Solicitation_Amendment_2.pdf
PDF 51 KB Posted
- Attached to
- Material Lift Basket
- Solicitation number
- W912EF-16-Q-0052
View the file
Other files
| File | Type | Posted |
|---|---|---|
| A.07.24_Solicitation_Amendment_5.pdf | ||
| Solicitation_Amendment_4.pdf | ||
| Solicitation_Amendment_3.pdf | ||
| Technical_Specifications_Amended.pdf | ||
| Amendment.1.pdf | ||
| Drawing.pdf | ||
| Solicitation.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W68SBV60396423
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendment is to answ er questions from industry and clarify the technical specifications.
All other terms and conditions remain unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 23-Mar-2016
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912EF-16-Q-0052
X 9B. DATED (SEE ITEM 11)
17-Feb-2016
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
23-Mar-2016
CODE
USAED, WALLA WALLA - CONTRACTING DIV.
LEANNE WALLING
201 N. THIRD AVENUE
WALLA WALLA WA 99362-1876
W912EF 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912EF-16-Q-0052
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 1449 - CONTINUATION SHEET
TABLE OF CONTENTS
The Table of Contents has changed from:
Exhibit/Attachment Table of Contents
DOCUMENT TYPE DESCRIPTION PAGES DATE
Attachment 1 Drawing 1 16-FEB-2016 to:
Exhibit/Attachment Table of Contents
DOCUMENT TYPE DESCRIPTION PAGES DATE
Attachment 1 Drawing 1 16-FEB-2016 Attachment 2 Amended Technical
Specifications
22-MAR-2016
The following have been added by full text:
QUESTIONS AND ANSWERS
Q. SOW says –The submittals will be reviewed by (will be provided at time of Award) then goes on to say 5 days after award. Could you please clarify?
A.Spec package was modified to allow 5 week (vice days) for general layout and engineering calculations.
Q. Is the USACE asking bidder to provide drawings, engineer calcs, etc. with the quote?
A. No, the sketch and requirements are provided in addition to the solicitation.
Q. Is there a specific max./min opening size required for the grating?
A. 19-W-4 or similar grating is acceptable.
Q. In order to sign off on permission for USACE to drill back wall for hanging shelves, etc. Loading and size requirements for that would need to be furnished by USACE and incorporated into design, or no permission could be given for that.
Adding shelves will alter loading design requirements if OSHA and other safety factor ratings are to be maintained.
W912EF-16-Q-0052
A. Sections of the technical specifications are deleted regarding allowing government personnel to modify materials basket.
Q. Can the basket be made of both steel and aluminum components?
A. No, only Steel components are allowed.
Q. Is there a particular length requirement for the twin leg sling assemblies?
A. 40’ Slings
Q. Is there a required size, dia, length that the fork pocket security chains need to be?
A. no required size
Q. What is the Minimum and maximum centerline dimension of fork pocket width?
A. Use a typical size for forklift.
Q. Please give size of govt. Padlocks.
A. Use a typical size for a commercial padlock
Q. How will the basket be lifted? Via a spreader bar or single hook? This will change the engineering on how the lift points are attached.
A. Could be lifted using a spreader beam or single point as shown on general layout
Q. Is there a load rating requirement on the removable ramp?
A. about 500 lbs
Q. If anything is required to have engineers seal, please advise what documents need to be sealed?
A. Engineering shall certify that the materials basket is rated for 4000 lb capacity with a safety factor of 2 on equipment schematic
(End of Summary of Changes)