include a seal-off bushing for GE T1 bus, a standoff bushing for GE T1 bus per the revised specification and Drawing L-82390, and a through/seal-off bushing for HK Porter T2 bus per Drawing T-157059. In addition, the contractor shall provide various gaskets, insulation, and installation hardware. Submittals are required for evaluation of quoted items. The selected contractor must provide product drawings and warrant the bushings for one year from delivery.

The solicitation was issued by the U.S. Army Corps of Engineers Walla Walla District for replacement of bushings at the three Snake River hydroelectric projects.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this Amendment is to revise Technical Specifications Section 3.2 T1 Standoff Bushing Assembly (GE T1) and to add Draw ing L-82390 and remove Draw ing 69006X25:

See revised specifications for details.

All other terms and conditions remain unchanged.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 5

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 10-Nov-2020

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912EF21Q0004

X 9B. DATED (SEE ITEM 11)

05-Nov-2020

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

10-Nov-2020

CODE

USAED, WALLA WALLA - CONTRACTING DIV.

ALAN INGLIS

201 N. THIRD AVENUE

WALLA WALLA WA 99362-1876

W912EF 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912EF21Q0004

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 1449 - CONTINUATION SHEET

TABLE OF CONTENTS

The Table of Contents has changed from:

Exhibit/Attachment Table of Contents

DOCUMENT TYPE DESCRIPTION PAGES DATE

Attachment 1 A.03.09 Drawing -

0544D0815

28-OCT-2020

Attachment 2 A.03.09 Drawing - 69006X25

28-OCT-2020

Attachment 3 A.03.09 Drawing - Porcelain Baffel Bushing T-157059

28-OCT-2020

to:

Exhibit/Attachment Table of Contents

DOCUMENT TYPE DESCRIPTION PAGES DATE

Attachment 1 A.03.09 Drawing -

0544D0815

28-OCT-2020

Attachment 3 A.03.09 Drawing - Porcelain Baffel Bushing T-157059

28-OCT-2020

Attachment 4 A.03.09 Drawing - L- 82390

09-NOV-2020

The following have been modified:

TECHNICAL SPECIFICATIONS

SNAKE RIVER DAM ISOPHASE BUSHINGS

TECHNICAL SPECIFICATIONS

1.0 INTENT

This specification pertains to the purchase of new isophase bushing assemblies as described, to replace existing fixtures at U.S. Army Corps of Engineers, Walla Walla District projects located at Little Goose Dam, Lower Granite Dam, and Lower Monumental Dam.

2.0 SCOPE

The successful bidder shall be required to supply and deliver the listed isophase bushing assemblies to each of the Snake River Dams listed by the date shown in Section “Shipment and Delivery”. The contractor shall also provide submittals, drawings, and other documentation as stated in the specifications.

3.0 EQUIPMENT REQUIREMENTS

3.1 T1 Round Through/Seal Off Bushing Assembly (GE T1)

Provide a quantity of nine replacement seal-off bushing assemblies to replace our current GE 1-0121C7451G23 seal off bushing assembly. The bushing assembly shall have the following characteristics:

The inner diameter shall be sealed off at 10 5/8” The bolt center diameter of the outermost flange shall be 23 3/8” There will only be 6 bolt holes on the outermost flange, separated by 60 degrees The outer diameter of the bushing shall be a 19”

The bushing shall meet the following minimum salient characteristics:

Rated for use on 10.5 inch round aluminum, 13.8KV, 7000 Amp rated bus

110KV BIL

Able to withstand a 1 minute 50KV AC dry over-potential test Rate for a 65 degrees Celsius rise over ambient temperature Rated for ambient temperatures ranging from -30 to 40 degrees Celsius Polymer, porcelain or government approved alternative material

The assembly shall include the insulator and all auxiliary equipment needed to install. This shall include gaskets, washers, bolts, and all other items.

3.2 T1 Standoff Bushing Assembly (GE T1)

Provide a quantity of nine direct replacement bus support insulator assemblies for the one shown in section J-J of drawing 0544DO815. Drawing L-82390 will be used for reference for the standoff insulator with the following modifications:

The outer diameter will be 8” max The insulator shall be 6” tall The top of the insulator shall have a centered 3/4"-10 bolt hole that goes 3” into the insulator

In addition to the above requirements the standoff bushing assembly shall meet the following minimum salient characteristics:

Rated for use on 10.5 inch round aluminum, 13.8KV, 7000 Amp rated bus

110KV BIL

Leakage Distance 19.5 inches Rated for 4000 lb cantilever strength at 2 1/2" above insert Able to withstand a 1 minute 60KV AC dry and dew over-potential test Rate for a 65 degrees Celsius rise over ambient temperature

Polymer based bushing or government approved alternative material

The replacement insulators shall meet or exceed the mechanical strength requirements stated on the attached drawing, file no. L-82390. The replacement insulators shall not create a larger gravitational weight than the existing insulators. The replacement insulators shall not create larger dynamic loads than the existing insulators. The dynamic loads include but are not limited to short circuit forces (if applicable).

