Amendment_0005.pdf
PDF 492 KB Posted
- Attached to
- Lower Monumental Spillway Weir Boat Barrier
- Solicitation number
- W912EF-15-B-0008
About this file
Amendment 0005
View the file
Other files
| File | Type | Posted |
|---|---|---|
| BidOpeningWorksheet.pdf | ||
| Amendment_0004.pdf | ||
| Amendment_0003.pdf | ||
| Amendment_0001.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W68SBV50510504
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
Low er Monumental Spillw ay Weir Boat Barrier
The purpose of this amendment is to make the changes indicated in the Summary of Changes.
Bid opening date remains unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 14
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 15-Jul-2015
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912EF-15-B-0008
X 9B. DATED (SEE ITEM 11)
27-May-2015
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
15-Jul-2015
CODE
USAED, WALLA WALLA - CONTRACTING DIV.
DEVON SHELLEY
201 N. THIRD AVENUE
WALLA WALLA WA 99362-1876
W912EF 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912EF-15-B-0008
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
CHANGES TO SPECIFICATIONS:
35 59 13.16 BOAT BARRIER
Changed title for SD-05 Design Data submittal in subpart 1.2 to “Calculations and Installation Plan”
Revised subpart 2.1.7
Revised subpart 2.1.8
Revised subpart 3.3. Changed name of subpart to “Calculations and Installation Plan”
CHANGES TO DRAWINGS:
M-501: Changed sheet notes and notes on details 2 and 5 to reflect selection of coupling components by Contractor.
CHANGES TO THE SOLICITATION:
Updated Wage Determination (WA85 dated 07/10/2015)
Updated Wage Determination (WA94 dated 07/10/2015)
The following have been modified:
WAGE DETERMINATION - FRANKLIN
General Decision Number: WA150094 07/10/2015 WA94
Superseded General Decision Number: WA20140094
State: Washington
Construction Type: Heavy including water and sewer line construction
County: Franklin County in Washington.
HEAVY CONSTRUCTION PROJECTS (including sewer/water construction).
Note: Executive Order (EO) 13658 establishes an hourly minimum wage of $10.10 for 2015 that applies to all contracts subject to the Davis-Bacon Act for which the solicitation is issued on or after January 1, 2015. If this contract is covered by the
EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.10 (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract. The
EO minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Modification Number Publication Date
0 01/02/2015
1 02/27/2015
2 06/12/2015
3 07/03/2015
4 07/10/2015
CARP9003-001 06/01/2014
Rates Fringes
CARPENTER (Including Form
Work)............................$ 31.27 13.39
MILLWRIGHT.......................$ 38.30 12.87
PILEDRIVERMAN....................$ 31.64 12.87
ZONE PAY:
ZONE 1 0-45 MILES FREE
ZONE 2 46-65 MILES $2.00/PER HOUR
ZONE 3 66-100 MILES $3.00/PER HOUR
ZONE 4 OVER 100 MILES $4.50/PER HOUR
DISPATCH POINTS:
PASCO (515 N. Neel Street) or Main Post Office of established residence of employee (Whichever is closest to the worksite).
SPOKANE (127 E. AUGUSTA AVE.) or Main Post Office of established residence of employee (Whichever is closest to the worksite).
WENATCHEE (27 N. CHELAN) or Main Post Office of established
COEUR D' ALENE (1839 N. GOVERNMENT WAY) or Main Post Office of established residence of employee (Whichever is closest to the worksite).
