Site visit information.pdf

PDF 16 KB Posted

Attached to
Devore Road Resurfacing, McNary Dam, Umatilla, Oregon
Solicitation number
W912EF-09-B-0011
Issued by

About this file

Site visit information

View the file

Other files

File Type Posted
Plans 1 of 1.zip ZIP file
Downloading and viewing drawings.pdf PDF
Solicitation 09-B-0011.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) – ALTERNATE I (FEB 1995)

(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.

(b) An organized site visit has been scheduled for—

DATE: Thursday, June 11, 2009 TIME: 10:00 a.m., local time

(c) Participants will meet at-- McNary Dam - guard station on the Oregon side.

There will be only one site visit offered. Bidders planning to attend must register for the site visit at the following website: http://www.nww.usace.army.mil/apps/csvr

Firms must register no later than the day before the site visit.

Site visit attendees must be prepared to give the following information: (1) Name of company being represented; (2) Number of people in the party; and (3) The name of each individual planning to attend. Each individual must have picture identification on his/her person while at the project site.

There can be no substitutions of one individual for another. If an individual arrives at the site visit without having called ahead of time and/or without picture identification, that individual may not be allowed on the project.

Participants of scheduled site visit must abide by the U.S. Army Corps of Engineers Safety and Health Requirements Manual (EM 385-1-1, latest version) in accordance with Section 5, “Personal Protective and Safety Equipment.” It is the responsibility of the participants to wear personal protective and safety equipment as required by this regulation. Failure to comply could result in denial of access to site visit location.

The latest version of EM 385-1-1 is available online at:

http://www.usace.army.mil/CESO/Documents/EM385-1-1FINAL.pdf

The ACCESS FOR FOREIGN NATIONALS requirement applies to site visits as well as to performance of the onsite work.

(End of provision) http://www.nww.usace.army.mil/apps/csvr http://www.usace.army.mil/CESO/Documents/EM385-1-1FINAL.pdf

File details come from the government source that posted it. Updated .