Amendment_0004.pdf
PDF 657 KB Posted
- Attached to
- Little Goose Fish Ladder Cooling - Permanent Power Federal contract opportunity
- Solicitation number
- W912EF-17-B-0007
About this file
Amendment 0004
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Bid_Opening_Abstract.pdf | ||
| Amendment_0008.pdf | ||
| Amendment_0007.doc.pdf | ||
| Amendment_0006.1.pdf | ||
| Amendment_0005.pdf | ||
| Amendment_0003.pdf | ||
| Amendment_0002.pdf | ||
| Amendment_0001.pdf | ||
| Site_Visit_Attendees,_17-B-0007_LGA_Fish_Ladder_Perm._Power.pdf | ||
| PLANS_17-B-0007.pdf | ||
| A.07.23_Solicitation.pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W68SBV62867550
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Construction Project: Little Goose Fish Ladder Cooling Permanent Pow er
The purpose of this amendment is to makes changes indicated in the Summary of Changes.
The date and time for the bid opening remains unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 9
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 01-Feb-2017
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912EF-17-B-0007
X 9B. DATED (SEE ITEM 11)
20-Dec-2016
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
01-Feb-2017
CODE
USAED, WALLA WALLA - CONTRACTING DIV.
HILLARY A. MORGAN
201 N. THIRD AVENUE
WALLA WALLA WA 99362
W912EF 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912EF-17-B-0007
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
W912EF-17-B-0007, Amendment 0004
Solicitation:
• Updated wage determination
• Updated Clause 252.236-7001
Specifications:
• Added new spec section 26 36 00.00 28 NON-AUTOMATIC TRANSFER SWITCH
• Updated Submittal Register provided that includes the new submittals for SECTION 26 36 00.00 28
Drawings:
• Revised the following drawings: E-101, E-601, E-603
SECTION 00700 - CONTRACT CLAUSES
The following have been modified:
252.236-7001 CONTRACT DRAWINGS AND SPECIFICATIONS (AUG 2000)
(a) The Government will provide to the Contractor, without charge, one set of contract drawings and specifications, except publications incorporated into the technical provisions by reference, in electronic or paper media as chosen by the Contracting Officer.
(b) The Contractor shall--
(1) Check all drawings furnished immediately upon receipt;
(2) Compare all drawings and verify the figures before laying out the work;
(3) Promptly notify the Contracting Officer of any discrepancies;
(4) Be responsible for any errors that might have been avoided by complying with this paragraph (b); and
(5) Reproduce and print contract drawings and specifications as needed.
(c) In general--
(1) Large-scale drawings shall govern small-scale drawings; and
(2) The Contractor shall follow figures marked on drawings in preference to scale measurements.
(d) Omissions from the drawings or specifications or the misdescription of details of work that are manifestly necessary to carry out the intent of the drawings and specifications, or that are customarily performed, shall not relieve the Contractor from performing such omitted or misdescribed details of the work. The Contractor shall perform such details as if fully and correctly set forth and described in the drawings and specifications.
(e) The work shall conform to the specifications and the contract drawings identified on the following index of drawings:
Drawing Number
Sheet Number
Title
Revision Number
Date
LITTLE GOOSE FISH LADDER COOLING PERMANENT
POWER
GENERAL
LGG-1-0-1/397 G-001 COVER SHEET AND LOCATION MAPS
LGG-1-0-1/398 G-002 INDEX TO DRAWINGS A 1/10/17
LGG-1-0-1/399 G-101 WORK AREA - KEY PLAN
ELECTRICAL
LGN-1-6-14/95 E-101 ELECTRICAL - NAVIGATION LOCK -
SUBSTATION ROOM (EL 636.83) - PLAN AND
SECTIONS
B
1/29/17
LGF-1-6-3/4 E-201 ELECTRICAL - FISH LADDER - FISH LADDER
EXIT - PLAN AND SECTIONS
A 1/3/17
LGF-1-6-3/5 E-601 ELECTRICAL - ONE-LINE DIAGRAM - THREE-
LINE AND GROUNDING DIAGRAM
B 1/29/17
LGF-1-6-3/6 E-602 ELECTRICAL - WIRING DIAGRAM
LGF-1-6-3/5 E-603 ELECTRICAL - EQUIPMENT SCHEDULE B 1/29/17
LGF-1-6-3/7 E-901 ELECTRICAL - NAVIGATION LOCK - AND FISH
LADDER EXIT - PHOTOS
A 1/9/17
FOR INFORMATION ONLY (FIO)
The Government does not warrant the accuracy of the FIO drawings. The Government recommends that the Contractor verify the accuracy of FIO drawings.