MOSCOW (302 N. JACKSON) or Main Post Office of established
* ELEC0112-014 06/01/2015
ELECTRICIAN......................$ 38.80 18.59
ENGI0370-022 06/01/2015
POWER EQUIPMENT OPERATOR
GROUP 1.....................$ 26.16 13.55
GROUP 2.....................$ 26.48 13.55
GROUP 3.....................$ 27.09 13.55
GROUP 4.....................$ 27.25 13.55
GROUP 5.....................$ 27.41 13.55
GROUP 6.....................$ 27.69 13.55
GROUP 7.....................$ 27.96 13.55
GROUP 8.....................$ 29.06 13.55
ZONE DIFFERENTIAL (Add to Zone 1 rate): Zone 2 - $2.00
Zone 1: Within 45 mile radius of Spokane, Pasco, Washington;
Lewiston, Idaho
Zone 2: Outside 45 mile radius of Spokane, Pasco, Washington; Lewiston, Idaho
POWER EQUIPMENT OPERATORS CLASSIFICATIONS
GROUP 1: Rollers, all types on subgrade, including seal and chip coatings; Drill Assistant; Crane Oiler
GROUP 2: Fork Lift; Broom/Sweeper
GROUP 3: Bulldozer (up to D-6 or equivalent); Boring Machine
GROUP 4: Oiler; Drill (churn, core, calyx or diamond);
Loaders (overhead & front-end, under 4 yds. R/T)
GROUP 5: Backhoe (Under 45,000 gw); Trackhoe/Excavator (under
3/4 yd.); Drilling equipment (8 unch bit and over)
(robbins, reverse circulation and similar); Piledriver;
Grade Checker; Boom Truck (Under 25 tons)
GROUP 6: Asphalt Roller; Backhoe (45,000 gw and over to
110,000 gw); Trackhoe/Excavator (3/4 yd. to 3 yd.), Bulldozer, 834 R/T & similar; Mechanic; Paver; Scraper;
Screed; Loader Operator (front-end & overhead, 4 yds. incl.
8 yds.)
GROUP 7: Backhoe (Over 110,000); Trackhoe/Excavator (3 yds & over); Grader/Blade; Loaders (overhead & front-end, over 8 yds. to 10 yds.)
GROUP 8: Loaders (overhead and front-end, 10 yards and over)
BOOM PAY: (All Cranes, Including Tower)
180 ft to 250 ft $ .50 over scale
Over 250 ft $ .80 over scale
NOTE:
In computing the length of the boom on Tower Cranes, they shall be measured from the base of the Tower to the point of the boom.
HAZMAT:
Anyone working on HAZMAT jobs, working with supplied air shall receive $1.00 an hour above classification.
IRON0014-012 07/01/2015
IRONWORKER (Ornamental, Reinforcing and Structural)......$ 32.76 23.19
LABO0238-014 06/01/2013
LABORER: Mason Tender - Brick...$ 24.10 10.65
LABO0238-015 06/01/2013
LABORER (Pasco)
GROUP 1.....................$ 21.70 10.65
GROUP 2.....................$ 23.80 10.65
GROUP 3.....................$ 24.07 10.65
GROUP 4.....................$ 24.34 10.65
Zone Differential (Add to Zone 1 rates): Zone 2 - $2.00
BASE POINTS: Spokane, Pasco, Lewiston
Zone 1: 0-45 radius miles from the main post office.
Zone 2: 45 radius miles and over from the main post office
LABORERS CLASSIFICATIONS
GROUP 1: Flagger
GROUP 2: Common or General Laborer; Form-Stripping
GROUP 3: Mason Tender-Cement/Concrete
GROUP 4: Grade Checker; High Scaler; Handheld Drill
PAIN0005-003 07/01/2014
PAINTER (Brush, Roller, and
Spray.)..........................$ 21.55 10.48
PLAS0072-008 06/01/2014
CEMENT MASON/CONCRETE FINISHER...$ 26.41 12.44
BASE POINTS: Spokane, Pasco, Lewiston, Wenatchee
Zone 1: 0 - 45 radius miles from the main post office
Zone 2: 45 radius miles from the main post office
TEAM0690-005 01/01/2014
Truck drivers: (ANYONE
WORKING ON HAZMAT JOBS SEE
FOOTNOTE A BELOW)
ZONE 1:PASCO ZONE CENTER
GROUP 4....................$ 25.39 15.19
GROUP 5....................$ 25.50 15.19
GROUP 6....................$ 25.50 15.19
Zone Differential (Add to Zone 1 rate: Zone 1 + $2.00)
BASE POINTS: Spokane, Moses Lake, Pasco, Lewiston
Zone 1: 0-45 radius miles from the main post office
Zone 2: Outside a 45 mile radius from the main post office
TRUCK DRIVERS CLASSIFICATIONS
GROUP 4: Water Truck (0-8,000 gallons)
GROUP 5: Semi-Trailer Truck
GROUP 6: Water Truck (8,001-14,000 Gallons)
FOOTNOTE A - Anyone working on a HAZMAT job, where HAZMAT cerfification is required, shall be compensated as a premium, in addition to the classification working in as follows:
LEVEL C-D: - $.50 PER HOUR - This level may use an air purifying respirator or additional protective clothing.
