18Q0105_Amend-0002_Submittal_Register.pdf

PDF 128 KB Posted

Attached to
Mill Creek Division Works Needle Gate Replacement Federal contract opportunity
Solicitation number
W912EF18Q0105
Issued by
Department of the Army Corps of Engineers Engineering District Walla Walla

About this file

18Q0105 Amend 0002 Submittal Register

View the file

Other files for this federal contract opportunity

Other files attached to Mill Creek Division Works Needle Gate Replacement, newest first.
File Type Posted
18Q0105_Amendment_0003.pdf PDF
Amend-0002_Drawings.pdf PDF
18Q0105_Amend-0002_31_00_00.12_28.pdf PDF
W912EF18Q0105_Amendment_0002.pdf PDF
18Q0105_Amend-0002_Section_00_01_15.00_28.pdf PDF
A.07.24_W912EF18Q0105_Amendment_0001.pdf PDF
Site_Visit_Attendees_18Q0105_MCL_Needle_Gate_Replacement.pdf PDF
Site_Visit_Attendees_-_18R0025_LLA_Pintle_Heel.pdf PDF
18Q0105_Plans.pdf PDF
W912EF18Q0105_MCL_Needle_Gate_Replacement.pdf PDF
18Q0105_Site_Visit_info_18Q0105.pdf PDF
18Q0105_Specs.pdf PDF
Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 6 PAGES

W912EF18Q0105

Mill Creek Needle Gate Replacement

01 11 01.00 28 SD-01 Preconstruction Submittals

1.5 G CProject Schedule

1.8 I CEquipment List

1.12 I CPre-Work Survey

1.14 I CProject Superintendent

SD-11 Closeout Submittals

1.12 I CPost-Work Survey

1.7 G CGovernment Issued Items

1.13 G CWeekly Progress Photographs

01 14 00.10 28 SD-01 Preconstruction Submittals

1.2 I SLEPre-Screen Candidates Using

E-Verify Program 01 14 00.90 28 SD-01 Preconstruction Submittals

1.3 I SLEPre-Screen Candidates Using

E-Verify Program

01 35 29.10 28 SD-01 Preconstruction Submittals

1.6 G CAccident Prevention Plan (APP)

1.7 G CActivity Hazard Analysis (AHA)

1.6.2.1 I CStandard Lift Plan

1.6.2.2 I CCritical Lift Plan

1.11.5 G STCrane Wheel And Outrigger

Loading Diagram And Deck Protection For Outriggers

1.5.1.1 G CSSHO And Alternate SSHO

SD-06 Test Reports

1.11 I CNotifications and Reports

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 6 PAGES

Mill Creek Needle Gate Replacement

01 35 29.10 28 1.11.2 I CAccident Reports

1.11.3 I CLHE Inspection Reports

SD-07 Certificates

1.5.1.3 I CCrane Operators/Riggers

1.8.1 I CHot Work Permit

1.11.4 I CCertificate of Compliance

01 45 04.00 28 SD-01 Preconstruction Submittals

3.2 G CContractor Quality Control (CQC)

Plan SD-07 Certificates

3.4.2 G CCQC System Manager

01 55 10.00 28 SD-01 Preconstruction Submittals

1.5 G CDocumentation And Permits

1.6 G CDust Control Plan

1.9.4 G CWild Land Fire Control Plan

01 57 20.00 28 SD-01 Preconstruction Submittals

1.6 G ECCEnvironmental Protection Plan

01 78 00.00 28 SD-03 Product Data

3.1.1 G CWarranty Management Plan

3.1.5 I CWarranty Tags

SD-04 Samples

3.1.5 G CMock Up Sample

SD-11 Closeout Submittals

3.2 G CFinal Contractor Prepared Shop

Drawings (HC)

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 6 PAGES

Mill Creek Needle Gate Replacement

01 78 00.00 28 3.3.1 I CWorking As-Built Drawings and FIO Drawings (HC)

3.4 G CFinal As-Built Drawings

02 24 20.00 28 SD-01 Preconstruction Submittals

1.2 G PECWater Quality Monitoring Plan

SD-06 Test Reports

3.1.4 I PECEquipment Calibration

3.2 I PECWater Quality Monitoring Report

02 24 30.10 28 SD-01 Preconstruction Submittals

1.6 G PECDewatering Plans

1.7 G PECIsolation Structure Removal

SD-02 Shop Drawings

1.6 G PECIsolation Structures

1.6 G PECPumping Details

03 30 50.00 28 SD-05 Design Data

1.4.1 G GTMaterials and Mix Design

03 40 00.00 28 SD-01 Preconstruction Submittals

1.7 G STErection, Handling, and Storage

Plan

3.8.1 G STErection, Handling, and Storage

Plan

1.7 G STDrawings and Design

Calculations

1.8.1 G STDrawings and Design

Calculations

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 6 PAGES

Mill Creek Needle Gate Replacement

03 40 00.00 28 3.8.2 G STDrawings and Design Calculations

1.9 G GTConcrete Mixture Proportions

SD-03 Product Data

2.8 G STNon-Shrink Grout

SD-04 Samples

2.6.4 G STSample Panels

2.6.4.2 G STSample Panels

SD-07 Certificates

2.4 G STEpoxy-Coated Steel Bars

05 50 01.00 28 SD-01 Preconstruction Submittals

1.3 G STQualification of Welders and

Welding Operators

3.2.3.1 G STWelding Procedure

3.2.4 G STCertified Welding Inspector

1.4 G STQualification For Anchor

Installers

1.5 G STDrawings And Design

Calculations

1.6.1 G STDrawings And Design

Calculations

3.4.2 G STDrawings And Design

Calculations

1.5 G STErection, Handling, And Storage

Plan

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 6 PAGES

Mill Creek Needle Gate Replacement

05 50 01.00 28 3.4.1 G STErection, Handling, And Storage Plan

3.3.1 G STDrilling Procedures

SD-03 Product Data

2.3 G STEpoxy Adhesive Anchors

3.3 G STEpoxy Adhesive Anchors

2.5 G STNon-Shrink Grout

SD-06 Test Reports

3.2.4.2 G STNondestructive Examination

3.3.1 G STConcrete Imaging Report

3.4.2 G STLoad Test Results

09 97 02.00 28 SD-03 Product Data

1.4.1 G GEManufacturer's Product Data

Sheet

1.4.1 G GEProduct Samples

SD-04 Samples

2.1 G GESpecial Paint Formulas

2.2 G GEPaint Formulations

2.3.3 G GESolvent and Thinners

26 05 19.00 28 SD-03 Product Data 3.2Installation Instructions 2.2.1Wire And Cable

SD-06 Test Reports 1.4Tests, Inspections, and

Verifications 3.5Test Report

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 6 PAGES

Mill Creek Needle Gate Replacement

31 00 00.12 28 SD-01 Preconstruction Submittals

3.1.1 G GTTrenching Work Plan

SD-03 Product Data

2.1.1 G GTBedding Material

2.1.2 G GTControlled Density Fill

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r) g4edddca Line

File details come from the government source that posted it.