Amendment_0005.pdf

PDF 492 KB Posted

Attached to
Lower Monumental Spillway Weir Boat Barrier
Solicitation number
W912EF-15-B-0008
Issued by

About this file

Amendment 0005

View the file

Other files

File Type Posted
BidOpeningWorksheet.pdf PDF
Amendment_0004.pdf PDF
Amendment_0003.pdf PDF
Amendment_0001.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W68SBV50510504

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

Low er Monumental Spillw ay Weir Boat Barrier

The purpose of this amendment is to make the changes indicated in the Summary of Changes.

Bid opening date remains unchanged.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 14

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 15-Jul-2015

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912EF-15-B-0008

X 9B. DATED (SEE ITEM 11)

27-May-2015

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

15-Jul-2015

CODE

USAED, WALLA WALLA - CONTRACTING DIV.

DEVON SHELLEY

201 N. THIRD AVENUE

WALLA WALLA WA 99362-1876

W912EF 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912EF-15-B-0008

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

CHANGES TO SPECIFICATIONS:

35 59 13.16 BOAT BARRIER

Changed title for SD-05 Design Data submittal in subpart 1.2 to “Calculations and Installation Plan”

Revised subpart 2.1.7

Revised subpart 2.1.8

Revised subpart 3.3. Changed name of subpart to “Calculations and Installation Plan”

CHANGES TO DRAWINGS:

M-501: Changed sheet notes and notes on details 2 and 5 to reflect selection of coupling components by Contractor.

CHANGES TO THE SOLICITATION:

Updated Wage Determination (WA85 dated 07/10/2015)

Updated Wage Determination (WA94 dated 07/10/2015)

The following have been modified:

WAGE DETERMINATION - FRANKLIN

General Decision Number: WA150094 07/10/2015 WA94

Superseded General Decision Number: WA20140094

State: Washington

Construction Type: Heavy including water and sewer line construction

County: Franklin County in Washington.

HEAVY CONSTRUCTION PROJECTS (including sewer/water construction).

Note: Executive Order (EO) 13658 establishes an hourly minimum wage of $10.10 for 2015 that applies to all contracts subject to the Davis-Bacon Act for which the solicitation is issued on or after January 1, 2015. If this contract is covered by the

EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.10 (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract. The

EO minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Modification Number Publication Date

0 01/02/2015

1 02/27/2015

2 06/12/2015

3 07/03/2015

4 07/10/2015

CARP9003-001 06/01/2014

Rates Fringes

CARPENTER (Including Form

Work)............................$ 31.27 13.39

MILLWRIGHT.......................$ 38.30 12.87

PILEDRIVERMAN....................$ 31.64 12.87

ZONE PAY:

ZONE 1 0-45 MILES FREE

ZONE 2 46-65 MILES $2.00/PER HOUR

ZONE 3 66-100 MILES $3.00/PER HOUR

ZONE 4 OVER 100 MILES $4.50/PER HOUR

DISPATCH POINTS:

PASCO (515 N. Neel Street) or Main Post Office of established residence of employee (Whichever is closest to the worksite).

SPOKANE (127 E. AUGUSTA AVE.) or Main Post Office of established residence of employee (Whichever is closest to the worksite).

WENATCHEE (27 N. CHELAN) or Main Post Office of established

COEUR D' ALENE (1839 N. GOVERNMENT WAY) or Main Post Office of established residence of employee (Whichever is closest to the worksite).

MOSCOW (302 N. JACKSON) or Main Post Office of established

* ELEC0112-014 06/01/2015

ELECTRICIAN......................$ 38.80 18.59

ENGI0370-022 06/01/2015

POWER EQUIPMENT OPERATOR

GROUP 1.....................$ 26.16 13.55

GROUP 2.....................$ 26.48 13.55

GROUP 3.....................$ 27.09 13.55

GROUP 4.....................$ 27.25 13.55

GROUP 5.....................$ 27.41 13.55

GROUP 6.....................$ 27.69 13.55

GROUP 7.....................$ 27.96 13.55

GROUP 8.....................$ 29.06 13.55

ZONE DIFFERENTIAL (Add to Zone 1 rate): Zone 2 - $2.00

Zone 1: Within 45 mile radius of Spokane, Pasco, Washington;