Finally, the replacement insulators will not alter the support conditions. Thermal expansion loads, if applicable shall also be taken into account.

The assembly shall include the insulator and all auxiliary equipment needed to install the assembly as shown on the drawing. This shall include gaskets, washers, bolts, and all other items.

3.3 T2 Through/Seal Off Bushing Assembly (HK Porter T2)

Provide a quantity of nine direct replacement seal-off bushing assemblies with the characteristics shown in drawing T-157059. In addition, the bushing assembly shall meet the minimum salient characteristics:

Rated for use on 6 inch square aluminum, 13.8KV, 7000 Amp rated bus

110KV BIL

Able to withstand a 1 minute 50KV AC dry over-potential test Rate for a 65 degrees Celsius rise over ambient temperature

Polymer based bushing or government approved alternative material

The assembly shall include the insulator and all auxiliary equipment needed to install the assembly as shown on the drawing. This shall include gaskets, washers, bolts, and all other items.

3.4 Isophase Bus End Bell Gaskets

Provide a quantity of fifty end bell gaskets with a splice kit and fifty split cover gaskets as shown in section “x-x” of drawing 0544D0815.

The material for the new gaskets shall be of the type used for gasketing applications. The material shall be resistant to temperatures between -103 to 450 degrees F and shall be UV/Ozone resistant. New gaskets' material shall be closed cell silicone sponge medium density or approved equal.

3.5 Isophase Bus End Bell Insulation

Provide a quantity of ten end bell insulation strips and one hundred insulation washers and sleeves as shown in section “y-y” of drawing 0544D0815.

All items shall meet or exceed to IEEE C 37.23 standard. The insulators shall be made by a manufacturer specializing in the design of insulators for this application.

4.0 SUBMITTALS

Submittals must be provided at the time of quote in order to determine technical acceptability of the quoted bushing assemblies. Submittals shall include any pertinent product data sheets and drawings for each family of bushing assembly. Drawing details are described below in Drawings.

5.0 DRAWINGS

The Contractor shall be required to provide drawings of the bushing assemblies. The drawings shall include construction material, dimensions, specifications, installation procedures, vendor’s name and phone number and a drawing number. If available, the drawings shall be provided in electronic format as a Microstation .dgn or AutoCAD .dwg, otherwise .PDF or .TIF files are acceptable.

6.0 WARRANTY

Each bushing assembly set shall be covered by a minimum one-year warranty on all parts, labor and workmanship from factory defects. Warranty period shall start at the time of delivery acceptance.

4.0 SHIPMENT & DELIVERY

The items listed above shall be divided equally and delivered FOB to Little Goose, Lower Granite, and Lower Monumental Projects not later than March 22, 2021. The Contractor shall be responsible for packing and shipping the components in a manner that will ensure undamaged and complete arrival to each facility. Deliveries shall only be made during normal Snake River Project business hours, Monday–Thursday, 6:30 a.m.–5:00 p.m., excluding federal holidays. Each facility will receive 3 of each type of bushing. Lower Monumental will receive all end bell gasket and end bell insulation components.

Shipment shall be to:

Little Goose Dam Attn: Contract Performance Specialist 1001 Little Goose Dam Rd Dayton, WA 99328-8602

Lower Granite Dam Attn: Contract Performance Specialist 885 Almota Ferry Rd.

Pomeroy, WA 99347-9632

Lower Monumental Dam Attn: Contract Performance Specialist P.O. Box 10 5520 Devils Canyon Rd Kahlotus, WA 99335-0010

Bushing assembly sets, end bell gaskets and end bell insulation components shall be bundled and packaged in wooden crates that are capable of being moved by a pallet jack or forklift and facilitate long term storage. The containers shall be sturdy enough to allow them to be stacked with a forklift. Each packing set shall be stowed in a manner that ensures the bushing assembly does not get damaged or otherwise distorted. Damaged items will be rejected and payment withheld until replacements are received. The packages shall be clearly labeled on all four sides and the top with the following description:

Bushing assembly type Contractor’s Name Contractor’s Part Number Contractor’s Phone Number Date of Manufacture (MM/YYYY)