LEVEL A-B: - $1.00 PER HOUR - Uses supplied air in conjunction with a chemical splash suit or fully encapsulated suit with a self-contained breathing apparatus.
Employees shall be paid Hazmat pay in increments of four(4) and eight(8) hours.
SUWA2009-060 08/07/2009
CARPENTER, Excludes Form Work....$ 23.54 4.99
LABORER: Landscape &
Irrigation.......................$ 12.27 2.73
LABORER: Pipelayer..............$ 19.28 0.00
OPERATOR: Asphalt Plant.........$ 34.14 0.68
OPERATOR: Bobcat/Skid
Steer/Skid Loader................$ 10.63 0.00
OPERATOR: Crane.................$ 23.42 5.54
OPERATOR: Power Shovel..........$ 25.12 7.83
TRUCK DRIVER, Includes Dump
Truck............................$ 27.67 0.00
TRUCK DRIVER: Flatbed Truck.....$ 22.74 6.29
TRUCK DRIVER: Lowboy Truck......$ 22.89 5.72
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses
(29CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate
(weighted union average rate).
Union Rate Identifiers
A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than "SU" or
"UAVG" denotes that the union classification and rate were prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.
Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.
Survey Rate Identifiers
Classifications listed under the "SU" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.
Survey wage rates are not updated and remain in effect until a new survey is conducted.
Union Average Rate Identifiers
Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010
08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.
A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour
Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the
Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the
Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations
Wage and Hour Division
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator
(See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative
Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION
WAGE DETERMINATION-WALLA WALLA
General Decision Number: WA150085 07/10/2015 WA85
Superseded General Decision Number: WA20140085
State: Washington
Construction Type: Heavy including water and sewer line construction
County: Walla Walla County in Washington.
HEAVY CONSTRUCTION PROJECTS (including sewer/water construction).
Note: Executive Order (EO) 13658 establishes an hourly minimum wage of $10.10 for 2015 that applies to all contracts subject to the Davis-Bacon Act for which the solicitation is issued on or after January 1, 2015. If this contract is covered by the
EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.10 (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract. The
EO minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Modification Number Publication Date
0 01/02/2015
1 02/27/2015
2 06/12/2015
3 07/03/2015
4 07/10/2015
ELEC0077-001 02/01/2013
Line Construction:
LINEMEN.....................$ 45.62 4%+12.90
* ELEC0112-014 06/01/2015
ELECTRICIAN......................$ 38.80 18.59
ENGI0370-010 06/01/2015
POWER EQUIPMENT OPERATOR
GROUP 1.....................$ 26.16 13.55
GROUP 2.....................$ 26.48 13.55
GROUP 3.....................$ 27.09 13.55
GROUP 4.....................$ 27.25 13.55
GROUP 5.....................$ 27.41 13.55
GROUP 6.....................$ 27.69 13.55
GROUP 7.....................$ 27.96 13.55
GROUP 8.....................$ 29.06 13.55
ZONE DIFFERENTIAL (Add to Zone 1 rate): Zone 2 - $2.00
Zone 1: Within 45 mile radius of Spokane, Pasco, Washington;
Lewiston, Idaho
Zone 2: Outside 45 mile radius of Spokane, Pasco, Washington; Lewiston, Idaho
POWER EQUIPMENT OPERATORS CLASSIFICATIONS
GROUP 1: Rollers, all types on subgrade, including seal and chip coatings
GROUP 2: Fork Lift
GROUP 3: Bulldozer (up to D-6 or equivalent)
GROUP 4: Loaders (overhead & front-end, under 4 yds. R/T);
Oiler; Drill (churn, core, calyx or diamond)
GROUP 5: Backhoe (Under 45,000 gw); Trackhoe/Excavator (under
3/4 yd.); Cranes (25 tons & under); Drilling equipment (8 unch bit and over) (robbins, reverse circulation and similar); Boom Truck (Under 25 tons)
GROUP 6: Asphalt Roller; Backhoe (45,000 gw and over to
110,000 gw); Trackhoe/Excavator (3/4 yd. to 3 yd.); Cranes
(over 25 tons, to and including 45 tons), Bulldozer, 834
R/T & similar; Loader Operator (front-end & overhead, 4 yds. incl. 8 yds.); Mechanic
GROUP 7: Backhoe (Over 110,000); Trackhoe/Excavator (3 yds & over); Cranes (over 45 tons to but not including 85 tons);
Loaders (overhead & front-end, over 8 yds. to 10 yds.);
Grader/Blade
GROUP 8: Cranes (85 tons and over, and all climbing, overhead,rail and tower); Loaders (overhead and front-end, 10 yards and over)
BOOM PAY: (All Cranes, Including Tower)
180 ft to 250 ft $ .50 over scale
Over 250 ft $ .80 over scale
NOTE:
In computing the length of the boom on Tower Cranes, they shall be measured from the base of the Tower to the point of the boom.