Lewiston, Idaho

Zone 2: Outside 45 mile radius of Spokane, Pasco, Washington; Lewiston, Idaho

POWER EQUIPMENT OPERATORS CLASSIFICATIONS

GROUP 1: Rollers, all types on subgrade, including seal and chip coatings; Drill Assistant; Crane Oiler

GROUP 2: Fork Lift; Broom/Sweeper

GROUP 3: Bulldozer (up to D-6 or equivalent); Boring Machine

GROUP 4: Oiler; Drill (churn, core, calyx or diamond);

Loaders (overhead & front-end, under 4 yds. R/T)

GROUP 5: Backhoe (Under 45,000 gw); Trackhoe/Excavator (under

3/4 yd.); Drilling equipment (8 unch bit and over)

(robbins, reverse circulation and similar); Piledriver;

Grade Checker; Boom Truck (Under 25 tons)

GROUP 6: Asphalt Roller; Backhoe (45,000 gw and over to

110,000 gw); Trackhoe/Excavator (3/4 yd. to 3 yd.), Bulldozer, 834 R/T & similar; Mechanic; Paver; Scraper;

Screed; Loader Operator (front-end & overhead, 4 yds. incl.

8 yds.)

GROUP 7: Backhoe (Over 110,000); Trackhoe/Excavator (3 yds & over); Grader/Blade; Loaders (overhead & front-end, over 8 yds. to 10 yds.)

GROUP 8: Loaders (overhead and front-end, 10 yards and over)

BOOM PAY: (All Cranes, Including Tower)

180 ft to 250 ft $ .50 over scale

Over 250 ft $ .80 over scale

NOTE:

In computing the length of the boom on Tower Cranes, they shall be measured from the base of the Tower to the point of the boom.

HAZMAT:

Anyone working on HAZMAT jobs, working with supplied air shall receive $1.00 an hour above classification.

IRON0014-012 07/01/2015

IRONWORKER (Ornamental, Reinforcing and Structural)......$ 32.76 23.19

LABO0238-014 06/01/2013

LABORER: Mason Tender - Brick...$ 24.10 10.65

LABO0238-015 06/01/2013

LABORER (Pasco)

GROUP 1.....................$ 21.70 10.65

GROUP 2.....................$ 23.80 10.65

GROUP 3.....................$ 24.07 10.65

GROUP 4.....................$ 24.34 10.65

Zone Differential (Add to Zone 1 rates): Zone 2 - $2.00

BASE POINTS: Spokane, Pasco, Lewiston

Zone 1: 0-45 radius miles from the main post office.

Zone 2: 45 radius miles and over from the main post office

LABORERS CLASSIFICATIONS

GROUP 1: Flagger

GROUP 2: Common or General Laborer; Form-Stripping

GROUP 3: Mason Tender-Cement/Concrete

GROUP 4: Grade Checker; High Scaler; Handheld Drill

PAIN0005-003 07/01/2014

PAINTER (Brush, Roller, and

Spray.)..........................$ 21.55 10.48

PLAS0072-008 06/01/2014

CEMENT MASON/CONCRETE FINISHER...$ 26.41 12.44

BASE POINTS: Spokane, Pasco, Lewiston, Wenatchee

Zone 1: 0 - 45 radius miles from the main post office

Zone 2: 45 radius miles from the main post office

TEAM0690-005 01/01/2014

Truck drivers: (ANYONE

WORKING ON HAZMAT JOBS SEE

FOOTNOTE A BELOW)

ZONE 1:PASCO ZONE CENTER

GROUP 4....................$ 25.39 15.19

GROUP 5....................$ 25.50 15.19

GROUP 6....................$ 25.50 15.19

Zone Differential (Add to Zone 1 rate: Zone 1 + $2.00)

BASE POINTS: Spokane, Moses Lake, Pasco, Lewiston

Zone 1: 0-45 radius miles from the main post office

Zone 2: Outside a 45 mile radius from the main post office

TRUCK DRIVERS CLASSIFICATIONS

GROUP 4: Water Truck (0-8,000 gallons)

GROUP 5: Semi-Trailer Truck

GROUP 6: Water Truck (8,001-14,000 Gallons)

FOOTNOTE A - Anyone working on a HAZMAT job, where HAZMAT cerfification is required, shall be compensated as a premium, in addition to the classification working in as follows:

LEVEL C-D: - $.50 PER HOUR - This level may use an air purifying respirator or additional protective clothing.

