18Q0105_Amend-0002_Submittal_Register.pdf
PDF 128 KB Posted
- Attached to
- Mill Creek Division Works Needle Gate Replacement Federal contract opportunity
- Solicitation number
- W912EF18Q0105
About this file
18Q0105 Amend 0002 Submittal Register
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 18Q0105_Amendment_0003.pdf | ||
| Amend-0002_Drawings.pdf | ||
| 18Q0105_Amend-0002_31_00_00.12_28.pdf | ||
| W912EF18Q0105_Amendment_0002.pdf | ||
| 18Q0105_Amend-0002_Section_00_01_15.00_28.pdf | ||
| A.07.24_W912EF18Q0105_Amendment_0001.pdf | ||
| Site_Visit_Attendees_18Q0105_MCL_Needle_Gate_Replacement.pdf | ||
| Site_Visit_Attendees_-_18R0025_LLA_Pintle_Heel.pdf | ||
| 18Q0105_Plans.pdf | ||
| W912EF18Q0105_MCL_Needle_Gate_Replacement.pdf | ||
| 18Q0105_Site_Visit_info_18Q0105.pdf | ||
| 18Q0105_Specs.pdf |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 6 PAGES
W912EF18Q0105
Mill Creek Needle Gate Replacement
01 11 01.00 28 SD-01 Preconstruction Submittals
1.5 G CProject Schedule
1.8 I CEquipment List
1.12 I CPre-Work Survey
1.14 I CProject Superintendent
SD-11 Closeout Submittals
1.12 I CPost-Work Survey
1.7 G CGovernment Issued Items
1.13 G CWeekly Progress Photographs
01 14 00.10 28 SD-01 Preconstruction Submittals
1.2 I SLEPre-Screen Candidates Using
E-Verify Program 01 14 00.90 28 SD-01 Preconstruction Submittals
1.3 I SLEPre-Screen Candidates Using
E-Verify Program
01 35 29.10 28 SD-01 Preconstruction Submittals
1.6 G CAccident Prevention Plan (APP)
1.7 G CActivity Hazard Analysis (AHA)
1.6.2.1 I CStandard Lift Plan
1.6.2.2 I CCritical Lift Plan
1.11.5 G STCrane Wheel And Outrigger
Loading Diagram And Deck Protection For Outriggers
1.5.1.1 G CSSHO And Alternate SSHO
SD-06 Test Reports
1.11 I CNotifications and Reports
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 6 PAGES
Mill Creek Needle Gate Replacement
01 35 29.10 28 1.11.2 I CAccident Reports
1.11.3 I CLHE Inspection Reports
SD-07 Certificates
1.5.1.3 I CCrane Operators/Riggers
1.8.1 I CHot Work Permit
1.11.4 I CCertificate of Compliance
01 45 04.00 28 SD-01 Preconstruction Submittals
3.2 G CContractor Quality Control (CQC)
Plan SD-07 Certificates
3.4.2 G CCQC System Manager
01 55 10.00 28 SD-01 Preconstruction Submittals
1.5 G CDocumentation And Permits
1.6 G CDust Control Plan
1.9.4 G CWild Land Fire Control Plan
01 57 20.00 28 SD-01 Preconstruction Submittals
1.6 G ECCEnvironmental Protection Plan
01 78 00.00 28 SD-03 Product Data
3.1.1 G CWarranty Management Plan
3.1.5 I CWarranty Tags
SD-04 Samples
3.1.5 G CMock Up Sample
SD-11 Closeout Submittals
3.2 G CFinal Contractor Prepared Shop
Drawings (HC)
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 6 PAGES
Mill Creek Needle Gate Replacement
01 78 00.00 28 3.3.1 I CWorking As-Built Drawings and FIO Drawings (HC)
3.4 G CFinal As-Built Drawings
02 24 20.00 28 SD-01 Preconstruction Submittals
1.2 G PECWater Quality Monitoring Plan
SD-06 Test Reports
3.1.4 I PECEquipment Calibration
3.2 I PECWater Quality Monitoring Report
02 24 30.10 28 SD-01 Preconstruction Submittals
1.6 G PECDewatering Plans
1.7 G PECIsolation Structure Removal
SD-02 Shop Drawings
1.6 G PECIsolation Structures
1.6 G PECPumping Details
03 30 50.00 28 SD-05 Design Data
1.4.1 G GTMaterials and Mix Design
03 40 00.00 28 SD-01 Preconstruction Submittals
1.7 G STErection, Handling, and Storage
Plan
3.8.1 G STErection, Handling, and Storage
Plan
1.7 G STDrawings and Design
Calculations
1.8.1 G STDrawings and Design
Calculations
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 6 PAGES
Mill Creek Needle Gate Replacement
03 40 00.00 28 3.8.2 G STDrawings and Design Calculations
1.9 G GTConcrete Mixture Proportions
SD-03 Product Data
2.8 G STNon-Shrink Grout
SD-04 Samples
2.6.4 G STSample Panels
2.6.4.2 G STSample Panels
SD-07 Certificates
2.4 G STEpoxy-Coated Steel Bars
05 50 01.00 28 SD-01 Preconstruction Submittals
1.3 G STQualification of Welders and
Welding Operators
3.2.3.1 G STWelding Procedure
3.2.4 G STCertified Welding Inspector
1.4 G STQualification For Anchor
Installers
1.5 G STDrawings And Design
Calculations
1.6.1 G STDrawings And Design
Calculations
3.4.2 G STDrawings And Design
Calculations
1.5 G STErection, Handling, And Storage
Plan
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 6 PAGES
Mill Creek Needle Gate Replacement
05 50 01.00 28 3.4.1 G STErection, Handling, And Storage Plan
3.3.1 G STDrilling Procedures
SD-03 Product Data
2.3 G STEpoxy Adhesive Anchors
3.3 G STEpoxy Adhesive Anchors
2.5 G STNon-Shrink Grout
SD-06 Test Reports
3.2.4.2 G STNondestructive Examination
3.3.1 G STConcrete Imaging Report
3.4.2 G STLoad Test Results
09 97 02.00 28 SD-03 Product Data
1.4.1 G GEManufacturer's Product Data
Sheet
1.4.1 G GEProduct Samples
SD-04 Samples
2.1 G GESpecial Paint Formulas
2.2 G GEPaint Formulations
2.3.3 G GESolvent and Thinners
26 05 19.00 28 SD-03 Product Data 3.2Installation Instructions 2.2.1Wire And Cable
SD-06 Test Reports 1.4Tests, Inspections, and
Verifications 3.5Test Report
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 6 PAGES
Mill Creek Needle Gate Replacement
31 00 00.12 28 SD-01 Preconstruction Submittals
3.1.1 G GTTrenching Work Plan
SD-03 Product Data
2.1.1 G GTBedding Material
2.1.2 G GTControlled Density Fill
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r) g4edddca Line