HAZMAT:
Anyone working on HAZMAT jobs, working with supplied air shall receive $1.00 an hour above classification.
IRON0014-001 07/01/2015
IRONWORKER (Reinforcing and
Structural)......................$ 32.76 23.19
* LABO0238-002 06/01/2014
LABORER (Spokane)
GROUP 1.....................$ 21.95 10.95
GROUP 2.....................$ 24.05 10.95
GROUP 3.....................$ 24.32 10.95
GROUP 4.....................$ 24.59 10.95
BASE POINTS: Spokane, Pasco, Lewiston
Zone 1: 0-45 radius miles from the main post office.
Zone 2: 45 radius miles and over from the main post office
LABORERS CLASSIFICATIONS
GROUP 1: Flagger
GROUP 2: Common or General Laborer;
GROUP 3: Mason Tender-Cement/Concrete; Pipelayer; Chipping
Guns
GROUP 4: Grade Checker
LABO0238-007 06/01/2013
Laborer, Mason Tender Brick......$ 24.10 10.65
PAIN0005-003 07/01/2014
PAINTER (Brush, Roller, and
Spray.)..........................$ 21.55 10.48
SUWA2009-051 08/07/2009
CARPENTER........................$ 24.03 6.50
CEMENT MASON/CONCRETE FINISHER...$ 17.21 0.00
LABORER: Landscape..............$ 14.67 0.00
TRUCK DRIVER: Dump Truck........$ 19.67 0.00
TRUCK DRIVER: Water Truck.......$ 24.36 8.30
TRUCK DRIVER: 10 Yard Truck.....$ 24.61 8.34
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses
(29CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate
(weighted union average rate).
Union Rate Identifiers
A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than "SU" or
"UAVG" denotes that the union classification and rate were prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.
Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.
Survey Rate Identifiers
Classifications listed under the "SU" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.
Survey wage rates are not updated and remain in effect until a new survey is conducted.
Union Average Rate Identifiers
Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010
08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.
A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour
Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the
Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the
Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations
Wage and Hour Division
U.S. Department of Labor
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator
(See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative
Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION
Lower Monumental Spillway Weir Boat Barrier W912EF-15-B-0008 amendment 0005
SECTION TABLE OF CONTENTS
DIVISION 35 - WATERWAY AND MARINE CONSTRUCTION
SECTION 35 59 13.16
BOAT BARRIER
PART 1 GENERAL
1.1 REFERENCES
1.2 SUBMITTALS
1.3 DELIVERY, HANDLING AND STORAGE
1.3.1 Rejection
1.3.2 Boat Barrier Instructions and Manual
1.3.3 Handling Coated Material
1.4 QUALITY ASSURANCE
1.4.1 Boom Skin
1.4.2 Foam Core
1.5 FOAM-FILLED BOOMS - WARRANTY
PART 2 PRODUCTS
2.1 FOAM-FILLED BOOMS AND POSITIONING FLOATS
2.1.1 Configuration
2.1.2 Foam Core
2.1.3 Boom Skin
2.1.3.1 Color
2.1.3.2 Repairability
2.1.4 Internal Hardware
2.1.5 Performance Requirements
2.1.6 Source Quality Control
2.1.6.1 Booms and Connecting Hardware
2.1.7 Stainless Steel Hardware
2.1.8 Anchor Cable Assemblies
2.1.9 Bird Spikes
2.1.10 Reflective Tape
2.1.11 Boom Graphic
PART 3 EXECUTION
3.1 FOAM-FILLED BOOMS
3.2 CONNECTIONS
3.2.1 Antiseize Compound
3.3 Calculations and Installation Plan
-- End of Section Table of Contents --
SECTION 35 59 13.16 Page 1
SECTION 35 59 13.16
BOAT BARRIER
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
ASTM INTERNATIONAL (ASTM)
ASTM A479/A479M (2013b) Standard Specification for Stainless Steel Bars and Shapes for Use in Boilers and Other Pressure Vessels
ASTM D1667 (2005; R 2011) Flexible Cellular Materials
- Poly (Vinyl Chloride) Foam (Closed-Cell)
ASTM D6226 (2010) Standard Test Method for Open Cell Content of Rigid Cellular Plastics
ASTM F593 (2013a) Stainless Steel Bolts, Hex Cap Screws, and Studs