LGF-1-6-12/6 FIO-001 FOR INFORMATION ONLY - PERMANENT JFF -
ELECTRICAL ONE-LINE - AND TELEPHONE
RISER DIAGRAM
LGF-1-6-12/8 FIO-002 FOR INFORMATION ONLY - PERMANENT
JUVENILE FISH FACILITIES - SECTIONALIZING
CABINET DETAILS
LGFN-1-6-14/58 FIO-003 FOR INFORMATION ONLY - NAVIGATION
LOCK - GROUNDING SYSTEM
(End of drawing list)
(End of Clause)
Microstation V8 is the only CAD system used by Walla Walla District. Contract drawings created on CAD in Microstation V8 will be available in electronic form for use by the Contractor. No For Information Only drawings are available on CAD. The Contractor assumes all risks associated in using electronic CAD drawings. The contract drawings shall govern if there are any discrepancies between the electronic copy and the contract drawing. The Contractor shall promptly notify the Contracting Officer of any discrepancies. The Government will not be responsible to correct the electronic CAD drawing. If contract modifications are issued, the associated electronic CAD drawings will not be available to the Contractor. Electronic copies of CAD drawings
SECTION 00800 - SPECIAL CONTRACT REQUIREMENTS
The following have been modified:
WAGE DETERMINATION
General Decision Number: WA170087 01/06/2017 WA87
Superseded General Decision Number: WA20160087
State: Washington
Construction Type: Heavy including water and sewer line construction
Counties: Columbia, Ferry and Garfield Counties in Washington.
HEAVY CONSTRUCTION PROJECTS (including sewer/water construction).
Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.20 for calendar year 2017 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015.
If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.20 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2017. The EO minimum wage rate will be adjusted annually.
Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Modification Number Publication Date 0 01/06/2017
ELEC0073-005 07/01/2016
FERRY COUNTY
Rates Fringes
ELECTRICIAN......................$ 31.50 17.60
ELEC0077-001 02/01/2013
Rates Fringes
Line Construction:
LINEMEN.....................$ 45.62 4%+12.90
ELEC0112-014 06/01/2016
Rates Fringes
ELECTRICIAN......................$ 40.30 18.89
ENGI0370-010 06/01/2016
Rates Fringes
POWER EQUIPMENT OPERATOR
GROUP 1.....................$ 26.66 14.55
GROUP 2.....................$ 26.98 14.55
GROUP 3.....................$ 27.59 14.55
GROUP 4.....................$ 27.75 14.55
GROUP 5.....................$ 27.91 14.55
GROUP 6.....................$ 28.19 14.55
GROUP 7.....................$ 28.46 14.55
GROUP 8.....................$ 29.56 14.55
ZONE DIFFERENTIAL (Add to Zone 1 rate): Zone 2 - $2.00
Zone 1: Within 45 mile radius of Spokane, Pasco, Washington;
Lewiston, Idaho
Zone 2: Outside 45 mile radius of Spokane, Pasco, Washington; Lewiston, Idaho
POWER EQUIPMENT OPERATORS CLASSIFICATIONS
GROUP 1: Rollers, all types on subgrade, including seal and chip coatings
GROUP 2: Fork Lift
GROUP 3: Bulldozer (up to D-6 or equivalent)
GROUP 4: Loaders (overhead & front-end, under 4 yds. R/T);
Oiler; Drill (churn, core, calyx or diamond)
GROUP 5: Backhoe (Under 45,000 gw); Trackhoe/Excavator (under 3/4 yd.); Cranes (25 tons & under); Drilling equipment (8 unch bit and over) (robbins, reverse circulation and similar); Boom Truck (Under 25 tons)
GROUP 6: Asphalt Roller; Backhoe (45,000 gw and over to 110,000 gw); Trackhoe/Excavator (3/4 yd. to 3 yd.); Cranes (over 25 tons, to and including 45 tons), Bulldozer, 834 R/T & similar; Loader Operator (front-end & overhead, 4 yds. incl. 8 yds.); Mechanic
GROUP 7: Backhoe (Over 110,000); Trackhoe/Excavator (3 yds & over); Cranes (over 45 tons to but not including 85 tons);
Loaders (overhead & front-end, over 8 yds. to 10 yds.);
Grader/Blade
GROUP 8: Cranes (85 tons and over, and all climbing, overhead,rail and tower); Loaders (overhead and front-end, 10 yards and over)
BOOM PAY: (All Cranes, Including Tower) 180 ft to 250 ft $ .50 over scale Over 250 ft $ .80 over scale
NOTE:
In computing the length of the boom on Tower Cranes, they shall be measured from the base of the Tower to the point of the boom.
