SPECS.pdf

PDF 971 KB Posted

Attached to
Narrows Access Bridge Rehabilitation, US Army Corps
Solicitation number
W912EE-16-R-0014
Issued by

About this file

Specifications

View the file

Other files

File Type Posted
A22_W912EE-16-R-0014-0003.pdf PDF
A22_W912EE-16-R-0014-0002_.pdf PDF
A22_W912EE-16-R-0014-0001_.pdf PDF
SUMMARY.pdf PDF
16r0014.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOLICITATION NO. W912EE-16-R-0014

DATE: 13 June 2016

SPECIFICATIONS

FOR

OUACHITA RIVER BASIN

LITTLE MISSOURI RIVER

NARROWS DAM, ARKANSAS

NARROWS ACCESS BRIDGE REHABILITATION

THIS PROCUREMENT IS UNRESTRICTED

Serving the Army Serving the Nation

VICKSBURG DISTRICT

4155 CLAY STREET

VICKSBURG, MS 39183-3435

TECHNICAL INQUIRIES

REGARDING THIS SOLICITATION SHOULD

BE MADE TO THE FOLLOWING:

http://www.projnet.org/projnet

Plans and specifications will be available on the Federal Business Opportunities (FBO) Web Page at: http://www.fedbizopps.gov/

W912EE-16-R-0014

PROJECT TABLE OF CONTENTS

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

SOLICITATION, OFFER, AND AWARD (SF1442)

00010 BIDDING SCHEDULE

00100 INSTRUCTIONS TO BIDDERS

00600 REPRESENTATIONS AND CERTIFICATIONS

00700 CONTRACT CLAUSES

00 80 00.00 09 SPECIAL CONTRACT REQUIREMENTS

DIVISION 01 - GENERAL REQUIREMENTS

01 00 00.00 09 GENERAL CONTRACT REQUIREMENTS

01 11 00 SCOPE OF WORK

01 22 00.00 09 MEASUREMENT AND PAYMENT

01 33 00 SUBMITTAL PROCEDURES

01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS

01 42 00 SOURCES FOR REFERENCE PUBLICATIONS

01 45 02.00 09 QUALITY CONTROL SYSTEM (QCS)

01 45 04.00 09 CONTRACTOR QUALITY CONTROL

01 57 20.00 09 ENVIRONMENTAL PROTECTION

DIVISION 02 - EXISTING CONDITIONS

02 41 00 DEMOLITION

DIVISION 03 - CONCRETE

03 01 01 CONCRETE REPAIRS

03 30 53 CAST-IN-PLACE CONCRETE

03 63 01 REPAIR OF CONCRETE STRUCTURES BY EPOXY INJECTION

DIVISION 05 - METALS

05 12 00 STRUCTURAL STEEL

05 48 20 BRIDGE BEARINGS

DIVISION 09 - FINISHES

09 96 00 PAINT: STRUCTURAL STEEL

DIVISION 31 - EARTHWORK

31 00 00 EARTHWORK

31 05 19 GEOTEXTILE

31 25 01.00 09 EROSION AND SEDIMENT CONTROL

DIVISION 32 - EXTERIOR IMPROVEMENTS

32 13 70 STRIP SEAL EXPANSION JOINTS

-- End of Project Table of Contents –

PROJECT TABLE OF CONTENTS Page 1

W807PM61130701

OUACHITA RIVER BASIN

LITTLE MISSOURI RIVER

NARROWS DAM, ARKANSAS

NARROWS ACCESS BRIDGE REHABILITATION

DESCRIPTION OF WORK: The work consists of furnishing all plant, labor, materials and equipment, and constructing the repairs on the Narrows Access Bridge located at Narrows Dam, Arkansas. Principle features include vertical jacking of the two end spans, excavation, fill, backfill, demolition and removal of materials, concrete work, removal and disposal of lead based paint from the steel superstructure, painting of steel super structure, control of water, erosion and sediment control, miscellaneous items, storm water pollution prevention and environmental protection.

The estimated value of the proposed work is between $1,000,000 and $5,000,000.

Scott Brown (601)631-7902

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS

NEGOTIATED

13 June 2016

(RFP)

(IFB)

CALL:

B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

See Item 7

2. TYPE OF SOLICITATION

SEALED BID

3. DATE ISSUED

9. FOR INFORMATION A. NAME

SOLICITATION

NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)

Prescribed by GSAFAR (48 CFR) 53.236-1(e)

The Contractor shall begin performance within 10 calendar days and complete it within 210 calendar days after receiving award, X notice to proceed. This performance period is X mandatory, negotiable. (See Section 00800.0009

12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

X YES NO

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original to perform the work required are due at the place specified in Item 8 by 1400 (hour) local time (date). IIf this is a sealed bid solicitation, offers must be publicly opened at that time.

shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.

B. An offer guarantee is required.

C. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than _______ 90 calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

4. CONTRACT NO.

7. ISSUED BY CODE

VBURG CONTRACTING OFC

4155 CLAY ST

VICKSBURG MS 39183-3435

W912EE

PAGE

CODE

(Title, identifying no., date):

12B. CALENDAR DAYS

Sealed envelopes containing offers

5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.