INTERNATIONAL MARITIME ORGANIZATION (IMO)
IMO Resolution A.689 Recommendation on Testing Life-Saving Appliances
U.S. COAST GUARD (USCG)
USCG Guideline 202 Rigid Buoyancy Foam for Lifeboats, Rescue Boats, Life Rings and Buoyant Apparatus
USCG Regulation 33CFR Federal Navigation Regulations
1.2 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals having an "I" designation are for information only. When used, a designation following the "G" or "I" designation identifies the office that will review the submittal for the Government. The following shall be submitted in accordance with SECTION 01 33 00 SUBMITTAL PROCEDURES:
SD-03 Product Data
Stainless Steel Hardware; G ME
Include Manufacturer's product data for all boat barrier hardware, including bolts, anchor bolts, inserts, nuts, washers, chains, turnbuckles, dimensions, material specifications, working loads and ultimate loads, as applicable. For anchor bolts and
SECTION 35 59 13.16 Page 2 inserts, include methods and materials for installation.
FOAM-FILLED BOOMS
Resilient, foam filled marine booms; G ME
Prior to fabrication, submit copies of the manufacturer's catalog data. Include dimensions, material specifications, and method of manufacture.
SD-05 Design Data
Calculations and Installation Plan; I ME
SD-07 Certificates
Stainless Steel Hardware; G ME
Submit certificates of compliance certifying that materials meet the requirements specified herein. In addition, when the coating is shop applied, submit certificates of conformance or compliance certifying that surface preparation, coverage, and thickness meet the requirements specified.
Booms and Connecting Hardware; G ME
Submit certificates of compliance certifying that the boom and connecting hardware meet or exceed the calculated design loads.
SD-08 Manufacturer's Instructions
Installation Instructions; I ME
Provide installation instructions for each boom type.
SD-10 Operation and Maintenance Data
Boat Barrier Manual; I ME
Provide Operation and Maintenance manual; I ME for each boom type.
1.3 DELIVERY, HANDLING AND STORAGE
All boat barrier components shall be new and undamaged when delivered and shall be handled and stored so as to prevent damage. Protect booms from exposure to damaging liquids, oils, greases and extended exposure to sunlight.
1.3.1 Rejection
Any boat barrier components that are delivered to the site in a damaged condition or that are not in conformance with this specification shall be rejected. Any rejected materials shall be replaced with suitable materials, at no additional cost to the Government.
1.3.2 Boat Barrier Instructions and Manual
Provide installation instructions, Boat Barrier Manual and a Operation and
SECTION 35 59 13.16 Page 3
G4EDDMTJ
Line
Maintenance manual describing maintenance requirements for each boom type.
1.3.3 Handling Coated Material
Store, handle and place coated material in a manner that will minimize damage to the coating and will not reduce its effective protective value.
Repair damaged surfaces as directed and per the Manufacturer's recommendations. Handle coated work which is flexible in a manner that will prevent flexing sufficient to crack coating, especially when temperature is below 40 degrees F. Do not place coated surfaces on strips or skids until coating has hardened thoroughly. Wide fabric slings used for lifting, and strips, slings, blocks, skids, cradles, and other supports shall provide ample bearing areas. In transporting, fasten and protect coated materials in a manner that will prevent movement and preclude chafing and rubbing, and when unloading, do not dump or drop. Place coated material in position carefully on suitably prepared beds and with a minimum of handling.
1.4 QUALITY ASSURANCE
1.4.1 Boom Skin
The polyethylene shell of the boom shall be free from cracks, burrs, warpage, checks, chipped or blistered surfaces, and shall have a smooth surface.