HAZMAT:
Anyone working on HAZMAT jobs, working with supplied air shall receive $1.00 an hour above classification.
IRON0014-001 07/01/2016
Rates Fringes
IRONWORKER (Reinforcing and Structural)......................$ 32.89 24.56
* LABO0238-002 06/01/2016
Rates Fringes
LABORER (Spokane)
GROUP 1.....................$ 23.51 11.40
GROUP 2.....................$ 25.61 11.40
GROUP 3.....................$ 25.88 11.40
GROUP 4.....................$ 26.15 11.40
Zone Differential (Add to Zone 1 rates): Zone 2 - $2.00
BASE POINTS: Spokane, Pasco, Lewiston
Zone 1: 0-45 radius miles from the main post office.
Zone 2: 45 radius miles and over from the main post office
LABORERS CLASSIFICATIONS
GROUP 1: Flagger
GROUP 2: Common or General Laborer;
GROUP 3: Mason Tender-Cement/Concrete; Pipelayer; Chipping Guns
GROUP 4: Grade Checker
* LABO0238-007 06/01/2016
Rates Fringes
Laborer, Mason Tender Brick......$ 25.61 0.00
PAIN0005-003 07/01/2015
Rates Fringes
PAINTER (Brush, Roller, and Spray.)..........................$ 23.05 10.85
SUWA2009-053 08/07/2009
Rates Fringes
CARPENTER........................$ 24.03 6.50
CEMENT MASON/CONCRETE FINISHER...$ 17.21 0.00
LABORER: Landscape..............$ 14.67 0.00
TRUCK DRIVER: Dump Truck........$ 19.67 0.00
TRUCK DRIVER: Water Truck.......$ 24.36 8.30
TRUCK DRIVER: 10 Yard Truck.....$ 24.61 8.34
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).
Union Rate Identifiers
A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than "SU" or "UAVG" denotes that the union classification and rate were prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.
Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.
Survey Rate Identifiers
Classifications listed under the "SU" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.
Survey wage rates are not updated and remain in effect until a new survey is conducted.
Union Average Rate Identifiers
Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.