8. ADDRESS OFFER TO (If Other Than Item 7)

(601)631-7261 FAX: TEL: TEL: FAX:

W912EE-16-R-0014 x

20B. SIGNATURE

(REV. 4-85)STANDARD FORM 1442 BACK

TO SIGN

NSN 7540-01-155-3212

SOLICITATION, OFFER, AND AWARD (Continued) Page 2 (Construction, Alteration, or Repair)

CODE FACILITY CODE

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within ________ calendar days after the date offers are due.

the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)

AMOUNTS SEE SCHEDULE OF PRICES

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN

OFFER (Type or print)

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

SEE SCHEDULE

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

96X 3112

24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

(4 copies unless otherwise specified)

CODE

(Insert any number equal to or greater than

20C. OFFER DATE

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

CODE27. PAYMENT WILL BE MADE BY: 964145

US ARMY CORPS OF ENGRS FINANCE CENTER

5722 INTEGRITY DRIVE

MILLINGTON TN 38054-5005

26. ADMINISTERED BY

Vicksburg Contracting Office 4155 Clay Street Vicksburg, MS 39183-3435

(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)

See Item 14

(Include only if different than Item 14)16. REMITTANCE ADDRESS

30B. SIGNATURE

29. AWARD (Contractor is not required to sign this document.)

document and return _______ copies to issuing office.) Contractor agrees Your offer on this solicitation, is hereby accepted as to the items listed. This award con-to furnish and deliver all items or perform all work, requisitions identified summates the contract, which consists of (a) the Government solicitation and on this form and any continuation sheets for the consideration stated in this your offer, and (b) this contract award. No further contractual document is contract. The rights and obligations of the parties to this contract shall be necessary.

governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications or incorporated by refer-ence in or attached to this contract.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)

30C. DATE

(Type or print)

TEL: EMAIL:

31B. UNITED STATES OF AMERICA 31C. AWARD DATE

BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this28. NEGOTIATED AGREEMENT

(Must be fully completed by offeror)OFFER

Section 00010 - Solicitation Contract Form

OUACHITA RIVER BASIN

LITTLE MISSOURI RIVER

NARROWS DAM, ARKANSAS

NARROWS ACCESS BRIDGE REHABILITATION

BIDDING SCHEDULE

ITEM DESCRIPTION

EST

QTY U/M UNIT PRICE AMOUNT

BASE BID

0001 Abutments, Bearings, Approaches, and Minor End

1 JOB FOR $___________

Span Painting

0002 Repair Type 1 20 SF $___________ $___________

0003 Repair Type 2 100 SF $___________ $___________

0004 Repair Type 3 40 SF $___________ $___________

OPTION A

0005 End Spans Painting 1 JOB FOR $___________

OPTION B

0006 Middle Spans Painting 1 JOB FOR $___________

Base, Option A, and Option B Total:___________________

NOTES

(a) Bidders shall furnish unit prices for all items listed on the schedule of bid items which require unit prices. If the bidder fails to insert a unit price in the appropriate blank for required items, but does furnish an extended total or an estimated amount for such items, the Government will deem his unit price to be the quotient obtained by dividing the extended estimated amount for that line item by the quantity. IF THE BIDDER OMITS BOTH THE UNIT

PRICE AND THE EXTENDED ESTIMATED AMOUNT FOR ANY ITEM, HIS BID WILL BE DECLARED

NONRESPONSIVE.

(b) All quantities shown on the BIDDING SCHEDULE are estimated quantities except when the unit of measure is shown as "job" or "each".

(c) If a bid or modification to a bid based on unit price is submitted which provides for a lump sum adjustment to the total estimated cost, the application of the lump sum adjustment to the unit price in the schedule must be stated. If it is not stated, the bidder agrees that the lump sum adjustment shall be applied on a pro rata basis to the unit price in the Bid Schedule.

(d) All extensions of the unit price shown will be subject to verification by the Government. In case of variation between the unit price and the extension, the unit price will be considered to be the bid.

(e) The Government reserves the right to award the Option items shown on the bid schedule. Award of the Option items may be exercised at award or the Government reserves the right to award Option items within 60 days commencing from the award date of the Base Contract depending on the availability of funding.

(f) THE NOTICE TO PROCEED (NTP): The successful bidder is advised that performance and payment bonds shall be submitted in accordance with the time frame in block 12B of SF 1442. The NTP will be issued immediately after verification of acceptable performance and payment bonds. Within seven (7) days after issuance of the NTP, the Contractor shall initiate a meeting to discuss the submittal process with the Area or Resident Engineer or his authorized representative. Physical work cannot start until the Accident Prevention Program, Contractor Quality Control Plan, and other submittals which may be required, have been submitted and approved and all preliminary meetings called for under the contract, have been conducted.

Section 00100 - Bidding Schedule/Instructions to Bidders

INSTRUCTIONS TO OFFERORS

INSTRUCTIONS, CONDITIONS & NOTICES TO OFFERORS

1.0 GENERAL REQUIREMENTS

1.1 Request for Proposal (RFP) NO. W912EE-16-R-0014

FOR: NARROWS ACCESS BRIDGE REHABILITATION, US ARMY CORPS OF

ENGINEERS, VICKSBURG DISTRICT

Proposal Due: 14 July 2016, 1400 hours

AUTHORITY: Section 4 of Flood Control act of 1944, as amended authorized the Chief of Engineers provides for recreation development at Water Resource Projects. The USACE is a participant in the Federal Lands Transportation Program as stipulated in 23 USC 201, 203 with the passage of MAP-21 on 6 July 2012 and the FAST Act on 4 December 2015

APPROPRIATION: FY 2016 Energy and Water Development Appropriations Bill

FUNDING CITATION: 96x3112

1.2 THIS PROCUREMENT IS UNRESTRICTED.

1.3 Basis of Selection of Award: This is a Lowest Price Technically Acceptable (LPTA) solicitation conducted pursuant to FAR 15.101-2.

1.4 Type of Contract: The Government intends to award one (1) firm-fixed price contract.

1.5 North American Industry Classification System (NAICS) Code and Small Business Size Standard: The NAICS code for this project is 237310 - Highway, Street, and Bridge Construction with a size standard of $36.5 million is applicable to this project.

1.6 Pre-Proposal Site Visit: Please refer to the Federal Acquisition Regulations (FAR) clause 52.236-27 Alt I, incorporated by full text in this solicitation, for information pertaining to the scheduled site visit.

1.7 Amendments Prior to Date Set for Closing of RFP. The right is reserved as the interest of the Government may require, to revise or amend the specifications or drawings or both prior to the date set for submission of proposal. Such revisions and amendments, if any will be announced by an amendment or amendments to this RFP. If the revisions and amendments are of a nature which requires material changes in quantities or prices proposed or both, the date set for receipt of proposals may be postponed by such number of days as in the opinion of the issuing officer will enable offeror to revise their proposal. In such cases, the amendment will include an announcement of the new date for receipt of proposals.

