A.07.24_Solicitation_Amendment_(W912EF17R00180002).pdf

PDF 120 KB Posted

Attached to
Oil Flushing Federal contract opportunity
Solicitation number
W912EF-17-R-0018
Issued by
Department of the Army Corps of Engineers Engineering District Walla Walla

About this file

Amendment 0002 to the solicitation. Change in CLINs and delivery dates.

View the file

Other files for this federal contract opportunity

Other files attached to Oil Flushing, newest first.
File Type Posted
A.07.24._Amendment_0003.pdf PDF
Amend_0003_Section_48_13_13.20_26.pdf PDF
Amend_0003_Section_01_45_00.01_28.pdf PDF
Amend_0003_Section_01_11_00.00_26.pdf PDF
A.01.30_Technical_Specifications_(Amendment_0002).pdf PDF
A.07.24._Solicitation_Amendment_0001.pdf PDF
A.07.23._Solicitation.pdf PDF
A.07.23._Atch_2_TechSpec.pdf PDF
A.07.23._Atch_5_Wage_Det_2015-5511.docx DOCX document
A.07.23._Atch_1_PastPerformanceQuestionnaires.pdf PDF
A.07.23._Atch_4_VOL_2_MNA_PLANS.PDF PDF
A.07.23._Atch_6_Wage_Det_2015-5527.docx DOCX document
A.07.23._Atch_3_VOL_1_DWA_PLANS.PDF PDF
A.07.23._Atch_7_Wage_Det_2015-5589.docx DOCX document
Show all 14

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is as follow s (See attached):

Delete the follow ing CLINs & SubCLINS: 0002, 0002AA, 0002AB, 0003, 0003AA, 0003AB, 0004, 0004AA & 0004AB. Add the follow ing

CLINS: 0005, 0006, 0007 & 0008.

CLAUSES

1. Revised Clause 52.211-9 “DESIRED AND REQUIRED TIME OF DELIVERY” – revised period of performance.

SPECIFICATIONS

1.Revised section 01 11 00.00 26 “SUMMARY OF WORK”
2.Revised section 01 11 00.00 28 “SUPPLEMENTARY REQUIREMENTS”
3.Revised section 48 13 13.02 26 “FLUSHING AND CLEANING OF LUBRICATING OIL SYSTEMS”

1. CONTRACT ID CODE PAGE OF PAGES

1 14

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 07-Aug-2017

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912EF-17-R-0018

X 9B. DATED (SEE ITEM 11)

11-Jul-2017

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

07-Aug-2017

CODE

USAED, WALLA WALLA - CONTRACTING DIV.

ANDREW J SPRYS

201 N. THIRD AVENUE

WALLA WALLA WA 99362-1876

W912EF 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912EF-17-R-0018

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 1449 - CONTINUATION SHEET

SUPPLIES OR SERVICES AND PRICES

CLIN 0001

The CLIN extended description has changed from:

Performance Period: 1 September 2017 to 31 October 2017 Line Item 0001, 0003 and 0004 shall be done in one contractor mobilization per project. Schedule work at each project, as coordinated with the COR

To:

Performance Period: 25 September 2017 to 22 December 2017. Schedule work at each project, as coordinated with the COR.

SUBCLIN 0001AA

Schedule work at each project, as coordinated with the COR

Schedule work at each project, as coordinated with the COR. All work must be completed by the end of the performance period. POP Sept 25-Oct 12, 2017

SUBCLIN 0001AB

Schedule work at each project, as coordinated with the COR

Schedule work at each project, as coordinated with the COR. All work must be completed by the end of the performance period. POP Nov 13-Dec 22, 2017

CLIN 0002

Performance Period: 1 September 2017 to 31 October 2017 Line Item 0001, 0003 and 0004

THE ENTIRE CLIN AND RELATED SUBCLINS ARE DELETED AND REPLACED WITH

CLIN 0005.

SUBCLIN 0002AA

The pricing detail quantity has decreased by 1.00 from 1.00 to 0.00.