A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION
(End of Summary of Changes)
LIttle Goose Fish Ladder Cooling Permanent Power W912EF-17-B-0007 amend 0004
PROJECT TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
01 00 00.00 28 GENERAL REQUIREMENTS
01 11 01.00 28 SUPPLEMENTARY REQUIREMENTS
01 14 00.10 28 PROJECT SITE RESTRICTIONS
01 14 00.90 28 INTEGRATING ANTITERRORISM (AT) AND OPERATIONS SECURITY
(OPSEC)
01 22 00.00 28 MEASUREMENT AND PAYMENT
01 32 16.00 28 SMALL PROJECT CONSTRUCTION PROGRESS SCHEDULES
01 33 00 SUBMITTAL PROCEDURES
01 35 29.10 28 GOVERNMENTAL SAFETY REQUIREMENTS
01 42 00 SOURCES FOR REFERENCE PUBLICATIONS
01 45 02.00 28 QUALITY CONTROL SYSTEM (QCS)
01 45 04.00 28 CONTRACTOR QUALITY CONTROL
01 51 00.00 28 TEMPORARY UTILITIES
01 55 10.00 28 CONTRACTOR WORK, ACCESS AND STORAGE AREAS
01 57 20.00 28 ENVIRONMENTAL PROTECTION
01 78 00.00 28 CLOSEOUT SUBMITTALS
DIVISION 03 - CONCRETE
03 60 00.01 28 CONCRETE CORE DRILLING
DIVISION 26 - ELECTRICAL
26 05 00.00 28 GENERAL ELECTRICAL WORK
26 05 13.00 40 MEDIUM-VOLTAGE CABLES
26 05 19.00 28 LOW-VOLTAGE INSULATED WIRE AND CABLE
26 05 33.10 28 RACEWAYS AND BOXES FOR ELECTRICAL SYSTEMS
26 05 48.00 10 SEISMIC PROTECTION FOR ELECTRICAL EQUIPMENT
26 11 16 SECONDARY UNIT SUBSTATIONS
26 29 23 VARIABLE FREQUENCY DRIVE SYSTEMS UNDER 600 VOLTS
26 36 00.00 28 NON-AUTOMATIC TRANSFER SWITCH
-- End of Project Table of Contents --
PROJECT TABLE OF CONTENTS Page 1
SECTION TABLE OF CONTENTS
DIVISION 26 - ELECTRICAL
SECTION 26 36 00.00 28
NON-AUTOMATIC TRANSFER SWITCH
PART 1 GENERAL
1.1 REFERENCES
1.2 SUBMITTALS
1.3 QUALITY ASSURANCE
1.3.1 Detail Drawings
1.3.2 Switching Equipment
PART 2 PRODUCTS
2.1 STANDARD PRODUCTS
2.2 NAMEPLATE
2.3 NON-AUTOMATIC TRANSFER SWITCH (NATS)
2.3.1 Operator
2.3.2 Green Indicating Light
2.3.3 Red Indicating Light
2.4 ENCLOSURE
2.4.1 Construction
2.4.2 Cleaning and Painting
2.5 TESTING
2.5.1 Factory Testing
2.5.2 Factory Test Reports
PART 3 EXECUTION
3.1 INSTALLATION
3.2 INSTRUCTIONS
3.3 SITE TESTING
3.3.1 Insulation Resistance
3.3.2 ATS Functions
-- End of Section Table of Contents --
SECTION 26 36 00.00 28 Page 1
SECTION 26 36 00.00 28
NON-AUTOMATIC TRANSFER SWITCH
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
ASTM INTERNATIONAL (ASTM)
ASTM B117 (2016) Standard Practice for Operating Salt Spray (Fog) Apparatus
NATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION (NEMA)
NEMA ICS 2 (2000; R 2005; Errata 2008) Standard for Controllers, Contactors, and Overload Relays Rated 600 V
NEMA ICS 4 (2015) Terminal Blocks
NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)
NFPA 70 (2014; AMD 1 2013; Errata 1 2013; AMD 2 2013; Errata 2 2013; AMD 3 2014; Errata 3-4 2014; AMD 4-6 2014) National Electrical Code
UNDERWRITERS LABORATORIES (UL)
UL 1008 (2014) Transfer Switch Equipment
UL 1066 (2012; Reprint Jul 2013) Low-Voltage AC and DC Power Circuit Breakers Used in Enclosures
1.2 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-02 Shop Drawings
Detail Drawings; G, EL Equipment; G, EL Installation; G, EL
SD-03 Product Data
SECTION 26 36 00.00 28 Page 2
Equipment; G, EL
SD-06 Test Reports
Testing; G, EL
SD-07 Certificates
Equipment; G, EL
SD-10 Operation and Maintenance Data
Switching Equipment; ; G, EL Instructions; ; G, EL
1.3 QUALITY ASSURANCE
1.3.1 Detail Drawings
Submit interface equipment connection diagram showing conduit and wiring between non-automatic transfer switch (NATS) and related equipment.
Submit schematic, external connection, one-line schematic and wiring diagram. Device, nameplate, and item numbers shown in list of equipment and material shall appear on drawings wherever that item appears.
Diagrams shall show interlocking provisions and cautionary notes, if any.
Operating instructions shall be shown either on one-line diagram or separately. Unless otherwise approved, one-line and elementary or schematic diagrams shall appear on same drawing.
