A.07.24_REGISTER_Amend-0002.pdf
PDF 97 KB Posted
- Attached to
- W912EF18R0025 Amendment 0003 Federal contract opportunity
- Solicitation number
- W912EF18R0025
About this file
Amendment 0002 Register
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W912EF18R0025_Amendment_0004.pdf | ||
| 18R0025_Plans_Amend0004.pdf | ||
| W912EF18R0025_Amendment_0003.pdf | ||
| 18R0025_specs_01_55_10.00_28_Amend-0003.pdf | ||
| A.07.24_18R0025_Amend-0002_Plans.pdf | ||
| W912EF18R0025_Amendment_0002.pdf | ||
| A.07.24_Techspec_Amend-0002.pdf | ||
| Site_Visit_Attendees_-_18R0025_LLA_Pintle_Heel.pdf | ||
| W912EF18R0025_Amend_0001.pdf | ||
| W912EF18R0025_Small_Business_Participation_Plan.pdf | ||
| W912EF18R0025_Plans.pdf | ||
| W912EF18R0025_Lower_Granite_Pintle_Heel_Modifications.docx.pdf | ||
| W912EF18R0025_TechSpec.pdf | ||
| Site_Visit_Information_18R0025.pdf |
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 5 PAGES
W912EF18R0025
Lower Granite Navlock Miter Gate Pintle Modifications
01 11 01.00 28 SD-01 Preconstruction Submittals
1.7 G CProperty Management Plan
1.8 I CEquipment List
1.12 I CPre-Work Survey
1.17 I CProject Superintendent
SD-07 Certificates
1.16 G CInstallation Supervisor
1.18 G CKey Personnel Substitution
SD-11 Closeout Submittals
1.12 I CPost-Work Survey
1.13 G CWeekly Progress Photographs
01 14 00.10 28 SD-01 Preconstruction Submittals
1.6 I CEmployee Training And
Identification Summary 01 14 00.90 28 SD-01 Preconstruction Submittals
1.5 I CiWATCH, CORPS Watch, or See
Something, Say Something
1.6 I CLevel 1 OPSEC training
1.8 I SLEPre-Screen Candidates Using
E-Verify Program
1.2.1 G CBiographical Information (HC)
01 32 01.00 28 SD-01 Preconstruction Submittals
1.3 G CProject Scheduler Qualifications
3.4.1 G CPreliminary Project Schedule
3.4.2 G CInitial Project Schedule
3.6.2 G CPeriodic Schedule Update
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 5 PAGES
Lower Granite Navlock Miter Gate Pintle Modifications
01 35 29.10 28 SD-01 Preconstruction Submittals
1.7 G CAccident Prevention Plan (APP)
1.8 G CActivity Hazard Analysis (AHA)
1.9 I CSafe Clearance
1.9 I CAuthorized Individuals
1.7.2.2 I CStandard Lift Plan
1.7.2.3 I CCritical Lift Plan
1.13.5 G STCrane Wheel And Outrigger
Loading Diagram And Deck Protection For Outriggers
1.6.1.1 G CSSHO And Alternate SSHO
SD-06 Test Reports
1.4 I CMonthly Exposure Reports
1.13 I CNotifications and Reports
1.13.2 I CAccident Reports
1.13.3 I CLHE Inspection Reports
SD-07 Certificates
1.6.1.4 I CCrane Operators/Riggers
1.10.1 I CConfined Space Entry Permit
1.10.1 I CHot Work Permit
1.13.4 I CCertificate of Compliance
1.6.1.3 G CCompetent Person Trainer
01 45 04.00 28 SD-01 Preconstruction Submittals
3.2 G CContractor Quality Control (CQC)
Plan 01 55 10.00 28 SD-01 Preconstruction Submittals
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
G4EDHCMP
Line
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 5 PAGES
Lower Granite Navlock Miter Gate Pintle Modifications
01 55 10.00 28 1.15 G STTransport Loading Diagrams
1.7.2 G CHoist System Plan
1.7.3 G STScaffolding System Plan;
1.16 I CDust Control Plan
1.17.4 I CWild Land Fire Control Plan
01 57 20.00 28 SD-01 Preconstruction Submittals
1.6 G ECCEnvironmental Protection Plan
SD-06 Test Reports
3.2.2 I ECCTCLP Testing
SD-07 Certificates
3.2.2 I ECCNotification To The Recycler
3.2.2 I ECCRecycling Facility
01 78 00.00 28 SD-11 Closeout Submittals
3.1 G CFinal Contractor Prepared Shop
Drawings (HC)
3.2 G CPreliminary As-Built Drawings
(HC)
3.4 G CFinal As-Built Drawings (HC)
3.5 G CGovernment Issued Items
02 21 00.01 28 SD-01 Preconstruction Submittals
1.4 G STMiter Gate Survey Plan
SD-06 Test Reports
2.2 G STUnloaded Miter Gate - Existing
Conditions Report
2.2 G STPintle Assembly - Existing
Conditions Report
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 5 PAGES
Lower Granite Navlock Miter Gate Pintle Modifications
02 21 00.01 28 2.2 G STAdditional Information - Existing Conditions Report
2.3 G STPintle Assembly - Final
Conditions Report
2.3 G STUnloaded Miter Gate - Final
Conditions Report
2.3 G STAdditional Information - Final
Conditions Report
02 41 19.40 28 SD-01 Preconstruction Submittals
1.3.1 G STGate Removal and Shoring Plan
SD-07 Certificates
1.6 G STSurvey And Report Of Existing
Conditions 03 30 90.00 28 SD-01 Preconstruction Submittals
3.2.1 G GTGrouting Plan
3.4.1 G STBulkhead Floor Repair Plan
3.2.2 G GTGrouting Specialist
SD-03 Product Data
2.2.1 G GTShrinkage Compensating Repair
Mortar
2.1 G GTCrack Grout
05 60 05.00 28 SD-01 Preconstruction Submittals
1.6.1 G STQualification of Welders and
Welding Operators
1.6.2 G STWelding Procedure Specifications
(WPS)
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 5 PAGES
Lower Granite Navlock Miter Gate Pintle Modifications
05 60 05.00 28 3.4.1 G MEPintle Removal Plan
1.6.3 G STQualification For Anchor
Installers SD-02 Shop Drawings
2.4 G MEGudgeon and Eyebar Pins
2.5 G MEClevis Pins
3.4.2 G MEPintle Modifications
SD-03 Product Data
2.7 G STEpoxy Adhesive Anchors
3.9 G STEpoxy Adhesive Anchors
09 97 02.00 28 SD-03 Product Data Part 2 G GEManufacturer's Product Data
Sheet SD-06 Test Reports
3.6 G GEInspection Reports
SD-07 Certificates
1.3.1 G CSSPC QP 1 Certificate
1.3.4 G CCoating Thickness Gage
Qualification
1.3.3 G CQualified Paint Applicator
Part 2 G CSpecial Formulation Paint
1.3.2 G CIndependent Third Party Test
Agency Part 2 G CSolvents and Thinners
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
| Amend-0002 |
| Amend-0002 |
| Amend-0002 |
| Amend-0002 |