1.8 TECHNICAL INQUIRIES AND QUESTIONS

ALL TECHNICAL INQUIRIES AND QUESTIONS RELATING TO THIS SOLICITATION

ARE TO BE SUBMITTED VIA BIDDER INQUIRY IN PROJNET

(HTTPS://WWW.PROJNET.ORG) NO LATER THAN 5 DAYS PRIOR TO BID OPENING

DATE IN ORDER TO ENSURE ADEQUATE TIME IS ALLOTED TO FORM AN

APPROPRIATE RESPONSE AND AMEND THE SOLICITATION IF NECESSARY. TO

SUBMIT AND REVIEW INQUIRY ITEMS, PROSPECTIVE VENDORS WILL NEED TO

USE THE BIDDER INQUIRY KEY PRESENTED BELOW AND FOLLOW THE

INSTRUCTIONS LISTED BELOW THE KEY FOR ACCESS. A PROSPECTIVE VENDOR

WHO SUBMITS A COMMENT /QUESTION WILL RECEIVE AN ACKNOWLEDGEMENT

OF THEIR COMMENT/QUESTION VIA EMAIL, FOLLOWED BY AN ANSWER TO THE

COMMENT/QUESTION AFTER IT HAS BEEN PROCESSED BY OUR TECHNICAL

TEAM. ALL TIMELY QUESTIONS AND APPROVED ANSWERS WILL BE MADE

AVAILABLE THROUGH PROJNET. APPROVED ANSWERS TO ALL TIMELY

QUESTIONS WILL ALSO BE POSTED ON THE FEDBIZOPS IN THE FORM OF A

REPORT GENERATED FROM PROJNET AS SOON AS THE COMMENT/QUESTION

ENTERING PERIOD IS OVER AND ALL ANSWERS ARE ALL FINALIZED.

THE SOLICITATION NUMBER IS: W912EE-16-R-0014

THE BIDDER INQUIRY KEY IS: VDE7V4-RRMRAT

SPECIFIC INSTRUCTIONS FOR PROJNET BID INQUIRY ACCESS:

1. FROM THE PROJNET HOME PAGE LINKED ABOVE, CLICK ON QUICK ADD ON

THE UPPER RIGHT SIDE OF THE SCREEN.

2. IDENTIFY THE AGENCY. THIS SHOULD BE MARKED AS USACE.

3. KEY. ENTER THE BIDDER INQUIRY KEY LISTED ABOVE.

4. EMAIL. ENTER THE EMAIL ADDRESS YOU WOULD LIKE TO USE FOR

COMMUNICATION.

5. CLICK CONTINUE. A PAGE WILL THEN OPEN SAYING THAT A USER

ACCOUNT WAS NOT FOUND AND WILL ASK YOU TO CREATE ONE USING THE

PROVIDED FORM.

6. ENTER YOUR FIRST NAME, LAST NAME, COMPANY, CITY, STATE, PHONE,

EMAIL, SECRET QUESTION, SECRET ANSWER, AND TIME ZONE. MAKE SURE TO

REMEMBER YOUR SECRET QUESTION AND ANSWER AS THEY WILL BE USED

FROM THIS POINT ON TO ACCESS THE PROJNET SYSTEM.

7. CLICK ADD USER. ONCE THIS IS COMPLETED YOU ARE NOW REGISTERED

WITHIN PROJNET AND ARE CURRENTLY LOGGED INTO THE SYSTEM.

SPECIFIC INSTRUCTIONS FOR FUTURE PROJNET BID INQUIRY ACCESS:

1. FOR FUTURE ACCESS TO PROJNET, YOU WILL NOT BE EMAILED ANY TYPE

OF PASSWORD. YOU WILL UTILIZE YOUR SECRET QUESTION AND SECRET

ANSWER TO LOG IN.

2. FROM THE PROJNET HOME PAGE LINKED ABOVE, CLICK ON QUICK ADD ON

THE UPPER RIGHT SIDE OF THE SCREEN.

3. IDENTIFY THE AGENCY. THIS SHOULD BE MARKED AS USACE.

4. KEY. ENTER THE BIDDER INQUIRY KEY LISTED ABOVE.

5. EMAIL. ENTER THE EMAIL ADDRESS YOU USED TO REGISTER PREVIOUSLY

IN PROJNET.

6. CLICK CONTINUE. A PAGE WILL THEN OPEN ASKING YOU TO ENTER THE

ANSWER TO YOUR SECRET QUESTION.

7. ENTER YOUR SECRET ANSWER AND CLICK LOGIN. ONCE THIS IS

COMPLETED YOU ARE NOW LOGGED INTO THE SYSTEM.

THE CALL CENTER OPERATES WEEKDAYS FROM 8AM TO 5PM U.S. CENTRAL TIME

ZONE (CHICAGO). THE TELEPHONE NUMBER FOR THE CALL CENTER IS 800-428-

HELP.

1.9 ELECTRONIC FUNDS TRANSFER (EFT)

PURSUANT TO FAR 52.232-5 AND 52.232-33, ALL PAYMENTS UNDER THIS CONTRACT WILL BE MADE BY

ELECTRONIC FUNDS TRANSFER (EFT). CONTRACTORS ARE REQUIRED TO COMPLETE FORM:

UFC-DISB-4.

THE FORM AND COMPLETION INSTRUCTIONS MAY BE DOWNLOADED FROM THE U. S. ARMY CORPS

OF ENGINEERS FINANCE CENTER AT: HTTP://WWW.FC.USACE.ARMY.MIL (CLICK ON "DIRECTORATES"

AT THE TOP OF THE PAGE, THEN CLICK ON "DIRECTORATE OF ACCOUNTING OPERATIONS" AND

THEN “EFT DIRECT DEPOSIT FORM”)

THE “INSTALLATION EROC” FOR THE VICKSBURG CONSOLIDATED CONTRACTING OFFICE IS “B4."