1.3.2 Switching Equipment
Submit an operating manual outlining step-by-step procedures for system startup, operation, and shutdown. Manual shall include manufacturer's name, model number, service manual, parts list, and brief description of equipment and basic operating features. Manufacturer's spare parts data shall be included with supply source and current cost of recommended spare parts. Manual shall include simplified wiring and control diagrams for system as installed.
PART 2 PRODUCTS
2.1 STANDARD PRODUCTS
Provide material and equipment which are standard products of a manufacturer regularly engaged in manufacturing the products and that essentially duplicate items that have been in satisfactory use for at least 2 years prior to bid opening. Submit list of proposed equipment and material, containing a description of each separate item, and certificates of compliance showing evidence of UL listing and conformance with applicable NEMA standards. Such certificates are not required if manufacturer's published data, submitted and approved, reflect UL listing or conformance with applicable NEMA standards. The experience use shall include applications in similar circumstances and of same design and rating as specified NATS. Equipment shall be capable of being serviced by a manufacturer-authorized and trained organization that is, in the Contracting Officer's opinion, reasonably convenient to the site.
SECTION 26 36 00.00 28 Page 3
2.2 NAMEPLATE
Nameplate showing manufacturer's name and equipment ratings shall be made of corrosion-resistant material with not less than 1/8 inch tall characters. Nameplate shall be mounted to front of enclosure and shall comply with nameplate requirements of NEMA ICS 2 .
2.3 NON-AUTOMATIC TRANSFER SWITCH (NATS)
NATS shall be manually initiated, electrically operated, and mechanically held in both operating positions. NATS shall be suitable for use in optional systems described in NFPA 70 . NATS shall be UL listed. NATS shall be manufactured and tested in accordance with applicable requirements of UL 1008 and UL 489 . To facilitate maintenance, manufacturer's instruction manual shall provide typical maximum contact voltage drop readings under specified conditions for use during periodic maintenance. Manufacturer shall provide instructions for determination of contact integrity. NATS shall be rated for continuous duty at specified continuous current rating. NATS shall have following characteristics:
Voltage 480 volts ac
Number of Phases three
Number of Wires four
Frequency 60 Hz
Poles Three switched and switched neutral
ATS WCR Rated to withstand short-circuit current of 25,000 amperes, RMS symmetrical, minimum
Nonwelding Contacts Rated for nonwelding of contacts when used with upstream feeder overcurrent devices shown and with available fault current specified.
Main and Neutral Contacts
Contacts shall have silver alloy composition. Neutral contacts shall have same continuous current rating as main or phase contacts
2.3.1 Operator
Manual operator conforming to UL 1008 shall be provided, and shall incorporate features to prevent operation by unauthorized personnel. NATS shall be designed for safe manual operation under full load conditions.
If manual operation is accomplished by opening the door, then a dead-front shall be supplied for operator safety.
2.3.2 Green Indicating Light
A green indicating light shall supervise/provide normal power source switch position indication and shall have a nameplate engraved NORMAL.
SECTION 26 36 00.00 28 Page 4
2.3.3 Red Indicating Light
A red indicating light shall supervise/provide alternate power source switch position indication and shall have a nameplate engraved ALTERNATE.
2.4 ENCLOSURE
NATS and accessories shall be installed in wall-mounted or free-standing, floor-mounted, NEMA 250, Type 12, smooth sheet metal enclosure constructed in accordance with applicable requirements of UL 1066 and/or UL 1008 .
Metal gauge shall be not less than No. 14. Enclosure shall be equipped with at least two approved grounding lugs for grounding enclosure to facility ground system using No. 1/0 AWG copper conductors. Factory wiring within enclosure and field wiring terminating within enclosure shall comply with NFPA 70 . If wiring is not color coded, wire shall be permanently tagged or marked near terminal at each end with wire number shown on approved detail drawing. Terminal block shall conform to NEMA ICS 4 . Main switch terminals, including neutral terminal if used, shall be pressure type suitable for termination of external copper conductors shown.
2.4.1 Construction
Enclosure shall be constructed for ease of removal and replacement of NATS components and control devices from front without disconnection of external power conductors or removal or disassembly of major components.