LEVEL A-B: - $1.00 PER HOUR - Uses supplied air in conjunction with a chemical splash suit or fully encapsulated suit with a self-contained breathing apparatus.

Employees shall be paid Hazmat pay in increments of four(4) and eight(8) hours.

SUWA2009-060 08/07/2009

CARPENTER, Excludes Form Work....$ 23.54 4.99

LABORER: Landscape &

Irrigation.......................$ 12.27 2.73

LABORER: Pipelayer..............$ 19.28 0.00

OPERATOR: Asphalt Plant.........$ 34.14 0.68

OPERATOR: Bobcat/Skid

Steer/Skid Loader................$ 10.63 0.00

OPERATOR: Crane.................$ 23.42 5.54

OPERATOR: Power Shovel..........$ 25.12 7.83

TRUCK DRIVER, Includes Dump

Truck............................$ 27.67 0.00

TRUCK DRIVER: Flatbed Truck.....$ 22.74 6.29

TRUCK DRIVER: Lowboy Truck......$ 22.89 5.72

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses

(29CFR 5.5 (a) (1) (ii)).

The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate

(weighted union average rate).

Union Rate Identifiers

A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than "SU" or

"UAVG" denotes that the union classification and rate were prevailing for that classification in the survey. Example:

PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.

Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.

Survey Rate Identifiers

Classifications listed under the "SU" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.

Survey wage rates are not updated and remain in effect until a new survey is conducted.

Union Average Rate Identifiers

Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010

08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.

A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour

Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the

Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the

Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations

Wage and Hour Division

U.S. Department of Labor

200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator

(See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative

Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION

WAGE DETERMINATION-WALLA WALLA

General Decision Number: WA150085 07/10/2015 WA85

Superseded General Decision Number: WA20140085

State: Washington

Construction Type: Heavy including water and sewer line construction

County: Walla Walla County in Washington.

HEAVY CONSTRUCTION PROJECTS (including sewer/water construction).

Note: Executive Order (EO) 13658 establishes an hourly minimum wage of $10.10 for 2015 that applies to all contracts subject to the Davis-Bacon Act for which the solicitation is issued on or after January 1, 2015. If this contract is covered by the

EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.10 (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract. The

EO minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Modification Number Publication Date

0 01/02/2015

1 02/27/2015

2 06/12/2015

3 07/03/2015

4 07/10/2015

ELEC0077-001 02/01/2013

Line Construction:

LINEMEN.....................$ 45.62 4%+12.90

* ELEC0112-014 06/01/2015

ELECTRICIAN......................$ 38.80 18.59

ENGI0370-010 06/01/2015

POWER EQUIPMENT OPERATOR

GROUP 1.....................$ 26.16 13.55

GROUP 2.....................$ 26.48 13.55

GROUP 3.....................$ 27.09 13.55

GROUP 4.....................$ 27.25 13.55

GROUP 5.....................$ 27.41 13.55

GROUP 6.....................$ 27.69 13.55

GROUP 7.....................$ 27.96 13.55

GROUP 8.....................$ 29.06 13.55

ZONE DIFFERENTIAL (Add to Zone 1 rate): Zone 2 - $2.00

Zone 1: Within 45 mile radius of Spokane, Pasco, Washington;

Lewiston, Idaho

Zone 2: Outside 45 mile radius of Spokane, Pasco, Washington; Lewiston, Idaho

POWER EQUIPMENT OPERATORS CLASSIFICATIONS

GROUP 1: Rollers, all types on subgrade, including seal and chip coatings

GROUP 2: Fork Lift

GROUP 3: Bulldozer (up to D-6 or equivalent)

GROUP 4: Loaders (overhead & front-end, under 4 yds. R/T);

Oiler; Drill (churn, core, calyx or diamond)

GROUP 5: Backhoe (Under 45,000 gw); Trackhoe/Excavator (under

3/4 yd.); Cranes (25 tons & under); Drilling equipment (8 unch bit and over) (robbins, reverse circulation and similar); Boom Truck (Under 25 tons)

GROUP 6: Asphalt Roller; Backhoe (45,000 gw and over to

110,000 gw); Trackhoe/Excavator (3/4 yd. to 3 yd.); Cranes

(over 25 tons, to and including 45 tons), Bulldozer, 834

R/T & similar; Loader Operator (front-end & overhead, 4 yds. incl. 8 yds.); Mechanic