SUBCLIN 0002AB

CLIN 0003

Performance Period: 1 September 2017 to 31 October 2017 Schedule work at each project, as

CLIN 0006.

SUBCLIN 0003AA

SUBCLIN 0003AB

CLIN 0004

Performance Period: 1 September 2017 to 31 October 2017 Line Item 0001, 0003 and 0004

CLIN 0007.

SUBCLIN 0004AA

SUBCLIN 0004AB

CLIN 0005 is added as follows:

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0005 1 Job

CLEAN MCNARY TRANSFORMER & LUBRICATING

FFP

OIL TANKS #1, #2, #3 and #6 Period of performance: Sept 18 - Oct 19, 2017.

Tank #1 and Tank #2 must be cleaned before Sep 25, 2017.

FOB: Destination

NET AMT

CLIN 0006 is added as follows:

0006 1 Job

CLEAN DWORSHAK CLEAN LUBRICATING OIL

FFP

TANK. POP: Oct 2-Oct 6, 2017. Schedule work to occur during the onsite high velocity flush at Dworshak.

CLIN 0007 is added as follows:

0007 1 Job

CLEAN MCNARY CLEAN LUBRICATING OIL TANK

FFP

#5 AND GRAVITY FEED LUBRICATING OIL TANK

Performance Period: Nov 13-Dec 22, 2017. Schedule work to occur during the onsite high velocity flush at McNary.

CLIN 0008 is added as follows:

0008 1 Job

CLEAN DWORSHAK DIRTY LUBRICATING OIL AND

FFP

CLEAN TRANSFORMER OIL TANKS. POP: Feb 15-Feb 28, 2018. Schedule work at each project, as coordinated with the COR.

DELIVERIES AND PERFORMANCE

The following Delivery Schedule item for SUBCLIN 0001AA has been changed from:

DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /

CAGE

POP 01-SEP-2017 TO

31-OCT-2017

N/A ARMY CORPS OF ENGINEERS

CONTRACTOR PERFORMANCE

SPECIALIST

DWORSHAK NATIONAL FISH

HATCHERY

276 DWORSHAK COMPLEX DRIVE

OROFINO ID 83544

208-476-1296

140261

DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /

CAGE

POP 25-SEP-2017 TO

12-OCT-2017

N/A ARMY CORPS OF ENGINEERS

PERFORMANCE SPECIALIST

DWORSHAK PROJECT OFFICE

1428 NORTHFORK DRIVE

AHSAHKA ID 83520-0048

960201

The following Delivery Schedule item for SUBCLIN 0001AB has been changed from:

CAGE

POP 01-SEP-2017 TO

31-OCT-2017

N/A ARMY CORPS OF ENGINEERS

PERFORMANCE SPECIALIST

MCNARY PROJECT WHSE

82790 DEVORE ROAD

UMATILLA OR 97882-1230

541-922-1355

960401

CAGE

POP 13-NOV-2017 TO

22-DEC-2017

N/A ARMY CORPS OF ENGINEERS

PERFORMANCE SPECIALIST

MCNARY PROJECT WHSE

82790 DEVORE ROAD

UMATILLA OR 97882-1230

541-922-1355

The following Delivery Schedule item for SUBCLIN 0002AA has been changed from:

CAGE

POP 01-SEP-2017 TO

31-OCT-2017

N/A ARMY CORPS OF ENGINEERS

PERFORMANCE SPECIALIST

DWORSHAK PROJECT OFFICE

1428 NORTHFORK DRIVE

AHSAHKA ID 83520-0048

CAGE

POP 01-SEP-2017 TO

31-OCT-2017

N/A ARMY CORPS OF ENGINEERS

PERFORMANCE SPECIALIST

DWORSHAK PROJECT OFFICE

1428 NORTHFORK DRIVE

AHSAHKA ID 83520-0048

The following Delivery Schedule item for SUBCLIN 0002AB has been changed from:

CAGE

POP 01-SEP-2017 TO

31-OCT-2017

N/A ARMY CORPS OF ENGINEERS

PERFORMANCE SPECIALIST

MCNARY PROJECT

82790 DEVORE ROAD

UMATILLA OR 97882-1230

541-922-1355

960434

CAGE

POP 01-SEP-2017 TO

31-OCT-2017

N/A ARMY CORPS OF ENGINEERS

PERFORMANCE SPECIALIST

MCNARY PROJECT

82790 DEVORE ROAD

UMATILLA OR 97882-1230

541-922-1355

960434

The following Delivery Schedule item for SUBCLIN 0003AA has been changed from:

CAGE

POP 01-SEP-2017 TO

31-OCT-2017

N/A ARMY CORPS OF ENGINEERS

PERFORMANCE SPECIALIST

DWORSHAK PROJECT OFFICE

1428 NORTHFORK DRIVE

AHSAHKA ID 83520-0048

POP 01-SEP-2017 TO

31-OCT-2017

N/A ARMY CORPS OF ENGINEERS

PERFORMANCE SPECIALIST

DWORSHAK PROJECT OFFICE

1428 NORTHFORK DRIVE

AHSAHKA ID 83520-0048

The following Delivery Schedule item for SUBCLIN 0003AB has been changed from:

CAGE

POP 01-SEP-2017 TO

31-OCT-2017

N/A ARMY CORPS OF ENGINEERS

PERFORMANCE SPECIALIST

MCNARY PROJECT WHSE

82790 DEVORE ROAD

UMATILLA OR 97882-1230

541-922-1355

CAGE

POP 01-SEP-2017 TO

31-OCT-2017

N/A ARMY CORPS OF ENGINEERS

PERFORMANCE SPECIALIST

MCNARY PROJECT WHSE

82790 DEVORE ROAD

UMATILLA OR 97882-1230

541-922-1355

The following Delivery Schedule item for SUBCLIN 0004AA has been changed from:

CAGE

POP 01-SEP-2017 TO

31-OCT-2017

N/A ARMY CORPS OF ENGINEERS

CONTRACTOR PERFORMANCE

SPECIALIST

DWORSHAK NATIONAL FISH

HATCHERY

276 DWORSHAK COMPLEX DRIVE

OROFINO ID 83544

208-476-1296

CAGE

POP 01-SEP-2017 TO

31-OCT-2017

N/A ARMY CORPS OF ENGINEERS

CONTRACTOR PERFORMANCE

SPECIALIST

DWORSHAK NATIONAL FISH

HATCHERY

276 DWORSHAK COMPLEX DRIVE

OROFINO ID 83544

208-476-1296

The following Delivery Schedule item for SUBCLIN 0004AB has been changed from:

CAGE

POP 01-SEP-2017 TO

31-OCT-2017

N/A ARMY CORPS OF ENGINEERS

PERFORMANCE SPECIALIST

MCNARY PROJECT WHSE

82790 DEVORE ROAD

UMATILLA OR 97882-1230

541-922-1355

CAGE

POP 01-SEP-2017 TO

31-OCT-2017

N/A ARMY CORPS OF ENGINEERS

PERFORMANCE SPECIALIST

MCNARY PROJECT WHSE

82790 DEVORE ROAD

UMATILLA OR 97882-1230

541-922-1355

The following Delivery Schedule for CLIN 0005 has been added:

POP 18-SEP-2017 TO

19-OCT-2017

N/A ARMY CORPS OF ENGINEERS

PERFORMANCE SPECIALIST

MCNARY PROJECT WHSE

82790 DEVORE ROAD

UMATILLA OR 97882-1230

541-922-1355

The following Delivery Schedule for CLIN 0006 has been added:

CAGE

POP 02-OCT-2017 TO

06-OCT-2017

N/A ARMY CORPS OF ENGINEERS

PERFORMANCE SPECIALIST

DWORSHAK PROJECT OFFICE

1428 NORTHFORK DRIVE

AHSAHKA ID 83520-0048

The following Delivery Schedule for CLIN 0007 has been added:

CAGE

POP 13-NOV-2017 TO

22-DEC-2017

N/A ARMY CORPS OF ENGINEERS

PERFORMANCE SPECIALIST

MCNARY PROJECT WHSE

82790 DEVORE ROAD

UMATILLA OR 97882-1230

541-922-1355

The following Delivery Schedule for CLIN 0008 has been added:

CAGE

POP 15-FEB-2018 TO

28-FEB-2018

N/A ARMY CORPS OF ENGINEERS

PERFORMANCE SPECIALIST

DWORSHAK PROJECT OFFICE

1428 NORTHFORK DRIVE

AHSAHKA ID 83520-0048

INSPECTION AND ACCEPTANCE

The following Acceptance/Inspection Schedule was added for CLIN 0005:

INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY

Destination Government Destination Government

The following Acceptance/Inspection Schedule was added for CLIN 0006:

The following Acceptance/Inspection Schedule was added for CLIN 0007:

The following Acceptance/Inspection Schedule was added for CLIN 0008:

TABLE OF CONTENTS

The Table of Contents has changed from:

Exhibit/Attachment Table of Contents

DOCUMENT TYPE DESCRIPTION PAGES DATE

Attachment 1 Past Performance

Questionnaire

4 06-JUL-2017

Attachment 2 Technical Specifications 111 06-JUL-2017 Attachment 3 McNary Plans 10 06-JUL-2017 Attachment 4 Dworshak Plans 12 06-JUL-2017 Attachment 5 Wage Determination

2015-5511

18 17-JAN-2017

Attachment 6 Wage Determination 2015-5527

18 12-JAN-2017

Attachment 7 Wage Determination 2015-5589

18 15-JUN-2017

to:

Exhibit/Attachment Table of Contents

DOCUMENT TYPE DESCRIPTION PAGES DATE

Attachment 1 Amended Specifications

(Amendment 0002)

The following have been added by full text:

52.211-9 DESIRED AND REQUIRED TIME OF DELIVERY (JUN 1997)

(a) The Government desires delivery to be made according to the following schedule:

DESIRED DELIVERY SCHEDULE

PROJECTS/DESTINATIONS

McNary Dam US Army Corps of Engineers 82790 Devore Road Umatilla, Oregon 97882

Dworshak Dam US Army Corps of Engineers North Fork Drive, Ahsahka, Idaho 83520-0048

CLIN 0001 HIGH VELOCITY FLUSH

CLIN 0001AA Dworshak Period of performance (POP): Sept 25-Oct 12, 2017 CLIN 0001AB McNary POP Nov 13-Dec 22, 2017

- Schedule work at each project, as coordinated with the COR. All work must be completed by the end of the performance period.

CLIN 0005 CLEAN MCNARY TRANSFORMER & LUBRICATING OIL TANKS #1, #2, #3

and #6 Period of performance: Sept 18 - Oct 19, 2017

- Tank #1 and Tank #2 must be cleaned before Sep 25, 2017.

- FOB: Destination

CLIN 0006 CLEAN DWORSHAK CLEAN LUBRICATING OIL TANK

Period of performance: Oct 2-Oct 6, 2017

- FFP

- Schedule work to occur during the onsite high velocity flush at Dworshak

CLIN 0007 CLEAN MCNARY CLEAN LUBRICATING OIL TANK #5 AND GRAVITY FEED

LUBRICATING OIL TANK

Period of performance: Nov 13-Dec 22, 2017

- FFP

- Schedule work to occur during the onsite high velocity flush at McNary

CLIN 0008 CLEAN DWORSHAK DIRTY LUBRICATING OIL AND CLEAN TRANSFORMER

OIL TANKS

Period of performance: Feb 15-Feb 28, 2018

- FFP

- Schedule work at each project, as coordinated with the COR

(End of clause)

(End of Summary of Changes)