2.4.2 Cleaning and Painting
Both the inside and outside surfaces of an enclosure, including means for fastening, shall be protected against corrosion by enameling, galvanizing, plating, powder coating, or other equivalent means. Protection is not required for metal parts that are inherently resistant to corrosion, bearings, sliding surfaces of hinges, or other parts where such protection is impractical. Finish shall be manufacturer's standard material, process, and color and shall be free from runs, sags, peeling, or other defects. An enclosure marked Type 1, 3R, 4 or 12 shall be acceptable if there is no visible rust at the conclusion of a salt spray (fog) test using the test method in ASTM B117, employing a 5 percent by weight, salt solution for 24 hours. Type 4X enclosures are acceptable following performance of the above test with an exposure time of 200 hours.
2.5 TESTING
Submit a description of proposed field test procedures, including proposed date and steps describing each test, its duration and expected results, not less than 2 weeks prior to test date. Submit certified factory and field test reports, within 14 days following completion of tests. Reports shall be certified and dated and shall demonstrate that tests were successfully completed prior to shipment of equipment.
2.5.1 Factory Testing
A prototype of specified NATS shall be factory tested in accordance with UL 1008 . In addition, factory tests shall be performed on each NATS as follows:
a. Insulation resistance test to ensure integrity and continuity of entire system.
SECTION 26 36 00.00 28 Page 5
b. Main switch contact resistance test.
c. Visual inspection to verify that each ATS is as specified.
d. Mechanical test to verify that ATS sections are free of mechanical hindrances.
e. Electrical tests to verify complete system electrical operation and to set up time delays and voltage sensing settings.
2.5.2 Factory Test Reports
Manufacturer shall provide three certified copies of factory test reports.
PART 3 EXECUTION
3.1 INSTALLATION
NATS shall be installed as shown and in accordance with approved manufacturer's instructions. Submit dimensioned plans, sections and elevations showing minimum clearances, weights, and conduit entry provisions for each NATS.
3.2 INSTRUCTIONS
Manufacturer's approved operating instructions shall be permanently secured to cabinet where operator can see them. One-line and elementary or schematic diagram shall be permanently secured to front enclosure door. Subm operating and maintenance manuals listing routine maintenance, possible breakdowns, repairs, and troubleshooting guide.
3.3 SITE TESTING
Following completion of NATS installation and after making proper adjustments and settings, site tests shall be performed in accordance with manufacturer's written instructions to demonstrate that each NATS functions satisfactorily and as specified. Advise Contracting Officer not less than 5 working days prior to scheduled date for site testing, and provide certified field test reports within 2 calendar weeks following successful completion of site tests. Test reports shall describe adjustments and settings made and site tests performed. Minimum operational tests shall include the following:
3.3.1 Insulation Resistance
Insulation resistance shall be tested, both phase-to-phase and phase-to-ground.
3.3.2 ATS Functions
Verify manual NATS functions.
-- End of Section --
SECTION 26 36 00.00 28 Page 6
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 7 PAGES
LIttle Goose Fish Ladder Cooling Permanent Power
01 11 01.00 28 SD-01 Preconstruction Submittals
1.7 I CEquipment List
1.11 I CPre-Work Survey
1.14 I CProject Superintendent
SD-07 Certificates
1.15 G CKey Personnel Substitution
SD-11 Closeout Submittals
1.11 I CPost-Work Survey
1.6 G CGovernment Issued Items