2.0 INSURANCE/BONDS:

2.1 INSURANCE. Contractor shall carry Liability and Insurance. See FAR clause 52.228-5, Insurance – Work on A Government Installation

2.2 BID BONDS (SF 24). All offerors are required to submit bid bonds with their proposal.

In accordance with FAR 52.228-1, Bid Guarantee, the bid guarantee amount shall be at least 20 percent of the base bid price but shall not exceed $3,000,000.00.

2.3 The offeror whose proposal is accepted will be required to comply with the following within the time established in the proposal:

a. PERFORMANCE BONDS (SF 25-A). Pursuant to FAR clause 52.228-15, Performance and Payment Bonds—Construction.

b. PAYMENT BONDS (SF 25). Pursuant to FAR clause 52.228-15, Performance and Payment Bonds—Construction.

3.0 SYSTEM FOR AWARD MANAGEMENT (SAM) AND ANNUAL

REPRESENTATIONS AND CERTIFICATIONS

3.1 To be considered for award all contractors must be successfully registered in the SAM database (www.sam.gov). See FAR Clause 52.204-7, System for Award Management, as applicable for requirement information. For SAM Customer Service, contact:

Federal Service Desk URL: www.fsd.gov Hours: 8am - 8pm (Eastern Time) US Calls: 866-606-8220 International Calls: 334-206-7828

DSN: 866-606-8220

3.2 Contractors shall have representations and certifications completed in www.sam.gov OR provide FAR clause 52.204-8, Annual Representations and Certifications, with paragraph (c) completed. If completing the aforementioned clause, provide with submitted proposal.

4.0 WHERE TO SUBMIT

4.1 MAIL PROPOSALS TO:

U.S. Army Corps of Engineers Vicksburg District Contracting Office, ROOM 120 Attn: Scott Brown Solicitation Number: W912EE-16-R-0014

4155 CLAY STREET

VICKSBURG, MISSISSIPPI 39183-3435

4.2 HAND CARRIED PROPOSALS MUST BE DELIVERED TO:

U.S. Army Corps of Engineers Vicksburg District Contracting Office, ROOM 120 Attn: Scott Brown Solicitation Number: W912EE-16-R-0014

4155 CLAY STREET

VICKSBURG, MISSISSIPPI 39183-3435

4.3 PROPOSALS WILL NOT BE ACCEPTED TELEGRAPHICALLY OR BY

ELECTRONIC COMMERCE.

5.0 PROPOSAL FORMAT AND NUMBER OF SUBMITTALS

5.1 The Government will not make assumptions concerning an Offeror’s intent, capabilities, or experiences. Clear identification of proposal details shall be the Offeror’s sole responsibility.

The Government may reject incomplete proposals after initial evaluation without further consideration. Therefore, all proposals must meet the following basic requirements at the time of submission:

a. The proposal must be typed, submitted in English, and easy to read.

b. The proposal must be organized, concise, and submitted in the volumes and order indicated below. Volumes shall be clearly identified and tabbed. Each evaluation factor and subfactor shall be described in a separate tabbed section.

c. Reference is made to contract clause 52.215-1, Instructions to Offerors—Competitive Acquisition. The Offeror shall submit one (1) original and two (2) copies of their proposal, along with a CD containing the content of the proposal for evaluation. Each proposal should contain a cover sheet as the first page which identifies the following: (1) the Offeror’s name, (2) the Offeror’s address, (3) the Offeror’s phone number, and e-mail address, (4) the Offeror’s point(s) of contact including contact information, (5) the Offeror’s authorized signer(s)/negotiator(s) including their contact information, (6) the Offeror’s cage code and duns number, (7) the volume number, and (8) the requirement’s solicitation number, and (9) the proposal’s period of validity.

The second sheet should be an index/table of contents.

Such information should be plainly written or typed on 8-1/2- by 11-inch paper with a minimum of 1-inch left margin to allow for binding perforations. However, all sheets submitted shall not be permanently bound so that changes may be incorporated, as necessary, into the final contract document. Conformance with the requested format demonstrates ability to follow directions and also an understanding of the solicitation requirements.

d. Offerors are required to submit a proposal made up of Two (2) volumes as shown below. All proposal materials shall be in three ring binders with a table of contents and tabbed section dividers. All pages in each binder shall be numbered to correspond with a table of contents.

Volume I - Technical:

Factor 1 Experience;

Factor 2 Personnel; and Factor 3 Past Performance

This Volume shall also include the Joint Venture Agreement (if applicable). The JV agreement will not count against total page limit.

Volume II - Price:

Tab A Standard Form 1442; including verification of receipt of all amendments Tab B Section 00010, Proposal Bid Schedule, and;

Tab C Section 600 Representations and Certifications (reps and Certs) or SAM Reps and Certs Tab D Bid Bond

e. Volume I, Technical Proposal shall be limited to no more than 90 pages total (30 pages Experience, 30 pages Personnel, and 30 pages Past performance, note; past performance questionnaires do not count toward the page limitation) 8-1/2” by 11”, printed on the front side only. Illustrations, tables and charts printed on 11” by 17” paper will count as 2 pages. Pages should have a one-inch margin on all sides. Text should be 12-point, Times New Roman.

(Captions for drawings and tables may be 10-point.) Pages exceeding the page limit will be removed and not evaluated. No mention of price shall be included in Volume I.

f. Volume II, Price Proposal should be limited to no more than the above stated requirements for Tab A, Tab B, Tab C, and Tab D.