1.4.2 Foam Core
The foam core shall be internal foam fill. The foam core shall not contain scraps, strips, or sheets of foam either rolled or stuffed into the required shape. Foam fill must take up a minimum of 95% of the interior volume of the boom. The Contractor shall show a minimum 5-year performance of similar booms.
1.5 FOAM-FILLED BOOMS - WARRANTY
Furnish the manufacturer's warranty. The warranty shall be issued directly to the Government and shall not be limited in dollar value. The warranty period shall be not less than 1 year from the date of Government acceptance of the work.
PART 2 PRODUCTS
2.1 FOAM-FILLED BOOMS AND POSITIONING FLOATS
2.1.1 Configuration
The boom shall be an off-the-shelf item. Booms shall have cylindrical bodies with ends terminating in an end fitting on the cylinder's centerline at each end. End-to-end boom spacing shall be 10 feet nominal, no less than 6 feet and no greater than 10 feet. The fittings at either end shall be connected through the center of the boom by a steel axle. The boom shall be designed with weights bolted in place at one side of each of the cylindrical bodies to prevent rotation of the bodies in the water. Design end fitting as small as possible to transmit the ultimate load of the connector to the boom. The use of chipped or particulate foam is not acceptable. Positioning float configuration shall be determined by the boom manufacturer based on design parameters. Positioning float body and hardware strength requirements shall meet or exceed that of the boom
SECTION 35 59 13.16 Page 4 requirements.
2.1.2 Foam Core
The foam core shall be polyurethane foam with the following properties:
a. Density, ASTM D1667, maximum of 2 lbs/ft3
b. Approved as Rigid Buoyancy Foam for Lifeboats, Rescue Boats, Life Rings and Buoyant Apparatus per USCG Guideline 202 and IMO Resolution A.689
c. Meets USCG Regulation 33CFR, Section 183.114
2.1.3 Boom Skin
The outer boom skin shall be a polyethylene shell and shall be UV-stabilized for long-term environmental exposure. The nominal wall thickness of the polyethylene encasement shall be .2 inches.
2.1.3.1 Color
Boom skin color shall be international orange throughout the entire thickness. Stainless steel hardware shall be unpainted.
2.1.3.2 Repairability
The boom shell shall be replaceable in the event of tears or punctures in the shell. Required repair materials shall be readily available from the boom manufacturer.
2.1.4 Internal Hardware
The internal steel axle connecting end fittings shall be stainless steel in accordance with ASTM A479/A479M or ASTM F593 as appropriate. The steel axle and connector fitting shall have a minimum tensile resistance of 54,000 pounds.
2.1.5 Performance Requirements
The foam filled marine booms shall measure 18 inches in radius, 48 inches long. Booms shall have a nominal buoyancy of not less than 1700 lbs.
Internal foam fill shall be a non-ODP, non-GWP, and VOC exempt polyurethane floatation foam that helps protect the environment by being zero-depleting and VOC exempt. Closed cell content shall be greater than 90 percent as per ASTM D6226.
2.1.6 Source Quality Control
2.1.6.1 Booms and Connecting Hardware
Booms shall be new units not previously used for any other purpose. Booms shall be supplied by a manufacturer with not less than 5-years experience providing boat barriers for the specified purpose. The supplier shall provide the reaction loads at each end of the boom line and certify that the boom and connecting hardware meet or exceed the calculated design loads. The supplier shall provide testing certificates from an independent laboratory verifying the strength of the connecting hardware and materials used.
SECTION 35 59 13.16 Page 5
2.1.7 Stainless Steel Hardware
All connecting components such as chain, cable, coupling links and shackles shall be 300 series stainless steel in accordance with ASTM A479/A479M or ASTM F593, as appropriate.
All connecting bolts and pins shall be of stainless steel 300 series and secured in place with stainless steel (300 series) cotter pins or locking pins. All hardware shall be provided with a minimum breaking strength greater than or equal to the components to which it is attached.
2.1.8 Anchor Cable Assemblies
Cables shall be wire rope and shall be made of extra improved plow stainless steel with an Independent Wire Rope Core (IWRC). Wires in the IWRC shall be of the same material as the wires in the strands of the wire rope. The wire rope shall be not less than 1 inch diameter and a 6x19 construction of wire strands closed around the core. The wire rope selected shall have a breaking strength that exceeds or is equal to the design load and factor of safety calculated and assumed per paragraph "Calculations and Installation Plan." Closed spelter socket and flemish eye splice connected to the anchor cable shall be able to withstand the same working load requirements as the wire rope.
