Amendment 0003.pdf
PDF 814 KB Posted
- Attached to
- Lucky Peak Electrical Upgrades
- Solicitation number
- W912EF-10-B-0010
About this file
Amendment 0003
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Bid Opening Results.pdf | ||
| Amendment 0002.pdf | ||
| Amendment 0001.pdf | ||
| 10-B-0010_Plans.pdf | ||
| W912EF-10-B-0010.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W68SBV01261791
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
TITLE: Lucky Peak Electrical Upgrades
The purpose of this amendment is to make changes to Draw ings E-604 and E-102 as indicated in the Summary of Changes.
Bid opening date remains unchanged, August 3, 2010 at 2:00 p.m.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 4
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 28-Jul-2010
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912EF-10-B-0010
X 9B. DATED (SEE ITEM 11)
29-Jun-2010
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
28-Jul-2010
CODE
USAED, WALLA WALLA - CONTRACTING DIV.
JANI C. LONG
201 N. THIRD AVENUE
WALLA WALLA WA 99362-1876
W912EF 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912EF-10-B-0010
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
1. Revised Drawing E-604 “NEW ONE LINE DIAGRAM” – In the top left section of the drawing, Removed – three fused disconnects with amperages of; 125 A, 125A, 30A Added – three circuit breaker disconnects with amperages of; 100A, 125A, 30A
2. Revised Drawing E-102 “MAINTENANCE BUILDING NEW POWER AND
LIGHTING PLAN” – In the top left section of the drawing, Removed – Note “FUSED DISCONNECT SWITCHES (3) (NOTE 1, & 2)”
Added – Note “CIRCUIT BREAKER DISCONNECT SWITCHES (3) (NOTE 1, & 2)”
SECTION 00700 - CONTRACT CLAUSES
The following have been modified:
252.236-7001 CONTRACT DRAWINGS AND SPECIFICATIONS (AUG 2000)
(a) The Government will provide to the Contractor, without charge, one set of contract drawings and specifications, except publications incorporated into the technical provisions by reference, in electronic or paper media as chosen by the Contracting Officer.
(b) The Contractor shall--
(1) Check all drawings furnished immediately upon receipt;
(2) Compare all drawings and verify the figures before laying out the work;
(3) Promptly notify the Contracting Officer of any discrepancies;
(4) Be responsible for any errors that might have been avoided by complying with this paragraph (b); and
(5) Reproduce and print contract drawings and specifications as needed.
(c) In general--
(1) Large-scale drawings shall govern small-scale drawings; and
(2) The Contractor shall follow figures marked on drawings in preference to scale measurements.
(d) Omissions from the drawings or specifications or the misdescription of details of work that are manifestly necessary to carry out the intent of the drawings and specifications, or that are customarily performed, shall not relieve the Contractor from performing such omitted or misdescribed details of the work. The Contractor shall perform such details as if fully and correctly set forth and described in the drawings and specifications.
(e) The work shall conform to the specifications and the contract drawings identified on the following index of drawings:
FILE
NUMBER
SHEET
NUMBER
TITLE
REVISION
NUMBER
DATE
LPG-1-0-1/68 G-001 COVER SHEET AND LOCATION MAPS
LPG-1-0-1/69 G-002 INDEX TO DRAWINGS
LPG-1-0-1/70 G-003 KEY PLAN
LPB-1-6-3/4 E-001 ELECTRICAL - LEGEND
LPB-1-6-3/5 ED-101
ADMINISTRATIVE AND SHOP BUILDING -
EXISTING POWER & LIGHTING PLAN
LPB-1-6-3/6 ED-102
MAINTENANCE BUILDING - EXISTING
POWER & LIGHTING PLAN
LPB-1-6-3/7 ED-103
BOAT STORAGE BUILDING - EXISTING
POWER & LIGHTING PLAN
LPB-1-6-3/8 ED-601 EXISTING PANEL SCHEDULES - PQ1 & PR1
LPB-1-6-3/9 ED-602 EXISTING PANEL SCHEDULES - PR2 & PR3
LPB-1-6-3/10 ED-603 EXISTING ONE LINE DIAGRAM
LPB-1-6-3/11 E-101
ADMINISTRATIVE AND SHOP BUILDING -
NEW POWER AND LIGHTING PLAN
LPB-1-6-3/12 E-102
MAINTENANCE BUILDING - NEW POWER
AND LIGHTING PLAN
A 7/28/10
LPB-1-6-3/13 E-103
BOAT STORAGE BUILDING - NEW POWER
AND LIGHTING PLAN
LPB-1-6-3/14 E-501
SHOP BUILDING - NEW POWER AND
LIGHTING DETAILS
LPB-1-6-3/15 E-601 NEW PANEL SCHEDULES - PQ1 & PR1
LPB-1-6-3/16 E-602 NEW PANEL SCHEDULES - PR2 & PR3
LPB-1-6-3/17 E-603 NEW PANEL SCHEDULES - PQ2 & PR4
LPB-1-6-3/18 E-604 NEW ONE LINE DIAGRAM A 7/28/10
FOR INFORMATION ONLY
LPB-1-6-1/12 I-001 MAINTENANCE YARD (SECURITY)
(End of drawing list)
(End of clause)
(End of Summary of Changes)
LPOEE-102---.DGN 7/28/2010 11:22:34 AM