GROUP 7: Backhoe (Over 110,000); Trackhoe/Excavator (3 yds & over); Cranes (over 45 tons to but not including 85 tons);

Loaders (overhead & front-end, over 8 yds. to 10 yds.);

Grader/Blade

GROUP 8: Cranes (85 tons and over, and all climbing, overhead,rail and tower); Loaders (overhead and front-end, 10 yards and over)

BOOM PAY: (All Cranes, Including Tower)

180 ft to 250 ft $ .50 over scale

Over 250 ft $ .80 over scale

NOTE:

In computing the length of the boom on Tower Cranes, they shall be measured from the base of the Tower to the point of the boom.

HAZMAT:

Anyone working on HAZMAT jobs, working with supplied air shall receive $1.00 an hour above classification.

IRON0014-001 07/01/2015

IRONWORKER (Reinforcing and

Structural)......................$ 32.76 23.19

* LABO0238-002 06/01/2014

LABORER (Spokane)

GROUP 1.....................$ 21.95 10.95

GROUP 2.....................$ 24.05 10.95

GROUP 3.....................$ 24.32 10.95

GROUP 4.....................$ 24.59 10.95

BASE POINTS: Spokane, Pasco, Lewiston

Zone 1: 0-45 radius miles from the main post office.

Zone 2: 45 radius miles and over from the main post office

LABORERS CLASSIFICATIONS

GROUP 1: Flagger

GROUP 2: Common or General Laborer;

GROUP 3: Mason Tender-Cement/Concrete; Pipelayer; Chipping

Guns

GROUP 4: Grade Checker

LABO0238-007 06/01/2013

Laborer, Mason Tender Brick......$ 24.10 10.65

PAIN0005-003 07/01/2014

PAINTER (Brush, Roller, and

Spray.)..........................$ 21.55 10.48

SUWA2009-051 08/07/2009

CARPENTER........................$ 24.03 6.50

CEMENT MASON/CONCRETE FINISHER...$ 17.21 0.00

LABORER: Landscape..............$ 14.67 0.00

TRUCK DRIVER: Dump Truck........$ 19.67 0.00

TRUCK DRIVER: Water Truck.......$ 24.36 8.30

TRUCK DRIVER: 10 Yard Truck.....$ 24.61 8.34

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses

(29CFR 5.5 (a) (1) (ii)).

The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate

(weighted union average rate).

Union Rate Identifiers

A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than "SU" or

"UAVG" denotes that the union classification and rate were prevailing for that classification in the survey. Example:

PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.

Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.

Survey Rate Identifiers

Classifications listed under the "SU" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.

Survey wage rates are not updated and remain in effect until a new survey is conducted.

Union Average Rate Identifiers

Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010

08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.

A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour

Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the

Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the

Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations

Wage and Hour Division

U.S. Department of Labor

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator

(See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative

Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION

Lower Monumental Spillway Weir Boat Barrier W912EF-15-B-0008 amendment 0005

SECTION TABLE OF CONTENTS

DIVISION 35 - WATERWAY AND MARINE CONSTRUCTION

SECTION 35 59 13.16

BOAT BARRIER

PART 1 GENERAL

1.1 REFERENCES

1.2 SUBMITTALS

1.3 DELIVERY, HANDLING AND STORAGE

1.3.1 Rejection

1.3.2 Boat Barrier Instructions and Manual

1.3.3 Handling Coated Material

1.4 QUALITY ASSURANCE

1.4.1 Boom Skin

1.4.2 Foam Core

1.5 FOAM-FILLED BOOMS - WARRANTY

PART 2 PRODUCTS

2.1 FOAM-FILLED BOOMS AND POSITIONING FLOATS

2.1.1 Configuration

2.1.2 Foam Core

2.1.3 Boom Skin

2.1.3.1 Color

2.1.3.2 Repairability

2.1.4 Internal Hardware

2.1.5 Performance Requirements

2.1.6 Source Quality Control

2.1.6.1 Booms and Connecting Hardware

2.1.7 Stainless Steel Hardware

2.1.8 Anchor Cable Assemblies

2.1.9 Bird Spikes

2.1.10 Reflective Tape

2.1.11 Boom Graphic

PART 3 EXECUTION

3.1 FOAM-FILLED BOOMS

3.2 CONNECTIONS

3.2.1 Antiseize Compound

3.3 Calculations and Installation Plan

-- End of Section Table of Contents --

SECTION 35 59 13.16 Page 1

SECTION 35 59 13.16

BOAT BARRIER

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

ASTM INTERNATIONAL (ASTM)

ASTM A479/A479M (2013b) Standard Specification for Stainless Steel Bars and Shapes for Use in Boilers and Other Pressure Vessels

ASTM D1667 (2005; R 2011) Flexible Cellular Materials

- Poly (Vinyl Chloride) Foam (Closed-Cell)

ASTM D6226 (2010) Standard Test Method for Open Cell Content of Rigid Cellular Plastics

ASTM F593 (2013a) Stainless Steel Bolts, Hex Cap Screws, and Studs

INTERNATIONAL MARITIME ORGANIZATION (IMO)

IMO Resolution A.689 Recommendation on Testing Life-Saving Appliances

U.S. COAST GUARD (USCG)

USCG Guideline 202 Rigid Buoyancy Foam for Lifeboats, Rescue Boats, Life Rings and Buoyant Apparatus

USCG Regulation 33CFR Federal Navigation Regulations

1.2 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals having an "I" designation are for information only. When used, a designation following the "G" or "I" designation identifies the office that will review the submittal for the Government. The following shall be submitted in accordance with SECTION 01 33 00 SUBMITTAL PROCEDURES:

SD-03 Product Data

Stainless Steel Hardware; G ME

Include Manufacturer's product data for all boat barrier hardware, including bolts, anchor bolts, inserts, nuts, washers, chains, turnbuckles, dimensions, material specifications, working loads and ultimate loads, as applicable. For anchor bolts and

SECTION 35 59 13.16 Page 2 inserts, include methods and materials for installation.

FOAM-FILLED BOOMS

Resilient, foam filled marine booms; G ME

Prior to fabrication, submit copies of the manufacturer's catalog data. Include dimensions, material specifications, and method of manufacture.

SD-05 Design Data

Calculations and Installation Plan; I ME

SD-07 Certificates

Stainless Steel Hardware; G ME

Submit certificates of compliance certifying that materials meet the requirements specified herein. In addition, when the coating is shop applied, submit certificates of conformance or compliance certifying that surface preparation, coverage, and thickness meet the requirements specified.

Booms and Connecting Hardware; G ME

Submit certificates of compliance certifying that the boom and connecting hardware meet or exceed the calculated design loads.

SD-08 Manufacturer's Instructions

Installation Instructions; I ME

Provide installation instructions for each boom type.

SD-10 Operation and Maintenance Data

Boat Barrier Manual; I ME

Provide Operation and Maintenance manual; I ME for each boom type.

1.3 DELIVERY, HANDLING AND STORAGE

All boat barrier components shall be new and undamaged when delivered and shall be handled and stored so as to prevent damage. Protect booms from exposure to damaging liquids, oils, greases and extended exposure to sunlight.

1.3.1 Rejection

Any boat barrier components that are delivered to the site in a damaged condition or that are not in conformance with this specification shall be rejected. Any rejected materials shall be replaced with suitable materials, at no additional cost to the Government.

1.3.2 Boat Barrier Instructions and Manual

Provide installation instructions, Boat Barrier Manual and a Operation and

SECTION 35 59 13.16 Page 3

G4EDDMTJ

Line

Maintenance manual describing maintenance requirements for each boom type.

1.3.3 Handling Coated Material

Store, handle and place coated material in a manner that will minimize damage to the coating and will not reduce its effective protective value.

Repair damaged surfaces as directed and per the Manufacturer's recommendations. Handle coated work which is flexible in a manner that will prevent flexing sufficient to crack coating, especially when temperature is below 40 degrees F. Do not place coated surfaces on strips or skids until coating has hardened thoroughly. Wide fabric slings used for lifting, and strips, slings, blocks, skids, cradles, and other supports shall provide ample bearing areas. In transporting, fasten and protect coated materials in a manner that will prevent movement and preclude chafing and rubbing, and when unloading, do not dump or drop. Place coated material in position carefully on suitably prepared beds and with a minimum of handling.

1.4 QUALITY ASSURANCE

1.4.1 Boom Skin

The polyethylene shell of the boom shall be free from cracks, burrs, warpage, checks, chipped or blistered surfaces, and shall have a smooth surface.

1.4.2 Foam Core

The foam core shall be internal foam fill. The foam core shall not contain scraps, strips, or sheets of foam either rolled or stuffed into the required shape. Foam fill must take up a minimum of 95% of the interior volume of the boom. The Contractor shall show a minimum 5-year performance of similar booms.

1.5 FOAM-FILLED BOOMS - WARRANTY

Furnish the manufacturer's warranty. The warranty shall be issued directly to the Government and shall not be limited in dollar value. The warranty period shall be not less than 1 year from the date of Government acceptance of the work.

PART 2 PRODUCTS

2.1 FOAM-FILLED BOOMS AND POSITIONING FLOATS

2.1.1 Configuration

The boom shall be an off-the-shelf item. Booms shall have cylindrical bodies with ends terminating in an end fitting on the cylinder's centerline at each end. End-to-end boom spacing shall be 10 feet nominal, no less than 6 feet and no greater than 10 feet. The fittings at either end shall be connected through the center of the boom by a steel axle. The boom shall be designed with weights bolted in place at one side of each of the cylindrical bodies to prevent rotation of the bodies in the water. Design end fitting as small as possible to transmit the ultimate load of the connector to the boom. The use of chipped or particulate foam is not acceptable. Positioning float configuration shall be determined by the boom manufacturer based on design parameters. Positioning float body and hardware strength requirements shall meet or exceed that of the boom

SECTION 35 59 13.16 Page 4 requirements.

2.1.2 Foam Core

The foam core shall be polyurethane foam with the following properties:

a. Density, ASTM D1667, maximum of 2 lbs/ft3

b. Approved as Rigid Buoyancy Foam for Lifeboats, Rescue Boats, Life Rings and Buoyant Apparatus per USCG Guideline 202 and IMO Resolution A.689

c. Meets USCG Regulation 33CFR, Section 183.114

2.1.3 Boom Skin

The outer boom skin shall be a polyethylene shell and shall be UV-stabilized for long-term environmental exposure. The nominal wall thickness of the polyethylene encasement shall be .2 inches.

2.1.3.1 Color

Boom skin color shall be international orange throughout the entire thickness. Stainless steel hardware shall be unpainted.

2.1.3.2 Repairability

The boom shell shall be replaceable in the event of tears or punctures in the shell. Required repair materials shall be readily available from the boom manufacturer.

2.1.4 Internal Hardware

The internal steel axle connecting end fittings shall be stainless steel in accordance with ASTM A479/A479M or ASTM F593 as appropriate. The steel axle and connector fitting shall have a minimum tensile resistance of 54,000 pounds.

2.1.5 Performance Requirements

The foam filled marine booms shall measure 18 inches in radius, 48 inches long. Booms shall have a nominal buoyancy of not less than 1700 lbs.

Internal foam fill shall be a non-ODP, non-GWP, and VOC exempt polyurethane floatation foam that helps protect the environment by being zero-depleting and VOC exempt. Closed cell content shall be greater than 90 percent as per ASTM D6226.

2.1.6 Source Quality Control

2.1.6.1 Booms and Connecting Hardware

Booms shall be new units not previously used for any other purpose. Booms shall be supplied by a manufacturer with not less than 5-years experience providing boat barriers for the specified purpose. The supplier shall provide the reaction loads at each end of the boom line and certify that the boom and connecting hardware meet or exceed the calculated design loads. The supplier shall provide testing certificates from an independent laboratory verifying the strength of the connecting hardware and materials used.

SECTION 35 59 13.16 Page 5

2.1.7 Stainless Steel Hardware

All connecting components such as chain, cable, coupling links and shackles shall be 300 series stainless steel in accordance with ASTM A479/A479M or ASTM F593, as appropriate.

All connecting bolts and pins shall be of stainless steel 300 series and secured in place with stainless steel (300 series) cotter pins or locking pins. All hardware shall be provided with a minimum breaking strength greater than or equal to the components to which it is attached.

2.1.8 Anchor Cable Assemblies

Cables shall be wire rope and shall be made of extra improved plow stainless steel with an Independent Wire Rope Core (IWRC). Wires in the IWRC shall be of the same material as the wires in the strands of the wire rope. The wire rope shall be not less than 1 inch diameter and a 6x19 construction of wire strands closed around the core. The wire rope selected shall have a breaking strength that exceeds or is equal to the design load and factor of safety calculated and assumed per paragraph "Calculations and Installation Plan." Closed spelter socket and flemish eye splice connected to the anchor cable shall be able to withstand the same working load requirements as the wire rope.

2.1.9 Bird Spikes

Provide bird spike strips on the top of each boom unit across the length of the boom. Spikes shall be stainless steel .04" in diameter and full-hard spring tempered. Base strip shall be stainless steel with full anneal and easy strip cutting and surface shape memory. The complete model shall be at least 4" high with no less than 24 wire points per foot. The spikes shall have a blunt tip and be designed to prevent injury to humans in the event the a passenger vessels which has lost power impacts the boom and a person falls on the spikes. When installed, wire points shall cover an approximate 75 degree arc centered at the top of the boom unit.

2.1.10 Reflective Tape

Reflective tape shall be a minimum of 2" wide and be placed across the length of the upstream face of each boom unit. Reflective tape shall be comprised of prismatic lenses formed in a transparent, synthetic resin. The tape shall meet a minimum coefficient of retroreflection of 72. Tape shall be sealed and backed with a pressure sensitive adhesive and paper liner.

2.1.11 Boom Graphic

Each boom unit shall be provided with a graphic on the upstream face of the boom unit. Graphic shall read "DAM AHEAD KEEP AWAY". Graphic shall be block letter font, all caps, black and boldface. Lettering shall be 12 inches high.

PART 3 EXECUTION

3.1 FOAM-FILLED BOOMS

Install booms and accessories as indicated on the drawings and in accordance with the manufacturer's specifications and shop drawings. Bolts shall be tightened an additional 1/3 turn of the nut, from the snug tight condition, and secured with cotter pins.

SECTION 35 59 13.16 Page 6

G4EDDMTJ

Line

3.2 CONNECTIONS

3.2.1 Antiseize Compound

Coat threads of bolts prior to applying washers and nuts. Recoat bolt thread projection beyond nut after tightening.

3.3 Calculations and Installation Plan

Submit calculations performed to size components that connect the anchors at the river bottom to the positioning floats and the positioning floats to the boom provided by the boom manufacturer. Include calculations performed to show cable lengths, positioning float buoyancies and assumed loadings will result in final positioning of system components according to the drawings and specifications. Also include calculations performed to ensure anchor cables will not interfere with the navigation channel or floating lock wall anchor cables according to the drawings and specifications.

Calculations shall be stamped by a registered Professional Engineer.

With the above, submit an installation plan detailing step by step how the anchors, positioning floats and boat barrier will be installed. The installation plan shall include how the anchors will be placed and oriented on the river bottom, how anchor cables will be attached, and how boom units provided by the boom manufacturer will be stretched across the river and attached to the positioning floats.

-- End of Section --

SECTION 35 59 13.16 Page 7

TECHSPECS_15-B-0008_amend5.pdf
BOAT BARRIER
BOAT BARRIER
PART 1 GENERAL
1.1 REFERENCES
1.2 SUBMITTALS
1.3 DELIVERY, HANDLING AND STORAGE
1.3.1 Rejection
1.3.2 Boat Barrier Instructions and Manual
1.3.3 Handling Coated Material
1.4 QUALITY ASSURANCE
1.4.1 Boom Skin
1.4.2 Foam Core

1.5 FOAM-FILLED BOOMS - WARRANTY

PART 2 PRODUCTS
2.1 FOAM-FILLED BOOMS AND POSITIONING FLOATS
2.1.1 Configuration
2.1.2 Foam Core
2.1.3 Boom Skin
2.1.3.1 Color
2.1.3.2 Repairability
2.1.4 Internal Hardware
2.1.5 Performance Requirements
2.1.6 Source Quality Control
2.1.6.1 Booms and Connecting Hardware
2.1.7 Stainless Steel Hardware
2.1.8 Anchor Cable Assemblies
2.1.9 Bird Spikes
2.1.10 Reflective Tape
2.1.11 Boom Graphic
PART 3 EXECUTION
3.1 FOAM-FILLED BOOMS
3.2 CONNECTIONS
3.2.1 Antiseize Compound

3.3 Calculations and Installation Plan

File details come from the government source that posted it. Updated .