SECTION 00115

1.0 PROPOSAL CONTENT

1.1 Volume I - Technical Proposal

A. Factor 1 – Experience: Submission Requirements

Each Offeror shall complete a minimum of three (3), but no more than five (5), project ‘Prime Contractor Experience’ form(s), attached at the end of this section. All blocks must be filled-in and all data must be accurate, current, and complete. Submission requirements (in English) for experience are:

1) To meet Prime Contractor Experience, a Prime Contractor must have self-performed on site at least 25% of the direct contract labor, exclusive of other general condition or field overhead personnel, material, equipment, design, or subcontractors.

2) At least three (3) projects provided to demonstrate experience with bridge jacking as prime contractor.

3) All other projects provided shall demonstrate experience with similar type bridge repairs as prime contractor.

4) Each project used to demonstrate experience must be at least 75% complete or have been completed within the last 5 years from the date of this solicitation.

5) Provide detail project descriptions to demonstrate experience with ALL OF THE FOLLOWING construction facilities, features, or activities:

1. Bridge jacking

2. Bridge bearing replacement

3. Reinforced concrete repair and construction

4. Working over water

One project can be used to satisfy multiple features or activities, but a minimum of three separate projects must be described. As stated above, each Offeror is required to submit at least three (3), but not more than five (5), ‘Prime Contractor Experience’ forms. Regardless of the number of forms submitted, the Offeror must demonstrate all of the above features/activities.

NOTE: The Prime Contractor is the contractor identified in Block 14 of the Standard Form 1442. If more than one contractor identified in Block 14, then a signed joint venture must be submitted with the Offeror’s proposal.

B. Factor 2 - Personnel

Submission Requirements

Provide resumes for the following key personnel:

I. Overall Project Manager;

II. Construction Superintendent;

III. Quality Control Manager;

The Overall Project Manager, Construction Superintendent, and Quality Control Manager must have:

A. A minimum of five years of relevant experience in the assigned job position they are to perform on this project as it relates to similar construction projects;

B. Relevant experience with ALL OF THE FOLLOWING construction facilities, features, or activities:

1. Bridge jacking

2. Bridge bearing replacement

3. Reinforced concrete repair and construction

4. Working over water

C. Documentation identifying each person as a current full-time employee of the Prime Contractor or a letter of intent signifying their employment for this project.

Resumes must include the information on ‘Personnel Resume/Experience’ form attached at the end of this section. All information must be filled in and all data should be accurate, current, and complete.

NOTE: Identified personnel must be used on the project. Any substitution of identified persons will not be permitted without prior approval of the Contracting Officer. Identification of two individuals proposed for a single position will result in the evaluation of only the most qualified person. A single individual cannot be identified as ‘key personnel’ for more than one ‘key personnel’ position.

C. Factor 3 – Past Performance

Submission Requirements

The Offeror shall provide past performance information in one of two formats for each project provided under Factor 1 - Experience.

(1) Copies of Contractor Performance Assessment Reports (CPARs – also commonly referred to as CCASS reports) for projects performed for the U.S. Government. If the project provided has a CPAR, it must be used by the Offeror to demonstrate past performance. If CPAR submission is used to validate past performance, it shall be the most recent evaluation in the system (i.e., for projects submitted as completed, the final 100% completed CPAR shall be provided). If the Offeror submits a CPAR, they are not required to submit a separate Past Performance Questionnaire for the specific project.

(2) If CPAR information is not available for a project provided for experience, a completed Past Performance Questionnaire (PPQ), attached at the end of this section (Form PPQ-0) must be provided per the following guidance:

a. The Past Performance Questionnaire included in the solicitation is provided for the Offeror to submit to the client for each project the Offeror includes in its proposal for Factor 1 (Experience). Ensure correct phone numbers and email addresses are provided for the client point of contact.

b. Completed Past Performance Questionnaires should be submitted with your proposal. If the Offeror is unable to obtain a completed PPQ from a client for a project(s) before proposal closing date, the Offeror should still submit Form PPQ-0 with their proposal, only with blocks 1-6 filled out, which will provide contract and client information for the respective project(s).

c. Offerors should follow-up with clients/references to ensure timely submittal of questionnaires. If the client requests, questionnaires may be submitted directly to the Government’s point of contact, Scott Brown, via email at Scott.L.Brown@usace.army.mil, with the subject reading “NARROWS BRIDGE PPQ” prior to the proposal closing date. Offerors shall not incorporate by reference into their proposal PPQs previously submitted for other RFPs.

However, this does not preclude the Government from utilizing previously submitted PPQ information in the past performance evaluation.

It is the Offeror’s responsibility to ensure the Government will be able to contact the POCs using the contact information provided. Offerors are encouraged to send their request to the POC as soon as possible once a project is identified for experience under Factor 1.

The Offeror may also include performance recognition documents received within the last 3 years such as awards, award fee determinations, customer letters of commendation, and any other forms of performance recognition.

In addition to the above, the Government may review any other sources of information for evaluating past performance. Other sources may include, but are not limited to, past performance information retrieved through the Past Performance Information Retrieval System (PPIRS), including Contractor Performance Assessment Reporting System (CPARS), using all CAGE/DUNS numbers of team members (partnership, joint venture, teaming arrangement, or parent company/subsidiary/affiliate) identified in the Offeror’s proposal, inquiries of owner representative(s), Federal Awardee Performance and Integrity Information System (FAPIIS), and any other known sources not provided by the Offeror.

While the Government may elect to consider data from other sources, the burden of providing detailed, current, accurate, and complete past performance information rests with the Offeror.

Overall Technical Acceptability

If a proposal is found to be technically unacceptable in any one of the three evaluated areas (experience, personnel, or past performance), this will render the proposal as technically unacceptable overall, and the offer will be removed from further consideration for award.

1.2 Volume II, Price Proposal

a. Tab A, Standard Form 1442

Submission Requirements

An original Standard Form (SF) 1442 must be submitted in a separate electronic file as part of Volume II.

b. Tab B, Section 00010, Proposal Bid Schedule

Submission Requirements

The Offeror shall complete and submit in its entirety Section 00010, Proposal Bid Schedule.