01 14 00.90 28 SD-01 Preconstruction Submittals
1.6 I SLEPre-Screen Candidates Using
E-Verify Program
01 32 16.00 28 SD-01 Preconstruction Submittals
1.2 G CConstruction Schedule
SD-07 Certificates
1.4 G CMonthly Updates
01 35 29.10 28 SD-01 Preconstruction Submittals
1.7 G CAccident Prevention Plan (APP)
1.8 G CActivity Hazard Analysis (AHA)
1.9 G CSafe Clearance
1.9 G CAuthorized Individuals
1.7.2.1 G CStandard Lift Plan
1.7.2.2 G CCritical Lift Plan
1.13.5 G STCrane Wheel And Outrigger
Loading Diagram And Deck
Protection For Outriggers
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I
C A T I
O N
G O V
R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I
D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I
D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 7 PAGES
LIttle Goose Fish Ladder Cooling Permanent Power
01 35 29.10 28 1.6.1.1 G CSSHO And Alternate SSHO
SD-06 Test Reports
1.4 I CMonthly Exposure Reports
1.13 I CNotifications and Reports
1.13.2 I CAccident Reports
1.13.3 I CLHE Inspection Reports
SD-07 Certificates
1.6.1.4 I CCrane Operators/Riggers
1.10.1 I CHot Work Permit
1.13.4 I CCertificate of Compliance
1.6.1.3 G CCompetent Person Trainer
01 45 04.00 28 SD-01 Preconstruction Submittals
3.2 G CContractor Quality Control (CQC)
Plan
01 55 10.00 28 SD-01 Preconstruction Submittals
1.7 G STTransport Loading Diagrams
01 57 20.00 28 SD-01 Preconstruction Submittals
1.8 G ECCEnvironmental Protection Plan
3.3.3 G ECCHazardous Waste Handling Plan
SD-11 Closeout Submittals
3.3.4 G ECCWaste Determination
Documentation
01 78 00.00 28 SD-10 Operation and Maintenance
Data
3.6.1 G CDraft O&M Manuals and Parts
Catalogs
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I
C A T I
O N
G O
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I
D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I
D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 7 PAGES
LIttle Goose Fish Ladder Cooling Permanent Power
01 78 00.00 28 3.6.1 G CFinal Operation And Maintenance
Manuals and Parts Catalogs
SD-11 Closeout Submittals
3.1 G CPreliminary Versions of
Contractor Prepared Drawings
3.2 G CFinal Approved Versions of
Contractor Prepared Drawings
3.3 G CPreliminary As-Built Contract
Drawings
3.4 G CAs-Built Contract Drawings and
FIO Drawings
3.5 G CFinal As-Built Contract Drawings
3.8 G CGovernment Issued Items
03 60 00.01 28 SD-01 Preconstruction Submittals
3.2.1 G STCore Drilling Procedure
3.2.1 G STConcrete Imaging Report
3.1.2 I CWorker Safety Training
SD-03 Product Data
2.1 G CFirestopping Materials
2.2 G CNon-Shrink Grout
26 05 00.00 28 SD-07 Certificates
1.6 G ELQUALIFICATIONS
26 05 13.00 40 SD-03 Product Data
2.2.1 G ELMultiple-Conductor Shielded
Cables
2.3.3.1 G ELDeadbreak Terminations
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I
C A T I
O N
G O
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I
D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I
D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 7 PAGES
LIttle Goose Fish Ladder Cooling Permanent Power
26 05 13.00 40 2.3.3.2 G ELLug Terminations
SD-06 Test Reports
3.2 G ELDielectric Absorption Tests
3.2 G ELMedium-Voltage Tests
SD-07 Certificates
2.4.1 I ELFlammability
1.5 I ELQualifications
SD-08 Manufacturer’s Instructions
1.4 I ELMedium-Voltage Power Cable
Instructions
1.4 I ELDeadbreak Termination
Instructions
26 05 19.00 28 SD-01 Preconstruction Submittals
3.6 G ELCable Pulling Plan
SD-03 Product Data
3.5 I ELInstallation Instructions
2.3.1 G ELWire And Cable
SD-06 Test Reports
1.4 G ELTests, Inspections, and
Verifications
3.7 G ELField Test Report
26 05 33.10 28 SD-03 Product Data
2.1.1 I ELPVC Coated Rigid Metal Conduit
2.3.3 I ELSplice Enclosure
2.3.4 G ELControl Cable Receptacle
3.1.9 I ELExpansion Fittings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I
C A T I
O N
G O
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I
D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I
D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 7 PAGES
LIttle Goose Fish Ladder Cooling Permanent Power
26 05 33.10 28 2.4 I ELConduit Seal
2.2.2 I ELConduit Bonding Jumper
SD-07 Certificates
1.5 G ELQualifications
SD-08 Manufacturer’s Instructions
3.1.2 I ELManufacturer's Instructions for
PVC Coated RMC
26 05 48.00 10 SD-02 Shop Drawings
1.4 G STEquipment Requirements
1.3.4 G STContractor Designed Bracing
2.1 G STConcrete Anchors
SD-03 Product Data
1.4 G STEquipment Requirements
SD-05 Design Data
1.3.5 G STStructural Design Calculations for
Seismic Restraints of Equipment
26 11 16 SD-01 Preconstruction Submittals
2.5.1 G ELEquipment Test Schedule
SD-02 Shop Drawings
1.4.1.1 G ELUnit Substation Drawings
1.4.1.2 G ELTransformer Drawings
SD-03 Product Data
1.4.1.1 I ELFuse curves
2.1 G ELSecondary unit substation
2.1.2 G ELTransformer (Dry-Type)
SD-06 Test Reports
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I
C A T I
O N
G O
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I
D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I
D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 7 PAGES
LIttle Goose Fish Ladder Cooling Permanent Power
26 11 16 3.5.1 G ELAcceptance checks and tests
SD-07 Certificates
2.5.3 I ELTransformer Losses
SD-09 Manufacturer’s Field
Reports
2.5.2 G ELLoad Interrupter Switch
Production Tests
2.5.3 G ELDesign Tests (dry-type)
2.5.4 G ELRoutine and Other Tests
(dry-type)
SD-10 Operation and Maintenance
Data
2.1 G ELUnit substations
26 29 23 SD-02 Shop Drawings
1.4.1 G ELSchematic diagrams
1.4.2 G ELInterconnecting diagrams
1.4.3 G ELInstallation drawings
SD-03 Product Data
2.1 G ELVariable frequency drives
2.3 G ELWires and cables
1.4.4 G ELEquipment schedule
SD-06 Test Reports
3.2.1 G ELVFD Test
3.2.2 G ELPerformance Verification Tests
3.2.3 G ELEndurance Test
SD-08 Manufacturer’s Instructions
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I
C A T I
O N
G O
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I
D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I
D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 7 PAGES
LIttle Goose Fish Ladder Cooling Permanent Power
26 29 23 1.4.5 I ELInstallation instructions
SD-09 Manufacturer’s Field
Reports
2.5.1 I ELVFD Factory Test Plan
1.4.6 I ELFactory test results
SD-10 Operation and Maintenance
Data
2.1 G ELVariable frequency drives
26 36 00.00 28 SD-02 Shop Drawings
1.3.1 G ELDetail Drawings
2.1 G ELEquipment
3.1 G ELInstallation
SD-03 Product Data
2.1 G ELEquipment
SD-06 Test Reports
2.5 G ELTesting
SD-07 Certificates
2.1 G ELEquipment
SD-10 Operation and Maintenance
Data
1.3.2 G ELSwitching Equipment
3.2 G ELInstructions
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I
C A T I
O N
G O
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I
D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I
D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
G4EDDMTJ
Line
| TECHSPECS_amd0004.pdf |
| PROJECT TABLE OF CONTENTS |
| DIVISION 26 - ELECTRICAL |
| NON-AUTOMATIC TRANSFER SWITCH |
| NON-AUTOMATIC TRANSFER SWITCH |
| PART 1 GENERAL |
| 1.1 REFERENCES |
| 1.2 SUBMITTALS |
| 1.3 QUALITY ASSURANCE |
| 1.3.1 Detail Drawings |
| 1.3.2 Switching Equipment |
| PART 2 PRODUCTS |
| 2.1 STANDARD PRODUCTS |
| 2.2 NAMEPLATE |
| 2.3 NON-AUTOMATIC TRANSFER SWITCH NATS |
| 2.3.1 Operator |
| 2.3.2 Green Indicating Light |
| 2.3.3 Red Indicating Light |
| 2.4 ENCLOSURE |
| 2.4.1 Construction |
| 2.4.2 Cleaning and Painting |
| 2.5 TESTING |
| 2.5.1 Factory Testing |
| 2.5.2 Factory Test Reports |
| PART 3 EXECUTION |
| 3.1 INSTALLATION |
| 3.2 INSTRUCTIONS |
| 3.3 SITE TESTING |
| 3.3.1 Insulation Resistance |
| 3.3.2 ATS Functions |