2.1.9 Bird Spikes
Provide bird spike strips on the top of each boom unit across the length of the boom. Spikes shall be stainless steel .04" in diameter and full-hard spring tempered. Base strip shall be stainless steel with full anneal and easy strip cutting and surface shape memory. The complete model shall be at least 4" high with no less than 24 wire points per foot. The spikes shall have a blunt tip and be designed to prevent injury to humans in the event the a passenger vessels which has lost power impacts the boom and a person falls on the spikes. When installed, wire points shall cover an approximate 75 degree arc centered at the top of the boom unit.
2.1.10 Reflective Tape
Reflective tape shall be a minimum of 2" wide and be placed across the length of the upstream face of each boom unit. Reflective tape shall be comprised of prismatic lenses formed in a transparent, synthetic resin. The tape shall meet a minimum coefficient of retroreflection of 72. Tape shall be sealed and backed with a pressure sensitive adhesive and paper liner.
2.1.11 Boom Graphic
Each boom unit shall be provided with a graphic on the upstream face of the boom unit. Graphic shall read "DAM AHEAD KEEP AWAY". Graphic shall be block letter font, all caps, black and boldface. Lettering shall be 12 inches high.
PART 3 EXECUTION
3.1 FOAM-FILLED BOOMS
Install booms and accessories as indicated on the drawings and in accordance with the manufacturer's specifications and shop drawings. Bolts shall be tightened an additional 1/3 turn of the nut, from the snug tight condition, and secured with cotter pins.
SECTION 35 59 13.16 Page 6
G4EDDMTJ
Line
3.2 CONNECTIONS
3.2.1 Antiseize Compound
Coat threads of bolts prior to applying washers and nuts. Recoat bolt thread projection beyond nut after tightening.
3.3 Calculations and Installation Plan
Submit calculations performed to size components that connect the anchors at the river bottom to the positioning floats and the positioning floats to the boom provided by the boom manufacturer. Include calculations performed to show cable lengths, positioning float buoyancies and assumed loadings will result in final positioning of system components according to the drawings and specifications. Also include calculations performed to ensure anchor cables will not interfere with the navigation channel or floating lock wall anchor cables according to the drawings and specifications.
Calculations shall be stamped by a registered Professional Engineer.
With the above, submit an installation plan detailing step by step how the anchors, positioning floats and boat barrier will be installed. The installation plan shall include how the anchors will be placed and oriented on the river bottom, how anchor cables will be attached, and how boom units provided by the boom manufacturer will be stretched across the river and attached to the positioning floats.
-- End of Section --
SECTION 35 59 13.16 Page 7
| TECHSPECS_15-B-0008_amend5.pdf |
| BOAT BARRIER |
| BOAT BARRIER |
| PART 1 GENERAL |
| 1.1 REFERENCES |
| 1.2 SUBMITTALS |
| 1.3 DELIVERY, HANDLING AND STORAGE |
| 1.3.1 Rejection |
| 1.3.2 Boat Barrier Instructions and Manual |
| 1.3.3 Handling Coated Material |
| 1.4 QUALITY ASSURANCE |
| 1.4.1 Boom Skin |
| 1.4.2 Foam Core |
1.5 FOAM-FILLED BOOMS - WARRANTY
| PART 2 PRODUCTS |
| 2.1 FOAM-FILLED BOOMS AND POSITIONING FLOATS |
| 2.1.1 Configuration |
| 2.1.2 Foam Core |
| 2.1.3 Boom Skin |
| 2.1.3.1 Color |
| 2.1.3.2 Repairability |
| 2.1.4 Internal Hardware |
| 2.1.5 Performance Requirements |
| 2.1.6 Source Quality Control |
| 2.1.6.1 Booms and Connecting Hardware |
| 2.1.7 Stainless Steel Hardware |
| 2.1.8 Anchor Cable Assemblies |
| 2.1.9 Bird Spikes |
| 2.1.10 Reflective Tape |
| 2.1.11 Boom Graphic |
| PART 3 EXECUTION |
| 3.1 FOAM-FILLED BOOMS |
| 3.2 CONNECTIONS |
| 3.2.1 Antiseize Compound |
3.3 Calculations and Installation Plan
File details come from the government source that posted it. Updated .