This form is included in Section 00010 of the RFP.

c. Tab C, Representations and Certifications, Submission requirements

Each Offeror shall complete all representations and certifications in Section 00600 if they have not previously completed the Representations and Certifications Section at www.SAM.gov.

d. Tab D, Bid Bond, Each Oferor shall bubmitt a Bid Bond in accordance with FAR 52.228-1 Bid Guarantee.

Attachment 01: Prime Contractor Experience: W912EE-16-R-0014

1. Firm Name:

2. Project name and location (City, State, Country)

3. Project owners name (Government Agency, commercial firm or other organization)

4. Project owners complete address

5. Were you the Prime Contractor? YES NO

Percentage of work that was self-performed? ____________%

6. Contract number of project 7. Date of contract

7. Date work began 8. Completion Dates:

Initial: ________________

Actual: _______________

9. Project Completion Percentage (%)

10. Contract Value at Time of Award 11. Final invoiced amount (or amount invoiced to date)

12a. English speaking Technical point of contact for the Project Owner (name, title, e-mail address, phone number)

12b. English speaking Contracting point of contact of the Project Owner (name, title, e-mail, phone number)

13. Description of Construction contract work -describe DETAILED nature and scope of work. Detail how project demonstrates experience requirements. Also include explanation of any performance problems or other conflicts with the customer. (Offerors will be evaluated for the ability to provide timely, complete work; be certain to explain any differences between the initial and actual completion dates in block 8.) Use continuation sheet for additional information, if necessary.

14. Current status of the project (check one) ___ Work continuing, on schedule ___ Work continuing, behind schedule ___ Work completed, no further action pending ___ Work completed, routine administrative action pending ___ Work completed, claims negotiation pending/underway ___ Work completed, litigation pending/underway ___ Terminated for convenience ___ Terminated for default ___ Other (Explain, use additional sheets as necessary)

Attachment 02 –Personnel Resume/Experience: W912EE-16-R-0014

Name and Title ________________________________________________________________________________ Name of your firm

No. of years: Presently with this firm __________ With other firms _________

Education (Degree(s)/Year/Specialization):

Registration/Accreditation: No. __________ Country/State __________ Year ______ Your Assignment on this project

Your specific experience and qualifications relevant to this project. Include a POC with phone number for the two most recent projects described:

Project Name and Location:

General Scope of Project:

Your Role in the Project and a Description of the Duties You Performed:

POC for reference (name and phone number):

Project Name and Location:

General Scope of Project:

Your Role in the Project and a Description of the Duties You Performed:

POC for reference (name and phone number): _______________________________________________________

Attachment 03 – Past Performance Questionnaire: W912EE-16-R-0014 NAVFAC/USACE PAST PERFORMANCE QUESTIONNAIRE (Form PPQ-0) CONTRACT INFORMATION (Contractor to complete Blocks 1-4)

1. Contractor Information Firm Name: CAGE Code:

Address: DUNs Number:

Phone Number:

Email Address:

Point of Contact: Contact Phone Number:

2. Work Performed as: Prime Contractor Sub Contractor Joint Venture

Other (Explain) Percent of project work performed:

If subcontractor, who was the prime (Name/Phone #):

3. Contract Information Contract Number:

Delivery/Task Order Number (if applicable):

Contract Type: Firm Fixed Price Cost Reimbursement Other (Please specify):

Contract Title:

Contract Location:

Award Date (mm/dd/yy):

Contract Completion Date (mm/dd/yy):

Actual Completion Date (mm/dd/yy):

Explain Differences:

Original Contract Price (Award Amount):

Final Contract Price (to include all modifications, if applicable):

Explain Differences:

4. Project Description:

Complexity of Work High Med Routine How is this project relevant to project of submission? (Please provide details such as similar equipment, requirements, conditions, etc.)

CLIENT INFORMATION (Client to complete Blocks 5-8)

5. Client Information Name:

Title:

Phone Number:

Email Address:

6. Describe the client’s role in the project:

7. Date Questionnaire was completed (mm/dd/yy):

8. Client’s Signature:

NOTE: NAVFAC/USACE REQUESTS THAT THE CLIENT COMPLETES THIS

QUESTIONNAIRE AND SUBMITS DIRECTLY BACK TO THE OFFEROR. THE

OFFEROR WILL SUBMIT THE COMPLETED QUESTIONNAIRE TO USACE WITH

THEIR PROPOSAL, AND MAY DUPLICATE THIS QUESTIONNAIRE FOR FUTURE

SUBMISSION ON USACE SOLICITATIONS. CLIENTS ARE HIGHLY

ENCOURAGED TO SUBMIT QUESTIONNAIRES DIRECTLY TO THE OFFEROR.

HOWEVER, QUESTIONNAIRES MAY BE SUBMITTED DIRECTLY TO USACE.

PLEASE CONTACT THE OFFEROR FOR USACE POC INFORMATION. THE

GOVERNMENT RESERVES THE RIGHT TO VERIFY ANY AND ALL

INFORMATION ON THIS FORM.

ADJECTIVE RATINGS AND DEFINITIONS TO BE USED TO BEST REFLECT

YOUR EVALUATION OF THE CONTRACTOR’S PERFORMANCE

RATING DEFINITION NOTE

(E) Exceptional Performance meets contractual requirements and exceeds many to the Government/Owner’s benefit.

The contractual performance of the element or sub-element being assessed was accomplished with few minor problems for which corrective actions taken by the contractor was highly effective.

An Exceptional rating is appropriate when the Contractor successfully performed multiple significant events that were of benefit to the Government/Owner. A singular benefit, however, could be of such magnitude that it alone constitutes an Exceptional rating. Also, there should have been NO significant weaknesses identified.

(VG) Very Good

Performance meets contractual requirements and exceeds some to the Government’s/Owner’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with some minor problems for which corrective actions taken by the contractor were effective.

A Very Good rating is appropriate when the Contractor successfully performed a significant event that was a benefit to the Government/Owner. There should have been no significant weaknesses identified.

(S) Satisfactory Performance meets minimum contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory.

A Satisfactory rating is appropriate when there were only minor problems, or major problems that the contractor recovered from without impact to the contract. There should have been NO significant weaknesses identified. Per DOD policy, a fundamental principle of assigning ratings is that contractors will not be assessed a rating lower than Satisfactory solely for not performing beyond the requirements of the contract.

(M) Marginal Performance does not meet some contractual requirements. The contractual performance of the element or sub-element being assessed reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor's proposed actions appear only marginally effective or were not fully implemented.

A Marginal is appropriate when a significant event occurred that the contractor had trouble overcoming which impacted the Government/Owner.

(U) Unsatisfactory

Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element contains serious problem(s) for which the contractor's corrective actions appear or were ineffective.

An Unsatisfactory rating is appropriate when multiple significant events occurred that the contractor had trouble overcoming and which impacted the Government/Owner. A singular problem, however, could be of such serious magnitude that it alone constitutes an unsatisfactory rating.

(N) Not Applicable

No information or did not apply to your contract

Rating will be neither positive nor negative.

TO BE COMPLETED BY CLIENT PLEASE CIRCLE THE ADJECTIVE RATING WHICH

BEST REFLECTS YOUR EVALUATION OF THE CONTRACTOR’S PERFORMANCE.

1. QUALITY:

a) Quality of technical data/report preparation efforts

E VG S M U

N

b) Ability to meet quality standards specified for technical performance

E VG S M U

N

c) Timeliness/effectiveness of contract problem resolution without extensive customer guidance

E VG S M U

N

d) Adequacy/effectiveness of quality control program and adherence to contract quality assurance requirements (without adverse effect on performance)

E VG S M U

N

2. SCHEDULE/TIMELINESS OF PERFORMANCE:

a) Compliance with contract delivery/completion schedules including any significant intermediate milestones. (If liquidated damages were assessed or the schedule was not met, please address below)

E VG S M U

N

b) Rate the contractor’s use of available resources to accomplish tasks identified in the contract

E VG S M U

N

3. CUSTOMER SATISFACTION:

a) To what extent were the end users satisfied with the project?

E VG S M U

N

b) Contractor was reasonable and cooperative in dealing with your staff (including the ability to successfully resolve disagreements/disputes; responsiveness to administrative reports, businesslike and communication)

E VG S M U

N

c) To what extent was the contractor cooperative, businesslike, and concerned with the interests of the customer?

E VG S M U

N

d) Overall customer satisfaction

E VG S M U

N

4. MANAGEMENT/ PERSONNEL/LABOR

a) Effectiveness of on-site management, including management of subcontractors, suppliers, materials, and/or labor force?

E VG S M U

N

b) Ability to hire, apply, and retain a qualified workforce to this effort

E VG S M U

N

c) Government Property Control

E VG S M U

N

d) Knowledge/expertise demonstrated by contractor personnel

E VG S M U

N

e) Utilization of Small Business concerns

E VG S M U

N

f) Ability to simultaneously manage multiple projects with E VG S M U multiple disciplines N

g) Ability to assimilate and incorporate changes in requirements and/or priority, including planning, execution and response to Government changes

E VG S M U

N

h) Effectiveness of overall management (including ability to effectively lead, manage and control the program)

E VG S M U

N

5. COST/FINANCIAL MANAGEMENT

a) Ability to meet the terms and conditions within the contractually agreed price(s)?

E VG S M U

N

b) Contractor proposed innovative alternative methods/processes that reduced cost, improved maintainability or other factors that benefited the client

E VG S M U

N

c) If this is/was a Government cost type contract, please rate the Contractor’s timeliness and accuracy in submitting monthly invoices with appropriate back-up documentation, monthly status reports/budget variance reports, compliance with established budgets and avoidance of significant and/or unexplained variances (under runs or overruns)

E VG S M U

N

d) Is the Contractor’s accounting system adequate for management and tracking of costs? If no, please explain in Remarks section.

Yes No

e) If this is/was a Government contract, has/was this contract been partially or completely terminated for default or convenience or are there any pending terminations? Indicate if show cause or cure notices were issued, or any default action in comment section below.

Yes No

f) Have there been any indications that the contractor has had any financial problems? If yes, please explain below.

Yes No

6. SAFETY/SECURITY

a) To what extent was the contractor able to maintain an environment of safety, adhere to its approved safety plan, and respond to safety issues? (Includes: following the users rules, regulations, and requirements regarding housekeeping, safety, correction of noted deficiencies, etc.)

E VG S M U

N

b) Contractor complied with all security requirements for the project and personnel security requirements.

E VG S M U

N

7. GENERAL

a) Ability to successfully respond to emergency and/or surge situations (including notifying COR, PM or Contracting Officer in a timely manner regarding urgent contractual issues).

E VG S M U

N

b) Compliance with contractual terms/provisions (explain if specific issues)

E VG S M U

N

c) Would you hire or work with this firm again? (If no, please Yes No explain below)

d) In summary, provide an overall rating for the work performed by this contractor.

E VG S M U

N

Please provide responses to the questions above (if applicable) and/or additional remarks.

Furthermore, please provide a brief narrative addressing specific strengths, weaknesses, deficiencies, or other comments which may assist our office in evaluating performance risk (please attach additional pages if necessary):

SECTION 00130

1.0 PROPOSAL EVALUATION

1.1 Technical:

Proposals will be evaluated by the Source Selection Evaluation Board (SSEB) for Technical Acceptability based on the established evaluation factors specified in the solicitation. This will be accomplished by reviewing each offeror’s Subfactor 1 Experience, Subfactor 2 Personnel, and Subfactor 3 Past Performance. To be found technically acceptable each offeror must be found acceptable for all subfactors. Failure to demonstrate the capability to perform in any area will cause an overall unacceptable rating. The SSEB will not have access to price information until completion of the technical evaluation.

a. Factor 1 – Experience: Evaluation Criteria

The be determined acceptable the Offeror must demonstrate Sufficient and Satisfactory business experience necessary to comply with all regulations governing bridge rehabilitation/bridge construction, as well as, provide services of the type, scope, and complexity required to perform all contract requirements as defined by the solicitation, statement of work, and accompanying attachments. To be considered Sufficient and Satisfactory demonstrated business experience must also be Recent and Relevant.

Recent - Only Business Experience from contracts that were performed or awarded within the last five (5) calendar years will be considered.

Relevant – Only Business Experience on contracts for work of a similar nature, scope, and complexity as that defined by the solicitation SOW.

Table A-1. Technical Experience Acceptable/Unacceptable Ratings

Rating Description

Acceptable Proposal clearly meets the minimum requirements of the solicitation.

Unacceptable Proposal does not clearly meet the minimum requirements of the solicitation.

If discussions are warranted, the Contracting Officer will make the competitive range determination based on the results of the evaluation assessment and the analysis of the offeror’s proposed price including options.

b. Factor 2 - Evaluation criteria

To be determined acceptable the Offeror must demonstrate Sufficient and Satisfactory Personnel that meet or exceed the minimum qualifications that are outlined above. To be considered Sufficient and Satisfactory demonstrated personnel qualifications must be Relevant.

Relevant –Personnel Experience on projects of a similar nature, scope, and complexity as that defined by the solicitation SOW.

Table A-2. Personnel Experience Acceptable/Unacceptable Ratings

Rating Description

Acceptable Proposal clearly meets the minimum requirements of the solicitation.

Unacceptable Proposal does not clearly meet the minimum requirements of the solicitation.

c. Factor 3 – Past Performance

The evaluation of past performance is a subjective assessment of the Offeror’s past performance on contracts of a similar nature, size, scope, and complexity, utilizing a comparable number of personnel with like skills. The Government will consider the Offeror’s previous and current record of contractual performance. In this context, Offeror refers to the proposed prime contractor and major subcontractors. Major subcontractors are defined as those intended to perform a critical contract function and/or whose annual subcontract revenue is expected to exceed (10% percent) of the anticipated prime contract revenue.

The Government will consider the combined Offeror’s and proposed subcontractor’s experience and performance in providing services consistent with the scope and complexity of the requirement during the last five (5) calendar years. The Government will assess the Offeror’s team to determine whether the team displays the depth and breadth of experience necessary to demonstrate a satisfactory history of performance relative to the solicitation requirements in the scope of work.

The Government’s assessment will focus on contracts that meet the following conditions:

Recency. Only contracts that were performed or awarded within the last five (5) calendar years will be considered.

Relevancy. Only contracts which were/are relevant in size and scope of work will be considered.

The Government will examine the Offeror’s record of satisfying customer requirements, including consideration of the Offeror’s:

1. Technical performance, including technical performance, staffing, subcontractor management, quality control, safety, and commitment to customer satisfaction as evidenced by reasonable and cooperative behavior.

2. Cost Controls. Record of containing and forecasting costs on previously performed contracts.

3. Schedule. Record of adherence to contractual schedules.

Satisfactory Past Performance displays the depth and breadth of experience necessary to demonstrate a satisfactory history of performance relative to the solicitation requirements.

Any significant achievement, problem, or lack of relevant data in any element of the work can become an important consideration in the source selection process. A negative finding under any element may result in an overall unsatisfactory determination. Therefore, Offerors are reminded to include all relevant past efforts, including demonstrated corrective actions, in their proposal. Offerors are directed to FAR 15.305 and advised that where they are without a record of relevant past performance, or where information on past performance is not available, the Offeror may not be evaluated either favorably or unfavorably on past performance.

The Government will use data provided in the Offeror’s proposal and data obtained from other sources. The Offeror is cautioned that while the Government will consider data from other sources, the burden of demonstrating satisfactory past performance rests with the Offeror. In the case of an Offeror without a record of recent and/or relevant past performance or for whom information on past performance is not available, the Offeror will not be evaluated favorably or unfavorably on past performance, providing the Offeror supplies a certified statement with their offer that no past performance information is available.

Past Performance will be rated on an “acceptable” or “unacceptable” basis using the ratings in Table A-3.

Table A-3. Past Performance Evaluation Ratings

Rating Description

Acceptable Based on the offeror’s performance record, the Government has a reasonable expectation that the offeror will successfully perform the required effort. Low Risk; Little doubt exists, based on the Offeror’s performance record, that the Offeror can perform the proposed effort.

Unacceptable Based on the offeror’s performance record, the Government has no reasonable expectation that the offeror will be able to successfully perform the required effort.

The SSEB will reach a consensus rating, including supporting narrative, for each factor.

The SSEB Chairperson will review the narrative summary and recommended factor and sub-factor ratings and provide an overall summary report (Initial Evaluation Report) of technical factors. This report will be forwarded to the SSA and shall contain the assessment for each technical factor and sub-factor and the supporting rationale.

1.2 Price:

Only proposals determined to be Technically Acceptable will be evaluated for Price. The total proposal price will be calculated using the offeror’s price proposal which reflects a total price including options for the contract. A determination will be made as to the Completeness and Reasonableness of each offeror’s price proposal. Cost elements will be analyzed, and price proposals will also be examined to determine the extent to which proposed prices are comparable with the Government estimates, and previous procurement history and a determination made of Price Reasonableness.

Completeness & Reasonableness of Price Proposals: A determination will be made as to the Completeness and Reasonableness of each Offeror’s price proposal. Cost elements, will be analyzed, and price proposals will also be examined to determine the extent to which proposed prices are comparable with the Government Estimate, previous procurement history, and a determination made of Price Reasonableness.

Completeness of Price Proposals: Price proposals will be evaluated to determine the extent to which all price elements of the offer have been addressed.

Reasonableness of Price Proposals; Price proposals will be evaluated to determine the extent to which proposed prices are comparable to other technically acceptable price proposals and the Government Estimate.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .