Amendment_0003.pdf
PDF 40 KB Posted
- Attached to
- Roof replacement - CMU Building
- Solicitation number
- W912EE-15-T-0048
About this file
Amendment 03
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment_02.pdf | ||
| Amendment_01.pdf | ||
| specifications.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W807PM51912321
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Reference Request for Quote W912EE-15-T-0048 for Reroof of CMU Building, Colfax, La, w ith quotes due on September 11, 2015 at 2:00 p.m. CST, is amended as follow s:
See continuation page for changes.
1. CONTRACT ID CODE PAGE OF PAGES
1 4
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 08-Sep-2015
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W912EE-15-T-0048
X 9B. DATED (SEE ITEM 11)
25-Aug-2015
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
08-Sep-2015
CODE
VICKSBURG CONTRACTING OFFICE
4155 CLAY ST
VICKSBURG MS 39183-3435
W912EE 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
ellis.screws@usace.army.milEMAIL:601-631-7527TEL:
ELLIS SCREWS / ADDED BY SUMI
W912EE-15-T-0048
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
Section C – Descriptions and Specifications has been revised and replaced. Updated specifications are posted below.
All other terms and conditions remain unchanged.
CMU Maintenance Building Reroof Building “G”
1. GENERAL PURPOSE
The purpose of this contract is to remove the existing roof system and install a new roof system.
2. SCOPE OF WORK
The work to be performed under this contract consists of the removal and disposal of the existing roof systems, insulation, associated roofing materials that requires removal during construction, and all related flashing down to existing metal deck in compliance with Local, State, and Federal regulations. The contractor shall install Polyiso insulation with a minimum starting thickness of 1.5 inch at the rear of the building and a 1/8 inch on 1 foot slope up to the front of the building over existing metal decking and mechanically attach into existing metal decking; a new .045 TPO mechanically attached roof system over new insulation per manufacturer’s details and specifications; new wood blocking and associated new roofing materials as needed.
Terminate new roof system under existing copper flashing using a manufacturer’s termination bar, and rework existing copper counter flashing where needed. Install new Aluminum gutters and downspouts.
2.1 REQUIREMENTS
The contractor shall provide a professionally installed roof system that meets all manufacturer’s standards, and issue a manufacturer’s 15 year warranty upon contract completion.
2.2 SECURITY REQUIREMENTS
1 Access and General Protection/Security Policy and Procedures: All contractor and all associated sub-contractors employees shall comply with applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative). The contractor shall also provide all information required for background checks to meet installation/facility access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204-9, Personal Identity Verification of Contractor Personnel) as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any installation or facility change, the Government may require changes in contractor security matters or processes.
2 Escort Requirements: All contract employees, including subcontractor employees who are not in possession of the appropriate security clearance or access privileges, will be escorted in areas where they may be exposed to classified and/or sensitive materials and/or sensitive or restricted areas."
3 Pre-screen candidates using E-Verify Program: The Contractor must pre-screen Candidates using the E-verify Program (http://www.uscis.gov/e-verify) website to meet the established employment eligibility requirements. The Vendor must ensure that the Candidate has two valid forms of Government issued identification prior to enrollment to ensure the correct information is entered into the E-verify system. An initial list of verified/eligible Candidates must be provided to the COR no later than 3 business days after the initial contract award." *When contracts are with individuals, the individuals will be required to complete a Form I-9, Employment Eligibility Verification, with the designated Government representative. This Form will be provided to the Contracting Officer and shall become part of the official contract file.
3. PERFORMANCE PERIOD
The Contractor will have 30 days to complete the work, including cleanup after issuance of the Notice to Proceed.
4. CONTRACT PERFORMANCE
The government will monitor the Contractor’s performance under this contract using the following deficiency definitions or such other procedures as may be necessary to ascertain Contractor compliance with the contract.
4.1 The roof system shall be considered deficient if the roof system fails to be both weather tight and watertight after installation by contractor and/or during manufacturer’s warranty period due to either deficient installation by contractor and/or deficient materials supplied by manufacturer. The Government reserves the right to have the roof inspected in the event of roof system failure.
5. QUALITY CONTROL
The contractor shall establish a quality control program or use an internal quality control program to assure the requirements of the contract are provided as specified.
6. QUALITY ASSURANCE
The Contracting Officer Representative (Government employee) will troubleshoot issues and inspect/accept service provided under the contract. Payment will not be made for deficient performance.
End of Specifications
(End of Summary of Changes)
File details come from the government source that posted it. Updated .