W912EF18R0025_Amendment_0002.pdf
PDF 127 KB Posted
- Attached to
- W912EF18R0025 Amendment 0003 Federal contract opportunity
- Solicitation number
- W912EF18R0025
About this file
Amendment 0002
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 18R0025_Plans_Amend0004.pdf | ||
| W912EF18R0025_Amendment_0004.pdf | ||
| W912EF18R0025_Amendment_0003.pdf | ||
| 18R0025_specs_01_55_10.00_28_Amend-0003.pdf | ||
| A.07.24_Techspec_Amend-0002.pdf | ||
| A.07.24_18R0025_Amend-0002_Plans.pdf | ||
| A.07.24_REGISTER_Amend-0002.pdf | ||
| Site_Visit_Attendees_-_18R0025_LLA_Pintle_Heel.pdf | ||
| W912EF18R0025_Amend_0001.pdf | ||
| W912EF18R0025_Small_Business_Participation_Plan.pdf | ||
| Site_Visit_Information_18R0025.pdf | ||
| W912EF18R0025_Lower_Granite_Pintle_Heel_Modifications.docx.pdf | ||
| W912EF18R0025_TechSpec.pdf | ||
| W912EF18R0025_Plans.pdf |
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
See Summary of Changes and attached plans and specif ications for revisions.
1. CONTRACT ID CODE PAGE OF PAGES
1 14
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 15-Aug-2018
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912EF18R0025
X 9B. DATED (SEE ITEM 11)
24-Jul-2018
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 5 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
15-Aug-2018
CODE
USAED, WALLA WALLA - CONTRACTING DIV.
CYNTHIA H JACOBSEN
201 N. THIRD AVE
WALLA WALLA WA 99362-1876
W912EF 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912EF18R0025
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
Summary of Changes for Amend -0002 Lower Granite Navlock Miter Gate Pintle Modifications
1. Revised box 13A-Additional Solicitation Requirements on solicitation document: Changed number of copies from 1 to 4
2. Revised the Bid Schedule:
a. Added the following new Bid Items
• CLIN 0006 Drainage Culvert Crack Grouting
• CLIN 0007 Drainage Culvert Chamfer Repair
• CLIN 0008 Drainage Culvert Bulkhead Slot Floor Repair
See Yellow Highlights
3. Revised Evaluation Proposal Submission information in D. Proposal Submission 3.(ii)(5) Section 5-Past
Performance questionnaire (see changes in red)
4. Revised the following Clauses:
a. 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)
b. 52.211-12 LIQUIDATED DAMAGES
c. LISTING OF GOVERNMENT-FURNISHED PROPERTY
See Yellow Highlights. See revised clauses for details.
5. Incorporated the revised Wage Determination WA86
6. Revised the following Specifications:
a. SECTION 00 01 15.00 28 LIST OF DRAWINGS
• Revised paragraph 1.2 CONTRACT DRAWINGS.
• Revised paragraph 1.3 FOR INFORMATION ONLY DRAWINGS (FIO).
b. SECTION 01 11 01.00 28 SUPPLEMENTARY REQUIREMENTS
• Revised paragraph 1.20.1 "Daily Coordination Meetings".
• Revised paragraph 1.23 RED ZONE MEETING.
c. SECTION 01 14 00.10 28 PROJECT SITE RESTRICTIONS
• Revised paragraph 1.3 SITE CONDITIONS AND OPERATIONAL RESTRICTIONS.
• Added paragraph 1.9.2.1 "Government Overtime and Emergency Work Hours".
d. SECTION 01 22 00.00 28 MEASUREMENT AND PAYMENT
• Added paragraph 1.7 CLIN 0006 DRAINAGE CULVERT CRACK GROUTING.
• Added paragraph 1.8 CLIN 0007 DRAINAGE CULVERT CHAMFER REPAIR.
• Added paragraph 1.9 CLIN 0008 DRAINAGE CULVERT BULKHEAD SLOT FLOOR
REPAIR.
e. SECTION 01 33 00 SUBMITTAL PROCEDURES
• Revised Submittal Register.
f. SECTION 01 35 29.10 28 GOVERNMENTAL SAFETY REQUIREMENTS
• Revised paragraph 1.2.7 "High Risk Activities".
• Revised paragraph 1.3 SUBMITTALS.
• Added paragraph 1.6.1.2.1 "Competent Person for Confined Space Entry".
• Revised paragraph 1.6.1.3 "Qualified Trainer Requirements".
• Revised paragraph 1.7.1 "Names and Qualifications".
• Added paragraph 1.7.2.1 "Confined Space Entry Plan".
• Revised paragraph 1.10.1 "Safety Bulletin Board".
• Added paragraph 1.15 CONFINED SPACE ENTRY REQUIREMENTS.
• Added paragraph 1.15.1 "Entry Procedures".
• Added paragraph 1.15.2 "Forced Air Ventilation".
• Added paragraph 1.15 .3 "Rescue Procedures and Coordination with Local Emergency
Responders".
• Renumbered paragraphs.
g. SECTION 01 51 00.00 28 TEMPORARY UTILITIES
• Revised paragraph 1.2.2 "Water".
h. SECTION 01 55 10.00 28 CONTRACTOR WORK, ACCESS AND STORAGE AREAS
• Revised paragraph 1.1 REFERENCES.
• Revised paragraph 1.2 SUBMITTALS.
• Deleted paragraph 1.5 COORDINATION WITH OTHER CONTRACTORS.
• Revised paragraph 1.5 CONTRACTOR ACCESS TO NAVIGATION LOCK.
• Added paragraph 1.7 CONTRACTOR ACCESS TO CULVERT VALVE SHAFT.
• Added paragraph 1.7.1 "Dewatering of the Drainage Culverts".
• Added paragraph 1.7.2 "Hoist System Plan".
• Added paragraph 1.7.3 "Scaffolding System Plan".
• Added paragraph 1.7.4 "Government Access During Work".
• Added paragraph 1.9 CONSTRUCTION DEBRIS AND WASTE WATER.
• Renumbered paragraphs.
i. SECTION 01 57 20.00 28 ENVIRONMENTAL PROTECTION
• Revised paragraph 3.1.6 "Wastewater".
j. SECTION 02 21 00.01 28 MITER GATE SURVEY
• Revised paragraph 1.4 MITER GATE SURVEY PLAN.
• Revised paragraph 2.3 FINAL CONDITIONS SURVEY REPORTS.
k. Added SECTION 03 30 90.00 28 CRACK GROUTING AND CONCRETE REPAIR.
l. SECTION 05 60 05.00 28 PINTLE BEARING, GREASE LINE, AND CULVERT REPAIRS
• Revised SECTION title.
• Revised paragraph 1.2 SUBMITTALS.
• Revised paragraph 1.5 APPLICABLE WELDING CODES.
• Revised paragraph 1.6.1 "Qualification of Welders and Welding Operators".
• Revised paragraph 1.6.2 " Welding Procedure Specifications (WPS)".
• Added paragraph 2.1.4 "Stainless Steel Anchors and Threaded Rods".
• Revised paragraph 2.3 WELD FILLER METAL.
• Revised paragraph 2.7 EPOXY ADHESIVE ANCHORS.
• Revised paragraph 3.5.1 "Welding Operations".
• Revised paragraph 3.5.2.1 "Welding Procedures".
• Revised paragraph 3.5.2.2 "Welding Technique".
• Revised paragraph 3.5.2.3 "Workmanship".
• Revised paragraph 3.6.1 "Visual Examination".
7. Revised the following Drawings. See Clouded areas.
a. G-002.
b. G-101.
8. Added the following Drawings.
a. C-501.
b. C-502.
c. FIO-072.
d. FIO-073.
e. FIO-074.
SECTION 00 10 00 - SOLICITATION
The number of offeror copies required has increased by 3 from 1 to 4.
SECTION 00 21 00 - INSTRUCTIONS
The following have been modified:
BID SCHEDULE
Walla Walla District Corps of Engineers Lower Granite Navlock Miter Gate Pintle Modifications
The magnitude of construction is estimated to be between $500,000 and $1,000,000.
UNRESTRICTED
ITEM
DESCRIPTION
QUANTITY
U/M
U/P
AMOUNT
0001 Gate Removal, Shoring, and Return to Operation. 1 JOB XXXXX $________
0002 Removal, Repair, and Reinstallation of
Pintle. 1 JOB XXXXX $________
0003 Replacement of Supply and Return Grease
Lines, and Related Items. 1 JOB XXXXX $________
0004 Additional Embedded Steel Channel Painting Est* 100 SF XXXXX $________
0005 Miter Gate Survey 1 JOB XXXXX $________
0006 Drainage Culvert Crack Grouting Est* 100 Gal _________ $________
0007 Drainage Culvert Chamfer Repair Est* 50 SF _________ $________
0008 Drainage Culvert Bulkhead Slot Floor Repair 1 JOB XXXXX $________
SCHEDULE TOTAL $__________
IMPORTANT:
1. See Section 01 22 00.00 28; MEASUREMENT AND PAYMENT; Paragraph; Retainage of Payment, for withholding of payment for final deliverables.
2. EST* = Estimated Quantities identified as Estimated (“EST”) in the bid schedule are subject to FAR Clasue 52.211-18, Variation in Estimated Quantity, located in Section 00 70 00.
3. Environmental clearance has not yet been obtained for this project. No contract award will be made until all applicable environmental clearances are obtained.
EVAL FACTORS – SUBMISSION
D. PROPOSAL SUBMISSION
(5) Section 5-Past Performance Questionnaire. For all contracts identified in Section 1 - Contract Descriptions, a Past Performance Questionnaire for any project that has not received a formal Contractor Performance Assessment Reporting System (CPARS) evaluation. Appendix E, must be completed and submitted. The offeror shall complete Part I of the Past Performance Questionnaire and e-mail the questionnaire to the technical representative responsible for the current and past contract. The Point of Contacts (POCs) shall be instructed to electronically complete Part II of the questionnaire and e-mail the entire questionnaire to the Contracting Office no later than the proposal due date, to cynthia.h.jacobsen@usace.army.mil.
mailto:cynthia.h.jacobsen@usace.army.mil
SECTION 00 70 00 - CONDITIONS OF THE CONTRACT
52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)
The Contractor shall be required to
(a) Commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed,
(b) prosecute the work diligently, and
(c) complete the entire work ready for use not later than the dates listed below.
See SECTION 01 14 00.10 28 PROJECT SITE RESTRICTIONS, paragraph SITE CONDITIONS AND OPERATIONAL RESTRICTIONS for anticipated Navigation Lock Outage dates and restrictions.
(1) The Contractor shall complete all work for the Lower Granite Pintle Heel Replacement by not later than 2359 hours on 22 March 2019.
(2) The Contractor shall complete final cleanup and demobilization by not later than 15 calendar days after completion of work in (1) above.
(3) The Contractor shall complete final submission of working “as-built” contract drawings and final approved versions of Contractor prepared drawings (see SECTION 01 78 00.00 28) by not later than 30 calendar days after completion of work in (1) above.
(d) Other Contracts. Other Contractors will be working in the area. See FAR 52.236-8 OTHER CONTRACTS (APR 1984). See SECTION 01 11 01.00 28 SUPPLEMENTARY REQUIREMENTS, paragraph "Daily Coordination Meetings", and SECTION 01 55 10.00 28 CONTRACTOR WORK, ACCESS AND STORAGE AREAS, paragraph COORDINATION WITH OTHER CONTRACTORS for additional information.
(End of clause)
52.211-12 LIQUIDATED DAMAGES--CONSTRUCTION (SEP 2000)
(a) If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of $4,951.00 for each calendar day of delay until the work is completed or accepted.
(b) If the Government terminates the Contractor's right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.
(End of clause)
SECTION 00 73 00 - SUPPLEMENTARY CONDITIONS
SPECIAL CONTRACT REQUIREMENTS
LISTING OF GOVERNMENT-FURNISHED PROPERTY
(a) The following items will be made available to the Contractor at the Work Site. The Contractor shall verify the condition of the property and acknowledge receipt in writing to the Contracting Officer. The Contractor shall provide the Government a minimum 48-hour notice prior to the date that receipt of Government Furnished Property is required.
The following will be made available to the Contractor to use during the performance of this job. The Contractor is responsible to ensure this property is returned to the Government in the same condition as prior to use.
Item No.
Description Quantity Unit Acquisition
Cost
Total Acquisition
Cost 1 Pintle Assembly 1 Set $175,533 $175,533 2 Pintle Lubrication Grease 11 Gallons $227 $2,500
WAGE DETERMINATION
General Decision Number: WA180086 08/10/2018 WA86
Superseded General Decision Number: WA20170086
State: Washington
Construction Type: Heavy including water and sewer line construction
County: Whitman County in Washington.
HEAVY CONSTRUCTION PROJECTS (including sewer/water construction).
Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.35 for calendar year 2018 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.35 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2018. The EO minimum wage rate will be adjusted annually.
Please note that this EO applies to the above-mentioned types of contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but it does not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60). Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Modification Number Publication Date 0 01/05/2018 1 01/12/2018 2 02/23/2018 3 03/30/2018 4 06/29/2018 5 08/10/2018
ELEC0073-002 01/01/2018
Rates Fringes
ELECTRICIAN......................$ 33.25 18.40
ELEC0077-001 02/01/2013
Rates Fringes
Line Construction:
LINEMEN.....................$ 45.62 4%+12.90
* ENGI0370-010 06/01/2018
Rates Fringes
POWER EQUIPMENT OPERATOR
GROUP 1.....................$ 27.51 15.95
GROUP 2.....................$ 27.83 15.95
GROUP 3.....................$ 28.44 15.95
GROUP 4.....................$ 28.60 15.95
GROUP 5.....................$ 28.76 15.95
GROUP 6.....................$ 29.04 15.95
GROUP 7.....................$ 29.31 15.95
GROUP 8.....................$ 30.41 15.95
ZONE DIFFERENTIAL (Add to Zone 1 rate): Zone 2 - $2.00
Zone 1: Within 45 mile radius of Spokane, Pasco, Washington;
Lewiston, Idaho
Zone 2: Outside 45 mile radius of Spokane, Pasco, Washington; Lewiston, Idaho
POWER EQUIPMENT OPERATORS CLASSIFICATIONS
GROUP 1: Rollers, all types on subgrade, including seal and chip coatings
GROUP 2: Fork Lift
GROUP 3: Bulldozer (up to D-6 or equivalent)
GROUP 4: Loaders (overhead & front-end, under 4 yds. R/T);
Oiler; Drill (churn, core, calyx or diamond)
GROUP 5: Backhoe (Under 45,000 gw); Trackhoe/Excavator (under 3/4 yd.); Cranes (25 tons & under); Drilling equipment (8 unch bit and over) (robbins, reverse circulation and similar); Boom Truck (Under 25 tons)
GROUP 6: Asphalt Roller; Backhoe (45,000 gw and over to 110,000 gw); Trackhoe/Excavator (3/4 yd. to 3 yd.); Cranes (over 25 tons, to and including 45 tons), Bulldozer, 834 R/T & similar; Loader Operator (front-end & overhead, 4 yds. incl. 8 yds.); Mechanic
GROUP 7: Backhoe (Over 110,000); Trackhoe/Excavator (3 yds & over); Cranes (over 45 tons to but not including 85 tons);
Loaders (overhead & front-end, over 8 yds. to 10 yds.);
Grader/Blade
GROUP 8: Cranes (85 tons and over, and all climbing, overhead,rail and tower); Loaders (overhead and front-end, 10 yards and over)
BOOM PAY: (All Cranes, Including Tower) 180 ft to 250 ft $ .50 over scale Over 250 ft $ .80 over scale
NOTE:
In computing the length of the boom on Tower Cranes, they shall be measured from the base of the Tower to the point of the boom.
HAZMAT:
Anyone working on HAZMAT jobs, working with supplied air shall receive $1.00 an hour above classification.
IRON0014-001 07/01/2017
Rates Fringes
IRONWORKER (Reinforcing and
Structural)......................$ 32.64 25.06
LABO0238-002 06/01/2018
Rates Fringes
LABORER (Spokane)
GROUP 1.....................$ 24.84 12.35
GROUP 2.....................$ 26.94 12.35
GROUP 3.....................$ 27.21 12.35
GROUP 4.....................$ 27.48 12.35
Zone Differential (Add to Zone 1 rates): Zone 2 - $2.00
BASE POINTS: Spokane, Pasco, Lewiston
Zone 1: 0-45 radius miles from the main post office.
Zone 2: 45 radius miles and over from the main post office
LABORERS CLASSIFICATIONS
GROUP 1: Flagger
GROUP 2: Common or General Laborer;
GROUP 3: Mason Tender-Cement/Concrete; Pipelayer; Chipping Guns
GROUP 4: Grade Checker
LABO0238-007 06/01/2018
Rates Fringes
Laborer, Mason Tender Brick......$ 26.94 12.35
* PAIN0005-003 07/01/2018
Rates Fringes
PAINTER (Brush, Roller, and Spray.)..........................$ 22.94 11.61
SUWA2009-052 08/07/2009
Rates Fringes
CARPENTER........................$ 24.03 6.50
CEMENT MASON/CONCRETE FINISHER...$ 17.21 0.00
LABORER: Landscape..............$ 14.67 0.00
TRUCK DRIVER: Dump Truck........$ 19.67 0.00
TRUCK DRIVER: Water Truck.......$ 24.36 8.30
TRUCK DRIVER: 10 Yard Truck.....$ 24.61 8.34
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).
Union Rate Identifiers
A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than "SU" or "UAVG" denotes that the union classification and rate were prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.
Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.
Survey Rate Identifiers
Classifications listed under the "SU" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.
Survey wage rates are not updated and remain in effect until a new survey is conducted.
Union Average Rate Identifiers
Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.
A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator
U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION